Attachment_2_-_Drawings_Lakenheath_Commissary_v1.pdf

PDF 23 MB Posted

Attached to
RAF Lakenheath Commissary Renovation Project
Solicitation number
FA5587-18-R-0013
Issued by

About this file

Drawings_v1

View the file

Other files

File Type Posted
Hazard_Materials_Report.pdf PDF
Asbestos_Refurbishment_Survey.pdf PDF
FA558719R0001-P0003.pdf PDF
Q&A_through_09_May_2019.pdf PDF
Attachment_6_-_PPI_Contract_Reference_Sheet_v1.docx DOCX document
FA558719R0001-P0002.pdf PDF
Q&A_through_23April_019.pdf PDF
FA558719RA001_RAF_Lakenheath_RFP_P0002.pdf PDF
Attachment_8_-_Subcontractor_Consent_Ltr_v1.docx DOCX document
Attachment_1_Construction_Price_Breakdown_v1.xls XLS spreadsheet
Attachment_7_-_Past_Performance_Questionaire_v1.docx DOCX document
Attachment_3_-_Specifications_Lakenheath_Commissary_v1.pdf PDF
FA558719R0001-P0001_Amendment_1.pdf PDF
Attachment_1_Construction_Price_Breakdown.xls XLS spreadsheet
Attachment_8_-_Form29-1081_NEW_REFRIGERATION.doc DOC document
Attachment_2_-_Drawings_Lakenheath_Commissary.pdf PDF
Attachment_4-_SF1413-Statement_and_Acknowledgment.pdf PDF
FA558719R0001_RAF_Lakenheath_Commissary_Renovation_Project.pdf PDF
Attachment_6_-_Past_Performance_Questionaire.docx DOCX document
Attachment_5_-_PPI_Contract_Reference_Sheet.docx DOCX document
Attachment_3_-_Specifications_Lakenheath_Commissary.pdf PDF
Attachment_7_-_Subcontractor_Consent_Ltr.docx DOCX document
Attachment_8__Drawings_Lakenheath_Commissary.pdf PDF
Attachment_5_Schedule_Material_Submittals_(AF66).xls XLS spreadsheet
Attachment_4__AF_Form_3000_Material_Approval_Submittal.pdf PDF
Attachment_6-_SF1413-Statement_and_Acknowledgment.pdf PDF
Attachment_7__AF_IMT_3064_Progress_Schedule.xlsx XLSX spreadsheet
Attachment_3_Past_Performance_Questionaire.docx DOCX document
[DRAFT_RFP]_FA558718R0013_RAF_Lakenheath_Commissary_Freezer_Upgrade.docx DOCX document
Attachment_9__Specifications_Lakenheath_Commissary.pdf PDF
Attachment_2_Past_Performance_Infomation_Sheet.docx DOCX document
Attachment_1_Construction_Price_Breakdown.xlsx XLSX spreadsheet
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADA RAMP

1:15 RAMP UP

1:15 RAMP UP

V

V

1:12 RAMP UP

ve n d in g

A

S C

R E

F C

O F

F

IN

M

G D

-1

R O

A D

Y A

R M

O U

T H

R I C H M O N D R

O A D

DESIGNATED GOVERNMENT

AUTHORIZED TECHNICAL

REPRESENTATIVE'S FIELD

OFFICE. SEE 01 50 00

CONTRACTOR STAGING

AREA (OPTION 2)

REFRIGERATED/FROZEN TRAILERS,

REFER TO O-102 FOR DESCRIPTION.

CONTRACT LIMITS

CONTRACTOR ADVISED TO LIMIT USE OF

COMMISSARY SITE AREAS NOT DIRECTLY AFFECTED

BY THE SCOPE OF WORK. BOUNDARY SHOWN SHALL

BE VERIFIED AND APPROVED.

CONTRACTOR ACCESS TO STAGING

AREA

CONTRACTOR STAGING

AREA (OPTION 1)

CONTRACTOR ACCESS TO STAGING

AREA

CONTRACTOR

PARKING

CONSTRUCTION TRAILER

CONSTRUCTION TRAILERPARKING LOT ACCESS

CLOSED TO TRAFFIC

531 G-001

COVER SHEET

REFRIGERATION EQUIPMENT AND HVAC UPGRADES

FOR LAKENHEATH COMMISSARY

DEFENSE COMMISSARY AGENCY

DIRECTORATE OF ENGINEERING - FORT LEE, VIRGINIA

LACKLAND AFB, TEXAS

100% FOR CONSTRUCTION

DATE : JUNE 22, 2018

PROJECT # : EU18MI03

CONTRACT AGREEMENT # : HDEC03-13-D-0003-0045

DRAWINGS INDEX

GENERAL

G-001 COVER SHEET

G-002 NEW EQUIPMENT PLAN

PHASING

O-101 OVERALL DEMOLITION PHASING PLAN

O-102 OVERALL REMODEL PHASING PLAN

O-103 MEZZANINE PHASING PLAN & PHASES

ARCHITECTURAL

A-001 ARCHITECTURAL LEGEND & GENERAL NOTES

AD101 ARCHITECTURAL DEMOLITION FLOOR PLAN AREA "A"

AD102 ARCHITECTURAL DEMOLITION FLOOR PLAN AREA "B"

A-100 ARCHITECTURAL OVERALL FLOOR PLAN & ROOM LEGEND

A-101 ARCHITECTURAL FLOOR PLAN AREA "A"

A-102 ARCHITECTURAL FLOOR PLAN AREA "B"

A-301 SECTIONS

A-401 ENLARGED FLOOR PLANS

A-501 DETAILS

A-601 ROOM FINISH SCHEDULE & DOOR SCHEDULE

AI201 INTERIOR ELEVATIONS

M-001 MECHANICAL LEGEND & GENERAL NOTES

MD101 MECHANICAL DEMOLITION FLOOR PLAN

MD102 MECHANICAL DEMOLITION MEZZANINE FLOOR PLAN

M-101 MECHANICAL FLOOR PLAN

M-102 MECHANICAL MEZZANINE FLOOR PLAN

M-501 MECHANICAL DETAILS AND SCHEDULES

REFRIGERATION

R-001 REFRIGERATION LEGEND & GENERAL NOTES

RD101 REFRIGERATION DEMOLITION FLOOR PLAN AREA "A"

RD102 REFRIGERATION DEMOLITION FLOOR PLAN AREA "B"

RD103 REFRIGERATION DEMOLITION ROOF/MEZZANINE FLOOR PLAN

R-101 REFRIGERATION FLOOR PLAN AREA "A"

R-102 REFRIGERATION FLOOR PLAN AREA "B"

R-103 REFRIGERATION ROOF/MEZZANINE FLOOR PLAN

R-501 DETAILS 01

R-502 DETAILS 02

R-503 RMCS DETAILS 01

R-504 RMCS DETAILS 02

R-601 SCHEDULES 01

R-602 SCHEDULES 02

ELECTRICAL

E-001 ELECTRICAL LEGEND & GENERAL NOTES

ED101 ELECTRICAL DEMOLITION FLOOR PLAN AREA "A"

ED102 ELECTRICAL DEMOLITION FLOOR PLAN AREA "B"

ED103 ELECTRICAL DEMOLITION MEZZANINE FLOOR PLAN

E-101 ELECTRICAL POWER & LIGHTING FLOOR PLAN AREA "A"

E-102 ELECTRICAL POWER & LIGHTING FLOOR PLAN AREA "B"

E-103 ELECTRICAL MEZZANINE POWER FLOOR PLAN

E-601 SINGLE LINE DIAGRAMS

SITE LOCATION

HAUL ROUTE

GATE 8

MECHANICAL

SITE PLAN2

G-001

EIG

TEA & MMS

JJH

STRUCTURAL

S-001 STRUCTURAL LEGEND & GENERAL NOTES

S-101 MEZZANINE FLOOR PLAN

S-301 SECTIONS & DETAILS

PLUMBING

P-001 PLUMBING LEGEND & GENERAL NOTES

PD101 PLUMBING DEMOLITION FLOOR PLAN

PD102 PLUMBING DEMOLITION MEZZANINE FLOOR PLAN

P-101 PLUMBING FLOOR PLAN

P-102 PLUMBING MEZZANINE FLOOR PLAN

HAUL ROUTE

G-001

E-700 ELECTRICAL DISTRIBUTION BOARD CIRCUIT CHARTS

PROJECT INFORMATION

PRINCIPLE DESIGNER:

RS&H, INC.

US MAILING ADDRESS: 13750 SAN PEDRO SUITE 300

SAN ANTONIO, TX 78232

PHONE: 011 210 224 2800

REFRIGERATION AND ENVIRONMENTAL SUB-CONSULTANT:

CTA, INC

US MAILING ADDRESS: 306 W. RAILROAD AVE., SUITE 104,

MISSOULA, MT 59802

PHONE: 011 406 728-9522

DESIGN TEAM:

ELDA GALVEZ, PROJECT MANAGER AND ARCHITECT

CHRISTOPHER RHOADES, STRUCTURAL ENGINEER

JEFFREY NEUMANN, MECHANICAL ENGINEER

ROBERT ARTHUR, REFRIGERATION ENGINEER

DANIEL POHNERT, ELECTRICAL ENGINEER

KEITH CRON, ENVIRONMENTAL ENGINEER

OWNER REPRESENTATIVE:

48 CIVIL ENGINEER SQUADRON, MR. WALTER GRAVES,

UK MAILING ADDRESS: 48 CES/CD, RAF LAKENHEATH,

BRANDON, SUFFOLK, IP27 9PN

PHONE: 01638521906

DELEGATED DESIGN:

FINAL REFRIGERATION DESIGN IS BY SELECTED

REFRIGERATION EQUIPMENT MANUFACTURER.

FINAL ELECTRICAL DESIGN FOR SELECTED

REFRIGERATION SYSTEM IS BY REFRIGERATION

EQUIPMENT MANUFACTURER.

FINAL DESIGN OF RMCS SYSTEM IS BY SELECTED

RMCS MANUFACTURER.

FINAL DESIGN OF PRE-FINISHED INSULATED PANEL

CEILING SUPPORT SYSTEM TO BE PROVIDED BY

PRE-FINISHED INSULATED PANEL MANUFACTURER.

THE CONTRACTOR SHALL PERFORM ALL CONSTRUCTION

DESIGN AND MANAGEMENT DUTIES AS PRINCIPLE

CONTRACTOR COMPLIANT WITH THE CONSTRUCTION

DESIGN AND MANAGEMENT REGULATIONS 2015 (CDM). THE

CONTRACTOR SHALL ALSO SUBMIT THE NOTIFICATIONS

REQUIRED UNDER CDM REGULATIONS TO THE HEALTH AND

SAFETY EXECUTIVE ON BEHALF OF THE OWNER AND

PROVIDE A COPY OF THAT NOTIFICATION TO THE

CONTRACTING OFFICER TECHNICAL REPRESENTATIVE.

M-502 MECHANICAL CONTROL SEQUENCES

ApodacaT Galvez 6.22.18

HD

SALES

AREA

PRODUCE

PROCESSING

MEAT/DELI

ALCOVE

JANITOR

CHASE

STAGING

AREA

DAMAGED

MERCHANDISE

VESTIBULE

21B

VESTIBULE

21A

PERISHABLE/

SEMI-PERISHABLE

87/88

TRAINING/

CONFERENCE

ADMIN

AREA

DIRECTOR

DELI

COOLER

BAKERY

COOLER

BAKERY

FREEZER

BREAKROOM

16A

STORE

ADMINISTRATOR

PRODUCE

ALCOVE

ENTRY

VESTIBULE

1A

CART

STORAGE

ENTRY

VESTIBULE

1B

EXIT

VESTIBULE

2A

CART

RETURN

VAULT

CASHIER

OFFICE

CHECKOUT

QUEUING

EXIT

VESTIBULE

2B

BAG

STORAGE

MEN'S

VESTIBULE

WOMEN'S

VESTIBULE

MECHANICAL

DELI PREP.

