Attachment_2_-_Drawings_Lakenheath_Commissary_v1.pdf
PDF 23 MB Posted
- Attached to
- RAF Lakenheath Commissary Renovation Project
- Solicitation number
- FA5587-18-R-0013
About this file
Drawings_v1
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADA RAMP
1:15 RAMP UP
1:15 RAMP UP
V
V
1:12 RAMP UP
ve n d in g
A
S C
R E
F C
O F
F
IN
M
G D
-1
R O
A D
Y A
R M
O U
T H
R I C H M O N D R
O A D
DESIGNATED GOVERNMENT
AUTHORIZED TECHNICAL
REPRESENTATIVE'S FIELD
OFFICE. SEE 01 50 00
CONTRACTOR STAGING
AREA (OPTION 2)
REFRIGERATED/FROZEN TRAILERS,
REFER TO O-102 FOR DESCRIPTION.
CONTRACT LIMITS
CONTRACTOR ADVISED TO LIMIT USE OF
COMMISSARY SITE AREAS NOT DIRECTLY AFFECTED
BY THE SCOPE OF WORK. BOUNDARY SHOWN SHALL
BE VERIFIED AND APPROVED.
CONTRACTOR ACCESS TO STAGING
AREA
CONTRACTOR STAGING
AREA (OPTION 1)
CONTRACTOR ACCESS TO STAGING
AREA
CONTRACTOR
PARKING
CONSTRUCTION TRAILER
CONSTRUCTION TRAILERPARKING LOT ACCESS
CLOSED TO TRAFFIC
531 G-001
COVER SHEET
REFRIGERATION EQUIPMENT AND HVAC UPGRADES
FOR LAKENHEATH COMMISSARY
DEFENSE COMMISSARY AGENCY
DIRECTORATE OF ENGINEERING - FORT LEE, VIRGINIA
LACKLAND AFB, TEXAS
100% FOR CONSTRUCTION
DATE : JUNE 22, 2018
PROJECT # : EU18MI03
CONTRACT AGREEMENT # : HDEC03-13-D-0003-0045
DRAWINGS INDEX
GENERAL
G-001 COVER SHEET
G-002 NEW EQUIPMENT PLAN
PHASING
O-101 OVERALL DEMOLITION PHASING PLAN
O-102 OVERALL REMODEL PHASING PLAN
O-103 MEZZANINE PHASING PLAN & PHASES
ARCHITECTURAL
A-001 ARCHITECTURAL LEGEND & GENERAL NOTES
AD101 ARCHITECTURAL DEMOLITION FLOOR PLAN AREA "A"
AD102 ARCHITECTURAL DEMOLITION FLOOR PLAN AREA "B"
A-100 ARCHITECTURAL OVERALL FLOOR PLAN & ROOM LEGEND
A-101 ARCHITECTURAL FLOOR PLAN AREA "A"
A-102 ARCHITECTURAL FLOOR PLAN AREA "B"
A-301 SECTIONS
A-401 ENLARGED FLOOR PLANS
A-501 DETAILS
A-601 ROOM FINISH SCHEDULE & DOOR SCHEDULE
AI201 INTERIOR ELEVATIONS
M-001 MECHANICAL LEGEND & GENERAL NOTES
MD101 MECHANICAL DEMOLITION FLOOR PLAN
MD102 MECHANICAL DEMOLITION MEZZANINE FLOOR PLAN
M-101 MECHANICAL FLOOR PLAN
M-102 MECHANICAL MEZZANINE FLOOR PLAN
M-501 MECHANICAL DETAILS AND SCHEDULES
REFRIGERATION
R-001 REFRIGERATION LEGEND & GENERAL NOTES
RD101 REFRIGERATION DEMOLITION FLOOR PLAN AREA "A"
RD102 REFRIGERATION DEMOLITION FLOOR PLAN AREA "B"
RD103 REFRIGERATION DEMOLITION ROOF/MEZZANINE FLOOR PLAN
R-101 REFRIGERATION FLOOR PLAN AREA "A"
R-102 REFRIGERATION FLOOR PLAN AREA "B"
R-103 REFRIGERATION ROOF/MEZZANINE FLOOR PLAN
R-501 DETAILS 01
R-502 DETAILS 02
R-503 RMCS DETAILS 01
R-504 RMCS DETAILS 02
R-601 SCHEDULES 01
R-602 SCHEDULES 02
ELECTRICAL
E-001 ELECTRICAL LEGEND & GENERAL NOTES
ED101 ELECTRICAL DEMOLITION FLOOR PLAN AREA "A"
ED102 ELECTRICAL DEMOLITION FLOOR PLAN AREA "B"
ED103 ELECTRICAL DEMOLITION MEZZANINE FLOOR PLAN
E-101 ELECTRICAL POWER & LIGHTING FLOOR PLAN AREA "A"
E-102 ELECTRICAL POWER & LIGHTING FLOOR PLAN AREA "B"
E-103 ELECTRICAL MEZZANINE POWER FLOOR PLAN
E-601 SINGLE LINE DIAGRAMS
SITE LOCATION
HAUL ROUTE
GATE 8
MECHANICAL
SITE PLAN2
G-001
EIG
TEA & MMS
JJH
STRUCTURAL
S-001 STRUCTURAL LEGEND & GENERAL NOTES
S-101 MEZZANINE FLOOR PLAN
S-301 SECTIONS & DETAILS
PLUMBING
P-001 PLUMBING LEGEND & GENERAL NOTES
PD101 PLUMBING DEMOLITION FLOOR PLAN
PD102 PLUMBING DEMOLITION MEZZANINE FLOOR PLAN
P-101 PLUMBING FLOOR PLAN
P-102 PLUMBING MEZZANINE FLOOR PLAN
HAUL ROUTE
G-001
E-700 ELECTRICAL DISTRIBUTION BOARD CIRCUIT CHARTS
PROJECT INFORMATION
PRINCIPLE DESIGNER:
RS&H, INC.
US MAILING ADDRESS: 13750 SAN PEDRO SUITE 300
SAN ANTONIO, TX 78232
PHONE: 011 210 224 2800
REFRIGERATION AND ENVIRONMENTAL SUB-CONSULTANT:
CTA, INC
US MAILING ADDRESS: 306 W. RAILROAD AVE., SUITE 104,
MISSOULA, MT 59802
PHONE: 011 406 728-9522
DESIGN TEAM:
ELDA GALVEZ, PROJECT MANAGER AND ARCHITECT
CHRISTOPHER RHOADES, STRUCTURAL ENGINEER
JEFFREY NEUMANN, MECHANICAL ENGINEER
ROBERT ARTHUR, REFRIGERATION ENGINEER
DANIEL POHNERT, ELECTRICAL ENGINEER
KEITH CRON, ENVIRONMENTAL ENGINEER
OWNER REPRESENTATIVE:
48 CIVIL ENGINEER SQUADRON, MR. WALTER GRAVES,
UK MAILING ADDRESS: 48 CES/CD, RAF LAKENHEATH,
BRANDON, SUFFOLK, IP27 9PN
PHONE: 01638521906
DELEGATED DESIGN:
FINAL REFRIGERATION DESIGN IS BY SELECTED
REFRIGERATION EQUIPMENT MANUFACTURER.
FINAL ELECTRICAL DESIGN FOR SELECTED
REFRIGERATION SYSTEM IS BY REFRIGERATION
EQUIPMENT MANUFACTURER.
FINAL DESIGN OF RMCS SYSTEM IS BY SELECTED
RMCS MANUFACTURER.
FINAL DESIGN OF PRE-FINISHED INSULATED PANEL
CEILING SUPPORT SYSTEM TO BE PROVIDED BY
PRE-FINISHED INSULATED PANEL MANUFACTURER.
THE CONTRACTOR SHALL PERFORM ALL CONSTRUCTION
DESIGN AND MANAGEMENT DUTIES AS PRINCIPLE
CONTRACTOR COMPLIANT WITH THE CONSTRUCTION
DESIGN AND MANAGEMENT REGULATIONS 2015 (CDM). THE
CONTRACTOR SHALL ALSO SUBMIT THE NOTIFICATIONS
REQUIRED UNDER CDM REGULATIONS TO THE HEALTH AND
SAFETY EXECUTIVE ON BEHALF OF THE OWNER AND
PROVIDE A COPY OF THAT NOTIFICATION TO THE
CONTRACTING OFFICER TECHNICAL REPRESENTATIVE.
M-502 MECHANICAL CONTROL SEQUENCES
ApodacaT Galvez 6.22.18
HD
SALES
AREA
PRODUCE
PROCESSING
MEAT/DELI
ALCOVE
JANITOR
CHASE
STAGING
AREA
DAMAGED
MERCHANDISE
VESTIBULE
21B
VESTIBULE
21A
PERISHABLE/
SEMI-PERISHABLE
87/88
TRAINING/
CONFERENCE
ADMIN
AREA
DIRECTOR
DELI
COOLER
BAKERY
COOLER
BAKERY
FREEZER
BREAKROOM
16A
STORE
ADMINISTRATOR
PRODUCE
ALCOVE
ENTRY
VESTIBULE
1A
CART
STORAGE
ENTRY
VESTIBULE
1B
EXIT
VESTIBULE
2A
CART
RETURN
VAULT
CASHIER
OFFICE
CHECKOUT
QUEUING
EXIT
VESTIBULE
2B
BAG
STORAGE
MEN'S
VESTIBULE
WOMEN'S
VESTIBULE
MECHANICAL
DELI PREP.
BAKERY
PREP.
74A
BAKERY
PREP.
74B
STORAGE
DELI
SERVICE
VESTIBULE
WOMEN'S
CUSTOMER
RESTROOM
MEN'S
CUSTOMER
RESTROOM
1A03
1A03
1A03
1A03
R
R
R
R
1A03
1A03
1A03
R
R
R
R
2K02
2K00
2R24
R
2R24
R
1B01 above
1B13A w/Hood storage
2R24
2R24
2R24
1D08
2D01
2R24
2R24
2R24
2R24
2R24
1D20
1D11A
1D15
1D10B w/Hood
1B20-B
1B28
2D01
1B26
2B02
1B20-B
2D00
1B00
1D09B
1E031E031E031E031E031E031E031E03
2G162G16 2G16
CBT Terminals
G
G
2G15
G
A
G
A
G
A
G
2R24 2R24
G
G
G
G
G
A
G
A
G
A
G
A
G
A
G
G
G
G
G
A
G
A
2G15A
G
A
G
A
G
G
G
2G162G16 2G162G16 2G16
G
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
2G15
G
A
2G15
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
2G15
G
A
G
A
2G15
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
2G15
G
A
G
A
G
A
2G15A
G
A
G
A
2G15A
G
A
G
A
2G15A
G
A
G
A
2G15A
G
A
2G15A
G
A
G
A
G
A
G
A
G
A
R
1E031E031E03 1E031E03 1E03
G
A
2G152G15
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
2G15
G
A
2G15
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
G
A
2G15
G
A
G
A
G
A
2P08
2P08
2P08
2P08
2P08
2P08
G
A
G
A
G
A
G
A
2P08
2P08
2P08
2P08
G
A
G
A
G
A
G
A
2P08
2P08
2P08
2P08
2P08
2P08
G
A
G
A
G
A
2G15A
G
A
G
A
2G15A
G
A
G
A
2G15A
G
A
G
A
2G15A
G
A
G
A
2G15A
G
A
2P08
2P08
2P08
2P08
G
A
G
A
G
A
G
A
G
A
GP-3
v e n d i n g
A
Pedestal
Sink
S/S
Sink
S/S
Sink
S/S
Sink
P
P
P
P
P
P
P
G
G
G
G
G
G
G
G
G
G
1G06GD-
1G06GD-
P
1P07GD-12 1P07GD-12 1M04GD-121M04GD-121M04GD-12
1M04GD-12
1G10-2 1G10-2
G
G
G
S C
R
E F
B A
K E
R Y
SC REF
BAKERY
SC REF
CABINET
S/S
Sink
HAND SINK
OVEN
1D09
D
D
G
W
F
C O
F F
I N
SC REF
COFFIN
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G D
G
G D
G
G D
G
G D
G
G D
G
G D
1G10-2 1G10-2
G
G D
G
G D
1G12-2
1G12-2
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
1G11 (19 DOORS)
D
B
W
1D09T
MECHANICAL
BAKERY/DELI
DISPLAY
4TFP-6
PRODUCE
MANAGER
SC REF
CABINET
DAIRY
DISPLAY
1M04GD-8
SALES
AREA
G
G D
G
G
D
1M02GD-37501M02GD-3750
1M02GD-37501M02GD-3750
G
G D
G
G D
G
G D
G
G
D
G
G D
D
D
D
S
1D00-
1M04GD-12
M
G D
M
G D
1M04GD-8
M
G D
M
G D
1D00-EC45
1D00-EC45
BAKERY
SERVICE
67A
19 20 21 23 25 27 29 31 33 35 36 1
SF
SL
SM
SR
RETARDER/
PROOFER
RETARDER/
PROOFER
SB
SC
SE
SH
SJ
SK
SN
SP
SQ
ST
SU
SV
22 24 26 28 30 32 34
13750 SAN PEDRO, SUITE 300
SAN ANTONIO, TEXAS 78232
210-224-2800 www.rsandh.com TX. CERT. No. F-3401
KEY PLAN
N.I.C.
