Ques-Ans_complete__2_to_FBO_30_Jan_13_6Feb_thru_68_CE_Res_complete_.doc

DOC document 152 KB Posted

Attached to
Protective Coating/Paint
Solicitation number
FA8101-12-R-0009
Issued by

About this file

Government Responses

View the file

Other files

File Type Posted
Question-Answers__5_to_FBOcomplete21_Mar_13_84-88_thru.doc.docx DOCX document
fa8101-12-r-0009-0004_amend.pdf PDF
PROTECTIVE_COATING_BID_SCHEDULE_REVISED_13_Mar_13.xls XLS spreadsheet
FA8101-12-R-0009-0003.pdf PDF
FA8101-12-R-0009_solicitation_final.pdf PDF
3rd_amendment_paint_IDIQ.doc DOC document
Amendment_1.doc DOC document
B-1086_Paint_Exterior_SOW_26_Feb_13_(2).pdf PDF
PROTECTIVE_COATING_BID_SCHEDULE_REVISED_26_FEB_13.xls XLS spreadsheet
Prot_Coat_SOW_Rev_26_Feb_13.pdf PDF
Bid_Schedule_to_Paint_Ext_B1086_Seed_Project.pdf PDF
Question-Answers_Complete__3_to_FBO_15_Feb_13_69_-_81_CE_Res.doc DOC document
Question-Answers__4_Complete_to_FBO_14Feb__13_-19_feb_13_82__-_83_thru_____.doc DOC document
Question-Answers__1_to_FBO_29_Jan_13_final.doc DOC document
B-1086_Paint_Exterior_SOW.doc DOC document
00_70_00_dated_07_11.pdf PDF
ITO_ATTACHMENT_1.4_SAMPLE_CONSENT_LETTER.doc DOC document
00_71_00_dtd_07_11.pdf PDF
ITO_ATTACHMENT_1.2_PAST_PERFORMANCE_QUESTIONNAIRE.doc DOC document
Wage_Determination_OK120080.mht MHT file
Section_M.doc DOC document
ITO_ATTACHMENT_2.0_PROPOSED_TEAM_LIST.doc DOC document
ITO_ATTACHMENT_1.1_PAST_AND_PRESENT_PERFORMANCE_INFORMATION_SHEET.doc DOC document
Protective_Coating_SOW_14_Aug_12_(2).doc DOC document
Solicitation.doc DOC document
00_72_00_dtd_07_11.pdf PDF
Section_L_27_jun_2012.doc DOC document
EXHIBITS_A-E._BID_SCHEDULE.xls XLS spreadsheet
DD_254.pdf PDF
ITO_ATTACHMENT_1.3_SAMPLE_QUESTIONNAIRE_COVER_LETTER.doc DOC document
01_33_00_Submittal_Procedures_16_Feb_12.pdf PDF
ITO_ATTACHMENT_1.5_SAMPLE_CLIENT_AUTHORIZATION_LETTER.doc DOC document
AF_66_Submittals_for_Protective_Coating__26_Jul_12.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question/Answers #2 (16-68) 19 Feb 2013 The questions and answers below comprise all questions submitted by contractors from 30 JAN 13 through 6 Feb. If there is a question that isn’t included in this document and was submitted, please contact Sharla Brandon at sharla.flowers-brandon@tinker.af.mil and lori.fixico@tinker.af.mil

RFI #

Subject Question/Answer

16
Past Perf
On attachment 1.2, there are 3 references for different projects. Could we delete Ref 2&3 so other POCs do not see information on projects that are not theirs? We would fill out this form up to 5 times with different projects we wish to be evaluated on and send to only to that Project Manager.

Please complete forms with applicable information

17
Contracting
On the cover letter attachment 1.3, do we need to correct the email for Sharla Flowers. I have also added Lori Fixico with email and a fax number that forms can be sent to as found in 4.0 Past Performance section 4.2.2. Is this okay?

Yes, Sharla Brandon can be reached through email by using either sharla.flowers@tinker.af.mil or sharla.flowers-brandon@tinker.af.mil. Most correspondence should come through email.

18
Contracting
I have also added Lori and a fax on the bottom of the attachment 1.2, is this okay?

Yes, Lori Fixico at lori.fixico@tinker.af.mil should be added. Most correspondence should come through email.