BAKERY

PREP.

74A

BAKERY

PREP.

74B

STORAGE

DELI

SERVICE

VESTIBULE

WOMEN'S

CUSTOMER

RESTROOM

MEN'S

CUSTOMER

RESTROOM

1A03

1A03

1A03

1A03

R

R

R

R

1A03

1A03

1A03

R

R

R

R

2K02

2K00

2R24

R

2R24

R

1B01 above

1B13A w/Hood storage

2R24

2R24

2R24

1D08

2D01

2R24

2R24

2R24

2R24

2R24

1D20

1D11A

1D15

1D10B w/Hood

1B20-B

1B28

2D01

1B26

2B02

1B20-B

2D00

1B00

1D09B

1E031E031E031E031E031E031E031E03

2G162G16 2G16

CBT Terminals

G

G

2G15

G

A

G

A

G

A

G

2R24 2R24

G

G

G

G

G

A

G

A

G

A

G

A

G

A

G

G

G

G

G

A

G

A

2G15A

G

A

G

A

G

G

G

2G162G16 2G162G16 2G16

G

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

2G15

G

A

2G15

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

2G15

G

A

G

A

2G15

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

2G15

G

A

G

A

G

A

2G15A

G

A

G

A

2G15A

G

A

G

A

2G15A

G

A

G

A

2G15A

G

A

2G15A

G

A

G

A

G

A

G

A

G

A

R

1E031E031E03 1E031E03 1E03

G

A

2G152G15

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

2G15

G

A

2G15

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

G

A

2G15

G

A

G

A

G

A

2P08

2P08

2P08

2P08

2P08

2P08

G

A

G

A

G

A

G

A

2P08

2P08

2P08

2P08

G

A

G

A

G

A

G

A

2P08

2P08

2P08

2P08

2P08

2P08

G

A

G

A

G

A

2G15A

G

A

G

A

2G15A

G

A

G

A

2G15A

G

A

G

A

2G15A

G

A

G

A

2G15A

G

A

2P08

2P08

2P08

2P08

G

A

G

A

G

A

G

A

G

A

GP-3

v e n d i n g

A

Pedestal

Sink

S/S

Sink

S/S

Sink

S/S

Sink

P

P

P

P

P

P

P

G

G

G

G

G

G

G

G

G

G

1G06GD-

1G06GD-

P

1P07GD-12 1P07GD-12 1M04GD-121M04GD-121M04GD-12

1M04GD-12

1G10-2 1G10-2

G

G

G

S C

R

E F

B A

K E

R Y

SC REF

BAKERY

SC REF

CABINET

S/S

Sink

HAND SINK

OVEN

1D09

D

D

G

W

F

C O

F F

I N

SC REF

COFFIN

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G D

G

G D

G

G D

G

G D

G

G D

G

G D

1G10-2 1G10-2

G

G D

G

G D

1G12-2

1G12-2

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

1G11 (19 DOORS)

D

B

W

1D09T

MECHANICAL

BAKERY/DELI

DISPLAY

4TFP-6

PRODUCE

MANAGER

SC REF

CABINET

DAIRY

DISPLAY

1M04GD-8

SALES

AREA

G

G D

G

G

D

1M02GD-37501M02GD-3750

1M02GD-37501M02GD-3750

G

G D

G

G D

G

G D

G

G

D

G

G D

D

D

D

S

1D00-

1M04GD-12

M

G D

M

G D

1M04GD-8

M

G D

M

G D

1D00-EC45

1D00-EC45

BAKERY

SERVICE

67A

19 20 21 23 25 27 29 31 33 35 36 1

SF

SL

SM

SR

RETARDER/

PROOFER

RETARDER/

PROOFER

SB

SC

SE

SH

SJ

SK

SN

SP

SQ

ST

SU

SV

22 24 26 28 30 32 34

13750 SAN PEDRO, SUITE 300

SAN ANTONIO, TEXAS 78232

210-224-2800 www.rsandh.com TX. CERT. No. F-3401

KEY PLAN

N.I.C.

N.I.C.

A

B

SCALE:

1:100

2 G-002

NEW EQUIPMENT PLAN

NEW EQUIPMENT PLAN

400020000

SCALE: 1:100

G-002

EQUIPMENT PLAN LEGEND

SYMBOL DESCRIPTION

EXISTING EQUIPMENT

CF/CI EQUIPMENT

EQUIPMENT TAG

RELOCATED EQUIPMENT BY

GOVERNMENT REPRESENTATIVE

1G24-8

NO. DESCRIPTION CF/CI

DELI DEPARTMENT *

1D00-940

CASE, DELI, CLERK SERVED, REFRIGERATED, REMOTE, 940 MM

1D00-3125

CASE, DELI, CLERK SERVED, REFRIGERATED, REMOTE, 3125 MM

1D00S-2500

CASE, DELI, SELF SERVE, REFRIGERATED, REMOTE, 2500 MM

1D00-EC45

CASE, DELI, CLERK SERVED, REFRIGERATED, REMOTE, END 45 CORNER

1D09T

OVEN ROTISSERIE CHICKEN, TABLE ONLY

1D14BW-1250

DISPLAY, ISLAND, HEATED, BAIN MARIE, 1250 MM

1D14GW-1250

DISPLAY, ISLAND, HEATED PLATE, HOT LAMP, 1250 MM

1D17-1880

TABLE, PREP, SANDWICH, REFRIGERATED, REMOTE

GROCERY DEPARTMENT

1G02GD-4

CASE, DAIRY, REFRIGERATED, GLASS DOOR, MULTI-DECK, REMOTE, 1250 MM

1G02GD-6

CASE, DAIRY, REFRIGERATED, GLASS DOOR, MULTI-DECK, REMOTE, 1880 MM

1G02GD-8

CASE, DAIRY, REFRIGERATED, GLASS DOOR, MULTI-DECK, REMOTE, 2500 MM

1G02GD-12

CASE, DAIRY, REFRIGERATED, GLASS DOOR, MULTI-DECK, REMOTE, 3750 MM

1G06GD-2100

CASE, FROZEN FOOD, END CAP FOR WIDE ISLAND, REMOTE, WITH GLASS LIDS, 2100 MM

1G07GD-2500

CASE, FROZEN FOOD, WIDE ISLAND, REMOTE, WITH GLASS LIDS, 2500 MM

1G10-2

CASE, FROZEN FOOD, REMOTE, 2 GLASS DOORS, UPRIGHT

1G10-5

CASE, FROZEN FOOD, REMOTE, 5 GLASS DOORS, UPRIGHT

1G11

DAIRY DISPLAY GLASS DOOR FOR USE WITH ROLL IN CART (# AS REQUIRED)

1G12-2

CASE, ICE CREAM, REMOTE, 2 GLASS DOORS, UPRIGHT

1G12-4

CASE, ICE CREAM, REMOTE, 4 GLASS DOORS, UPRIGHT

1G13-4

CASE, FROZEN JUICE, REMOTE, 4 GLASS DOORS, UPRIGHT

1G24GD-12

MERCHANDISER, GRAB N GO, REFRIGERATED, 3750 MM REMOTE

MEAT DEPARTMENT *

1M02GD-3750

CASE, MEAT, SINGLE DECK, REFRIGERATED, REMOTE, WITH GLASS LIDS, 3750 MM

1M04GD-8

CASE, MEAT OR PRE-PACKAGED DELI, MEDIUM TEMP, GLASS DOOR, MULTI-DECK,

REFRIGERATED, REMOTE 2500 MM

1M04GD-12

CASE, MEAT OR PRE-PACKAGED DELI, MEDIUM TEMP, GLASS DOOR, MULTI-DECK,

REFRIGERATED, REMOTE 3750 MM

PRODUCE DEPARTMENT *

1P03-2500

CASE, PRODUCE, REFRIGERATED, REMOTE, 2500 MM

1P03-3750

CASE, PRODUCE, REFRIGERATED, REMOTE, 3750 MM

1P07GD-12

CASE, PRODUCE, REFRIGERATED, REMOTE, 3750 MM

EIG

TEA & MMS

JJH

EQUIPMENT LIST

SB

20 21 23 25 27 29 31 33 35 36 1

SC

SE

SH

SJ

SK

SN

SP

SQ

ST

SU

SV

L

SW

SX

SY

2 3

20 22 24 26 28 30 32 34 36 1 2 3

SF

SL

SM

SR

SALES AREA WORK SIDE

50mm X 100mm WOOD TOP PLATE

50mm X 100 mm WOOD STUDS AT

1200mm O.C.

50mm X 100mm WOOD BRACE AT ENDS

AND 1200mm O.C.

DRILL FLOOR FOR 10mm DIA.

EXP. ANCHOR BOLT AT 2500mm O.C.

(REMOVE BOLT & PATCH FLOOR

AFTER REMOVAL OF TEMPORARY

BARRIER)

ANCHOR KICKER TO FLOOR

OR ADD SAND BAG TO SECURE

50mm X 100mm WOOD SILL PLATE

CONT. 6 MIL POLYETHELENE

SHEETING (TAPE ALL JOINTS)

CONT. 6 MIL POLYETHELENE

SHEETING (TAPE ALL JOINTS)

EXISTING CEILING

CONT. 6 MIL POLYETHELENE

SHEETING (TAPE ALL JOINTS)

SALES AREA

50mm X 100mm WOOD

TOP PLATE

50mm X 100mm WOOD STUDS

AT 1200mm O.C.

50mm X 100mm WOOD BRACE

AT ENDS AND 1200mm O.C.

ANCHOR KICKER TO

FLOOR OR ADD SAND

BAG TO SECURE

50mm X 100mm WOOD

SILL PLATE

DRILL FLOOR FOR 10mm DIA. EXP.

ANCHOR BOLT AT 2500mm O.C.

(REMOVE BOLT & PATCH FLOOR AFTER

REMOVAL OF TEMPORARY BARRIER)

NOTE: SOFT CONSTRUCTION BARRIER MAY BE

SUBSTITUTED WITH A PRE-MANUFACTURED

DUST BARRIER SYSTEM BY "ZIP WALL" OR

EQUAL. VERIFY WITH GOVERNMENT

AUTHORIZED TECHNICAL REPRESENTATIVE IF

APPROVED AND AREAS WHICH IT MAY BE

USED.

WORK SIDE

EXISTING PRE-FINISHED INSULATED

PANEL

50mm X 100mm WOOD

TOP PLATE

50mm X 100mm WOOD STUDS

AT 1200mm O.C.

50mm X 100mm WOOD BRACE

AT ENDS AND 1200mm O.C.

