Attachment_8_-_Form29-1081_NEW_REFRIGERATION.doc

DOC document 721 KB Posted

Attached to
RAF Lakenheath Commissary Renovation Project
Solicitation number
FA5587-18-R-0013
Issued by

About this file

Attachment 8: Form 29- 1081 New Refrigeration

View the file

Other files

File Type Posted
Hazard_Materials_Report.pdf PDF
Asbestos_Refurbishment_Survey.pdf PDF
FA558719R0001-P0003.pdf PDF
Q&A_through_09_May_2019.pdf PDF
Attachment_6_-_PPI_Contract_Reference_Sheet_v1.docx DOCX document
FA558719R0001-P0002.pdf PDF
Attachment_2_-_Drawings_Lakenheath_Commissary_v1.pdf PDF
Q&A_through_23April_019.pdf PDF
FA558719RA001_RAF_Lakenheath_RFP_P0002.pdf PDF
Attachment_8_-_Subcontractor_Consent_Ltr_v1.docx DOCX document
Attachment_1_Construction_Price_Breakdown_v1.xls XLS spreadsheet
Attachment_7_-_Past_Performance_Questionaire_v1.docx DOCX document
Attachment_3_-_Specifications_Lakenheath_Commissary_v1.pdf PDF
FA558719R0001-P0001_Amendment_1.pdf PDF
Attachment_1_Construction_Price_Breakdown.xls XLS spreadsheet
Attachment_2_-_Drawings_Lakenheath_Commissary.pdf PDF
Attachment_4-_SF1413-Statement_and_Acknowledgment.pdf PDF
FA558719R0001_RAF_Lakenheath_Commissary_Renovation_Project.pdf PDF
Attachment_6_-_Past_Performance_Questionaire.docx DOCX document
Attachment_5_-_PPI_Contract_Reference_Sheet.docx DOCX document
Attachment_3_-_Specifications_Lakenheath_Commissary.pdf PDF
Attachment_7_-_Subcontractor_Consent_Ltr.docx DOCX document
Attachment_8__Drawings_Lakenheath_Commissary.pdf PDF
Attachment_5_Schedule_Material_Submittals_(AF66).xls XLS spreadsheet
Attachment_4__AF_Form_3000_Material_Approval_Submittal.pdf PDF
Attachment_6-_SF1413-Statement_and_Acknowledgment.pdf PDF
Attachment_7__AF_IMT_3064_Progress_Schedule.xlsx XLSX spreadsheet
Attachment_3_Past_Performance_Questionaire.docx DOCX document
[DRAFT_RFP]_FA558718R0013_RAF_Lakenheath_Commissary_Freezer_Upgrade.docx DOCX document
Attachment_9__Specifications_Lakenheath_Commissary.pdf PDF
Attachment_2_Past_Performance_Infomation_Sheet.docx DOCX document
Attachment_1_Construction_Price_Breakdown.xlsx XLSX spreadsheet
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USVF REQUEST FOR HOST NATION APPROVAL

(USVF Direct Contracting / Labour as 1973 CSA Clause c(2))

DIO Received 27/09/2017 more information requested.
Form 29 Serial Number: LAK0173
Base / Establishment
RAF Lakenheath
USVF Project Number
66852
Project Title
Replace Existing Refrigeration system with new CO2 system

Construction Cost Limit

F100 Number (for DIO time charge)
LAK18-001 (X5791)
Value allocated to DIO: £203.12
USVF Agency Initiating Works
DeCA
Proposed Designer
TBD based on contract acquisition
Proposed Contractor
TBD based on contract acquisition

Proposed scope of work

The scope of the work is to remove the entire existing R404A refrigeration system and associated components and install new CO2 (R744) refrigeration system to include new refrigerated display cabinets/cases, evaporators, compressors, condensers, piping, controls and electrical components. Repair existing Air Handler unit serving the Sales Area in-order to maintain humidity and temperatures per DeCA design criteria. Some electrical work may be required in-order to support the new refrigeration system. All work will be conducted in phases in-order to keep the commissary in operation.

Proposed contracting method
DeCA / 48 CONS

A. Parts 1, 2 and 3 of this form should be completed by the USVF Focal Point for issue to the DIO Focal Point.

B. On receipt the DIO Focal Point should insert estimated costs for any DIO involvement, create a project record for cost recovery and return to the USVF Focal Point to obtain the BCE’s acceptance prior to issue to the DIO Manager for final agreement / approval.

C. * Definition of DIO USF involvement
Assurance – indicates that DIO USF will require evidence that the task has been satisfactorily completed.
(consultation between CE/DIO)
Yes – indicates that DIO USF will play an active role in completing the tasks and all costs incurred will be recoverable.