Technical
According to the questions and answers regarding certification of SSPC QP1 I am a bit confused. One person does not get certified it is the company that gets certified. I think our questions are: 1) How do we get just one person certified and 2) Can certification be accomplished after the award of the contract, to eliminate a financial burden on all bidders?

#1 The SOW will be changed back to requiring a contractor OR a subcontractor will be certified during the life of the contract.

#2 Part of the government’s technical evaluation is that successful contractors have the certifications listed IAW Section L and M.

#3 See SOW, Section 01000, paragraphs 3.4.1 and 3.4.4 stating “all the above publications, either incorporated by reference or attached, are considered as mandatory compliance requirements to this SOW.”

The amended SOW will be posted as an amendment on FBO and will include changes.

20
Technical
Regarding flooring, on bid schedule, it states labor only. Should the contractor place a price for these listed as NPI’s?

No, NPI items will be priced with each delivery order.

21
Technical
Can the contractor use and equal to product approved by the government on the cementitious overlay?

If the product meets all the specifications for cementitious overlay. Yes.

22
Technical
Will there be submittals required at the delivery order level?

Normally no, unless a special material is needed for that particular delivery order. Sec SOW, Section 01000, paragraph 1.9.3.

23
Technical
Can two separate materials be submitted for approval for the cementitious flooring?

Please clarify – two different brands or two different materials?

24
Technical
The RFP states there needs to be a material specialist on site during placement of the cementitious flooring, is this correct?

Yes, reference SOW, Section 03000, Paragraph 1.5. Please note – this is for all floor coating systems.

25
Contracting
Will bonds be required for each delivery order?

Bid Bonds will be required for proposal submission, bonds will be required for the estimated amount for the years that are being awarded or exercised. For example, if awarded for the first two years, the contractor would need bond amount of $4 million.

26
Contracting
Will orders be issued or will the contractor be issues an RFP and be allowed a site visit and allowed to propose?

The contractor will be issued an RFP, and allowed to go on a site visit and submit a proposal for technical review and possibly negotiated if needed.

27
Technical
The contractor would like to know a way to include the cost of lifts and hoists into their proposals?

Will adjust the Bid Schedule to include a % ELIN for areas above certain heights (i.e. add 10% for heights above 15 feet)

28
Technical
Is there a line item for tarps required for larger projects such as the water towers? The containment process is different for this type of work.

Will modify the Bid Schedule to include a NPI for Containment Systems, this will be posted with the amendment to the solicitation

29
Technical
Does the government use a different calculation for corrugated and flat surface?

Yes, the government does use different calculations for total square footage calculation.

30
Technical
Does the government’s square footage calculation include windows and doors?

Yes, the government’s calculation does include windows and doors. In addition, there is an exhibit line item to use for doors. Windows do not have a separate line item (the trim)

31
Technical
In situations that include asbestos, what line item should the contractor use?

Asbestos removal or abatement is not included in this contract. If the contractor discovers asbestos during work, they are to contact the contracting officer for direction.

32
Technical
In regards to general painting, is the contractor to use the line item for block filler and two coats of paint, regardless if block filler and two, rather than one coat of paint is needed?

ELIN will be changed to clarify the confusion of multiple coats

33
Contracting
When the contractor completes proposal for the seed project, should the line item prices match what is proposed in the bid schedule?

Yes, the line item prices shall match the contractor’s proposed bid schedule.

34
Contracting
Is the government’s intent to award a single or multiple award contract for Protective Coating?

A single award

35
Technical
When will the contractor be required to become SSPCQP1 certified? Some contractors are concerned with incurring costs to propose and be technically acceptable and then not being selected as the awardee.

See RFI #19

36
Technical
Will the contractor be required to catch all water and paint, even if there is no lead involved?

The contractor is required to ensure all paint chips and debris from a delivery order is contained and removed from work site. All water, free of chemical or detergent, will not need to be collected but the contractor must comply with SOW, Section 00 71 00, Paragraph 1.3.11 Maintenance of Work Site and SOW, Section 00 72 00, Paragraph 1.3.3 and 1.3.3.2.