ADD SAND

BAG TO SECURE

50mm X 100mm WOOD

SILL PLATE

F I E

L D

V

R

I F

Y

9mm CD PLYWOOD (PAINTED - SEE

CONSTRUCTION BARRIER NOTES)

VAPOR BARRIER

50mm X 100mm WOOD

TOP PLATE

WARM AREACHILLED SIDE

13750 SAN PEDRO, SUITE 300

SAN ANTONIO, TEXAS 78232

210-224-2800 www.rsandh.com TX. CERT. No. F-3401

SCALE:

1:200

PHASING LEGEND

LIMIT OF PHASING AREA

CONSTRUCTION BARRIER

PHASE SEQUENCE NUMBER

FLOATING WORK: WORK CAN BE PERFORMED

CONCURRENTLY WITH OTHER WORK

TEMPORARILY RELOCATED EQUIPMENT

3 O-101

OVERALL DEMOLITION

PHASING PLAN

OVERALL DEMOLITION PHASING PLAN

800040000

SCALE: 1:200

F#

O-101

GENERAL PHASING NOTES:

1. THE COMMISSARY WILL CONTINUE TO OPERATE AND PROVIDE FULL SERVICE TO

CUSTOMERS DURING CONSTRUCTION. THE FOLLOWING NOTES APPLY TO THE

CONTRACTOR'S PLAN TO ACCOMPLISH CONSTRUCTION WITHIN THE EXISTING

FACILITY. THE CONTRACTOR MUST VISIT THE FACILITY AND CAREFULLY EXAMINE

THOSE PORTIONS OF THE BUILDING AND SITE AFFECTED BY THIS WORK BEFORE

SUBMITTING PROPOSAL AND BECOME FAMILIAR WITH THE EXISTING CONDITIONS

AND DIFFICULTIES THAT WILL AFFECT THE EXECUTION OF WORK. SUBMISSION OF

A PROPOSAL WILL BE CONSTRUED AS EVIDENCE THAT SUCH EXAMINATION WAS

CONDUCTED AND LATER CLAIMS FOR LABOR, EQUIPMENT OR MATERIALS

REQUIRED BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE RECOGNIZED.

2. THE INTENT OF THE PHASING PLANS IS TO MINIMIZE THE IMPACT OF THE

CONSTRUCTION ON THE OPERATION OF THE COMMISSARY. THE PHASING PLAN

MUST ENABLE FULL SERVICE COMMISSARY SALES TO CUSTOMERS AT ALL TIMES

THAT THE COMMISSARY IS OPEN TO CUSTOMERS. CONSTRUCT THE PROJECT IN

SEQUENTIAL PHASES AS OUTLINED IN THE PLANS UNLESS OTHERWISE APPROVED

BY THE GOVERNMENT AUTHORIZED TECHNICAL REPRESENTATIVE.

3. PHASING PLANS SHOWN ARE DIAGRAMMATIC & FOR PHASING PURPOSES ONLY.

THEY SHOULD NOT BE SCALED OR OTHERWISE USED FOR TAKE-OFFS.

COORDINATE PHASING WITH DEMOLITION DRAWINGS AS WELL AS PLANS FOR

NEW WORK AND REPAIRS. COORDINATE WITH PROJECT PLANS AND

SPECIFICATIONS.

4. THE BOUNDARY LINES SHOWN (HATCHED AREAS) ARE FOR GENERALIZATION

PURPOSES ONLY AND DO NOT INDICATE A BOUNDARY WITHIN WHICH ALL WORK

MUST BE CONTAINED. COORDINATE ANY WORK THAT COULD DISRUPT REGULAR

COMMISSARY BUSINESS ACTIVITY WITH THE GOVERNMENT AUTHORIZED

TECHNICAL REPRESENTATIVE PRIOR TO BEGINNING. MAINTAIN VEHICULAR AND

PEDESTRIAN ACCESS INTO AND OUT OF FACILITIES FREE OF OBSTRUCTIONS

DURING CONSTRUCTION UNLESS OTHERWISE SHOWN.

5. PHASING NOTES DO NOT LIST ALL ITEMS OF WORK REQUIRED BY THE

CONSTRUCTION DOCUMENTS BUT ARE A GUIDE TO ACCOMPLISHING MAJOR

AREAS OF WORK.

6. ALL WORK ITEMS NOT INCLUDED IN PHASING PLANS ARE TO BE COMPLETED PER

TIME FRAMES DICTATED BY THE CONTRACT DOCUMENTS. WORK MAY BE DONE

DURING STORE OPERATING HOURS PROVIDED THE WORK DOES NOT INTERFERE

WITH COMMISSARY OPERATIONS AND HAS PRIOR APPROVAL BY THE

CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE AND STORE DIRECTOR.

7. PHASES ARE TO BE COMPLETED IN SEQUENTIAL ORDER. PROPOSED DEVIATIONS

TO THE SPECIFIED SEQUENCE MUST BE SUBMITTED IN ADVANCE FOR APPROVAL

BY THE GOVERNMENT AUTHORIZED TECHNICAL REPRESENTATIVE. PROVIDE A

JUSTIFICATION FOR WHY THE DEVIATION IS REQUIRED TO ACCOMPLISH THE

CONTRACT.

8. SUBMIT A CONSTRUCTION PHASING/SEQUENCING PLAN (IN ACCORDANCE WITH

SPECIFICATION SECTION 013216-10) WHICH COMPLIES WITH THE OPERATIONAL

AND ACCESS REQUIREMENTS INDICATED IN THESE PHASING PLANS AND

REQUIREMENTS OF THE CONTRACT DOCUMENTS. THE CONTRACTORS PHASING

PLAN MUST BE SPECIFIC AND INCLUDE ALL WORK REQUIRED INCLUDING

DEMOLITION, LOCATION & CONSTRUCTION OF TEMPORARY WALLS & BARRICADES,

UTILITY DOWN TIME, TEMPORARY UTILITY AS REQUIRED TO KEEP THE

COMMISSARY FACILITY OPERATIONAL AT ALL TIMES, AND WORK TO OCCUR

DURING NON-OPERATIONAL HOURS WITHIN THE COMMISSARY. COORDINATE THE

PRODUCTION OF THE CONTRACTOR'S PHASING PLAN WITH THE SPECIFIED

REQUIREMENTS FOR THE CONSTRUCTION PROGRESS MANAGEMENT SCHEDULE

WITH THE CONTRACTING OFFICER'S REPRESENTATIVE AND THE STORE

DIRECTOR.

9. THE CONTRACTOR'S PHASING PLAN MUST IDENTIFY MEASURES TO PROVIDE FOR

PUBLIC AND EMPLOYEE SAFETY AS WELL AS CONTRACTOR'S WORKFORCE

SAFETY. DIAGRAM HOW THE CONTRACTOR WILL MAINTAIN VEHICULAR

CIRCULATION, SERVICE CIRCULATION, AND PEDESTRIAN CIRCULATION

THROUGHOUT THE SITE DURING THE ENTIRE PROJECT. THE PLAN MUST SHOW

CUSTOMER ACCESS, SERVICE ACCESS AND EMERGENCY EGRESS DURING EACH

PHASE AND THROUGHOUT THE DURATION OF CONSTRUCTION.

10. NOTIFY THE GOVERNMENT AUTHORIZED TECHNICAL REPRESENTATIVE IN

WRITING UPON COMPLETION OF EACH PHASE. DO NOT PROCEED TO THE

SUBSEQUENT PHASE UNTIL THE WORK IS ACCEPTED BY THE GOVERNMENT.

PROVIDE REASONABLE TIME FOR THE COMMISSARY TO RELOCATE PRODUCT AND

GOVERNMENT EQUIPMENT WHEN MOVING IN AND OUT OF PHASES.

11. DO NOT BEGIN A SUBSEQUENT PHASE OF CONSTRUCTION UNTIL ALL WORK IN THE

PREVIOUS PHASE IS SUBSTANTIALLY COMPLETE AND TURNED OVER TO THE

COMMISSARY FOR USE.

12. DO NOT COMMENCE WORK IN ANY AREA UNTIL ALL MATERIALS, SUPPLIES AND

EQUIPMENT REQUIRED TO RETURN THAT AREA TO FULLY OPERATIONAL SERVICE

HAVE ARRIVED ON SITE AND ARE READILY AVAILABLE.

13. GOVERNMENT IS RESPONSIBLE FOR REMOVAL/RELOCATION OF MERCHANDISE

WITHIN EACH AREA OF WORK & WILL DO SO AFTER RECEIPT OF CONTRACTOR’S

WRITTEN NOTICE OF INTENT TO COMMENCE WORK. CONTRACTOR IS

RESPONSIBLE FOR REMOVAL/RELOCATION OF EXISTING EQUIPMENT AND

FURNITURE AS NEEDED TO COMPLETE WORK. PROTECT EQUIPMENT AND

MERCHANDISE IN AREAS OF WORK. EQUIPMENT AND FURNITURE THAT IS MOVED

IN ORDER TO COMPLETE WORK MUST BE RETURNED TO ITS ORIGINAL POSITION,

CLEANED, AND FULLY OPERATIONAL AT THE BEGINNING OF EACH BUSINESS DAY

UNLESS THAT AREA OF WORK IS DESIGNATED TO BE TEMPORARILY SHUT DOWN

OR RELOCATED DURING CONSTRUCTION. MAINTAIN IN OPERATION EXISTING

EQUIPMENT OUTSIDE AREAS OF WORK DURING CONSTRUCTION AND PROVIDE

TEMPORARY UTILITIES AND CONNECTIONS AS REQUIRED TO DO SO.

14. REMOVE DEBRIS AND TRASH FROM THE CONSTRUCTION WORK AREAS DAILY AND

PLACE INTO DUMPSTERS OR OTHER APPROVED CONTAINERS. IF TRASH MUST BE

HAULED WITHIN OPERATING AREAS, IT MUST BE IN APPROVED CLOSED

CONTAINERS.

15. MAINTAIN CLEAR PATHS THROUGH WORK AREAS FOR DELIVERY ACCESS TO

PROCESSING AND STAGING AREAS.

16. COMMISSARY SALES AND OPERATIONAL AREAS MUST BE CLEAN AND FREE OF

DEBRIS, DUST, DIRT, MUD, CONSTRUCTION MATERIALS, EQUIPMENT, ETC AT ALL

TIMES. IN INTERIOR CONSTRUCTION AREAS WHERE SIGNIFICANT DUST IS

GENERATED PROVIDE ACTIVE EXHAUST VENTILATION TO PROVIDE A NEGATIVE

AIR PRESSURE IN THE DUST AREA. PREVENT MIGRATION OF DUST TO OCCUPIED

AREAS OF THE BUILDING

17. THE CONTRACTOR MAY USE AREAS ON COMMISSARY PROPERTY FOR

CONSTRUCTION STAGING AND EQUIPMENT STORAGE AS SHOWN ON THE PLANS

AND WHERE DEEMED APPROPRIATE. THE LOCATION OF THESE AREAS MUST BE

APPROVED IN ADVANCE AND MUST COMPLY WITH ALL CONTRACT REGULATIONS

GOVERNING STAGING AND EQUIPMENT STORAGE AREAS (I.E.: FENCING, UTILITIES,

ACCESS HOURS, HAUL ROUTES, ETC.) AS PRESCRIBED BY THE GOVERNMENT

AUTHORIZED TECHNICAL REPRESENTATIVE. THE CONTRACTOR IS RESPONSIBLE

FOR THE SECURITY OF THESE AREAS THROUGHOUT THE DURATION OF THE

CONSTRUCTION. AFTER USE, RESTORE TO ORIGINAL CONDITION ANY

LANDSCAPING, PAVEMENT, FLOOR FINISHES, WHICH HAVE BEEN DAMAGED OR

ALTERED DURING CONSTRUCTION.

