Attachment_7__AF_IMT_3064_Progress_Schedule.xlsx

Air Force Form XLSX spreadsheet 35 KB Posted

Attached to
RAF Lakenheath Commissary Renovation Project
Solicitation number
FA5587-18-R-0013
Issued by

About this file

Attachment 7_ AF IMT 3064 Progress Schedule

View the file

Other versions and copies of AF Form 3064

File Revision Posted Attached to
Attachment C - AF Form 3064.xlsx Revision not stated Airfield Blast Shield
AF Form 3064.xlsx Revision not stated Demo B5276 & B8129 Amendment 0001
Attachment F BLANK SAMPLE AF Form 3064.xlsx Revision not stated Robins AFB Paving Multi-Award IDIQ
Template - AF IMT 3064 and 66 Fillable - Progress Schedule.xlsx Revision not stated Demo Reef Dining Facility, Bldg 90326
SOW App 002 AF IMT 3064 Progress Schedule.pdf Revision not stated Amendment 002***Multiple Award Construction Contract (MACC), Joint Base Elmendorf-Richardson (JBER), AK – Solicitation
FNWZ 17-0021A - Att E - AF Form 3064.xlsx Revision not stated Demo B6142
FNWZ 21-0071 - Att E - AF Form 3064.xlsx Revision not stated Demo B6119
Attachment 16 - AF FORM 3064 Contract Progress Schedule.xlsx Revision not stated SABER IDIQ - Dover AFB
SOW Attach 9 - AF Form 3064 PSFB.xlsx Revision not stated Peterson SFB Bldg 3 Soil Erosion Repair
Attachment 3_AF IMT 3064_2003091_VI_Progress Schedule.pdf Revision not stated Hazardous Materials Abatement Contract - IDIQ
Attachment 9 - BLANK SAMPLE AF Form 3064.xlsx Revision not stated Dismantling of Modular Facility & Storage Racks
Attachment 2.7 - AF Form 3064 Schedule Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 12 - AF Form 3064 Contract Progress Schedule - Sample.xlsx Revision not stated Civil Works IDIQ 2024 - Hurlburt Field, FL
Attachment 12 - Af Form 3064 Contract Progress Schedule-Sample.xlsx Revision not stated Civil Works IDIQ 2024 - Hurlburt Field, FL
Attah 15 - AF Form 3064.xlsx Revision not stated SABER IDIQ - Hurlburt Field FL
ATCH L4 - Contract Progress Schedule_AF Form 3064 - Fillable.xlsx Revision not stated ADDITION TO CDC WEST BLDG 90306, CP1024656
Attachment 1k Mini-MACC SOW AF IMT 3064 Progress Schedule.pdf Revision not stated JBER Mini-MACC
BLANK SAMPLE AF Form 3064.xlsx Revision not stated Civil Engineering Multiple Award Construction Contract III, IDIQ
Atch BLANK SAMPLE AF Form 3064.xlsx Revision not stated Design/Build ANG ACS Weapons Facility
17. AF Form 3064 Contract Progress Schedule (3 pages) - EXAMPLE.pdf Revision not stated Simplified Acquisition of Base Engineer Requirements (SABER) IDIQ at Seymour Johnson AFB, Goldsboro, NC.
Show all 20