Part 1 – Design Stage

#
Requirement

(Completed by CE) Required Yes/No *

(Completed by CE/DIO) Approximate Requirement Date

(Completed by CE for programming resources) Estimated DIO Costs involved

(Completed by DIO) Hours / cost £ Requirement Lead (Either CE, DIO or as stated) Comments

1
Compliance with CDM regulations 2015 and appointment of PD / PC if more than 1 contractor is involved.
Yes
CE/Contractor
As this project will exceed 30 days full CDM will be required. An appointment of a BCA will also be required and details passed to DIO. It is important that the current maintainer Phosters is aware of these works, along with the IDL A/Ps. As permits to work may be required on certain areas of these works. So they are aware that these works are going on.
2
Asbestos / Specialist Surveys
Yes
CE/Contractor
Check asbestos records with CEIE prior to commencing of any work. Also as part of the local risk assessment.
3
RAFCC Siting Board
No
CE
If required to be requested through RAFLO.
4
Local Authority Planning including archaeological compliance. Including DIO Land Management Services.
No
CE/DIO
As replacing existing system no change to the footprint.
5
Archaeological and Heritage
No
CE/DIO
Not appropriate to these works
6
SSSI / EN compliance
No
CE/DIO
Not appropriate to these works
7
Building Regulations compliance
No
CE/Contractor
A BCA will need to be appointed to oversee these works. Form C1 to be submitted to Nelson, Peter Mr (DIO SEE-ENG Bldg Stds2) Peter.Nelson868@mod.gov.uk also copy to DIO and submit C3 on completion as above.
8
MoD Fire Officer approval including NFPA
Yes
CE/Contractor/ BCA
Form 1 to be sent to DSA as email sent Sept 2017.

Send to DSA-DFSR-USVF-GroupMailbox@mod.uk and copy to DIO. Reading the scope of works for this project there is a line in document

9
Independent Structural Certification
No
CE/Contractor
This has been carried out by RS&H and copy received by DIO 23/07/2018
10
Water supply, boreholes, drainage. EA drainage plans approval
No
CE/Contractor/DIO
Notify DIO if any drains are to be compromised by these works prior to work starting.
11
Post Contract Maintenance strategy
Yes
CE/Contractor
Full maintenance schedules to be advised to the maintainer and a copy passed to DIO.
12
Authorising Engineer / Person Involvement. Chargeable service by IDL.
Yes
CE/Contractor/ IDL
Skilled person electrical and mechanical A/C will be required for these works and if not in possession of these the must be obtained through IDL. They must be added to the base Skilled person’s register. The type and quantities of gas to be recorded on the F-Gas register held by IDL. For removal and charging up the new system. Please note as this is a new installation under the PSSR 2000 regulations a new written scheme will be required. A hard copy must be passed to DIO.
13
Pre-construction H&S Information
Yes
CE/Contractor
Copy to be submitted to DIO prior to work commencing.
14
Energy Performance Certificates / SAP Calculation method.

Building Regs Part L No

CE
Copies to be passed to DIO if appropriate.

Part 2 – Construction Stage

#
Requirement

(Completed by CE) Required Yes/No *

(Completed by CE/DIO) Approximate Requirement Date

(Completed by CE for programming resources) Estimated DIO Costs involved

(Completed by DIO)

Hours / cost £ Requirement Lead

(Either CE, DIO or N/A) Comments

15
CDM Construction Phase H&S plan
Yes
CE/Contractor
As this project, will exceed 30 days full CDM will be required. An appointment of a BCA will also be required and details passed to DIO.
16
Contractor’s security clearance
Yes
CE
Requestor to be responsible for the contractor’s security clearance
17
HSE notification using HSE Form F10
No
CE/Contractor
As Lines 1 & 15
18
JSP375 compliance
Yes
CE/Contractor
Full compliance with JSP 375 and other relevant safety standards is required, at all times!
19
Authorising Engineer / Person Involvement Skilled Person Certification. Chargeable service by IDL.
Yes
CE/Contractor/lDL
As Line 12
20
Hazardous Waste Regulations compliance
Yes
CE/Contractor
Full documentation of F Gas removal and disposal is required. Any waste transfer notes. Copies to be sent to DIO.
21
MoD Fire Certification using Form DIO USF 15
Yes
CE/DSA
As Line 8
22
Issue of H&S file and O&M documentation.
Yes
CE/Contractor/DIO
Full handover of H&S / O&M documentation to be given to the maintainer. A full list of asset changes will be required by DIO. The maintainer is to be given a full handover and training on completion.
23
Building Regulations compliance
No
CE/Contractor
As this project, will exceed 30 days full CDM will be required. An appointment of a BCA will also be required and details passed to DIO

Part 3 – Post Construction Stage

#
Requirement

(Completed by CE) Required Yes/No *

(Completed by CE/DIO) Approximate Requirement Date

(Completed by CE for programming resources) Estimated DIO Costs involved

(Completed by DIO)

Hours / cost £ Requirement Lead (Either CE, DIO or N/A) Comments

24
Asset register and statutory test certificates.

Required F-Gas certification provision.