N.I.C.
A
B
SCALE:
1:100
2 G-002
NEW EQUIPMENT PLAN
NEW EQUIPMENT PLAN
400020000
SCALE: 1:100
G-002
EQUIPMENT PLAN LEGEND
SYMBOL DESCRIPTION
EXISTING EQUIPMENT
CF/CI EQUIPMENT
EQUIPMENT TAG
RELOCATED EQUIPMENT BY
GOVERNMENT REPRESENTATIVE
1G24-8
NO. DESCRIPTION CF/CI
DELI DEPARTMENT *
1D00-940
CASE, DELI, CLERK SERVED, REFRIGERATED, REMOTE, 940 MM
1D00-3125
CASE, DELI, CLERK SERVED, REFRIGERATED, REMOTE, 3125 MM
1D00S-2500
CASE, DELI, SELF SERVE, REFRIGERATED, REMOTE, 2500 MM
1D00-EC45
CASE, DELI, CLERK SERVED, REFRIGERATED, REMOTE, END 45 CORNER
1D09T
OVEN ROTISSERIE CHICKEN, TABLE ONLY
1D14BW-1250
DISPLAY, ISLAND, HEATED, BAIN MARIE, 1250 MM
1D14GW-1250
DISPLAY, ISLAND, HEATED PLATE, HOT LAMP, 1250 MM
1D17-1880
TABLE, PREP, SANDWICH, REFRIGERATED, REMOTE
GROCERY DEPARTMENT
1G02GD-4
CASE, DAIRY, REFRIGERATED, GLASS DOOR, MULTI-DECK, REMOTE, 1250 MM
1G02GD-6
CASE, DAIRY, REFRIGERATED, GLASS DOOR, MULTI-DECK, REMOTE, 1880 MM
1G02GD-8
CASE, DAIRY, REFRIGERATED, GLASS DOOR, MULTI-DECK, REMOTE, 2500 MM
1G02GD-12
CASE, DAIRY, REFRIGERATED, GLASS DOOR, MULTI-DECK, REMOTE, 3750 MM
1G06GD-2100
CASE, FROZEN FOOD, END CAP FOR WIDE ISLAND, REMOTE, WITH GLASS LIDS, 2100 MM
1G07GD-2500
CASE, FROZEN FOOD, WIDE ISLAND, REMOTE, WITH GLASS LIDS, 2500 MM
1G10-2
CASE, FROZEN FOOD, REMOTE, 2 GLASS DOORS, UPRIGHT
1G10-5
CASE, FROZEN FOOD, REMOTE, 5 GLASS DOORS, UPRIGHT
1G11
DAIRY DISPLAY GLASS DOOR FOR USE WITH ROLL IN CART (# AS REQUIRED)
1G12-2
CASE, ICE CREAM, REMOTE, 2 GLASS DOORS, UPRIGHT
1G12-4
CASE, ICE CREAM, REMOTE, 4 GLASS DOORS, UPRIGHT
1G13-4
CASE, FROZEN JUICE, REMOTE, 4 GLASS DOORS, UPRIGHT
1G24GD-12
MERCHANDISER, GRAB N GO, REFRIGERATED, 3750 MM REMOTE
MEAT DEPARTMENT *
1M02GD-3750
CASE, MEAT, SINGLE DECK, REFRIGERATED, REMOTE, WITH GLASS LIDS, 3750 MM
1M04GD-8
CASE, MEAT OR PRE-PACKAGED DELI, MEDIUM TEMP, GLASS DOOR, MULTI-DECK,
REFRIGERATED, REMOTE 2500 MM
1M04GD-12
CASE, MEAT OR PRE-PACKAGED DELI, MEDIUM TEMP, GLASS DOOR, MULTI-DECK,
REFRIGERATED, REMOTE 3750 MM
PRODUCE DEPARTMENT *
1P03-2500
CASE, PRODUCE, REFRIGERATED, REMOTE, 2500 MM
1P03-3750
CASE, PRODUCE, REFRIGERATED, REMOTE, 3750 MM
1P07GD-12
CASE, PRODUCE, REFRIGERATED, REMOTE, 3750 MM
EIG
TEA & MMS
JJH
EQUIPMENT LIST
SB
20 21 23 25 27 29 31 33 35 36 1
SC
SE
SH
SJ
SK
SN
SP
SQ
ST
SU
SV
L
SW
SX
SY
2 3
20 22 24 26 28 30 32 34 36 1 2 3
SF
SL
SM
SR
SALES AREA WORK SIDE
50mm X 100mm WOOD TOP PLATE
50mm X 100 mm WOOD STUDS AT
1200mm O.C.
50mm X 100mm WOOD BRACE AT ENDS
AND 1200mm O.C.
DRILL FLOOR FOR 10mm DIA.
EXP. ANCHOR BOLT AT 2500mm O.C.
(REMOVE BOLT & PATCH FLOOR
AFTER REMOVAL OF TEMPORARY
BARRIER)
ANCHOR KICKER TO FLOOR
OR ADD SAND BAG TO SECURE
50mm X 100mm WOOD SILL PLATE
CONT. 6 MIL POLYETHELENE
SHEETING (TAPE ALL JOINTS)
CONT. 6 MIL POLYETHELENE
SHEETING (TAPE ALL JOINTS)
EXISTING CEILING
CONT. 6 MIL POLYETHELENE
SHEETING (TAPE ALL JOINTS)
SALES AREA
50mm X 100mm WOOD
TOP PLATE
50mm X 100mm WOOD STUDS
AT 1200mm O.C.
50mm X 100mm WOOD BRACE
AT ENDS AND 1200mm O.C.
ANCHOR KICKER TO
FLOOR OR ADD SAND
BAG TO SECURE
50mm X 100mm WOOD
SILL PLATE
DRILL FLOOR FOR 10mm DIA. EXP.
ANCHOR BOLT AT 2500mm O.C.
(REMOVE BOLT & PATCH FLOOR AFTER
REMOVAL OF TEMPORARY BARRIER)
NOTE: SOFT CONSTRUCTION BARRIER MAY BE
SUBSTITUTED WITH A PRE-MANUFACTURED
DUST BARRIER SYSTEM BY "ZIP WALL" OR
EQUAL. VERIFY WITH GOVERNMENT
AUTHORIZED TECHNICAL REPRESENTATIVE IF
APPROVED AND AREAS WHICH IT MAY BE
USED.
WORK SIDE
EXISTING PRE-FINISHED INSULATED
PANEL
50mm X 100mm WOOD
TOP PLATE
50mm X 100mm WOOD STUDS
AT 1200mm O.C.
50mm X 100mm WOOD BRACE
AT ENDS AND 1200mm O.C.
ADD SAND
BAG TO SECURE
50mm X 100mm WOOD
SILL PLATE
F I E
L D
V
R
I F
Y
9mm CD PLYWOOD (PAINTED - SEE
CONSTRUCTION BARRIER NOTES)
VAPOR BARRIER
50mm X 100mm WOOD
TOP PLATE
WARM AREACHILLED SIDE
13750 SAN PEDRO, SUITE 300
SAN ANTONIO, TEXAS 78232
210-224-2800 www.rsandh.com TX. CERT. No. F-3401
SCALE:
1:200
PHASING LEGEND
LIMIT OF PHASING AREA
CONSTRUCTION BARRIER
PHASE SEQUENCE NUMBER
FLOATING WORK: WORK CAN BE PERFORMED
CONCURRENTLY WITH OTHER WORK
TEMPORARILY RELOCATED EQUIPMENT
3 O-101
OVERALL DEMOLITION
PHASING PLAN
OVERALL DEMOLITION PHASING PLAN
800040000
SCALE: 1:200
F#
O-101
GENERAL PHASING NOTES:
1. THE COMMISSARY WILL CONTINUE TO OPERATE AND PROVIDE FULL SERVICE TO
CUSTOMERS DURING CONSTRUCTION. THE FOLLOWING NOTES APPLY TO THE
CONTRACTOR'S PLAN TO ACCOMPLISH CONSTRUCTION WITHIN THE EXISTING
FACILITY. THE CONTRACTOR MUST VISIT THE FACILITY AND CAREFULLY EXAMINE
THOSE PORTIONS OF THE BUILDING AND SITE AFFECTED BY THIS WORK BEFORE
SUBMITTING PROPOSAL AND BECOME FAMILIAR WITH THE EXISTING CONDITIONS
AND DIFFICULTIES THAT WILL AFFECT THE EXECUTION OF WORK. SUBMISSION OF
A PROPOSAL WILL BE CONSTRUED AS EVIDENCE THAT SUCH EXAMINATION WAS
CONDUCTED AND LATER CLAIMS FOR LABOR, EQUIPMENT OR MATERIALS
REQUIRED BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE RECOGNIZED.
2. THE INTENT OF THE PHASING PLANS IS TO MINIMIZE THE IMPACT OF THE
CONSTRUCTION ON THE OPERATION OF THE COMMISSARY. THE PHASING PLAN
MUST ENABLE FULL SERVICE COMMISSARY SALES TO CUSTOMERS AT ALL TIMES
THAT THE COMMISSARY IS OPEN TO CUSTOMERS. CONSTRUCT THE PROJECT IN
SEQUENTIAL PHASES AS OUTLINED IN THE PLANS UNLESS OTHERWISE APPROVED
BY THE GOVERNMENT AUTHORIZED TECHNICAL REPRESENTATIVE.
3. PHASING PLANS SHOWN ARE DIAGRAMMATIC & FOR PHASING PURPOSES ONLY.
THEY SHOULD NOT BE SCALED OR OTHERWISE USED FOR TAKE-OFFS.