18. EACH STORE DEPARTMENT (MEAT, PRODUCE, DAIRY, FROZEN FOODS, DELI /

BAKERY) SHOULD LOSE NO MORE THAN 50% OF THEIR DISPLAY AT ANY TIME

UNLESS OTHERWISE APPROVED BY STORE DIRECTOR AND GOVERNMENT

AUTHORIZED TECHNICAL REPRESENTATIVE.

19. PROVIDE TEMPORARY COLD STORAGE TRAILERS AS REQUIRED DURING WORK IN

PROCESSING AREAS AND COLD STORAGE ROOMS. REFER TO GENERAL

DESCRIPTION OF WORK EACH PHASE FOR MINIMUM NUMBER OF TRAILERS

REQUIRED EACH PHASE.

20. THE CONTRACTOR IS RESPONSIBLE TO DETERMINE HOW TO TRANSFER NEW AND

EXISTING EQUIPMENT WHICH MAY OR MAY NOT FIT THROUGH EXISTING

OPENINGS. PROVIDE ANY TEMPORARY MODIFICATIONS NEEDED TO

ACCOMMODATE ALL EQUIPMENT.

21. CONTRACTOR SHALL MOVE, RELOCATE, AND RE-INSTALL LARGE (50 LBS OR

MORE) EXISTING TO REUSE PIECES OF EQUIPMENT INDICATED IN THE CONTRACT

DOCUMENTS. THIS INCLUDES MOVING THE EQUIPMENT OUT OF THE WORK AREA

SO THAT WORK MAY BE DONE, MOVING IT BACK TO ITS FINAL LOCATION AFTER

THE WORK IS COMPLETED, AND REINSTALLING THE TEMPORARY LOCATION FOR

THE EQUIPMENT WILL BE IDENTIFIED BY THE CONTRACTING OFFICER'S

REPRESENTATIVE. RE-INSTALLATION INCLUDES MAKING ALL UTILITY

CONNECTIONS REQUIRED BY EACH PIECE OF EQUIPMENT.

ARCHITECTURE, STRUCTURAL, MECHANICAL

/ELECTRICAL NOTES:

1. COORDINATE ALL WORK WITH THE ARCHITECTURE, STRUCTURAL, MECHANICAL,

AND ELECTRICAL PHASING NOTES AND DRAWINGS. MAINTAIN ALL UTILITIES IN

SERVICE AT ALL TIMES.

2. HEATING, COOLING, ELECTRICAL & PLUMBING UTILITY INTERRUPTIONS MUST BE

COORDINATED WITH THE STORE DIRECTOR AND SUBMITTED IN WRITING TO THE

GOVERNMENT AUTHORIZED TECHNICAL REPRESENTATIVE FOR REVIEW AND

APPROVAL A MINIMUM OF 2 WEEKS BEFORE WORK CAN BEGIN. RE-CONFIRM

UTILITY SERVICE DISRUPTIONS WITH THE STORE DIRECTOR A MINIMUM OF 24

HOURS PRIOR TO THE ACTUAL APPROVED OUTAGE.

3. TEMPORARY UTILITIES MUST BE INSTALLED, MAINTAINED, AND REMOVED BY THE

CONTRACTOR AT THE CONTRACTOR'S EXPENSE AND IN A MANNER SATISFACTORY

TO THE GOVERNMENT AUTHORIZED TECHNICAL REPRESENTATIVE. REMOVE

TEMPORARY UTILITIES AND CONNECTIONS PRIOR TO THE FINAL ACCEPTANCE OF

THE CONTRACT. THE GOVERNMENT WILL NOT BE HELD LIABLE FOR THE CONTRACT

DELAYS, DAMAGES, OR COST INCREASES INCURRED BY INTERRUPTIONS OF UTILITY

SERVICE.

4. HVAC SUPPLY AND RETURN AIR DUCTWORK CROSSING THROUGH OR TERMINATING

WITHIN A CONSTRUCTION AREA SHALL BE TEMPORARILY COVERED OR BLOCKED

OFF (AS APPROPRIATE) TO PREVENT CONSTRUCTION DUST AND DEBRIS FROM

ENTERING OTHER AREAS OF THE STORE.

5. PROVIDE POWER FOR CONTRACTOR SUPPLIED TEMPORARY REFRIGERATED

TRAILERS.

6. WHERE POSSIBLE, UNIT COOLER CHANGES ARE TO BE STAGED SO THAT NEW UNIT

COOLERS ARE RUNNING WHEN EXISTING UNIT COOLERS ARE SHUT DOWN. WHEN

STAGING IS NOT POSSIBLE, ADVANCE PREPARATION IS TO BE DONE TO KEEP DOWN

TIME TO A MINIMUM.

7. ENSURE ADEQUATE VENTILATION IS MAINTAINED IN ALL AREAS THROUGHOUT THE

PERIOD OF CONSTRUCTION, INCLUDING PROTECTION FROM NOXIOUS FUMES AND

VAPORS THAT MAY OCCUR DURING CONSTRUCTION.

8. IT IS ACKNOWLEDGED THAT IN SOME INSTANCES, WORK IS ONE PHASE REQUIRES

CONNECTIONS TO UTILITIES IN OTHER AREAS TO PROVIDE OPERATING SYSTEMS IN

CURRENT AREAS OF CONSTRUCTION.

NOTES REGARDING CONSTRUCTION BARRIERS:

1. PROVIDE A SOFT CONSTRUCTION BARRIER AT AREAS OF WORK WHICH CREATE

MINOR LEVELS OF DUST, DEBRIS, OFFENSIVE ODORS, AND OTHER ACTIONS WHICH

COULD BE DISRUPTIVE TO COMMISSARY OPERATION. SOFT CONSTRUCTION

BARRIER CONSISTS OF A 1600MM HIGH PLYWOOD BARRIER AND 6 MIL (MIN) POLY

CONSTRUCTION SHEETING TO THE CEILING. THE SOFT BARRIER IS TO BE

ADEQUATELY SUPPORTED AND COMPLETELY SEALED AT ALL SHEET JOINTS AND AT

THE FLOOR AND CEILING (OR ROOF DECK). WHERE CEILING HEIGHTS PROHIBIT

SEALING THE BARRIER TO THE CEILING, A CAP IS TO BE PROVIDED. DURING NON

OPERATIONAL STORE HOURS; SOFT BARRIERS MAY BE PLACED OUTSIDE OF LIMITS

OF CONSTRUCTION BARRIERS AS DESCRIBED ON THE PHASING PLANS AND

DIAGRAMS AND THEN TAKEN DOWN WITH THE AREA MADE CLEAN AND SAFE IN THE

MORNING PRIOR TO STORE OPERATING HOURS.

2. A PARTIAL HEIGHT CONSTRUCTION BARRIER MAY BE USED AS SAFETY BARRIER TO

AREAS OF WORK FOR SHORT PERIODS OF TIME (LESS THAN ONE WEEK) WHICH DO

NOT CREATE DUST, DEBRIS, OFFENSIVE ODORS OR EXCESSIVE NOISE. PARTIAL

HEIGHT BARRIERS WILL BE PLYWOOD 1600MM HIGH AND 6 MIL (MIN) POLY

CONSTRUCTION SHEETING AND MAY REMAIN IN PLACE DURING NORMAL STORE

OPERATING HOURS.

3. MAINTAIN ALL BARRIERS, FENCES, CONES, SCAFFOLDING, COVERED SCAFFOLDING

FOR OVERHEAD PROTECTION, SERVICE AND EGRESS ACCESS CORRIDORS

THROUGH WORK AREAS, TEMPORARY FIRE PROTECTION, ETC. IN GOOD CONDITION

FOR THE DURATION OF THE PROJECT.

4. PROVIDE TEMPORARY SIGNAGE TO DESIGNATE CONSTRUCTION AREAS, FOR

EXAMPLE "HARD HAT AREA"; "EMERGENCY EXIT"; AND NECESSARY SIGNAGE FOR

RE-ROUTING PATRONS AND EMPLOYEES AS REQUIRED BY THE GOVERNMENT

AUTHORIZED TECHNICAL REPRESENTATIVE.

5. PROVIDE ADA ACCESSIBLE PROTECTION BARRIERS OVER ANY EXPOSED OPENING

IN FLOOR.

6. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGES TO COMMISSARY FACILITY AND

PRODUCTS OCCURRING FROM INSUFFICIENT PROTECTION FROM WEATHER, DUST,

ETC.

7. OPENINGS THROUGH TEMPORARY CONSTRUCTION BARRIERS SHALL HAVE

LOCKABLE DOORS/GATES TO PREVENT UNAUTHORIZED PERSONS FROM ENTERING

CONSTRUCTION AREA.

8. ALL TEMPORARY ENCLOSURES AND BARRIERS SHALL FULLY COMPLY WITH THE

REQUIREMENTS OF SPECIFICATION SECTION 01 50 00 TEMPORARY CONSTRUCTION

FACILITIES AND CONTROLS.

9. COORDINATE ALL TEMPORARY CONSTRUCTION BARRIER TYPES AND LOCATIONS

AND GATE LOCATIONS WITH GOVERNMENT AUTHORIZED TECHNICAL

REPRESENTATIVE.

10. LOCATE VERTICAL FRAMING TO PREVENT INTERFERENCE WITH LIGHT FIXTURES.

11. SECURE PLYWOOD TO PARTITION FRAMING WITH SCREWS AT 300mm O.C. VERT.

12. REPAIR / REPLACE ANY DAMAGED FLOOR SLAB OR WALL FINISHES DUE TO

INSTALLATION OR REMOVAL OF TEMPORARY CONSTRUCTION BARRIERS.

13. ALL BARRIERS MUST BE PAINTED WHITE WHERE EXPOSED TO CUSTOMER AREAS.

14. REMOVE CONSTRUCTION BARRIERS ENCLOSING A PHASE ONCE PHASE WORK IS

COMPLETED.

EGRESS / LIFE SAFETY NOTES:

1. REQUIRED MEANS OF EGRESS MUST BE MAINTAINED AT ALL TIMES. TEMPORARY

CONSTRUCTION BARRIERS MUST ALLOW ACCESS TO EXISTING EXITS, CORRIDORS,

OCCUPIED SPACES, ETC. DURING NORMAL STORE HOURS. TEMPORARY EGRESS

CORRIDORS MUST MEET APPLICABLE CODES FOR EXIT SIGNAGE, EMERGENCY

LIGHTING, LIFE SAFETY SPEAKER / STROBES, FIRE EXTINGUISHER PLACEMENT,

SPRINKLERS, ETC. DO NOT CLOSE OR OBSTRUCT EXITS, CORRIDORS, OR ACCESS

TO OTHER OCCUPIED SPACES WITHOUT APPROVED WRITTEN PERMISSION FROM

GOVERNMENT AUTHORIZED TECHNICAL REPRESENTATIVE.

2. LIFE SAFETY SYSTEMS MUST REMAIN FULLY OPERATIONAL THROUGHOUT

DURATION OF CONSTRUCTION. ALL EXISTING SYSTEMS (FIRE ALARM, PULL

STATIONS, HORNS, STROBES, SPEAKERS, ETC) SHOULD BE EITHER RELOCATED OR

TEMPORARILY SUSPENDED FROM THE STRUCTURE AS REQUIRED. BEFORE

TEMPORARILY DISCONNECTING OR RELOCATING EXISTING FIRE ALARM EQUIPMENT

NOTIFY GOVERNMENT AUTHORIZED TECHNICAL REPRESENTATIVE.

3. PROVIDE TEMPORARY FIRE EXTINGUISHERS ON PORTABLE STANDS WHERE DOING

HOT WORK AND WHERE MOUNTED EXTINGUISHERS ARE NOT ACCESSIBLE.