Who attaches AF Form 3064

Other files

File Type Posted
Hazard_Materials_Report.pdf PDF
Asbestos_Refurbishment_Survey.pdf PDF
FA558719R0001-P0003.pdf PDF
Q&A_through_09_May_2019.pdf PDF
Attachment_6_-_PPI_Contract_Reference_Sheet_v1.docx DOCX document
FA558719R0001-P0002.pdf PDF
Attachment_2_-_Drawings_Lakenheath_Commissary_v1.pdf PDF
Q&A_through_23April_019.pdf PDF
FA558719RA001_RAF_Lakenheath_RFP_P0002.pdf PDF
Attachment_8_-_Subcontractor_Consent_Ltr_v1.docx DOCX document
Attachment_1_Construction_Price_Breakdown_v1.xls XLS spreadsheet
Attachment_7_-_Past_Performance_Questionaire_v1.docx DOCX document
Attachment_3_-_Specifications_Lakenheath_Commissary_v1.pdf PDF
FA558719R0001-P0001_Amendment_1.pdf PDF
Attachment_1_Construction_Price_Breakdown.xls XLS spreadsheet
Attachment_8_-_Form29-1081_NEW_REFRIGERATION.doc DOC document
Attachment_2_-_Drawings_Lakenheath_Commissary.pdf PDF
Attachment_4-_SF1413-Statement_and_Acknowledgment.pdf PDF
FA558719R0001_RAF_Lakenheath_Commissary_Renovation_Project.pdf PDF
Attachment_6_-_Past_Performance_Questionaire.docx DOCX document
Attachment_5_-_PPI_Contract_Reference_Sheet.docx DOCX document
Attachment_3_-_Specifications_Lakenheath_Commissary.pdf PDF
Attachment_7_-_Subcontractor_Consent_Ltr.docx DOCX document
Attachment_8__Drawings_Lakenheath_Commissary.pdf PDF
Attachment_5_Schedule_Material_Submittals_(AF66).xls XLS spreadsheet
Attachment_4__AF_Form_3000_Material_Approval_Submittal.pdf PDF
Attachment_6-_SF1413-Statement_and_Acknowledgment.pdf PDF
Attachment_3_Past_Performance_Questionaire.docx DOCX document
[DRAFT_RFP]_FA558718R0013_RAF_Lakenheath_Commissary_Freezer_Upgrade.docx DOCX document
Attachment_9__Specifications_Lakenheath_Commissary.pdf PDF
Attachment_2_Past_Performance_Infomation_Sheet.docx DOCX document
Attachment_1_Construction_Price_Breakdown.xlsx XLSX spreadsheet
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT PROGRESS SCHEDULE

1. CONTRACT NO.: 8. CONTRACTOR NAME: 8. SUBMITTED BY: 10. PROJECT TITLE:

2. STARTING DATE (NTP+10):
3. COMPLETION DATE:
5. PROJECT NO:9. SUBMITTAL #:9. SUBMITTAL DATE:11. PROJECT INSPECTOR:
6. ACTUAL STARTING DATE:
#WORK ELEMENTS%12/15/141/1/151/15/152/1/152/15/153/1/153/15/154/1/154/14/15
TOTALS
1234567891011121314151617181920212223242526272829
10.00%
0.00%
20.00%
0.00%
30.00%
0.00%
40.00%
0.00%
50.00%
0.00%
60.00%
0.00%
70.00%
0.00%
80.00%
0.00%
90.00%
0.00%
100.00%
0.00%
110.00%
0.00%
120.00%
0.00%
130.00%
0.00%
140.00%
0.00%
150.00%
0.00%
160.00%
0.00%
170.00%
0.00%
180.00%
0.00%
190.00%
0.00%
200.00%
0.00%
210.00%
0.00%
220.00%
0.00%
230.00%
0.00%
240.00%
0.00%
250.00%
0.00%
260.00%
0.00%
270.00%
0.00%
280.00%
0.00%
290.00%
0.00%
300.00%
0.00%
310.00%
0.00%
320.00%
0.00%
330.00%
0.00%
340.00%
0.00%
350.00%
0.00%
360.00%
0.00%
TOTAL PER PERIOD:0%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
ACCUMULATIVE TOTAL:0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
ACTUAL ACCUMULATIVE TOTAL:0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
AF FORM 3064
0

Projected Progress 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Actual Progress 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Instructions

INSTRUCTIONS TO CONTRACTORS

1.Prepare three copies of AF Form 3064, in accordance with these instructions and submit to the contracting officer at the time stated in the contract or
as established by the contracting officer.