COORDINATE PHASING WITH DEMOLITION DRAWINGS AS WELL AS PLANS FOR
NEW WORK AND REPAIRS. COORDINATE WITH PROJECT PLANS AND
SPECIFICATIONS.
4. THE BOUNDARY LINES SHOWN (HATCHED AREAS) ARE FOR GENERALIZATION
PURPOSES ONLY AND DO NOT INDICATE A BOUNDARY WITHIN WHICH ALL WORK
MUST BE CONTAINED. COORDINATE ANY WORK THAT COULD DISRUPT REGULAR
COMMISSARY BUSINESS ACTIVITY WITH THE GOVERNMENT AUTHORIZED
TECHNICAL REPRESENTATIVE PRIOR TO BEGINNING. MAINTAIN VEHICULAR AND
PEDESTRIAN ACCESS INTO AND OUT OF FACILITIES FREE OF OBSTRUCTIONS
DURING CONSTRUCTION UNLESS OTHERWISE SHOWN.
5. PHASING NOTES DO NOT LIST ALL ITEMS OF WORK REQUIRED BY THE
CONSTRUCTION DOCUMENTS BUT ARE A GUIDE TO ACCOMPLISHING MAJOR
AREAS OF WORK.
6. ALL WORK ITEMS NOT INCLUDED IN PHASING PLANS ARE TO BE COMPLETED PER
TIME FRAMES DICTATED BY THE CONTRACT DOCUMENTS. WORK MAY BE DONE
DURING STORE OPERATING HOURS PROVIDED THE WORK DOES NOT INTERFERE
WITH COMMISSARY OPERATIONS AND HAS PRIOR APPROVAL BY THE
CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE AND STORE DIRECTOR.
7. PHASES ARE TO BE COMPLETED IN SEQUENTIAL ORDER. PROPOSED DEVIATIONS
TO THE SPECIFIED SEQUENCE MUST BE SUBMITTED IN ADVANCE FOR APPROVAL
BY THE GOVERNMENT AUTHORIZED TECHNICAL REPRESENTATIVE. PROVIDE A
JUSTIFICATION FOR WHY THE DEVIATION IS REQUIRED TO ACCOMPLISH THE
CONTRACT.
8. SUBMIT A CONSTRUCTION PHASING/SEQUENCING PLAN (IN ACCORDANCE WITH
SPECIFICATION SECTION 013216-10) WHICH COMPLIES WITH THE OPERATIONAL
AND ACCESS REQUIREMENTS INDICATED IN THESE PHASING PLANS AND
REQUIREMENTS OF THE CONTRACT DOCUMENTS. THE CONTRACTORS PHASING
PLAN MUST BE SPECIFIC AND INCLUDE ALL WORK REQUIRED INCLUDING
DEMOLITION, LOCATION & CONSTRUCTION OF TEMPORARY WALLS & BARRICADES,
UTILITY DOWN TIME, TEMPORARY UTILITY AS REQUIRED TO KEEP THE
COMMISSARY FACILITY OPERATIONAL AT ALL TIMES, AND WORK TO OCCUR
DURING NON-OPERATIONAL HOURS WITHIN THE COMMISSARY. COORDINATE THE
PRODUCTION OF THE CONTRACTOR'S PHASING PLAN WITH THE SPECIFIED
REQUIREMENTS FOR THE CONSTRUCTION PROGRESS MANAGEMENT SCHEDULE
WITH THE CONTRACTING OFFICER'S REPRESENTATIVE AND THE STORE
DIRECTOR.
9. THE CONTRACTOR'S PHASING PLAN MUST IDENTIFY MEASURES TO PROVIDE FOR
PUBLIC AND EMPLOYEE SAFETY AS WELL AS CONTRACTOR'S WORKFORCE
SAFETY. DIAGRAM HOW THE CONTRACTOR WILL MAINTAIN VEHICULAR
CIRCULATION, SERVICE CIRCULATION, AND PEDESTRIAN CIRCULATION
THROUGHOUT THE SITE DURING THE ENTIRE PROJECT. THE PLAN MUST SHOW
CUSTOMER ACCESS, SERVICE ACCESS AND EMERGENCY EGRESS DURING EACH
PHASE AND THROUGHOUT THE DURATION OF CONSTRUCTION.
10. NOTIFY THE GOVERNMENT AUTHORIZED TECHNICAL REPRESENTATIVE IN
WRITING UPON COMPLETION OF EACH PHASE. DO NOT PROCEED TO THE
SUBSEQUENT PHASE UNTIL THE WORK IS ACCEPTED BY THE GOVERNMENT.
PROVIDE REASONABLE TIME FOR THE COMMISSARY TO RELOCATE PRODUCT AND
GOVERNMENT EQUIPMENT WHEN MOVING IN AND OUT OF PHASES.
11. DO NOT BEGIN A SUBSEQUENT PHASE OF CONSTRUCTION UNTIL ALL WORK IN THE
PREVIOUS PHASE IS SUBSTANTIALLY COMPLETE AND TURNED OVER TO THE
COMMISSARY FOR USE.
12. DO NOT COMMENCE WORK IN ANY AREA UNTIL ALL MATERIALS, SUPPLIES AND
EQUIPMENT REQUIRED TO RETURN THAT AREA TO FULLY OPERATIONAL SERVICE
HAVE ARRIVED ON SITE AND ARE READILY AVAILABLE.
13. GOVERNMENT IS RESPONSIBLE FOR REMOVAL/RELOCATION OF MERCHANDISE
WITHIN EACH AREA OF WORK & WILL DO SO AFTER RECEIPT OF CONTRACTOR’S
WRITTEN NOTICE OF INTENT TO COMMENCE WORK. CONTRACTOR IS
RESPONSIBLE FOR REMOVAL/RELOCATION OF EXISTING EQUIPMENT AND
FURNITURE AS NEEDED TO COMPLETE WORK. PROTECT EQUIPMENT AND
MERCHANDISE IN AREAS OF WORK. EQUIPMENT AND FURNITURE THAT IS MOVED
IN ORDER TO COMPLETE WORK MUST BE RETURNED TO ITS ORIGINAL POSITION,
CLEANED, AND FULLY OPERATIONAL AT THE BEGINNING OF EACH BUSINESS DAY
UNLESS THAT AREA OF WORK IS DESIGNATED TO BE TEMPORARILY SHUT DOWN
OR RELOCATED DURING CONSTRUCTION. MAINTAIN IN OPERATION EXISTING
EQUIPMENT OUTSIDE AREAS OF WORK DURING CONSTRUCTION AND PROVIDE
TEMPORARY UTILITIES AND CONNECTIONS AS REQUIRED TO DO SO.
14. REMOVE DEBRIS AND TRASH FROM THE CONSTRUCTION WORK AREAS DAILY AND
PLACE INTO DUMPSTERS OR OTHER APPROVED CONTAINERS. IF TRASH MUST BE
HAULED WITHIN OPERATING AREAS, IT MUST BE IN APPROVED CLOSED
CONTAINERS.
15. MAINTAIN CLEAR PATHS THROUGH WORK AREAS FOR DELIVERY ACCESS TO
PROCESSING AND STAGING AREAS.
16. COMMISSARY SALES AND OPERATIONAL AREAS MUST BE CLEAN AND FREE OF
DEBRIS, DUST, DIRT, MUD, CONSTRUCTION MATERIALS, EQUIPMENT, ETC AT ALL
TIMES. IN INTERIOR CONSTRUCTION AREAS WHERE SIGNIFICANT DUST IS
GENERATED PROVIDE ACTIVE EXHAUST VENTILATION TO PROVIDE A NEGATIVE
AIR PRESSURE IN THE DUST AREA. PREVENT MIGRATION OF DUST TO OCCUPIED
AREAS OF THE BUILDING
17. THE CONTRACTOR MAY USE AREAS ON COMMISSARY PROPERTY FOR
CONSTRUCTION STAGING AND EQUIPMENT STORAGE AS SHOWN ON THE PLANS
AND WHERE DEEMED APPROPRIATE. THE LOCATION OF THESE AREAS MUST BE
APPROVED IN ADVANCE AND MUST COMPLY WITH ALL CONTRACT REGULATIONS
GOVERNING STAGING AND EQUIPMENT STORAGE AREAS (I.E.: FENCING, UTILITIES,
ACCESS HOURS, HAUL ROUTES, ETC.) AS PRESCRIBED BY THE GOVERNMENT
AUTHORIZED TECHNICAL REPRESENTATIVE. THE CONTRACTOR IS RESPONSIBLE
FOR THE SECURITY OF THESE AREAS THROUGHOUT THE DURATION OF THE
CONSTRUCTION. AFTER USE, RESTORE TO ORIGINAL CONDITION ANY
LANDSCAPING, PAVEMENT, FLOOR FINISHES, WHICH HAVE BEEN DAMAGED OR
ALTERED DURING CONSTRUCTION.
18. EACH STORE DEPARTMENT (MEAT, PRODUCE, DAIRY, FROZEN FOODS, DELI /
BAKERY) SHOULD LOSE NO MORE THAN 50% OF THEIR DISPLAY AT ANY TIME
UNLESS OTHERWISE APPROVED BY STORE DIRECTOR AND GOVERNMENT
AUTHORIZED TECHNICAL REPRESENTATIVE.
19. PROVIDE TEMPORARY COLD STORAGE TRAILERS AS REQUIRED DURING WORK IN
PROCESSING AREAS AND COLD STORAGE ROOMS. REFER TO GENERAL
DESCRIPTION OF WORK EACH PHASE FOR MINIMUM NUMBER OF TRAILERS
REQUIRED EACH PHASE.
20. THE CONTRACTOR IS RESPONSIBLE TO DETERMINE HOW TO TRANSFER NEW AND
EXISTING EQUIPMENT WHICH MAY OR MAY NOT FIT THROUGH EXISTING
OPENINGS. PROVIDE ANY TEMPORARY MODIFICATIONS NEEDED TO
ACCOMMODATE ALL EQUIPMENT.
21. CONTRACTOR SHALL MOVE, RELOCATE, AND RE-INSTALL LARGE (50 LBS OR
MORE) EXISTING TO REUSE PIECES OF EQUIPMENT INDICATED IN THE CONTRACT
DOCUMENTS. THIS INCLUDES MOVING THE EQUIPMENT OUT OF THE WORK AREA
SO THAT WORK MAY BE DONE, MOVING IT BACK TO ITS FINAL LOCATION AFTER
THE WORK IS COMPLETED, AND REINSTALLING THE TEMPORARY LOCATION FOR
THE EQUIPMENT WILL BE IDENTIFIED BY THE CONTRACTING OFFICER'S
REPRESENTATIVE. RE-INSTALLATION INCLUDES MAKING ALL UTILITY
CONNECTIONS REQUIRED BY EACH PIECE OF EQUIPMENT.
ARCHITECTURE, STRUCTURAL, MECHANICAL
/ELECTRICAL NOTES:
1. COORDINATE ALL WORK WITH THE ARCHITECTURE, STRUCTURAL, MECHANICAL,
AND ELECTRICAL PHASING NOTES AND DRAWINGS. MAINTAIN ALL UTILITIES IN
SERVICE AT ALL TIMES.
