FA558719R0001-P0002.pdf

PDF 33 KB Posted

Attached to
RAF Lakenheath Commissary Renovation Project
Solicitation number
FA5587-18-R-0013
Issued by

About this file

SF-30

View the file

Other files

File Type Posted
Hazard_Materials_Report.pdf PDF
Asbestos_Refurbishment_Survey.pdf PDF
FA558719R0001-P0003.pdf PDF
Q&A_through_09_May_2019.pdf PDF
Attachment_6_-_PPI_Contract_Reference_Sheet_v1.docx DOCX document
Attachment_2_-_Drawings_Lakenheath_Commissary_v1.pdf PDF
Q&A_through_23April_019.pdf PDF
FA558719RA001_RAF_Lakenheath_RFP_P0002.pdf PDF
Attachment_8_-_Subcontractor_Consent_Ltr_v1.docx DOCX document
Attachment_1_Construction_Price_Breakdown_v1.xls XLS spreadsheet
Attachment_7_-_Past_Performance_Questionaire_v1.docx DOCX document
Attachment_3_-_Specifications_Lakenheath_Commissary_v1.pdf PDF
FA558719R0001-P0001_Amendment_1.pdf PDF
Attachment_1_Construction_Price_Breakdown.xls XLS spreadsheet
Attachment_8_-_Form29-1081_NEW_REFRIGERATION.doc DOC document
Attachment_2_-_Drawings_Lakenheath_Commissary.pdf PDF
Attachment_4-_SF1413-Statement_and_Acknowledgment.pdf PDF
FA558719R0001_RAF_Lakenheath_Commissary_Renovation_Project.pdf PDF
Attachment_6_-_Past_Performance_Questionaire.docx DOCX document
Attachment_5_-_PPI_Contract_Reference_Sheet.docx DOCX document
Attachment_3_-_Specifications_Lakenheath_Commissary.pdf PDF
Attachment_7_-_Subcontractor_Consent_Ltr.docx DOCX document
Attachment_8__Drawings_Lakenheath_Commissary.pdf PDF
Attachment_5_Schedule_Material_Submittals_(AF66).xls XLS spreadsheet
Attachment_4__AF_Form_3000_Material_Approval_Submittal.pdf PDF
Attachment_6-_SF1413-Statement_and_Acknowledgment.pdf PDF
Attachment_7__AF_IMT_3064_Progress_Schedule.xlsx XLSX spreadsheet
Attachment_3_Past_Performance_Questionaire.docx DOCX document
[DRAFT_RFP]_FA558718R0013_RAF_Lakenheath_Commissary_Freezer_Upgrade.docx DOCX document
Attachment_9__Specifications_Lakenheath_Commissary.pdf PDF
Attachment_2_Past_Performance_Infomation_Sheet.docx DOCX document
Attachment_1_Construction_Price_Breakdown.xlsx XLSX spreadsheet
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

P0002

FA5587

See Continuation Page

48 CONS/LGC - FA5587

BLDG 977, RAF LAKENHEATH

BRANDON IP27 9PN

TEL:01638 52 2079 FAX:

See Item 7

FA558719R0001

1 3

04/22/2019

02/28/2019

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

STANDARD FORM 30

CONTINUATION SHEET

AMENDMENT/MODIFICATION NUMBER

P0002

PAGE OF PAGES

2 3

NAME OF THE CONTRACTOR

The purpose of this amendment is to correct the following items in the above solicitation:

A. FAR 52.236-27, Site Visit (Construction), paragraph (b) is hereby changed to include:

Second site visit:

2 May 2019 @ 09:00 a.m.

British Summer Time (BST)

All interested contractors must submit, in writing, the names of the individual(s) that will be in attendance NLT 25 April 2019. Interested contractors may send up to 2 representatives for the prime contractor and up to 1 representative from each subcontractor.

B. Block 13(A) is hereby changed to read:

Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 02:00 PM local time 21 May 2019 (date).

C. Section L-2.2, Questions, is hereby change to read:

All questions are due no later than 09 May 2019, 1200 British Summer Time (BST).

D. Add Provision:

52.211-6 BRAND NAME OR EQUAL

(a) If an item in this solicitation is identified as “brand name or equal,” the purchase description reflects the characteristics and level of quality that will satisfy the Government’s needs. The salient physical, functional, or performance characteristics that “equal” products must meet are specified in the solicitation.

(b) To be considered for award, offers of “equal” products, including “equal” products of the brand name manufacturer, must—

(1) Meet the salient physical, functional, or performance characteristic specified in this solicitation;

(2) Clearly identify the item by—

(i) Brand name, if any; and

(ii) Make or model number;

(3) Include descriptive literature such as illustrations, drawings, or a clear reference to previously furnished descriptive data or information available to the Contracting Officer; and

(4) Clearly describe any modification the offeror plans to make in a product to make it conform to the solicitation requirements. Mark any descriptive material to clearly show the modification.

(c) The Contracting Officer will evaluate “equal” products on the basis of information furnished by the offeror or identified in the offer and reasonably available to the Contracting Officer. The Contracting Officer is not responsible for locating or obtaining any information not identified in the offer.

(d) Unless the offeror clearly indicates in its offer that the product being offered is an “equal” product, the offeror shall provide the brand name product referenced in the solicitation.

(End of provision)

E. L-4.4: What Counts as a Page. A page shall be “Letter” size (8-1/2-inch by 11-inch) sheet of paper, to include any spreadsheets.

F. L-5.4 Volume Contents, Past Performance Information (PPI) Contract Reference Sheets corrected limit to five (5) pages to concur with L-5.4.2.

G. L-6.2.4 corrected line to read:

This factor includes the following one subfactor:

H. L-7.1.1 Second Bullet:

•Complete Schedule B, with Attachment (1) as supporting documentation. Construction Price Breakdown (Attachment 1), shall be utilized for evaluation purposes only and shall not be a resultant part of the contract. Submit as a Microsoft Excel document.

I. L-7.1: Numbering corrected from 7.1.1, 7.3.1, 7.3.3 to 7.1.1, 7.1.2, 7.1.3 J. L-7.1: 7.3.2 Removed.

K. Attachment 1 – Construction Price Breakdown_v1:

L. Attachment 2 – Drawings_Lakenheath Commissary_v1:

M. Attachment 3 – Specifications_Lakenheath Commissary_v1: Revisions to Section 2309 N. Attachment 6 – PPI Contract Reference Sheet_v1: Update Solicitation Number O. Attachment 7 - Past Performance Questionnaire_v1: Updated reference to PPIRS P. Attachment 8- Subcontractor Consent Ltr_v1: Updated POC e-mail info Q. Questions and answers through 23 April 2019

---END OF CHANGES---

FA558719R0001-P0002_pg 1
FA558719R0001-P0002 Continuation Page

File details come from the government source that posted it.