2. Blocks 1, 2, and 3. Enter the contract number, starting date, and completion date as shown on the contract.

3. Block 8. Enter the title of the project as shown on the contract.

4.Block 9. Enter name and address of your firm. The three copies submitted to the contracting officer must be dated and signed by the contractor or an
auathorized representative of the firm.
5.Lines 1 through 16. Major elements of work (whether unit price or lump sum contract) such as excaavation, concrete work, carpentry, engineering,
installation of communication electronic facilities, etc., will be shown in Column B in logical seequence and in sufficient detail to identify the element.
6.The percentage of each listed work element to the complete job will be shown opposite each element in Column C.As an example, if 3 work elements
are shown: excavation, concrete work, and backfill, and it is estimated that excavation is 50% of the total job, concrete 30%, and backfill 20%, these
percentages will be shown opposite each element. The total must equal 100%.
7.Columns D through Q will be used to show planned periodic progress, as required by the contracting officer, during the period of the contract. Only
the top half of the space under these columns will be used by contractors. Using the example cited above and assuming that the contract period for
performance is 8 weeks, and it is planned to accomplish 10% of the excavation work the 1st week and 20% each week until excavation is complete, 10 would
be shown in the upper half of Line 1 under Column D, 20 under Column E, and 20 under Column F for a total of 50%. If it is planned to accomplish the
concrete work during the 4th, 5th, and 6th weeks in equal amounts, 10 would be entered under Columns G, H, and I on Line 2. Assuming the backfill will be
accomplished during the 7th and 8th weeks, 10 would be entered under Columns J and K on Line 3. If the contract extends beyond 14 weeks, additional
copies of AF Form 3064, with appropriate alterrations, may be spliced on as a continuation of performance record.
8.Total amount of work planned at intervals as shown in Columns D through Q will be totaled and entered in the top half of the space under the
appropriate column on Line 16. Again using the example cited above, the totals under Columns D through K would read 10, 20, 20, 10, 10, 10, 10, 10, for a
total of 100%. These totals will be used a lot an overlay graph using Lines 67 through 15, Beginning with Column D and extending to the right that number
of columns (weeks) authorized by the contract for performance time.
9.Beginning at the loweer left corner, line 15, column D, the graph will be plotted using a broken or dotted line showing the cumulative total progress for
planned intervals. Again using the example cited above, the dotted line would, for the 1st week, extend from line 15 to line 14 under column d for 10%. The
second week the dotted line would extend from Line 14 to Line 12 under Column E for 20%, making a cumulative total of 30%. The dotted line should end
(100%) at the intersection of Line 5 and Column K.
10.In the event the contract is modified by the contracting officer under terms of the contract, changing the progress of work as originally scheduled,
adding or deleting work or changing the original completion date, a revised progress schedule will be prepared and submitted to the contracting officer for
approval. In preparing the revised schedule, the amount of work completed will be considered, together with the changed new completiondate set forth in
the contract modification. Considering these factors, the work under the contract will be rescheduled over the new total performance time in the same
manner that the original schedule was prepared. The new completion date will be entered in Block 3. "First Revised Schedule," "Second Revised
Schedule," etc., will be entered immediately underneath the form title. Time of submission of the revised schedule will be determined by the contracting
officer.
11.At such, intervals as may be established by the contracting officer, the contractor will submit to the contracting officer AF Form 3065. "Contract
Progress Report," indicating the percentage of work accomplished for each work element during the established reporting period. Accurate reports are of
the utmost importance to the contractor and to the Government, since the percentage of completion, or progress, thus reported is used in administration of
the contract and may be used in connection with approval of partial payments under the contract. Care should be taken to plan the work in such manner
that it can be accomplished as stated in this schedule. If for any reason it becomes known that any part of the progress under this contract will be delayed,
this fact should be reported to the contracting officer immediately.