2. HEATING, COOLING, ELECTRICAL & PLUMBING UTILITY INTERRUPTIONS MUST BE
COORDINATED WITH THE STORE DIRECTOR AND SUBMITTED IN WRITING TO THE
GOVERNMENT AUTHORIZED TECHNICAL REPRESENTATIVE FOR REVIEW AND
APPROVAL A MINIMUM OF 2 WEEKS BEFORE WORK CAN BEGIN. RE-CONFIRM
UTILITY SERVICE DISRUPTIONS WITH THE STORE DIRECTOR A MINIMUM OF 24
HOURS PRIOR TO THE ACTUAL APPROVED OUTAGE.
3. TEMPORARY UTILITIES MUST BE INSTALLED, MAINTAINED, AND REMOVED BY THE
CONTRACTOR AT THE CONTRACTOR'S EXPENSE AND IN A MANNER SATISFACTORY
TO THE GOVERNMENT AUTHORIZED TECHNICAL REPRESENTATIVE. REMOVE
TEMPORARY UTILITIES AND CONNECTIONS PRIOR TO THE FINAL ACCEPTANCE OF
THE CONTRACT. THE GOVERNMENT WILL NOT BE HELD LIABLE FOR THE CONTRACT
DELAYS, DAMAGES, OR COST INCREASES INCURRED BY INTERRUPTIONS OF UTILITY
SERVICE.
4. HVAC SUPPLY AND RETURN AIR DUCTWORK CROSSING THROUGH OR TERMINATING
WITHIN A CONSTRUCTION AREA SHALL BE TEMPORARILY COVERED OR BLOCKED
OFF (AS APPROPRIATE) TO PREVENT CONSTRUCTION DUST AND DEBRIS FROM
ENTERING OTHER AREAS OF THE STORE.
5. PROVIDE POWER FOR CONTRACTOR SUPPLIED TEMPORARY REFRIGERATED
TRAILERS.
6. WHERE POSSIBLE, UNIT COOLER CHANGES ARE TO BE STAGED SO THAT NEW UNIT
COOLERS ARE RUNNING WHEN EXISTING UNIT COOLERS ARE SHUT DOWN. WHEN
STAGING IS NOT POSSIBLE, ADVANCE PREPARATION IS TO BE DONE TO KEEP DOWN
TIME TO A MINIMUM.
7. ENSURE ADEQUATE VENTILATION IS MAINTAINED IN ALL AREAS THROUGHOUT THE
PERIOD OF CONSTRUCTION, INCLUDING PROTECTION FROM NOXIOUS FUMES AND
VAPORS THAT MAY OCCUR DURING CONSTRUCTION.
8. IT IS ACKNOWLEDGED THAT IN SOME INSTANCES, WORK IS ONE PHASE REQUIRES
CONNECTIONS TO UTILITIES IN OTHER AREAS TO PROVIDE OPERATING SYSTEMS IN
CURRENT AREAS OF CONSTRUCTION.
NOTES REGARDING CONSTRUCTION BARRIERS:
1. PROVIDE A SOFT CONSTRUCTION BARRIER AT AREAS OF WORK WHICH CREATE
MINOR LEVELS OF DUST, DEBRIS, OFFENSIVE ODORS, AND OTHER ACTIONS WHICH
COULD BE DISRUPTIVE TO COMMISSARY OPERATION. SOFT CONSTRUCTION
BARRIER CONSISTS OF A 1600MM HIGH PLYWOOD BARRIER AND 6 MIL (MIN) POLY
CONSTRUCTION SHEETING TO THE CEILING. THE SOFT BARRIER IS TO BE
ADEQUATELY SUPPORTED AND COMPLETELY SEALED AT ALL SHEET JOINTS AND AT
THE FLOOR AND CEILING (OR ROOF DECK). WHERE CEILING HEIGHTS PROHIBIT
SEALING THE BARRIER TO THE CEILING, A CAP IS TO BE PROVIDED. DURING NON
OPERATIONAL STORE HOURS; SOFT BARRIERS MAY BE PLACED OUTSIDE OF LIMITS
OF CONSTRUCTION BARRIERS AS DESCRIBED ON THE PHASING PLANS AND
DIAGRAMS AND THEN TAKEN DOWN WITH THE AREA MADE CLEAN AND SAFE IN THE
MORNING PRIOR TO STORE OPERATING HOURS.
2. A PARTIAL HEIGHT CONSTRUCTION BARRIER MAY BE USED AS SAFETY BARRIER TO
AREAS OF WORK FOR SHORT PERIODS OF TIME (LESS THAN ONE WEEK) WHICH DO
NOT CREATE DUST, DEBRIS, OFFENSIVE ODORS OR EXCESSIVE NOISE. PARTIAL
HEIGHT BARRIERS WILL BE PLYWOOD 1600MM HIGH AND 6 MIL (MIN) POLY
CONSTRUCTION SHEETING AND MAY REMAIN IN PLACE DURING NORMAL STORE
OPERATING HOURS.
3. MAINTAIN ALL BARRIERS, FENCES, CONES, SCAFFOLDING, COVERED SCAFFOLDING
FOR OVERHEAD PROTECTION, SERVICE AND EGRESS ACCESS CORRIDORS
THROUGH WORK AREAS, TEMPORARY FIRE PROTECTION, ETC. IN GOOD CONDITION
FOR THE DURATION OF THE PROJECT.
4. PROVIDE TEMPORARY SIGNAGE TO DESIGNATE CONSTRUCTION AREAS, FOR
EXAMPLE "HARD HAT AREA"; "EMERGENCY EXIT"; AND NECESSARY SIGNAGE FOR
RE-ROUTING PATRONS AND EMPLOYEES AS REQUIRED BY THE GOVERNMENT
AUTHORIZED TECHNICAL REPRESENTATIVE.
5. PROVIDE ADA ACCESSIBLE PROTECTION BARRIERS OVER ANY EXPOSED OPENING
IN FLOOR.
6. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGES TO COMMISSARY FACILITY AND
PRODUCTS OCCURRING FROM INSUFFICIENT PROTECTION FROM WEATHER, DUST,
ETC.
7. OPENINGS THROUGH TEMPORARY CONSTRUCTION BARRIERS SHALL HAVE
LOCKABLE DOORS/GATES TO PREVENT UNAUTHORIZED PERSONS FROM ENTERING
CONSTRUCTION AREA.
8. ALL TEMPORARY ENCLOSURES AND BARRIERS SHALL FULLY COMPLY WITH THE
REQUIREMENTS OF SPECIFICATION SECTION 01 50 00 TEMPORARY CONSTRUCTION
FACILITIES AND CONTROLS.
9. COORDINATE ALL TEMPORARY CONSTRUCTION BARRIER TYPES AND LOCATIONS
AND GATE LOCATIONS WITH GOVERNMENT AUTHORIZED TECHNICAL
REPRESENTATIVE.
10. LOCATE VERTICAL FRAMING TO PREVENT INTERFERENCE WITH LIGHT FIXTURES.
11. SECURE PLYWOOD TO PARTITION FRAMING WITH SCREWS AT 300mm O.C. VERT.
12. REPAIR / REPLACE ANY DAMAGED FLOOR SLAB OR WALL FINISHES DUE TO
INSTALLATION OR REMOVAL OF TEMPORARY CONSTRUCTION BARRIERS.
13. ALL BARRIERS MUST BE PAINTED WHITE WHERE EXPOSED TO CUSTOMER AREAS.
14. REMOVE CONSTRUCTION BARRIERS ENCLOSING A PHASE ONCE PHASE WORK IS
COMPLETED.
EGRESS / LIFE SAFETY NOTES:
1. REQUIRED MEANS OF EGRESS MUST BE MAINTAINED AT ALL TIMES. TEMPORARY
CONSTRUCTION BARRIERS MUST ALLOW ACCESS TO EXISTING EXITS, CORRIDORS,
OCCUPIED SPACES, ETC. DURING NORMAL STORE HOURS. TEMPORARY EGRESS
CORRIDORS MUST MEET APPLICABLE CODES FOR EXIT SIGNAGE, EMERGENCY
LIGHTING, LIFE SAFETY SPEAKER / STROBES, FIRE EXTINGUISHER PLACEMENT,
SPRINKLERS, ETC. DO NOT CLOSE OR OBSTRUCT EXITS, CORRIDORS, OR ACCESS
TO OTHER OCCUPIED SPACES WITHOUT APPROVED WRITTEN PERMISSION FROM
GOVERNMENT AUTHORIZED TECHNICAL REPRESENTATIVE.
2. LIFE SAFETY SYSTEMS MUST REMAIN FULLY OPERATIONAL THROUGHOUT
DURATION OF CONSTRUCTION. ALL EXISTING SYSTEMS (FIRE ALARM, PULL
STATIONS, HORNS, STROBES, SPEAKERS, ETC) SHOULD BE EITHER RELOCATED OR
TEMPORARILY SUSPENDED FROM THE STRUCTURE AS REQUIRED. BEFORE
TEMPORARILY DISCONNECTING OR RELOCATING EXISTING FIRE ALARM EQUIPMENT
NOTIFY GOVERNMENT AUTHORIZED TECHNICAL REPRESENTATIVE.
3. PROVIDE TEMPORARY FIRE EXTINGUISHERS ON PORTABLE STANDS WHERE DOING
HOT WORK AND WHERE MOUNTED EXTINGUISHERS ARE NOT ACCESSIBLE.
OUTSIDE WORK
MECHANICAL ROOM
AND ROOF
COLD STORAGE
REFRIGERATION
REPLACEMENT
CRITICAL PATH SEQUENCE
NOTE:
THIS CHART IS NOT INTENDED TO CONVEY CONSTRUCTION DURATIONS, DURATIONS ARE TO BE DETERMINED BY
CONTRACTOR.
FLOATING WORK IS INTENDED TO BE COMPLETED IN AN ORDER CONDUCIVE TO CONSTRUCTION AND STORE
OPERATIONS.
STORE HOURS
SUNDAY: 1000 - 1900
MONDAY: 0900 - 2000
TUESDAY: 0900 - 2000
WEDNESDAY: 0900 - 2000
THURSDAY: 0900 - 2000
FRIDAY: 0900 - 2000
SATURDAY: 0900 - 2000
NOTE: SUPPLIERS STOCK AT NIGHT.
FLOATING
WORK
F1
SALES AREA
WORK
S1
R1
C1
SCALE:
N.T.S.
PARTIAL HEIGHT CONSTRUCTION BARRIER
O-101
SCALE:
N.T.S.
SOFT CONSTRUCTION BARRIER
O-101
C2 C3 C4 C5 C6
S2 S3 S4 S5 S6 S7 S8 S9 S10
C7
MECHANICAL SCOPE
OF WORK
M1
PHASING SEQUENCE CHART
R2
M2
SCALE:
N.T.S.