OUTSIDE WORK

MECHANICAL ROOM

AND ROOF

COLD STORAGE

REFRIGERATION

REPLACEMENT

CRITICAL PATH SEQUENCE

NOTE:

THIS CHART IS NOT INTENDED TO CONVEY CONSTRUCTION DURATIONS, DURATIONS ARE TO BE DETERMINED BY

CONTRACTOR.

FLOATING WORK IS INTENDED TO BE COMPLETED IN AN ORDER CONDUCIVE TO CONSTRUCTION AND STORE

OPERATIONS.

STORE HOURS

SUNDAY: 1000 - 1900

MONDAY: 0900 - 2000

TUESDAY: 0900 - 2000

WEDNESDAY: 0900 - 2000

THURSDAY: 0900 - 2000

FRIDAY: 0900 - 2000

SATURDAY: 0900 - 2000

NOTE: SUPPLIERS STOCK AT NIGHT.

FLOATING

WORK

F1

SALES AREA

WORK

S1

R1

C1

SCALE:

N.T.S.

PARTIAL HEIGHT CONSTRUCTION BARRIER

O-101

SCALE:

N.T.S.

SOFT CONSTRUCTION BARRIER

O-101

C2 C3 C4 C5 C6

S2 S3 S4 S5 S6 S7 S8 S9 S10

C7

MECHANICAL SCOPE

OF WORK

M1

PHASING SEQUENCE CHART

R2

M2

SCALE:

N.T.S.

TEMPORARY INSULATED WALL PANEL

O-101

EIG

TEA & MMS

SB

20 21 23 25 27 29 31 33 35 36 1

SC

SE

SH

SJ

SK

SN

SP

SQ

ST

SU

SV

L

SW

SX

SY

2 3

20 22 24 26 28 30 32 34 36 1 2 3

SF

SL

SM

SR

HD

HD

SALES

AREA

PRODUCE

PROCESSING

MEAT/DELI

ALCOVE

VACUUM

PACK

MEATS &

POULTRY

AMBIENT

STORAGE

43B

PRODUCE

CHILLED

STORAGE

43A

PRODUCE

RECEIVING

FROZEN

FOOD

STORAGE

RECEIVING

AISLE

STAIR

WOMEN'S

LOCKERS

WOMEN'S

RESTROOMS

DAIRY

STORAGE

BREAKROOM

16B

JANITOR

CHASE

MEDICAL

FOOD

INSPECTOR

RECEIVING

MANAGER

RECEIVING

MEN'S

RESTROOM

MEN'S

LOCKERS

STAGING

AREA

DAMAGED

MERCHANDISE

VESTIBULE

21B

VESTIBULE

21A

PERISHABLE/

SEMI-PERISHABLE

87/88

COM ROOM

31B

TRAINING/

CONFERENCE

ADMIN

AREA

RECEPTIONIST/

SECRETARY

MANAGER

STORE

DIRECTOR

DELI

COOLER

BAKERY

COOLER

BAKERY

FREEZER

BREAKROOM

16A

STORE

ADMINISTRATOR

PRODUCE

ALCOVE

ENTRY

VESTIBULE

1A

CART

STORAGE

ENTRY

VESTIBULE

1B

EXIT

VESTIBULE

2A

CART

RETURN

VAULT

CASHIER

OFFICE

CHECKOUT

QUEUING

EXIT

VESTIBULE

2B

BAG

STORAGE

MEN'S

VESTIBULE

WOMEN'S

VESTIBULE

MECHANICAL

DELI PREP.

BAKERY

PREP.

74A

BAKERY

PREP.

74B

STORAGE

DELI

SERVICE

VESTIBULE

WOMEN'S

CUSTOMER

RESTROOM

MEN'S

CUSTOMER

RESTROOM

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

43A

43B

MECHANICAL

BAKERY/DELI

DISPLAY

PRODUCE

MANAGER

67A

DAIRY

DISPLAY

SALES

AREA

BAKERY

SERVICE

PRODUCE

ALCOVE

2G15

G

A

G

A

G

A

2P08

2P08

2P08

2P08

2P08

2P08

G

A

G

A

G

A

G

A

2P08

2P08

2P08

2P08

G

A

G

A

G

A

G

A

2P08

2P08

2P08

2P08

2P08

2P08

G

A

G

A

G

A

2G15A

G

A

2P08

2P08

2P08

2P08

G

A

PRODU

PROVIDE CONTRACTOR ACCESS

PROVIDE CONSTRUCTION

BARRIER

REMOVE REFRIGERATED

CABINET

TEMPORARILY RELOCATE

REFRIGERATED CABINET

TEMPORARILY RELOCATE

REFRIGERATED CABINET

TEMPORARILY RELOCATE

REFRIGERATED CABINET

GOVERNMENT

TEMPORARILY REMOVE

OR RELOCATE PRODUCE

DISPLAY TABLE TO

ALLOW CUSTOMER

ACCESS

GOVERNMENT

TEMPORARILY REMOVE

OR RELOCATE PRODUCE

DISPLAY TABLE TO

ALLOW CUSTOMER

ACCESS

GOVERNMENT

TEMPORARILY REMOVE

OR RELOCATE PRODUCE

DISPLAY TABLE TO

ALLOW CUSTOMER

ACCESS

GOVERNMENT

TEMPORARILY REMOVE

OR RELOCATE PRODUCE

DISPLAY TABLE TO

ALLOW CUSTOMER

ACCESS

REMOVE REFRIGERATED

CABINET

GOVERNMENT

TEMPORARILY REMOVE

OR RELOCATE PRODUCE

DISPLAY TABLE TO

ALLOW CUSTOMER

ACCESS

GOVERNMENT

TEMPORARILY REMOVE

OR RELOCATE PRODUCE

DISPLAY TABLE TO

ALLOW CUSTOMER

ACCESS

PRODUCE

ALCOVE

PRODU

PROVIDE CONTRACTOR ACCESS

PROVIDE CONSTRUCTION

BARRIER

PROVIDE REFRIGERATED CABINET

PROVIDE REFRIGERATED CABINET

PROVIDE REFRIGERATED CABINET

PROVIDE REFRIGERATED CABINET

PROVIDE REFRIGERATED CABINET

TEMPORARILY RELOCATED

EXISTING PRODUCE CABINETS.

PROVIDE TEMPORARY POWER,

REFRIGERATION LINE, AND ABOVE

GROUND TEMPORARY DRAINAGE.

REMOVE CABINETS WHEN PHASE

WORK IS COMPLETE.

PROVIDE TEMPORARY END PANEL

PROVIDE GYPSUM BOARD WALL

SH

SJ

SK

SN

SP

SQ

ST

SU

19 20

SH

SJ

SK

SN

SP

SQ

ST

SU

19 20

PRODUCE

PROCESSING

MEAT/DELI

ALCOVE

2G15A

G

2G15A

G

2G15A

G

2G15A

G

2G15A

G

2G15A

G

2G15A

G

2G15A

G

2P08

2P08

PRODUCE

MANAGER

PROVIDE CONTRACTOR ACCESS

PROVIDE CONSTRUCTION

BARRIER

REMOVE REFRIGERATED

CABINET

REMOVE REFRIGERATED

CABINET

REMOVE REFRIGERATED

CABINET

REMOVE REFRIGERATED

CABINET

REMOVE REFRIGERATED

CORNER CABINET

REMOVE ELECTRICAL

CONDUIT

PROVIDE CONSTRUCTION

BARRIER

REMOVE FLOOR TO PROVIDE

CONDENSATE LINE IN

TRENCH

REMOVE FLOOR AND

EXISTING CONDENSATE

LINE

ST

SU

SV

20 22 24 26 28 20 22 24 26 28

ST

SU

SV

PRODUCE

PROCESSING

MEAT/DELI

ALCOVE

2G15A

G

2G15A

G

2G15A

G

2G15A

G

2G15A

G

2G15A

G

2G15A

G

2G15A

G

2P08

2P08

PRODUCE

MANAGER

PROVIDE CONSTRUCTION

BARRIER

PROVIDE CONSTRUCTION

BARRIER

PROVIDE

REFRIGERATED

CABINET

PROVIDE REFRIGERATED

CABINET

PROVIDE

REFRIGERATED

CABINET

PROVIDE WALL

PARTITION, TYP. BOTH

SIDES

PROVIDE REFRIGERATED

CABINET

PROVIDE WALL CLOSURE

PROVIDE CONCRETE

TRENCH AND DRAIN LINE

PROVIDE WALL CLOSURE

PROVIDE CONTRACTOR ACCESS

PATCH AND REPAIR

FLOOR

13750 SAN PEDRO, SUITE 300

SAN ANTONIO, TEXAS 78232

210-224-2800 www.rsandh.com TX. CERT. No. F-3401

SCALE:

1:200

4 O-102

OVERALL REMODEL

PHASING PLAN

OVERALL REMODEL PHASING PLAN

800040000

SCALE: 1:200

PHASING LEGEND

LIMIT OF PHASING AREA

CONSTRUCTION BARRIER

PHASE SEQUENCE NUMBER

FLOATING WORK: WORK CAN BE PERFORMED

CONCURRENTLY WITH OTHER WORK

TEMPORARILY RELOCATED EQUIPMENT

FLOOR TO BE REMOVED

F#

O-102

PHASING NOTES:

PHASING NOTES DO NOT LIST ALL ITEMS OF WORK REQUIRED BY THE

CONSTRUCTION DOCUMENTS. THE INTENT OF THE NOTES AND PHASING

PLAN IS TO ALLOW THE CONTRACTOR TO SEPARATE AREAS OF

CONSTRUCTION TO WORK ON WHILE COMMISSARY IS IN OPERATION.

REFER TO CONSTRUCTION DOCUMENTS TO IDENTIFY WORK THAT IS

REQUIRED FOR A SPECIFIC AREA. EACH STORE DEPARTMENT (MEAT,

PRODUCE, DAIRY, FROZEN FOODS, DELI / BAKERY) SHOULD LOSE NO MORE

THAN 50% OF THEIR DISPLAY AT ANY TIME UNLESS OTHERWISE APPROVED

BY STORE DIRECTOR AND CONTRACTING OFFICER REPRESENTATIVE.

PHASE S1

- TEMPORARILY RELOCATE EXISTING REFRIGERATED CABINETS

IDENTIFIED TO BE REMOVED ON THIS PHASE. PROVIDE TEMPORARY

POWER AND REFRIGERATION LINE CONNECTION. PROVIDE ABOVE

GROUND TEMPORARY DRAINAGE.

- REMOVE CABINET CLOSURE PANELS ABOVE REFRIGERATED DISPLAY

CABINETS.

- PROVIDE NEW REFRIGERATED DISPLAY CABINETS AND CABINET

PROTECTION IDENTIFIED ON THIS PHASE.

- PROVIDE NEW DISTRIBUTION PANEL AND CONNECT CABINETS TO THIS

PANEL

- PROVIDE CABINET CLOSURE PANELS ABOVE REFRIGERATED

CABINETS.

- PROVIDE COLD WATER CONNECTIONS TO PRODUCE CASES FOR QUICK

CONNECTION WATER HOSES.

- REMOVE TEMPORARILY RELOCATED REFRIGERATED CABINETS.

- REMOVE ELECTRICAL CIRCUITS TO EXISTING RELOCATED CABINETS

AND REMOVE DISTRIBUTION PANEL ONCE ALL LOADS ARE

TRANSFERRED AND OPERATIONAL.