37
Technical
Will the contractor be required to block all water contamination possibilities?

See RFI #36

38
Technical
How many pages will be allowed in the technical section? Will a SWWP be needed to be included?

25 pages and a SWWP only need to be submitted at time of award of contract (not part of the proposal).

39
Technical
What will need to be provided to the government at time of award?

Complete and full plans; such as, Quality and Safety Plans See AF Form 66 Schedule of Submittals

40
Technical
Who will determine how many coats will be appropriate for each delivery order?

The SOW will identify the number of coats and if the contractor proposes a different number of coats, the government and the contractor can negotiate.

41
Technical
Is Exhibit line item A002A an all inclusive line item?

No, See RFI # 32

42
Technical
What is the appropriate way to propose cove base? Is it to be proposed as a Non Priced Item?

Bid Schedule will be adjusted for Base Cove to be a NPI item and associated ELIN for Installation will be for Labor only.

43
Technical
The calculations for sheet rock on the exhibit line item structure (ELIN) does not calculate.

Calculations for Sheet Rock on ELIN will be corrected

44
Technical
Unable to locate the specifications and processes for the cementitious flooring.

Material specifications are located in paragraph 2.8, page 46 of the Section 03000.

45
Technical
The ELIN for the door includes both sides of the door. EX: there are 20 doors, the SOW states only one side of the door is to be painted, the contractor would include 10 on their proposal. The contractor would like to have an ELIN with a single side of the door rather than both sides.

The ELIN will be changed to reflect single side of door.

46
Technical
Are the frames and trim included in the ELIN for the door?

Yes.

47
Technical/Contracting
Where in our proposal is the cost and information concerning the sample project “Paint Exterior B-1086 to be placed?
48
Technical/Contracting
Does the government intent for us to provide the entire section I – Contract Clauses as part of our proposal? (paragraph 6.1 and 6.1.3)

Follow the instructions of paragraph 6.1 and 6.1.3 of Section L.

49
Technical
Do we have to have our certification for SSPC QP1 before the award of the IDIQ? This certification takes up to eight weeks and is $5400/year. It also states that all sucontractors must have this certification. We have never had to obtain thes cerification for any other projects. If we are unsuccessful in the IDIQ, we would not need it. Can this be a ceritification obtained after an award has been made? This certification is for complex steel metal structures. Government response to this RFI was “will change SOW, section 09900, paragraph 1.3.1 to require a minimum of one employee certified during the life of the contract. The response implies that a signle individual with this certification can be hired or obtained but this is not the case or the definition of a SSPC QP1 certification – it is a company certification it is not held as an individuual person, and it must be renewed. Certification for a company is a non refundable $5400 fee + and required audit deposit, then it is a 90 day app process initially and then a 45 day corrective action process if any corrective actions are needed after the end of the initial 90 day process. ………. Having this requirement, which no Ok company that is qualified to bid on this project currently posses and literall, by definition, forces a proposed contracto to sub out work seems detrimental to the intent of the IDIQ RFP itself. It is our respectful request for fair and reasonable evaluations and lower costs to the government that the SSPC-QP1 requirement be removed formt he RFP and the contractors submitted proposal be the judgement of merit for the technical capabilities to, financial ability to perform work, previous work history, and capabilities to be site specific requirements.

See RFI # 19

50
Technical/Contracting
Reference the subject solicitation; what bonding do you require us to demonstrate in our proposal? Will we need to post bond only for each delivery order or will you require us to post bond covering a time period, ie original base, then each option as it is awarded? If based on a time period, what amount will need to be posted?

See RFI #25

51
Contracting
The 1442 indicated as a DRAFT. Will an amendment be issued with a valid 1442?

Draft will be removed when the amendment to the solicitation is posted

52
Contracting
RE: Attachment 4 Instructions to Offerors

Paragraph 2.3.3, Table 2.3 Proposal Organization, column heading ITO, Paragraph Number – referenced paragraphs do not exist or are not applicable to the information requested. Also Page Limits indicated are confusing as page limits are also indicated under “Volume Title” column. Subfactors and their page limits are not listed in Table 2.3. Please verify the reference paragraphs applicable to the proposal sections and clarify page limits.