TEMPORARY INSULATED WALL PANEL
O-101
EIG
TEA & MMS
SB
20 21 23 25 27 29 31 33 35 36 1
SC
SE
SH
SJ
SK
SN
SP
SQ
ST
SU
SV
L
SW
SX
SY
2 3
20 22 24 26 28 30 32 34 36 1 2 3
SF
SL
SM
SR
HD
HD
SALES
AREA
PRODUCE
PROCESSING
MEAT/DELI
ALCOVE
VACUUM
PACK
MEATS &
POULTRY
AMBIENT
STORAGE
43B
PRODUCE
CHILLED
STORAGE
43A
PRODUCE
RECEIVING
FROZEN
FOOD
STORAGE
RECEIVING
AISLE
STAIR
WOMEN'S
LOCKERS
WOMEN'S
RESTROOMS
DAIRY
STORAGE
BREAKROOM
16B
JANITOR
CHASE
MEDICAL
FOOD
INSPECTOR
RECEIVING
MANAGER
RECEIVING
MEN'S
RESTROOM
MEN'S
LOCKERS
STAGING
AREA
DAMAGED
MERCHANDISE
VESTIBULE
21B
VESTIBULE
21A
PERISHABLE/
SEMI-PERISHABLE
87/88
COM ROOM
31B
TRAINING/
CONFERENCE
ADMIN
AREA
RECEPTIONIST/
SECRETARY
MANAGER
STORE
DIRECTOR
DELI
COOLER
BAKERY
COOLER
BAKERY
FREEZER
BREAKROOM
16A
STORE
ADMINISTRATOR
PRODUCE
ALCOVE
ENTRY
VESTIBULE
1A
CART
STORAGE
ENTRY
VESTIBULE
1B
EXIT
VESTIBULE
2A
CART
RETURN
VAULT
CASHIER
OFFICE
CHECKOUT
QUEUING
EXIT
VESTIBULE
2B
BAG
STORAGE
MEN'S
VESTIBULE
WOMEN'S
VESTIBULE
MECHANICAL
DELI PREP.
BAKERY
PREP.
74A
BAKERY
PREP.
74B
STORAGE
DELI
SERVICE
VESTIBULE
WOMEN'S
CUSTOMER
RESTROOM
MEN'S
CUSTOMER
RESTROOM
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
43A
43B
MECHANICAL
BAKERY/DELI
DISPLAY
PRODUCE
MANAGER
67A
DAIRY
DISPLAY
SALES
AREA
BAKERY
SERVICE
PRODUCE
ALCOVE
2G15
G
A
G
A
G
A
2P08
2P08
2P08
2P08
2P08
2P08
G
A
G
A
G
A
G
A
2P08
2P08
2P08
2P08
G
A
G
A
G
A
G
A
2P08
2P08
2P08
2P08
2P08
2P08
G
A
G
A
G
A
2G15A
G
A
2P08
2P08
2P08
2P08
G
A
PRODU
PROVIDE CONTRACTOR ACCESS
PROVIDE CONSTRUCTION
BARRIER
REMOVE REFRIGERATED
CABINET
TEMPORARILY RELOCATE
REFRIGERATED CABINET
TEMPORARILY RELOCATE
REFRIGERATED CABINET
TEMPORARILY RELOCATE
REFRIGERATED CABINET
GOVERNMENT
TEMPORARILY REMOVE
OR RELOCATE PRODUCE
DISPLAY TABLE TO
ALLOW CUSTOMER
ACCESS
GOVERNMENT
TEMPORARILY REMOVE
OR RELOCATE PRODUCE
DISPLAY TABLE TO
ALLOW CUSTOMER
ACCESS
GOVERNMENT
TEMPORARILY REMOVE
OR RELOCATE PRODUCE
DISPLAY TABLE TO
ALLOW CUSTOMER
ACCESS
GOVERNMENT
TEMPORARILY REMOVE
OR RELOCATE PRODUCE
DISPLAY TABLE TO
ALLOW CUSTOMER
ACCESS
REMOVE REFRIGERATED
CABINET
GOVERNMENT
TEMPORARILY REMOVE
OR RELOCATE PRODUCE
DISPLAY TABLE TO
ALLOW CUSTOMER
ACCESS
GOVERNMENT
TEMPORARILY REMOVE
OR RELOCATE PRODUCE
DISPLAY TABLE TO
ALLOW CUSTOMER
ACCESS
PRODUCE
ALCOVE
PRODU
PROVIDE CONTRACTOR ACCESS
PROVIDE CONSTRUCTION
BARRIER
PROVIDE REFRIGERATED CABINET
PROVIDE REFRIGERATED CABINET
PROVIDE REFRIGERATED CABINET
PROVIDE REFRIGERATED CABINET
PROVIDE REFRIGERATED CABINET
TEMPORARILY RELOCATED
EXISTING PRODUCE CABINETS.
PROVIDE TEMPORARY POWER,
REFRIGERATION LINE, AND ABOVE
GROUND TEMPORARY DRAINAGE.
REMOVE CABINETS WHEN PHASE
WORK IS COMPLETE.
PROVIDE TEMPORARY END PANEL
PROVIDE GYPSUM BOARD WALL
SH
SJ
SK
SN
SP
SQ
ST
SU
19 20
SH
SJ
SK
SN
SP
SQ
ST
SU
19 20
PRODUCE
PROCESSING
MEAT/DELI
ALCOVE
2G15A
G
2G15A
G
2G15A
G
2G15A
G
2G15A
G
2G15A
G
2G15A
G
2G15A
G
2P08
2P08
PRODUCE
MANAGER
PROVIDE CONTRACTOR ACCESS
PROVIDE CONSTRUCTION
BARRIER
REMOVE REFRIGERATED
CABINET
REMOVE REFRIGERATED
CABINET
REMOVE REFRIGERATED
CABINET
REMOVE REFRIGERATED
CABINET
REMOVE REFRIGERATED
CORNER CABINET
REMOVE ELECTRICAL
CONDUIT
PROVIDE CONSTRUCTION
BARRIER
REMOVE FLOOR TO PROVIDE
CONDENSATE LINE IN
TRENCH
REMOVE FLOOR AND
EXISTING CONDENSATE
LINE
ST
SU
SV
20 22 24 26 28 20 22 24 26 28
ST
SU
SV
PRODUCE
PROCESSING
MEAT/DELI
ALCOVE
2G15A
G
2G15A
G
2G15A
G
2G15A
G
2G15A
G
2G15A
G
2G15A
G
2G15A
G
2P08
2P08
PRODUCE
MANAGER
PROVIDE CONSTRUCTION
BARRIER
PROVIDE CONSTRUCTION
BARRIER
PROVIDE
REFRIGERATED
CABINET
PROVIDE REFRIGERATED
CABINET
PROVIDE
REFRIGERATED
CABINET
PROVIDE WALL
PARTITION, TYP. BOTH
SIDES
PROVIDE REFRIGERATED
CABINET
PROVIDE WALL CLOSURE
PROVIDE CONCRETE
TRENCH AND DRAIN LINE
PROVIDE WALL CLOSURE
PROVIDE CONTRACTOR ACCESS
PATCH AND REPAIR
FLOOR
13750 SAN PEDRO, SUITE 300
SAN ANTONIO, TEXAS 78232
210-224-2800 www.rsandh.com TX. CERT. No. F-3401
SCALE:
1:200
4 O-102
OVERALL REMODEL
PHASING PLAN
OVERALL REMODEL PHASING PLAN
800040000
SCALE: 1:200
PHASING LEGEND
LIMIT OF PHASING AREA
CONSTRUCTION BARRIER
PHASE SEQUENCE NUMBER
FLOATING WORK: WORK CAN BE PERFORMED
CONCURRENTLY WITH OTHER WORK
TEMPORARILY RELOCATED EQUIPMENT
FLOOR TO BE REMOVED
F#
O-102
PHASING NOTES:
PHASING NOTES DO NOT LIST ALL ITEMS OF WORK REQUIRED BY THE
CONSTRUCTION DOCUMENTS. THE INTENT OF THE NOTES AND PHASING
PLAN IS TO ALLOW THE CONTRACTOR TO SEPARATE AREAS OF
CONSTRUCTION TO WORK ON WHILE COMMISSARY IS IN OPERATION.
REFER TO CONSTRUCTION DOCUMENTS TO IDENTIFY WORK THAT IS
REQUIRED FOR A SPECIFIC AREA. EACH STORE DEPARTMENT (MEAT,
PRODUCE, DAIRY, FROZEN FOODS, DELI / BAKERY) SHOULD LOSE NO MORE
THAN 50% OF THEIR DISPLAY AT ANY TIME UNLESS OTHERWISE APPROVED
BY STORE DIRECTOR AND CONTRACTING OFFICER REPRESENTATIVE.
PHASE S1
- TEMPORARILY RELOCATE EXISTING REFRIGERATED CABINETS
IDENTIFIED TO BE REMOVED ON THIS PHASE. PROVIDE TEMPORARY
POWER AND REFRIGERATION LINE CONNECTION. PROVIDE ABOVE
GROUND TEMPORARY DRAINAGE.
- REMOVE CABINET CLOSURE PANELS ABOVE REFRIGERATED DISPLAY
CABINETS.
- PROVIDE NEW REFRIGERATED DISPLAY CABINETS AND CABINET
PROTECTION IDENTIFIED ON THIS PHASE.
- PROVIDE NEW DISTRIBUTION PANEL AND CONNECT CABINETS TO THIS
PANEL
- PROVIDE CABINET CLOSURE PANELS ABOVE REFRIGERATED
CABINETS.
- PROVIDE COLD WATER CONNECTIONS TO PRODUCE CASES FOR QUICK
CONNECTION WATER HOSES.
- REMOVE TEMPORARILY RELOCATED REFRIGERATED CABINETS.
- REMOVE ELECTRICAL CIRCUITS TO EXISTING RELOCATED CABINETS
AND REMOVE DISTRIBUTION PANEL ONCE ALL LOADS ARE
TRANSFERRED AND OPERATIONAL.
PHASE S2, S3, S5, S6, S7, S8
(CONTRACTOR IS TO PROVIDE CONSTRUCTION BARRIER FOR PHASE S5, S6,
AND S8)
- PROVIDE NEW DISTRIBUTION PANEL AND CONNECT CABINETS TO THIS
PANEL
- REMOVE EXISTING REFRIGERATED CABINETS IDENTIFIED TO BE
REMOVED ON THIS PHASE.
- REMOVE ELECTRICAL CIRCUITS TO EXISTING REMOVED CABINETS.
- REMOVE CABINET CLOSURE PANELS ABOVE REFRIGERATED DISPLAY
CABINETS.
- REMOVE THE EXISTING CONDENSATE DRAINS SERVING THE MEAT
CASES BACK TO WHERE THEY CONNECT INTO THE EXISTING STORM
DRAIN RISER. CAP AND SEAL THE CONNECTION TO THE STORM DRAIN
RISER.
- PROVIDE NEW REFRIGERATED DISPLAY CABINETS AND CABINET
PROTECTION IDENTIFIED ON THIS PHASE.
- PROVIDE ELECTRICAL CIRCUITS TO NEW CABINET AND REMOVE
DISTRIBUTION PANEL ONCE ALL LOADS ARE TRANSFERRED AND
OPERATIONAL
- PROVIDE CABINET CLOSURE PANELS ABOVE REFRIGERATED
CABINETS.
- PROVIDE WALL, BASE AND ADDITIONAL WORK IDENTIFIED ON THIS
AREA FOR THIS PHASE.
- FURNISH AND INSTALL NEW CONDENSATE PIPING SERVING THE NEW
MEAT CASES. ROUTE THE PIPING WITHIN THE NEW FLOOR TRENCHES
AND CONNECT INTO THE EXISTING SANITARY DRAINAGE PIPING.
PHASE S4
- PROVIDE TEMPORARY INSULATED WALL PANEL ON EXISTING DAIRY
COLD STORAGE.
- REMOVE EXISTING DAIRY DOORS, CARTS, CART RAIL SYSTEM,
SHELVING AND SHELVING FRAME SYSTEM.
- REMOVE PRE-FINISHED INSULATED PANELS IDENTIFIED ON THIS
PHASE.