PHASE S2, S3, S5, S6, S7, S8

(CONTRACTOR IS TO PROVIDE CONSTRUCTION BARRIER FOR PHASE S5, S6,

AND S8)

- PROVIDE NEW DISTRIBUTION PANEL AND CONNECT CABINETS TO THIS

PANEL

- REMOVE EXISTING REFRIGERATED CABINETS IDENTIFIED TO BE

REMOVED ON THIS PHASE.

- REMOVE ELECTRICAL CIRCUITS TO EXISTING REMOVED CABINETS.

- REMOVE CABINET CLOSURE PANELS ABOVE REFRIGERATED DISPLAY

CABINETS.

- REMOVE THE EXISTING CONDENSATE DRAINS SERVING THE MEAT

CASES BACK TO WHERE THEY CONNECT INTO THE EXISTING STORM

DRAIN RISER. CAP AND SEAL THE CONNECTION TO THE STORM DRAIN

RISER.

- PROVIDE NEW REFRIGERATED DISPLAY CABINETS AND CABINET

PROTECTION IDENTIFIED ON THIS PHASE.

- PROVIDE ELECTRICAL CIRCUITS TO NEW CABINET AND REMOVE

DISTRIBUTION PANEL ONCE ALL LOADS ARE TRANSFERRED AND

OPERATIONAL

- PROVIDE CABINET CLOSURE PANELS ABOVE REFRIGERATED

CABINETS.

- PROVIDE WALL, BASE AND ADDITIONAL WORK IDENTIFIED ON THIS

AREA FOR THIS PHASE.

- FURNISH AND INSTALL NEW CONDENSATE PIPING SERVING THE NEW

MEAT CASES. ROUTE THE PIPING WITHIN THE NEW FLOOR TRENCHES

AND CONNECT INTO THE EXISTING SANITARY DRAINAGE PIPING.

PHASE S4

- PROVIDE TEMPORARY INSULATED WALL PANEL ON EXISTING DAIRY

COLD STORAGE.

- REMOVE EXISTING DAIRY DOORS, CARTS, CART RAIL SYSTEM,

SHELVING AND SHELVING FRAME SYSTEM.

- REMOVE PRE-FINISHED INSULATED PANELS IDENTIFIED ON THIS

PHASE.

- PLUG, CAP, AND SEAL THE SIX (6) EXISTING CONDENSATE DRAIN

RECEPTORS IN THE FLOOR NEAR THE FRONT OF THE DAIRY COOLER.

- PROVIDE PRE-FINISHED INSULATED PANELS IDENTIFIED ON THIS

PHASE.

- PROVIDE DAIRY DOORS, CARTS AND CART RAIL SYSTEM.

PHASE S9

- REMOVE EXISTING EQUIPMENT IDENTIFIED TO BE REMOVED ON THIS

PHASE.

- REMOVE PARTIAL HEIGHT STAINLESS STEEL WALL AND DESK.

- REMOVE CEILING (BID OPTION 2) AND OTHER ITEMS IDENTIFIED ON

THIS PHASE.

- TEMPORARILY REMOVE ANY AIR DEVICES, LIGHT FIXTURES, AND

CEILING MOUNTED DEVICES IN CEILINGS BEING REPLACED AS PART OF

THE WORK (BID OPTION 2)

- PROVIDE NEW HEATED DISPLAY CABINETS AND CABINET WORK

IDENTIFIED ON THIS PHASE.

- PROVIDE POWER TO NEW HEATED DISPLAYS

- PROVIDE WALL, BASE, WALL FINISH, TRAFFIC DOOR AND CEILING AND

ADDITIONAL WORK IDENTIFIED ON THIS AREA FOR THIS PHASE.

- PROVIDE CEILING (BID OPTION 2)

- THOROUGHLY CLEAN AND REINSTALL ANY AIR DEVICES, LIGHT

FIXTURES, AND CEILING MOUNTED DEVICES THAT WERE REMOVED TO

ACCOMMODATE CEILING REPLACEMENT (BID OPTION 2)

PHASE S10

(WORK FOR PHASE S10 TO BE DONE DURING NON BUSINESS HOURS)

- REMOVE EXISTING REFRIGERATED CABINETS IDENTIFIED TO BE

REMOVED ON THIS PHASE.

- REMOVE EXISTING FIXED COUNTER AND CABINETS IDENTIFIED OF THIS

PHASE.

- PROVIDE NEW REFRIGERATED DISPLAY CABINETS AND CABINET

PROTECTION IDENTIFIED ON THIS PHASE.

PHASE C1, C2, C3, C4, C5, C6, C7

(PROVIDE UP TO 6 TEMPORARY REFRIGERATED OR FROZEN TRAILER IF

WORK CANNOT BE PHASED WITHIN EACH ROOM)

- INSTALL NEW DISTRIBUTION BOARD TO SERVICE EQUIPMENT

- REMOVE UNIT COOLER IDENTIFIED ON THIS PHASE.

- REMOVE ELECTRICAL CIRCUITS TO EACH UNIT

- PROVIDE NEW UNIT COOLERS ON ROOMS IDENTIFIED ON THIS PHASE.

- PROVIDE AIR CURTAIN IDENTIFIED ON THIS PHASE. FROZEN FOOD

STORAGE ROOM 66.

- REMOVE PLASTIC CURTAIN IDENTIFIED ON THIS PHASE. IF APPLICABLE.

- PROVIDE TRAFFIC DOOR IDENTIFIED ON THIS PHASE. IF APPLICABLE.

- REMOVE INSULATED SLIDING DOOR IDENTIFIED ON THIS PHASE. IF

APPLICABLE.

- PROVIDE INSULATED SLIDING DOOR IDENTIFIED ON THIS PHASE. IF

APPLICABLE.

- PATCH EXISTING HOLES LEFT BY REMOVAL OF EXISTING HVAC SUPPLY

DIFFUSER. IF APPLICABLE.

- RECONNECT CIRCUIT TO NEW DISTRIBUTION BOARD

- REMOVE EXISTING DISTRIBUTION BOARD BACK TO SOURCE AFTER ALL

LOADS HAVE BEEN REPLACED OR TRANSFERRED TO THE NEW BOARD

PHASE R1

- REMOVE EXISTING GYPSUM BOARD STUD PARTITION.

- TEMPORARILY REMOVE EXTERIOR LOUVERS.

- REMOVE THE EXISTING DOMESTIC COLD WATER STORAGE TANK FROM

THE MEZZANINE, INCLUDING THE SUPPORT STRUCTURE AND

CONCRETE PEDESTALS.

- REMOVE THE EXISTING DOMESTIC HOT WATER GENERATORS

(CALORIFIERS).

- REMOVE EXISTING CONCRETE PADS.

- PROVIDE NEW CONCRETE PADS FOR GAS COOLERS.

- INSTALL GAS COOLERS GS-1 AND GS-2.

- INSTALL CO2 COMPRESSOR SYSTEM CS-1 AND CS-2.

- INSTALL REFRIGERATION ELECTRICAL PANELS. PROVIDE TEMPORARY

GENERATOR POWER DURING TAPPING OF EXISTING CIRCUIT.

- FURNISH AND INSTALL NEW DOMESTIC COLD WATER SUPPLY PIPING

TO RECONNECT PIPING THAT WAS PREVIOUSLY CONNECTED TO THE

STORAGE TANK.

- FURNISH AND INSTALL A NEW DOMESTIC HOT WATER GENERATOR

(CALORIFIER) AND RECONNECT THE EXISTING PIPING.

PHASE R2

- REMOVE EXISTING REFRIGERATION CONDENSER FROM ROOF.

- REMOVE EXISTING REFRIGERATION SWITCHGEAR AND REMOVE TAP

CONNECTION TO THIS GEAR. PROVIDE TEMPORARY GENERATOR

DURING TRANSITION.

PHASE M1

NOTE: ALL WORK INVOLVING AIR HANDLER DEMOLITION MUST OCCUR

DURING SPRING, SUMMER, OR FALL MONTHS ONLY, UNLESS NOTED

OTHERWISE.

- DEMOLISH EXISTING HVAC COOLING PACK REFRIGERATION MACHINE

FROM MECHANICAL MEZZANINE (MAY OCCUR DURING ANY SEASON)

- REMOVE CIRCUIT AND ASSOCIATED EQUIPMENT FOR HVAC COOLING

RACK BACK TO SOURCE

- DEMOLISH EXISTING REMOTE CONDENSER SERVING AHU-2 IN

MECHANICAL YARD ADJACENT TO MECHANICAL MEZZANINE ON ROOF

(MAY OCCUR DURING ANY SEASON)

- REMOVE CIRCUIT AND ASSOCIATED EQUIPMENT FOR CONDENSER

BACK TO SOURCE

- DEMOLISH EXISTING REFRIGERANT PIPING BETWEEN AHU-2, HVAC

COOLING PACK REFRIGERATION MACHINE, AND HVAC REMOTE

CONDENSER (MAY OCCUR DURING ANY SEASON)

- DEMOLISH EXISTING AIR HANDLER UNIT (AHU-2) FROM MECHANICAL

MEZZANINE

- DEMOLISH EXISTING RETURN AIR FAN SERVING AHU-2 FROM

MECHANICAL MEZZANINE

- DEMOLISH EXISTING DUCTWORK AND HEATING WATER PIPING AS

REQUIRED TO ACCOMMODATE NEW WORK

- REMOVE ALL CONDUIT AND CONDUCTORS TO AHU-2, CONDENSER,

RETURN AIR FAN INCLUDING ALL ASSOCIATED CONTROL EQUIPMENT.

PHASE M2

- FURNISH AND INSTALL NEW AIR HANDLING UNIT (AHU-2) IN

MECHANICAL MEZZANINE

- PROVIDE NEW CIRCUIT TO AHU-2. MODIFY FUSE OR BREAKER

SETTINGS AS REQUIRED BY NEW UNIT.

- FURNISH AND INSTALL NEW ENERGY RECOVERY UNIT (ERU) IN

MECHANICAL MEZZANINE

- PROVIDE NEW CIRCUIT TO NEW ERU. PROVIDE MODIFICATION TO

EXISTING DISTRIBUTION BOARD FOR UNIT PROVIDED.

- FURNISH AND INSTALL NEW CO2 REFRIGERANT PIPING BETWEEN

AHU-2 AND REFRIGERATION SYSTEM.

- FURNISH AND INSTALL NEW DUCTWORK AS REQUIRED TO CONNECT

NEW EQUIPMENT TO EXISTING DUCTWORK

- FURNISH AND INSTALL NEW HEATING WATER PIPING TO NEW HVAC

EQUIPMENT

- FURNISH AND INSTALL NEW HEATING WATER PIPING FROM EXISTING

MAIN HEATING WATER PIPING LOOP IN BOILER ROOM TO NEW

REFRIGERANT HEAT RECLAIM HEAT EXCHANGER

- PROVIDE MOISTURE RESISTANT GYPSUM BOARD STUD WALL.