Yes

CE/Contractor
Full list of removals and additions will be required on completion. A complete set of test certificates for the installation must be provided to DIO.
25
Management of Warranty items
Yes
CE/Contractor
To be the responsibility of the requestor.
26
DIO Attendance at Meetings, Work Groups, F29 Management
Yes
£203.12
DIO
To carry out review and the processing of the Form 29
27
Other.

To be described in comments

TOTAL ESTIMATED COST AND ESTIMATED PROJECT COMPLETION

£203.12

Part 4 – Authorisation

USVF Focal Point - (Eg. CEO or CEP Flight Chief).
Name:

Mr Ross Jack Signature:

Date:

DIO Focal Point - (Eg. Senior Project Manager or Ops Manager)
Name:

Mrs Claire Bushnell

Signature:

Date:

Base Civil Engineer - (or Regional Civil Engineer if scope is applicable) Agreement to scope and DIO costs.
Name:

Mr Walter Graves

Signature:
Date:
DIO Area Manager – (or SDTFM USF RM if scope is applicable)
Name:

Mr Gary Syer

Signature:
Date:

Please note the Form 29 will only be valid for a 2 year period from the date of approval by the Senior Signatory above. After 2 year’s a review must be conducted to extend the period if required at the discretion of DIO. This may incur additional costs.

GUIDANCE - DIO REQUIREMENTS AND EXPECTATIONS

1
Compliance with CDM and appointment of PD / PC if more than 1 contractor used
DIO requires a copy of the HSE F10, signed by the USVF representative, for the design stage for notifiable works. For non-notifiable works written confirmation is required that the scheme complies with the CDM regulations
2
Asbestos / Specialist Surveys
DIO will provide support in obtaining any specialist / asbestos surveys and provide estimated costs if requested.
3
RAFCC Siting Board
DIO requires a copy of the Board Result.
4
Local Authority Planning including archaeological compliance
DIO will provide support and apply for the LPA Planning Consent and provide estimated costs if requested. CE to produce all required documents.
5
Archaeological survey
DIO will provide liaison with local authority archaeology unit and necessary funds. CE shall allow time in the programme for archaeological works
SSSI / EN compliance
DIO will provide support in applying for relevant approvals and provide estimated cost if requested.
7
Building Regulations compliance
DIO expects all works to comply with the Building Regulations and all designs and construction works are to be certified by an approved third party Building Control Adviser employed by the designer. Copies of design proposals and certificates are to be issued to the DIO BCO. Forms DIO USF 67 and 68 shall be used. All construction works are to be inspected by the DIO BCO prior to occupation.
8
MoD Fire Officer approval including NFPA
DIO expects all works to comply with UK and USVF fire standards. All design and construction work will be inspected and approved by the MoD Fire Adviser. DIO will provide estimated costs if requested
9
Independent Structural Certification
DIO expects all works to comply with relevant UK regulations and all structural designs are to be certified by an approved third party organisation. Form DIO USF 2518 and 2519 shall be used.
10
EA drainage plans approval
DIO will provide support in obtaining relevant approvals and provide estimated costs if requested.
11
Post Contract Maintenance strategy
DIO will provide support in agreeing a suitable maintenance strategy using Form DIO USF 148.
12
Authorising Engineer / Person involvement
DIO will provide support in providing estimated costs for requester funding.
13
Pre-construction H&S Information
DIO requires written confirmation that all Pre-construction H&S Information is in place prior to contract award.
14
Energy Performance Certificates / SAP Calculation Method
DIO requires written Energy Performance Certificates / SAP Calculation Method as Building Regs Part L
15
CDM Construction H&S plan
DIO requires written confirmation that a suitable safety plan is in place prior to construction commencing.
16
Contractor’s security clearance
Those requesting the works shall sponsor and arrange the security clearance through the local pass office.
17
HSE notification using From F10
DIO requires a copy of the F10 for the construction stage for notifiable works.
18
JSP375 compliance
DIO will provide support to ensure compliance with JSP 375.
19
AE / AP Involvement. Skilled Person Certificate
DIO can provide estimated costs from DIO’s contractor. All costs to be funded by requester
20
Hazardous Waste Regulations compliance
DIO requires written confirmation that the construction phase complies with the Hazardous Waste Regulations.
21
MoD Fire Certification using Form DIO USF 15
DIO expects all works to comply with UK and USVF fire standards. All construction works are to be inspected by the MoD Fire Adviser prior to occupation.
22
Issue of H&S file and O&M documentation
DIO expects a signed copy of the Form DIO USF 141 Schedule of Documents.
23
Building Regs Compliance
DIO will require full stage certification from a nominated BCO
24
Asset register and statutory test certificates

Required F-Gas certification provision DIO to be provided with all statutory test certificates

Form DIO SDTFM USF 29 (01/18) 3 of 6