- PLUG, CAP, AND SEAL THE SIX (6) EXISTING CONDENSATE DRAIN
RECEPTORS IN THE FLOOR NEAR THE FRONT OF THE DAIRY COOLER.
- PROVIDE PRE-FINISHED INSULATED PANELS IDENTIFIED ON THIS
PHASE.
- PROVIDE DAIRY DOORS, CARTS AND CART RAIL SYSTEM.
PHASE S9
- REMOVE EXISTING EQUIPMENT IDENTIFIED TO BE REMOVED ON THIS
PHASE.
- REMOVE PARTIAL HEIGHT STAINLESS STEEL WALL AND DESK.
- REMOVE CEILING (BID OPTION 2) AND OTHER ITEMS IDENTIFIED ON
THIS PHASE.
- TEMPORARILY REMOVE ANY AIR DEVICES, LIGHT FIXTURES, AND
CEILING MOUNTED DEVICES IN CEILINGS BEING REPLACED AS PART OF
THE WORK (BID OPTION 2)
- PROVIDE NEW HEATED DISPLAY CABINETS AND CABINET WORK
IDENTIFIED ON THIS PHASE.
- PROVIDE POWER TO NEW HEATED DISPLAYS
- PROVIDE WALL, BASE, WALL FINISH, TRAFFIC DOOR AND CEILING AND
ADDITIONAL WORK IDENTIFIED ON THIS AREA FOR THIS PHASE.
- PROVIDE CEILING (BID OPTION 2)
- THOROUGHLY CLEAN AND REINSTALL ANY AIR DEVICES, LIGHT
FIXTURES, AND CEILING MOUNTED DEVICES THAT WERE REMOVED TO
ACCOMMODATE CEILING REPLACEMENT (BID OPTION 2)
PHASE S10
(WORK FOR PHASE S10 TO BE DONE DURING NON BUSINESS HOURS)
- REMOVE EXISTING REFRIGERATED CABINETS IDENTIFIED TO BE
REMOVED ON THIS PHASE.
- REMOVE EXISTING FIXED COUNTER AND CABINETS IDENTIFIED OF THIS
PHASE.
- PROVIDE NEW REFRIGERATED DISPLAY CABINETS AND CABINET
PROTECTION IDENTIFIED ON THIS PHASE.
PHASE C1, C2, C3, C4, C5, C6, C7
(PROVIDE UP TO 6 TEMPORARY REFRIGERATED OR FROZEN TRAILER IF
WORK CANNOT BE PHASED WITHIN EACH ROOM)
- INSTALL NEW DISTRIBUTION BOARD TO SERVICE EQUIPMENT
- REMOVE UNIT COOLER IDENTIFIED ON THIS PHASE.
- REMOVE ELECTRICAL CIRCUITS TO EACH UNIT
- PROVIDE NEW UNIT COOLERS ON ROOMS IDENTIFIED ON THIS PHASE.
- PROVIDE AIR CURTAIN IDENTIFIED ON THIS PHASE. FROZEN FOOD
STORAGE ROOM 66.
- REMOVE PLASTIC CURTAIN IDENTIFIED ON THIS PHASE. IF APPLICABLE.
- PROVIDE TRAFFIC DOOR IDENTIFIED ON THIS PHASE. IF APPLICABLE.
- REMOVE INSULATED SLIDING DOOR IDENTIFIED ON THIS PHASE. IF
APPLICABLE.
- PROVIDE INSULATED SLIDING DOOR IDENTIFIED ON THIS PHASE. IF
APPLICABLE.
- PATCH EXISTING HOLES LEFT BY REMOVAL OF EXISTING HVAC SUPPLY
DIFFUSER. IF APPLICABLE.
- RECONNECT CIRCUIT TO NEW DISTRIBUTION BOARD
- REMOVE EXISTING DISTRIBUTION BOARD BACK TO SOURCE AFTER ALL
LOADS HAVE BEEN REPLACED OR TRANSFERRED TO THE NEW BOARD
PHASE R1
- REMOVE EXISTING GYPSUM BOARD STUD PARTITION.
- TEMPORARILY REMOVE EXTERIOR LOUVERS.
- REMOVE THE EXISTING DOMESTIC COLD WATER STORAGE TANK FROM
THE MEZZANINE, INCLUDING THE SUPPORT STRUCTURE AND
CONCRETE PEDESTALS.
- REMOVE THE EXISTING DOMESTIC HOT WATER GENERATORS
(CALORIFIERS).
- REMOVE EXISTING CONCRETE PADS.
- PROVIDE NEW CONCRETE PADS FOR GAS COOLERS.
- INSTALL GAS COOLERS GS-1 AND GS-2.
- INSTALL CO2 COMPRESSOR SYSTEM CS-1 AND CS-2.
- INSTALL REFRIGERATION ELECTRICAL PANELS. PROVIDE TEMPORARY
GENERATOR POWER DURING TAPPING OF EXISTING CIRCUIT.
- FURNISH AND INSTALL NEW DOMESTIC COLD WATER SUPPLY PIPING
TO RECONNECT PIPING THAT WAS PREVIOUSLY CONNECTED TO THE
STORAGE TANK.
- FURNISH AND INSTALL A NEW DOMESTIC HOT WATER GENERATOR
(CALORIFIER) AND RECONNECT THE EXISTING PIPING.
PHASE R2
- REMOVE EXISTING REFRIGERATION CONDENSER FROM ROOF.
- REMOVE EXISTING REFRIGERATION SWITCHGEAR AND REMOVE TAP
CONNECTION TO THIS GEAR. PROVIDE TEMPORARY GENERATOR
DURING TRANSITION.
PHASE M1
NOTE: ALL WORK INVOLVING AIR HANDLER DEMOLITION MUST OCCUR
DURING SPRING, SUMMER, OR FALL MONTHS ONLY, UNLESS NOTED
OTHERWISE.
- DEMOLISH EXISTING HVAC COOLING PACK REFRIGERATION MACHINE
FROM MECHANICAL MEZZANINE (MAY OCCUR DURING ANY SEASON)
- REMOVE CIRCUIT AND ASSOCIATED EQUIPMENT FOR HVAC COOLING
RACK BACK TO SOURCE
- DEMOLISH EXISTING REMOTE CONDENSER SERVING AHU-2 IN
MECHANICAL YARD ADJACENT TO MECHANICAL MEZZANINE ON ROOF
(MAY OCCUR DURING ANY SEASON)
- REMOVE CIRCUIT AND ASSOCIATED EQUIPMENT FOR CONDENSER
BACK TO SOURCE
- DEMOLISH EXISTING REFRIGERANT PIPING BETWEEN AHU-2, HVAC
COOLING PACK REFRIGERATION MACHINE, AND HVAC REMOTE
CONDENSER (MAY OCCUR DURING ANY SEASON)
- DEMOLISH EXISTING AIR HANDLER UNIT (AHU-2) FROM MECHANICAL
MEZZANINE
- DEMOLISH EXISTING RETURN AIR FAN SERVING AHU-2 FROM
MECHANICAL MEZZANINE
- DEMOLISH EXISTING DUCTWORK AND HEATING WATER PIPING AS
REQUIRED TO ACCOMMODATE NEW WORK
- REMOVE ALL CONDUIT AND CONDUCTORS TO AHU-2, CONDENSER,
RETURN AIR FAN INCLUDING ALL ASSOCIATED CONTROL EQUIPMENT.
PHASE M2
- FURNISH AND INSTALL NEW AIR HANDLING UNIT (AHU-2) IN
MECHANICAL MEZZANINE
- PROVIDE NEW CIRCUIT TO AHU-2. MODIFY FUSE OR BREAKER
SETTINGS AS REQUIRED BY NEW UNIT.
- FURNISH AND INSTALL NEW ENERGY RECOVERY UNIT (ERU) IN
MECHANICAL MEZZANINE
- PROVIDE NEW CIRCUIT TO NEW ERU. PROVIDE MODIFICATION TO
EXISTING DISTRIBUTION BOARD FOR UNIT PROVIDED.
- FURNISH AND INSTALL NEW CO2 REFRIGERANT PIPING BETWEEN
AHU-2 AND REFRIGERATION SYSTEM.
- FURNISH AND INSTALL NEW DUCTWORK AS REQUIRED TO CONNECT
NEW EQUIPMENT TO EXISTING DUCTWORK
- FURNISH AND INSTALL NEW HEATING WATER PIPING TO NEW HVAC
EQUIPMENT
- FURNISH AND INSTALL NEW HEATING WATER PIPING FROM EXISTING
MAIN HEATING WATER PIPING LOOP IN BOILER ROOM TO NEW
REFRIGERANT HEAT RECLAIM HEAT EXCHANGER
- PROVIDE MOISTURE RESISTANT GYPSUM BOARD STUD WALL.
- PROVIDE DUCT CLEANING SERVICES FOR THE ENTIRE AHU-2 SYSTEM,
TO INCLUDE ALL SUPPLY AIR DUCTWORK, RETURN AIR
TUNNELS/SHAFT, AND AIR DEVICES (BID OPTION 3)
FLOATING WORK F1
- REMOVE THE AIR DEVICES AND CAP THE ASSOCIATED BRANCH DUCTS
IN PRODUCE PROCESSING 44
- REMOVE LIGHT FIXTURES AND RETAIN CIRCUIT FOR RECONNECTION
(BID OPTION 1)
- ADDITION OF ELECTRICAL METERS
SCALE:
1:100
PHASING S1 - DEMOLITION
O-102
400020000
SCALE: 1:100
SCALE:
1:100
PHASING S1 - REMODEL
O-102
400020000
SCALE: 1:100
SCALE:
1:100
PHASING S2 - DEMOLITION
O-102
400020000
SCALE: 1:100
SCALE:
1:100
PHASING S2 - REMODEL
O-102
400020000
SCALE: 1:100
EIG
BOILER ROOM
SWITCH GEAR
MAIN PLANT ROOM
STORE
ESCAPE
BOILER ROOM
SWITCH GEAR
MAIN PLANT ROOM
STORE
ESCAPE
BOILER ROOM
SWITCH GEAR
MAIN PLANT ROOM
STORE
ESCAPE
BOILER ROOM
SWITCH GEAR
MAIN PLANT ROOM
STORE
ESCAPE
SU
SV
L
SW
20 22 24 26 28 30 32 34 36 1
20 22 24 26 28 30 32 34 36 1
SU
SV
L
SW
MEAT/DELI
ALCOVE
CHASE
G
2G15A
G
2G15A
G
2G15A
G
2G15A
G
2G15A2G15A
G
2G15A
G
2G15A
G
2G15A
G
F
C O
F F
I N
SC REF
COFFIN
PROVIDE CONTRACTOR ACCESS
PROVIDE CONSTRUCTION
BARRIER
REMOVE REFRIGERATED
CABINET
REMOVE REFRIGERATED
CORNER CABINET
REMOVE REFRIGERATED
CABINET
REMOVE REFRIGERATED
CABINET
PROVIDE CONSTRUCTION
BARRIER
REMOVE FLOOR TO PROVIDE
CONDENSATE LINE IN TRENCH
22 24 26 28 30
ST
SU
SV
ST
SU
SV
22 24 26 28 30
MEAT/DELI
ALCOVE
CHASE
G
2G15A
G
2G15A
G
2G15A
G
2G15A
G
2G15A2G15A
G
2G15A
G
2G15A
G
2G15A
G
F
C O
F F
I N
SC REF
COFFIN
PROVIDE REFRIGERATED
CABINET
PROVIDE CONSTRUCTION
BARRIER
PROVIDE REFRIGERATED
CABINET
PROVIDE REFRIGERATED
CABINET
PROVIDE CONTRACTOR ACCESS
PROVIDE CONSTRUCTION
BARRIER
PROVIDE TRENCH FOR
DRAIN LINE
PROVIDE WALL CLOSURE PROVIDE WALL CLOSURE
VES
2G16
F
C O
F F
I N
SC REF
COFFIN
DAIRY
DISPLAY
SALES
AREA
67A
PROVIDE INSULATED
CONSTRUCTION BARRIER,
SEE 4/O-101.