- PROVIDE DUCT CLEANING SERVICES FOR THE ENTIRE AHU-2 SYSTEM,

TO INCLUDE ALL SUPPLY AIR DUCTWORK, RETURN AIR

TUNNELS/SHAFT, AND AIR DEVICES (BID OPTION 3)

FLOATING WORK F1

- REMOVE THE AIR DEVICES AND CAP THE ASSOCIATED BRANCH DUCTS

IN PRODUCE PROCESSING 44

- REMOVE LIGHT FIXTURES AND RETAIN CIRCUIT FOR RECONNECTION

(BID OPTION 1)

- ADDITION OF ELECTRICAL METERS

SCALE:

1:100

PHASING S1 - DEMOLITION

O-102

400020000

SCALE: 1:100

SCALE:

1:100

PHASING S1 - REMODEL

O-102

400020000

SCALE: 1:100

SCALE:

1:100

PHASING S2 - DEMOLITION

O-102

400020000

SCALE: 1:100

SCALE:

1:100

PHASING S2 - REMODEL

O-102

400020000

SCALE: 1:100

EIG

BOILER ROOM

SWITCH GEAR

MAIN PLANT ROOM

STORE

ESCAPE

BOILER ROOM

SWITCH GEAR

MAIN PLANT ROOM

STORE

ESCAPE

BOILER ROOM

SWITCH GEAR

MAIN PLANT ROOM

STORE

ESCAPE

BOILER ROOM

SWITCH GEAR

MAIN PLANT ROOM

STORE

ESCAPE

SU

SV

L

SW

20 22 24 26 28 30 32 34 36 1

20 22 24 26 28 30 32 34 36 1

SU

SV

L

SW

MEAT/DELI

ALCOVE

CHASE

G

2G15A

G

2G15A

G

2G15A

G

2G15A

G

2G15A2G15A

G

2G15A

G

2G15A

G

2G15A

G

F

C O

F F

I N

SC REF

COFFIN

PROVIDE CONTRACTOR ACCESS

PROVIDE CONSTRUCTION

BARRIER

REMOVE REFRIGERATED

CABINET

REMOVE REFRIGERATED

CORNER CABINET

REMOVE REFRIGERATED

CABINET

REMOVE REFRIGERATED

CABINET

PROVIDE CONSTRUCTION

BARRIER

REMOVE FLOOR TO PROVIDE

CONDENSATE LINE IN TRENCH

22 24 26 28 30

ST

SU

SV

ST

SU

SV

22 24 26 28 30

MEAT/DELI

ALCOVE

CHASE

G

2G15A

G

2G15A

G

2G15A

G

2G15A

G

2G15A2G15A

G

2G15A

G

2G15A

G

2G15A

G

F

C O

F F

I N

SC REF

COFFIN

PROVIDE REFRIGERATED

CABINET

PROVIDE CONSTRUCTION

BARRIER

PROVIDE REFRIGERATED

CABINET

PROVIDE REFRIGERATED

CABINET

PROVIDE CONTRACTOR ACCESS

PROVIDE CONSTRUCTION

BARRIER

PROVIDE TRENCH FOR

DRAIN LINE

PROVIDE WALL CLOSURE PROVIDE WALL CLOSURE

VES

2G16

F

C O

F F

I N

SC REF

COFFIN

DAIRY

DISPLAY

SALES

AREA

67A

PROVIDE INSULATED

CONSTRUCTION BARRIER,

SEE 4/O-101.

REMOVE DISPLAY DOOR

PROVIDE CONTRACTOR ACCESS

PROVIDE CONSTRUCTION

BARRIER

REMOVE SHELVING

REMOVE DOORS AND

FRAMES

SU

32 34 36 1

J

H

HD

STORAGE

DELI

SERVICE

VESTIBULE

RESTROOM

1D11A

1D10B w/Hood

1B28

2D01

SC REF

CABINET

S/S

Sink

HAND SINK

OVEN

1D09

BAKERY/DELI

DISPLAY

4TFP-6

SC REF

CABINET

BAKERY

SERVICE

GOVERNMENT TO

REMOVE EQUIPMENT

REMOVE FIXED TABLE

PROVIDE CONTRACTOR ACCESS

PROVIDE CONSTRUCTION

BARRIER

PROVIDE CONSTRUCTION

BARRIER

REMOVE WALL

GOVERNMENT TO

REMOVE DRY GONDOLA

REMOVE PARTIAL HEIGHT

STAINLESS STEEL WALLS

SF

31 33 35

SF

HD

STORAGE

DELI

SERVICE

VESTIBULE

RESTROOM

1D11A

1D10B w/Hood

1B28

2D01

SC REF

CABINET

S/S

Sink

HAND SINK

OVEN

1D09

BAKERY/DELI

DISPLAY

4TFP-6

SC REF

CABINET

BAKERY

SERVICE

PROVIDE CONTRACTOR ACCESS

PROVIDE CONSTRUCTION

BARRIER

PROVIDE CONSTRUCTION

BARRIER

PROVIDE HOT DISPLAY

CABINET

PROVIDE COUNTER

PROVIDE INTERIOR WALL

PROVIDE DOOR

PROVIDE EQUIPMENT

PROVIDE

FLOORING AS

SCHEDULED

GOVERNMENT TO PROVIDE

AND INSTALL EQUIPMENT

31 33 35

VES

2G16

F

C O

F F

I N

SC REF

COFFIN

DAIRY

DISPLAY

SALES

AREA

67A

PROVIDE DISPLAY DOOR

PROVIDE PRE-INSULATED

PANEL WALL AND

CEILING

PROVIDE CONTRACTOR ACCESS

PROVIDE CONSTRUCTION

BARRIER

PROVIDE PRE-INSULATED

PANEL WALL

PROVIDE INSULATED

CONSTRUCTION BARRIER,

SEE 4/O-101.

J

H

32 34 36 1

SU

VESTIBULE

21B

VESTIBULE

21A

SALES

AREA

REMOVE

REFRIGERATED

CABINET

REMOVE

REFRIGERATED

CABINET

REMOVE

REFRIGERATED

CABINET

REMOVE

REFRIGERATED

CABINET

REMOVE

REFRIGERATED

CABINET

REMOVE

REFRIGERATED

CABINET

REMOVE

REFRIGERATED

CABINET

REMOVE

CART RAIL

PROTECTION

SYSTEM. PATCH

AND REPAIR

EXISTING

TERRAZO FLOOR.

PROVIDE

CONTRACTOR

ACCESS

PROVIDE

CONSTRUCTION

BARRIER

PROVIDE

CONTRACTOR

ACCESS

REMOVE

EXISTING

PARTITION

REMOVE

REFRIGERATED

CABINET

VESTIBULE

21B

VESTIBULE

21A

SALES

AREA

PROVIDE

REFRIGERATED

CABINET

PROVIDE

REFRIGERATED

CABINET

PROVIDE

REFRIGERATED

CABINET

PROVIDE

REFRIGERATED

CABINET

PROVIDE

REFRIGERATED

CABINET

PROVIDE

CONTRACTOR

ACCESS

PROVIDE

CONTRACTOR

ACCESS

PROVIDE

CONSTRUCTION

BARRIER

PROVIDE

STAINLESS

STEEL CORNER

GUARD, TYP

PROVIDE

STAINLESS

STEEL CORNER

GUARD, TYP

PROVIDE

REFRIGERATED

CABINET

PROVIDE

REFRIGERATED

CABINET

PROVIDE

REFRIGERATED

CABINET

SJ

SN

SP

SL

SR

H

G

F

E

D

SM

35 36 1

SN

SP

SJ

35 36 1

H

G

F

E

D

SR

SL

SM

13750 SAN PEDRO, SUITE 300

SAN ANTONIO, TEXAS 78232

210-224-2800 www.rsandh.com TX. CERT. No. F-3401

SCALE:

1:100

5 O-103

MEZZANINE DEMOLITION PHASING PLANS

400020000

SCALE: 1:100

MEZZANINE PHASING PLAN

& PHASES

O-103

SCALE:

1:100

MEZZANINE REMODEL PHASING PLANS

400020000

SCALE: 1:100

O-103

SCALE:

1:100

PHASE S3 - DEMOLITION

400020000

SCALE: 1:100

O-103

SCALE:

1:100

PHASE S3 - REMODEL

400020000

SCALE: 1:100

O-103

SCALE:

1:100

PHASE S4 - DEMOLITION

400020000

SCALE: 1:100

O-103

SCALE:

1:100

PHASE S4 - REMODEL

400020000

SCALE: 1:100

O-103

SCALE:

1:100

PHASE S9 - DEMOLITION

400020000

SCALE: 1:100

O-103

SCALE:

1:100

PHASE S9 - REMODEL

400020000

SCALE: 1:100

O-103

SCALE:

1:100

PHASE S7 - DEMOLITION

400020000

SCALE: 1:100

O-103

SCALE:

1:100

PHASE S7 - REMODEL

400020000

SCALE: 1:100

O-103

EIG

TEA & MMS

JJH

PHASING LEGEND

LIMIT OF PHASING AREA

CONSTRUCTION BARRIER

PHASE SEQUENCE NUMBER

FLOATING WORK: WORK CAN BE PERFORMED

CONCURRENTLY WITH OTHER WORK

TEMPORARILY RELOCATED EQUIPMENT

FLOOR TO BE REMOVED

F#

13750 SAN PEDRO, SUITE 300

SAN ANTONIO, TEXAS 78232

210-224-2800 www.rsandh.com TX. CERT. No. F-3401

536 A-001

ARCHITECTURAL LEGEND &

GENERAL NOTES

ARCHITECTURAL ABBREVIATIONS

ABBREVIATION DESCRIPTION

A

& AND

@ AT

# POUND, NUMBER

° DEGREE

ABV ABOVE

A/C AIR CONDITIONING

ACOUST ACOUSTICAL CEILING TILE ACOUSTICAL

ACM ASBESTOS CONTAINING MATERIAL

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES

ACT ADDENDUM

ADD ADDENDUM

ADDL ADDITIONAL

ADJ ADJACENT

ADJ ADJUSTABLE

ADMIN ADMINISTRATION

AFF ABOVE FINISHED FLOOR

AGG,AGGR AGGREGATE

AHU AIR HANDLER UNIT

ALT ALTERNATE

ALUM ALUMINUM

AMEND AMENDMENT

ANOD ANODIZED

ANUN ANUNCIATOR

AP ACCESS PANEL

APROX APPROXIMATE

ARCH ARCHITECT(URAL)

ASPH ASPHALT

AUTO AUTOMATIC

AVG AVERAGE

AWN, AWNG AWNING

AWP ACOUSTICAL WALL PANELS

AWT ACOUSTICAL WALL TREATMENT

B

BD BOARD

BG BUMPER GUARD

BIT BITUMINUOUS

BLDG BUILDING

BLK BLOCK

BLKG BLOCKING

BLT BOLT

BM BEAM

BOT,BOTT BOTTOM

BR BRICK

BRG,BRNG BEARING

BRZ BRONZE

BSMT BASEMENT

BTWN BETWEEN

BULL BULLETIN

BUR BUILT-UP ROOF

BW BOTH WAYS

C

CAB CABINET

CEN, CTR CENTER

CFCI CONTRACTOR FURNISHED

CONTRACTOR INSTALLED

CG CORNER GUARD

CH COAT HOOK

CHAM CHAMFER

CIR CIRCLE

CJ CONTROL JOINT

CL, ℄ CENTER LINE

CLG CEILING

CLO CLOSET

CLR CLEAR(ANCE)

CM CENTIMETER

CMU CONCRETE MASONRY UNIT

CNTR COUNTER

COL COLUMN

COMM COMMUNICATIONS

COMP COMPRESS(IBLE), (ION), (ED)

CONC CONCRETE

CONST CONSTRUCTION

CONT CONTINUOUS

COORD COORDINATE

CORR CORRIDOR

CPT CARPET

CRS COURSE

CSK COUNTERSINK

CSMT CASEMENT

CT CERAMIC TILE

CTD, CTR CENTERED, CENTER

CTRK CURTAIN TRACK

CTSK COUNTERSUNK

CU FT CUBIC FOOT

CUST CUSTODIAN

CW COLD WATER

CW CURTAIN WALL

PROJECT PHASING

THIS IS A PHASED PROJECT. DEMOLITION AND NEW WORK SHALL OCCUR IN PHASES AS DEFINED BY THE PHASING PLANS.