4.1

Present/Past Performance Information Sheets (PPIS) (See Attach 1.1)

4.1.2

Consent Letter (See Attach 1.4)

4.1.2

Client Authorization Letters (See Attach 1.5)

4.2

Present/Past Performance Questionnaires (See Attach 1.2)

4.3

Relevant Contract Narrative

4.3

Roadmap

III

Cost/Price Volume 5.2 General Information 2.3.3 Volume Organization

N/A

EXHIBIT A: Bid Schedule

IV

Contract Documentation

2.3.1 Title Page (SF1442) 2.3.2 Team List (see Attach 2.0) 2.3.7 Table of Contents 2.3.8 List of Tables and Figures 2.3.9 Glossary of Abbreviations and Acronyms

2.3.2/7.3.4 Team List, Arrangements, and/or Letters of Intent 6.1 Model Contract (Sections A-J) 6.1.4 Representations and Certifications (Section K) 6.3.1-6.3.4 Contact Information 6.3.4 Attachments to the Model Contract Changes in the table are reflected above. An updated Section L will be posted with the amendment.

53
Contracting
RE: Attachment 4 Instructions to Offerors

Para 4.2 requires we submit 15 calendar days prior to solicitation closing date. Will Pas Performance Volume be accepted between this designated time and the deadline for submissions?

Submit as stated in Para 4.2

54
Past Performance
Will the forms provided for Past Performance be required to be tailored to meet the font, page size, etc. described in paragraph 2.4 of Attachment 4?

Please resubmit question with more detail

55
Past Performance
The past and present information sheet has a place to indicate customer poc’s. The past performance questionnaire has the same information that will be submitted. This is redundant.?

Complete all forms with applicable information

56
Contracting
What is the last date for submission of questions?

Answers 16-75 will be posted 19 Feb 13, additional questions may be submitted until 11 Mar 13 @1500. The proposal due date has been extended to 15 Mar 13 @1200

57
Contracting
Where is the cost for the Sample Task Order supposed to be indicated? ITO paragraph 7 has not been provided.

This will be included in the amendment to the solicitation

58
Contracting
I understand that the prices proposed on the Bid Schedule will be fixed throughout the life of the contract. Please verify this assumption.

Yes, once the contract is awarded these are fixed for the life of the contract. There will be different prices for the basic two years and each option year (I, II, and III) if that is what the contractor proposes and is awarded.

59
Contracting
Where can a copy of the Model Contract be found for signature and inclusion in the proposal as directed?

“Draft” will be removed from the solicitation with the amendment and is considered to be a model contract.

60
Contracting/Technical
Is there information regarding how many orders can be expected that are emergency, urgent, and routine in terms of percentage?

There is no historical information however approximately 95% of delivery orders awarded are routine.

61
Technical
Is there historical data regarding amount of other than normal duty hours required?

Historically, there maybe two (2) delivery orders out of 20 that will require the contractor to work other than normal duty hours (See SOW, Section 01000, Special Conditions, paragraph 1.4). The contractor may opt to work other than normal duty hours to alleviate disruption of his work.

62
Technical
Will there be any specifications provided on how asbestos containing transit siding will be prepped for painting?

If asbestos containing transit siding is encountered, please contact the Contracting Officer for further instructions.

63
Contracting/Technical
What is the anticipated size of a typical delivery order?

$50K - $100K, please note this is a non binding and is an estimate only

64
Technical
Will anodized or prefinished metal surfaces be required to be repainted?

Anodized or prefinished metal surfaces could re-painted if our base standard requires for them to be re-painted. This will be determined at delivery order level and will be minimal

65
Technical
How does the Government anticipate payment for water tower painting that may include additional requirements (tarping the exterior)? Will additional requirements be considered at the time of issuance of delivery orders, for example height above grade factors?

Bid Schedule will be adjusted to provide a percentage for heights above a certain grade. See RFI #28

66
Technical
Will EIFS require painting?

Minor amount will require painting.

67
Contracting
Where will the pricing information for the model project be inserted?

This information will be included in solicitation amendment

68
Technical
During the site visit, it was mentioned that hardware was to be removed as a preparation for painting. There also was reference to removal of light fixtures mounted on the walls. Are we to assume anything attached to a surface that is to be painted requires removal and reinstallation?

Please refer to SOW, Section 09900, Paragraph 3.1, “Protection of Areas and Spaces Not to Be Painted,” (page 83).