REMOVE DISPLAY DOOR
PROVIDE CONTRACTOR ACCESS
PROVIDE CONSTRUCTION
BARRIER
REMOVE SHELVING
REMOVE DOORS AND
FRAMES
SU
32 34 36 1
J
H
HD
STORAGE
DELI
SERVICE
VESTIBULE
RESTROOM
1D11A
1D10B w/Hood
1B28
2D01
SC REF
CABINET
S/S
Sink
HAND SINK
OVEN
1D09
BAKERY/DELI
DISPLAY
4TFP-6
SC REF
CABINET
BAKERY
SERVICE
GOVERNMENT TO
REMOVE EQUIPMENT
REMOVE FIXED TABLE
PROVIDE CONTRACTOR ACCESS
PROVIDE CONSTRUCTION
BARRIER
PROVIDE CONSTRUCTION
BARRIER
REMOVE WALL
GOVERNMENT TO
REMOVE DRY GONDOLA
REMOVE PARTIAL HEIGHT
STAINLESS STEEL WALLS
SF
31 33 35
SF
HD
STORAGE
DELI
SERVICE
VESTIBULE
RESTROOM
1D11A
1D10B w/Hood
1B28
2D01
SC REF
CABINET
S/S
Sink
HAND SINK
OVEN
1D09
BAKERY/DELI
DISPLAY
4TFP-6
SC REF
CABINET
BAKERY
SERVICE
PROVIDE CONTRACTOR ACCESS
PROVIDE CONSTRUCTION
BARRIER
PROVIDE CONSTRUCTION
BARRIER
PROVIDE HOT DISPLAY
CABINET
PROVIDE COUNTER
PROVIDE INTERIOR WALL
PROVIDE DOOR
PROVIDE EQUIPMENT
PROVIDE
FLOORING AS
SCHEDULED
GOVERNMENT TO PROVIDE
AND INSTALL EQUIPMENT
31 33 35
VES
2G16
F
C O
F F
I N
SC REF
COFFIN
DAIRY
DISPLAY
SALES
AREA
67A
PROVIDE DISPLAY DOOR
PROVIDE PRE-INSULATED
PANEL WALL AND
CEILING
PROVIDE CONTRACTOR ACCESS
PROVIDE CONSTRUCTION
BARRIER
PROVIDE PRE-INSULATED
PANEL WALL
PROVIDE INSULATED
CONSTRUCTION BARRIER,
SEE 4/O-101.
J
H
32 34 36 1
SU
VESTIBULE
21B
VESTIBULE
21A
SALES
AREA
REMOVE
REFRIGERATED
CABINET
REMOVE
REFRIGERATED
CABINET
REMOVE
REFRIGERATED
CABINET
REMOVE
REFRIGERATED
CABINET
REMOVE
REFRIGERATED
CABINET
REMOVE
REFRIGERATED
CABINET
REMOVE
REFRIGERATED
CABINET
REMOVE
CART RAIL
PROTECTION
SYSTEM. PATCH
AND REPAIR
EXISTING
TERRAZO FLOOR.
PROVIDE
CONTRACTOR
ACCESS
PROVIDE
CONSTRUCTION
BARRIER
PROVIDE
CONTRACTOR
ACCESS
REMOVE
EXISTING
PARTITION
REMOVE
REFRIGERATED
CABINET
VESTIBULE
21B
VESTIBULE
21A
SALES
AREA
PROVIDE
REFRIGERATED
CABINET
PROVIDE
REFRIGERATED
CABINET
PROVIDE
REFRIGERATED
CABINET
PROVIDE
REFRIGERATED
CABINET
PROVIDE
REFRIGERATED
CABINET
PROVIDE
CONTRACTOR
ACCESS
PROVIDE
CONTRACTOR
ACCESS
PROVIDE
CONSTRUCTION
BARRIER
PROVIDE
STAINLESS
STEEL CORNER
GUARD, TYP
PROVIDE
STAINLESS
STEEL CORNER
GUARD, TYP
PROVIDE
REFRIGERATED
CABINET
PROVIDE
REFRIGERATED
CABINET
PROVIDE
REFRIGERATED
CABINET
SJ
SN
SP
SL
SR
H
G
F
E
D
SM
35 36 1
SN
SP
SJ
35 36 1
H
G
F
E
D
SR
SL
SM
13750 SAN PEDRO, SUITE 300
SAN ANTONIO, TEXAS 78232
210-224-2800 www.rsandh.com TX. CERT. No. F-3401
SCALE:
1:100
5 O-103
MEZZANINE DEMOLITION PHASING PLANS
400020000
SCALE: 1:100
MEZZANINE PHASING PLAN
& PHASES
O-103
SCALE:
1:100
MEZZANINE REMODEL PHASING PLANS
400020000
SCALE: 1:100
O-103
SCALE:
1:100
PHASE S3 - DEMOLITION
400020000
SCALE: 1:100
O-103
SCALE:
1:100
PHASE S3 - REMODEL
400020000
SCALE: 1:100
O-103
SCALE:
1:100
PHASE S4 - DEMOLITION
400020000
SCALE: 1:100
O-103
SCALE:
1:100
PHASE S4 - REMODEL
400020000
SCALE: 1:100
O-103
SCALE:
1:100
PHASE S9 - DEMOLITION
400020000
SCALE: 1:100
O-103
SCALE:
1:100
PHASE S9 - REMODEL
400020000
SCALE: 1:100
O-103
SCALE:
1:100
PHASE S7 - DEMOLITION
400020000
SCALE: 1:100
O-103
SCALE:
1:100
PHASE S7 - REMODEL
400020000
SCALE: 1:100
O-103
EIG
TEA & MMS
JJH
PHASING LEGEND
LIMIT OF PHASING AREA
CONSTRUCTION BARRIER
PHASE SEQUENCE NUMBER
FLOATING WORK: WORK CAN BE PERFORMED
CONCURRENTLY WITH OTHER WORK
TEMPORARILY RELOCATED EQUIPMENT
FLOOR TO BE REMOVED
F#
13750 SAN PEDRO, SUITE 300
SAN ANTONIO, TEXAS 78232
210-224-2800 www.rsandh.com TX. CERT. No. F-3401
536 A-001
ARCHITECTURAL LEGEND &
GENERAL NOTES
ARCHITECTURAL ABBREVIATIONS
ABBREVIATION DESCRIPTION
A
& AND
@ AT
# POUND, NUMBER
° DEGREE
ABV ABOVE
A/C AIR CONDITIONING
ACOUST ACOUSTICAL CEILING TILE ACOUSTICAL
ACM ASBESTOS CONTAINING MATERIAL
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES
ACT ADDENDUM
ADD ADDENDUM
ADDL ADDITIONAL
ADJ ADJACENT
ADJ ADJUSTABLE
ADMIN ADMINISTRATION
AFF ABOVE FINISHED FLOOR
AGG,AGGR AGGREGATE
AHU AIR HANDLER UNIT
ALT ALTERNATE
ALUM ALUMINUM
AMEND AMENDMENT
ANOD ANODIZED
ANUN ANUNCIATOR
AP ACCESS PANEL
APROX APPROXIMATE
ARCH ARCHITECT(URAL)
ASPH ASPHALT
AUTO AUTOMATIC
AVG AVERAGE
AWN, AWNG AWNING
AWP ACOUSTICAL WALL PANELS
AWT ACOUSTICAL WALL TREATMENT
B
BD BOARD
BG BUMPER GUARD
BIT BITUMINUOUS
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BLT BOLT
BM BEAM
BOT,BOTT BOTTOM
BR BRICK
BRG,BRNG BEARING
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BULL BULLETIN
BUR BUILT-UP ROOF
BW BOTH WAYS
C
CAB CABINET
CEN, CTR CENTER
CFCI CONTRACTOR FURNISHED
CONTRACTOR INSTALLED
CG CORNER GUARD
CH COAT HOOK
CHAM CHAMFER
CIR CIRCLE
CJ CONTROL JOINT
CL, ℄ CENTER LINE
CLG CEILING
CLO CLOSET
CLR CLEAR(ANCE)
CM CENTIMETER
CMU CONCRETE MASONRY UNIT
CNTR COUNTER
COL COLUMN
COMM COMMUNICATIONS
COMP COMPRESS(IBLE), (ION), (ED)
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
COORD COORDINATE
CORR CORRIDOR
CPT CARPET
CRS COURSE
CSK COUNTERSINK
CSMT CASEMENT
CT CERAMIC TILE
CTD, CTR CENTERED, CENTER
CTRK CURTAIN TRACK
CTSK COUNTERSUNK
CU FT CUBIC FOOT
CUST CUSTODIAN
CW COLD WATER
CW CURTAIN WALL
PROJECT PHASING
THIS IS A PHASED PROJECT. DEMOLITION AND NEW WORK SHALL OCCUR IN PHASES AS DEFINED BY THE PHASING PLANS.
ABBREVIATION DESCRIPTION
D
D DEPTH
DBL DOUBLE
DEMO DEMOLITION
DH DOUBLE HUNG
DIA DIAMETER
DIM DIMENSION
DISP DISPENSER
DF DRINKING FOUNTAIN
DN DOWN
DP DEEP
DR DOOR
DS DOWNSPOUT
DTL, DET DETAIL
DWG, DWGS DRAWING, DRAWINGS
E
E EAST
EA EACH
EDF ELECTRIC DRINKING FOUNTAIN
EF EACH FACE
EIFS EXTERIOR INSULATION & FINISH
SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC, ELECT ELECTRICAL
ELEV ELEVATOR
EQ EQUAL
EQF EPOXY QUARTZ
EQIUP EQUIPMENT
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
F
F FLUSH
FA FIRE ALARM
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FG FULL GLASS
FHC FIRE HOSE CABINET
FIN FINISH(ED)
FIX FIXTURE
FL, FLR FLOOR
FLASH FLASHING
FLEX FLEXIBLE
FLR FLOOR
FLUOR FLUORESCENT
FO FACE OF
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FP FIRE PROOFING
FR FIRE RATED
FS FLOOR SINK
FT FOOT, FEET
FURR FURRING
FV FIELD VERIFY
G
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GB GRADE BEAM
GC GENERAL CONTRACTOR
GD GRADE
GEN GENERAL
GFCI GOVERNMENT FURNISHED
CONTRACTOR INSTALLED
GFGI GOVERNMENT FURNISHED
GOVERNMENT INSTALLED
GI GALVANIZED IRON
GL GLASS
GT, GRD GRADE
GYP GYPSUM
GWB, GYP BD GYPSUM WALLBOARD
H
H HEIGHT
HB HOSE BIB
HC HOLLOW CORE
HC, HDCP HANDICAPPED, HOLLOW CORE
HD HAND DRYER
HD HEAD, HEAVY DUTY
HDW, HDWR HARDWARE
HDWD, HWD HARDWOOD
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HIGH POINT
HR HOUR
HT, HGT HEIGHT
HTG HEATING
HTR HEATER
HVAC HEATING, VENTILATING, & AIR
CONDITIONING
HW HOT WATER
ABBREVIATION DESCRIPTION
I
IBC INTERNATIONAL BUILDING
CODE
IC INTERCOM
ID INSIDE DIAMETER
ILLUS IN ILLUSTRATE(D), ILLUSTRATING
INCH, INCHES
INCL INFO INCULDE(D), INCLUDING
INFORMATION
INSUL INSULATION
INT INTERIOR
J
JAN JANITOR
JT JOINT
JB JUNCTION
JST BOX
JT JOIST
JOINT
K
KO KNOCK-OUT
L
LAM LAMINATE
LAV LAVATORY
LB(S) POUND(S)
LF LINEAR FEET
LP LOW POINT
LIB LIBRARY
LKR(S) LOCKER(S)
LOC LOCATION
LT LIGHT
LVR LOUVER
M
MAS MASONRY
MAT, MATL MATERIAL
MAX MAXIMUM
MB, MKBD MARKER BOARD
MECH MECHANICAL
MEMB MEMBRANE
MEP MECHANICAL/ELECTRICAL/
PLUMBING
MEZZ MEZZANINE
MFG, MFGR MANUFACTURING
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTD MOUNTED
MTL, MET METAL
MULL MULLION
N
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NL NARROW LIGHT
NO NUMBER
NOM NOMINAL
NR NOT RATED
NRC NOISE REDUCTION COEFFICIENT
NTS NOT TO SCALE
O
OA OVER ALL
OA OUTSIDE AIR
OC ON CENTER
OD OUTSIDE DIAMETER
OD OVERFLOW DRAIN
OH OVERHEAD, OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
P
P, PT, PTD PAINT, PAINTED
PART PARTITION
PB PUSH BUTTON
PL,⅊ PLATE
PLA PLASTIC
PLAM PLASTIC LAMINATE
PLAS PALSTIC
PLS PLASTER
PLYWD PLYWOOD
PNL PANE
PR PAIR
PROJ PROJECTION
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PVC POLYVINYL CHLORIDE
Q
QT QUARRY TILE
ABBREVIATION DESCRIPTION
R
R RADIUS
R RISER
RA, R/A RETURN AIR
RAD RADIUS
RB RUBBER
RD ROOF DRAIN
RE, REF REFERENCE
REINF REINFORCED, REINFORCING
REQD REQUIRED
REBAR REINFORCING BAR
RES RESILIENT
RET RETAINING
REV REVISED
RH RIGHT HAND
RH ROOF HATCH
RM ROOM
RO ROUGH OPENING
RTU ROOF TOP UNIT
S
S SOUTH
SCHED SCHEDULE
SD SMOKE DETECTOR
SEC, SECT SECTION
SF SQUARE FEET
SH SINGLE HUNG
SHLF SHELF
SHLV SHELVES, SHELVING
SHT SHEET
SHW, SHWR SHOWER
SPEC SPECIFICATIONS
SQ SQUARE
SS STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STANDARD
STD STEEL
STL STORAGE
STO, STOR STRUCT STRUCTURE
SUSP SUSPENDED
SVF SHEET VINYL FLOORING
SYS SYSTEM
T
T TREAD
TB, TKBD TACKBOARD
TC TIME CLOCK
TEL TELEPHONE
TERR TERRAZZO
THR THRESHOLD
THK THICK(NESS)
TLT TOILET
TOB TOP OF WOOD BLOCKING
TOC TOP OF CURB ELEVATION
TOM TOP OF MASONRY
TOS TOP OF SLAB, TOP OF STEEL
TOW TOP OF WALL
T/R TOILET ROOM
TYP TYPICAL
U
UBC UNIFIED BUILDING CODE
UL UNDERWRITER'S LABORATORIES
UNO UNLESS NOTED OTHERWISE
UR UTL URINAL UTILITY
V
V, VT VENT
VCT VINYL COMPOSITE TILE
VEND VENDING
VERT VERTICAL
VEST VESTIBULE
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
W
W WEST, WIDTH
W/ WIDE WITH
WC WATER CLOSET
WD WOOD
WDW WINDOW
WH WATER HEATER
WP WEATHERPROOFING
WS WEATHERSTRIP
WT WEIGHT
WW WATER WELL
WWF WELDED WIRE FABRIC
Y
YD YARD
ARCHITECTURAL DEMOLITION LEGEND
SYMBOL DESCRIPTION
KEY NOTE
EXISTING CONSTRUCTION OR ITEMS TO REMAIN
ITEM TO BE DEMOLISHED OR RELOCATED, SEE SPECIFIC
DEMOLITION NOTES
ROOM NUMBER. SEE ROOM LEGEND
ARCHITECTURAL CEILING PLAN LEGEND
SYMBOL DESCRIPTION
EXISTING PRE-MANUFACTURED COOLER/FREEZER CEILING PANELS.
EXISTING SUSPENDED 610X610 ACOUSTICAL CEILING TILE
EXISTING RIGID GYP BD CEILING PANELS
SUSPENDED ACOUSTICAL PANEL CEILING
PREFABRICATED INSULATED CEILING PANELS
GYPSUM BOARD CEILING PANELS
SUSPENDED MOISTURE RESISTANT GYPSUM BOARD CEILING
ACCESS PANELS
ARCHITECTURAL DEMOLITION CEILING PLAN LEGEND
SYMBOL DESCRIPTION
EXISTING PRE-MANUFACTURED COOLER/FREEZER CEILING PANELS TO REMAIN.
SUSPENDED 610X610 ACOUSTICAL CEILING TILE TO REMAIN.
RIGID GYP BD CEILING PANELS TO REMAIN.
AREA TO BE DEMOLISHED
XX
XX
A-505
IDENTIFICATION
NUMBER
SHEET
NUMBER
ARCHITECTURAL LEGEND
SYMBOL DESCRIPTION
NORTH ARROW
DETAIL/SECTION CALL OUT
DOOR SYMBOL
WALL TYPE, SEE A-102
MATCHLINE
TOILET ACCESSORY
FIRE EXTINGUISHER
KEY NOTE
EXISTING CONSTRUCTION OR ITEMS TO REMAIN
NEW ITEMS, SEE SPECIFIC NEW WORK NOTES
ROOM NUMBER, SEE ROOM LEGEND
A
20-1
TA-1
FE
ELECTRICAL/ LIGHTING SYMBOLS, TYP.
- REFER TO ELECTRICAL DRAWINGS
FOR MORE INFORMATION
HVAC/ MECHANICAL SYMBOLS, REFER
TO MECHANICAL DRAWINGS FOR
MORE INFORMATION
FIRE PROTECTION SYMBOLS, REFER
TO FIRE PROTECTION DRAWINGS FOR
MORE INFORMATION
GENERAL DESCRIPTION OF WORK:
THE ARCHITECTURAL SCOPE OF WORK INVOLVES WORK ASSOCIATED WITH
REPLACEMENT OF THE REFRIGERATION EQUIPMENT. THIS INCLUDES, BUT IS NOT
LIMITED TO:
1. REPLACEMENT OF REFRIGERATION SYSTEM AND REPLACEMENT OF
REFRIGERATED CABINETS
2. REPLACEMENT OF THE DAIRY DOORS AND CART RAIL
3. REPLACEMENT OF THE HVAC FOR THE SALES AREA
4. RENOVATION OF AN AREA NEXT TO THE BAKERY/DELI BY ADDING HEATED DISPLAY
CABINETS. ADD CEILING TILE TO THE AREA (BID OPTION 2).
5. ADD A TRAFFIC DOOR AND AN INSULATED SLIDING DOOR BY THE PRODUCE
CHILLED STORAGE.
6. REPLACE LED LIGHT FIXTURES IN ALL COLD STORAGE ROOM (BID OPTION 1)
NOTE: THIS IS ONLY A GENERAL DESCRIPTION OF WORK AND IS NOT INTENDED TO
DESCRIBE ALL WORK TO BE DONE. PLEASE REFER TO ALL DRAWINGS AND
SPECIFICATIONS FOR ENTIRE ARCHITECTURAL SCOPE.
ELECTRICAL/ LIGHTING SYMBOLS, TYP.
- REFER TO ELECTRICAL DRAWINGS
FOR MORE INFORMATION
HVAC/ MECHANICAL SYMBOLS, REFER
TO MECHANICAL DRAWINGS FOR
MORE INFORMATION
FIRE PROTECTION SYMBOLS, REFER
TO FIRE PROTECTION DRAWINGS FOR
MORE INFORMATION
S
FAS
RN
FACP
S
S
FAS
RN
FACP
S
GENERAL NOTES:
A. PROVIDE ALL LABOR AND MATERIALS TO REMOVE WALLS AND PORTIONS OF WALLS AS
SHOWN ON DEMOLITION PLAN. IF UNABLE TO REMOVE WALL AS SHOWN ON PLAN.
CONTACT GOVERNMENT AUTHORIZED TECHNICAL REPRESENTATIVE TO COME TO A
RESOLUTION.
B. OBTAIN AND VERIFY FIELD MEASUREMENTS FOR THE EXECUTION OF THE WORK AND
PRIOR TO FABRICATION OF THE VARIOUS COMPONENTS OF THE WORK.
C. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS TO DETERMINE QUANTITIES
OF DIFFUSERS, GRILLES, LIGHT FIXTURES, ETC.
D. PAINT ALL EXPOSED ELECTRICAL PANELS, ACCESS PANELS, SUPPORTS ETC. TO MATCH
ADJACENT WALL OR CEILING FINISH.
E. PROVIDE BLOCKING IN WALLS, SOFFITS, AND CEILINGS RECEIVING MOUNTED ITEMS.
F. VERIFY ALL GRADES AND THEIR RELATIONSHIP TO THE BUILDING AND FINISH FLOOR
ELEVATIONS.
G. VERIFY SIZE AND LOCATION FOR SURFACE MOUNTED ITEMS, PROVIDE ALL OPENINGS
THROUGH FLOORS AND WALLS, FURRING, CURBS, ANCHORS, INSERTS, MACHINE BASES
AND ROUGH BUCKS/BACKING FOR SURFACE MOUNTED ITEMS.
H. PROVIDE FURRING AS REQUIRED TO CONCEAL MECHANICAL AND/OR ELECTRICAL
WORK/HARDWARE IN FINISHED AREAS.
I. REPETITIVE FEATURES ARE OFTEN DRAWN ONLY ONCE AND SHALL BE PROVIDED AS IF
DRAWN IN FULL.
J. CONSTRUCTION FLOOR DIMENSIONS AND ELEVATIONS ARE FROM TOP OF FINISHED
FLOOR SLAB
K. THIS IS A PHASED PROJECT. DEMOLITION AND NEW WORK SHALL OCCUR IN PHASES AS
DEFINED BY THE PHASING PLANS. ALL WORK IN ONE PHASE SHALL BE COMPLETE AND
TURNED OVER TO THE GOVERNMENT BEFORE BEGINNING WORK IN THE NEXT PHASE
UNLESS OTHERWISE NOTED.
L. REFER TO SHEETS-001 FOR SEISMIC AND WIND LOAD INFORMATION.
M. PATCH AND REPAIR GYPSUM BOARD AT SOFFITS AND WALLS DAMAGED BY THE
REMOVAL OF EXISTING REFRIGERATED CABINETS, CLOSURE PANEL, AND EQUIPMENT
AS PART OF…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.