ABBREVIATION DESCRIPTION

D

D DEPTH

DBL DOUBLE

DEMO DEMOLITION

DH DOUBLE HUNG

DIA DIAMETER

DIM DIMENSION

DISP DISPENSER

DF DRINKING FOUNTAIN

DN DOWN

DP DEEP

DR DOOR

DS DOWNSPOUT

DTL, DET DETAIL

DWG, DWGS DRAWING, DRAWINGS

E

E EAST

EA EACH

EDF ELECTRIC DRINKING FOUNTAIN

EF EACH FACE

EIFS EXTERIOR INSULATION & FINISH

SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELEC, ELECT ELECTRICAL

ELEV ELEVATOR

EQ EQUAL

EQF EPOXY QUARTZ

EQIUP EQUIPMENT

EW EACH WAY

EWC ELECTRIC WATER COOLER

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

F

F FLUSH

FA FIRE ALARM

FD FLOOR DRAIN

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FLOOR

FG FULL GLASS

FHC FIRE HOSE CABINET

FIN FINISH(ED)

FIX FIXTURE

FL, FLR FLOOR

FLASH FLASHING

FLEX FLEXIBLE

FLR FLOOR

FLUOR FLUORESCENT

FO FACE OF

FOC FACE OF CONCRETE

FOM FACE OF MASONRY

FP FIRE PROOFING

FR FIRE RATED

FS FLOOR SINK

FT FOOT, FEET

FURR FURRING

FV FIELD VERIFY

G

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GB GRADE BEAM

GC GENERAL CONTRACTOR

GD GRADE

GEN GENERAL

GFCI GOVERNMENT FURNISHED

CONTRACTOR INSTALLED

GFGI GOVERNMENT FURNISHED

GOVERNMENT INSTALLED

GI GALVANIZED IRON

GL GLASS

GT, GRD GRADE

GYP GYPSUM

GWB, GYP BD GYPSUM WALLBOARD

H

H HEIGHT

HB HOSE BIB

HC HOLLOW CORE

HC, HDCP HANDICAPPED, HOLLOW CORE

HD HAND DRYER

HD HEAD, HEAVY DUTY

HDW, HDWR HARDWARE

HDWD, HWD HARDWOOD

HM HOLLOW METAL

HORIZ HORIZONTAL

HP HIGH POINT

HR HOUR

HT, HGT HEIGHT

HTG HEATING

HTR HEATER

HVAC HEATING, VENTILATING, & AIR

CONDITIONING

HW HOT WATER

ABBREVIATION DESCRIPTION

I

IBC INTERNATIONAL BUILDING

CODE

IC INTERCOM

ID INSIDE DIAMETER

ILLUS IN ILLUSTRATE(D), ILLUSTRATING

INCH, INCHES

INCL INFO INCULDE(D), INCLUDING

INFORMATION

INSUL INSULATION

INT INTERIOR

J

JAN JANITOR

JT JOINT

JB JUNCTION

JST BOX

JT JOIST

JOINT

K

KO KNOCK-OUT

L

LAM LAMINATE

LAV LAVATORY

LB(S) POUND(S)

LF LINEAR FEET

LP LOW POINT

LIB LIBRARY

LKR(S) LOCKER(S)

LOC LOCATION

LT LIGHT

LVR LOUVER

M

MAS MASONRY

MAT, MATL MATERIAL

MAX MAXIMUM

MB, MKBD MARKER BOARD

MECH MECHANICAL

MEMB MEMBRANE

MEP MECHANICAL/ELECTRICAL/

PLUMBING

MEZZ MEZZANINE

MFG, MFGR MANUFACTURING

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MTD MOUNTED

MTL, MET METAL

MULL MULLION

N

N NORTH

NA NOT APPLICABLE

NIC NOT IN CONTRACT

NL NARROW LIGHT

NO NUMBER

NOM NOMINAL

NR NOT RATED

NRC NOISE REDUCTION COEFFICIENT

NTS NOT TO SCALE

O

OA OVER ALL

OA OUTSIDE AIR

OC ON CENTER

OD OUTSIDE DIAMETER

OD OVERFLOW DRAIN

OH OVERHEAD, OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

P

P, PT, PTD PAINT, PAINTED

PART PARTITION

PB PUSH BUTTON

PL,⅊ PLATE

PLA PLASTIC

PLAM PLASTIC LAMINATE

PLAS PALSTIC

PLS PLASTER

PLYWD PLYWOOD

PNL PANE

PR PAIR

PROJ PROJECTION

PROP PROPERTY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PVC POLYVINYL CHLORIDE

Q

QT QUARRY TILE

ABBREVIATION DESCRIPTION

R

R RADIUS

R RISER

RA, R/A RETURN AIR

RAD RADIUS

RB RUBBER

RD ROOF DRAIN

RE, REF REFERENCE

REINF REINFORCED, REINFORCING

REQD REQUIRED

REBAR REINFORCING BAR

RES RESILIENT

RET RETAINING

REV REVISED

RH RIGHT HAND

RH ROOF HATCH

RM ROOM

RO ROUGH OPENING

RTU ROOF TOP UNIT

S

S SOUTH

SCHED SCHEDULE

SD SMOKE DETECTOR

SEC, SECT SECTION

SF SQUARE FEET

SH SINGLE HUNG

SHLF SHELF

SHLV SHELVES, SHELVING

SHT SHEET

SHW, SHWR SHOWER

SPEC SPECIFICATIONS

SQ SQUARE

SS STAINLESS STEEL

STC SOUND TRANSMISSION CLASS

STANDARD

STD STEEL

STL STORAGE

STO, STOR STRUCT STRUCTURE

SUSP SUSPENDED

SVF SHEET VINYL FLOORING

SYS SYSTEM

T

T TREAD

TB, TKBD TACKBOARD

TC TIME CLOCK

TEL TELEPHONE

TERR TERRAZZO

THR THRESHOLD

THK THICK(NESS)

TLT TOILET

TOB TOP OF WOOD BLOCKING

TOC TOP OF CURB ELEVATION

TOM TOP OF MASONRY

TOS TOP OF SLAB, TOP OF STEEL

TOW TOP OF WALL

T/R TOILET ROOM

TYP TYPICAL

U

UBC UNIFIED BUILDING CODE

UL UNDERWRITER'S LABORATORIES

UNO UNLESS NOTED OTHERWISE

UR UTL URINAL UTILITY

V

V, VT VENT

VCT VINYL COMPOSITE TILE

VEND VENDING

VERT VERTICAL

VEST VESTIBULE

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

W

W WEST, WIDTH

W/ WIDE WITH

WC WATER CLOSET

WD WOOD

WDW WINDOW

WH WATER HEATER

WP WEATHERPROOFING

WS WEATHERSTRIP

WT WEIGHT

WW WATER WELL

WWF WELDED WIRE FABRIC

Y

YD YARD

ARCHITECTURAL DEMOLITION LEGEND

SYMBOL DESCRIPTION

KEY NOTE

EXISTING CONSTRUCTION OR ITEMS TO REMAIN

ITEM TO BE DEMOLISHED OR RELOCATED, SEE SPECIFIC

DEMOLITION NOTES

ROOM NUMBER. SEE ROOM LEGEND

ARCHITECTURAL CEILING PLAN LEGEND

SYMBOL DESCRIPTION

EXISTING PRE-MANUFACTURED COOLER/FREEZER CEILING PANELS.

EXISTING SUSPENDED 610X610 ACOUSTICAL CEILING TILE

EXISTING RIGID GYP BD CEILING PANELS

SUSPENDED ACOUSTICAL PANEL CEILING

PREFABRICATED INSULATED CEILING PANELS

GYPSUM BOARD CEILING PANELS

SUSPENDED MOISTURE RESISTANT GYPSUM BOARD CEILING

ACCESS PANELS

ARCHITECTURAL DEMOLITION CEILING PLAN LEGEND

SYMBOL DESCRIPTION

EXISTING PRE-MANUFACTURED COOLER/FREEZER CEILING PANELS TO REMAIN.

SUSPENDED 610X610 ACOUSTICAL CEILING TILE TO REMAIN.

RIGID GYP BD CEILING PANELS TO REMAIN.

AREA TO BE DEMOLISHED

XX

XX

A-505

IDENTIFICATION

NUMBER

SHEET

NUMBER

ARCHITECTURAL LEGEND

SYMBOL DESCRIPTION

NORTH ARROW

DETAIL/SECTION CALL OUT

DOOR SYMBOL

WALL TYPE, SEE A-102

MATCHLINE

TOILET ACCESSORY

FIRE EXTINGUISHER

KEY NOTE

EXISTING CONSTRUCTION OR ITEMS TO REMAIN

NEW ITEMS, SEE SPECIFIC NEW WORK NOTES

ROOM NUMBER, SEE ROOM LEGEND

A

20-1

TA-1

FE

ELECTRICAL/ LIGHTING SYMBOLS, TYP.

- REFER TO ELECTRICAL DRAWINGS

FOR MORE INFORMATION

HVAC/ MECHANICAL SYMBOLS, REFER

TO MECHANICAL DRAWINGS FOR

MORE INFORMATION

FIRE PROTECTION SYMBOLS, REFER

TO FIRE PROTECTION DRAWINGS FOR

MORE INFORMATION

GENERAL DESCRIPTION OF WORK:

THE ARCHITECTURAL SCOPE OF WORK INVOLVES WORK ASSOCIATED WITH

REPLACEMENT OF THE REFRIGERATION EQUIPMENT. THIS INCLUDES, BUT IS NOT

LIMITED TO:

1. REPLACEMENT OF REFRIGERATION SYSTEM AND REPLACEMENT OF

REFRIGERATED CABINETS

2. REPLACEMENT OF THE DAIRY DOORS AND CART RAIL

3. REPLACEMENT OF THE HVAC FOR THE SALES AREA

4. RENOVATION OF AN AREA NEXT TO THE BAKERY/DELI BY ADDING HEATED DISPLAY

CABINETS. ADD CEILING TILE TO THE AREA (BID OPTION 2).

5. ADD A TRAFFIC DOOR AND AN INSULATED SLIDING DOOR BY THE PRODUCE

CHILLED STORAGE.

6. REPLACE LED LIGHT FIXTURES IN ALL COLD STORAGE ROOM (BID OPTION 1)

NOTE: THIS IS ONLY A GENERAL DESCRIPTION OF WORK AND IS NOT INTENDED TO

DESCRIBE ALL WORK TO BE DONE. PLEASE REFER TO ALL DRAWINGS AND

SPECIFICATIONS FOR ENTIRE ARCHITECTURAL SCOPE.

ELECTRICAL/ LIGHTING SYMBOLS, TYP.

- REFER TO ELECTRICAL DRAWINGS

FOR MORE INFORMATION

HVAC/ MECHANICAL SYMBOLS, REFER

TO MECHANICAL DRAWINGS FOR

MORE INFORMATION

FIRE PROTECTION SYMBOLS, REFER

TO FIRE PROTECTION DRAWINGS FOR

MORE INFORMATION

S

FAS

RN

FACP

S

S

FAS

RN

FACP

S

GENERAL NOTES:

A. PROVIDE ALL LABOR AND MATERIALS TO REMOVE WALLS AND PORTIONS OF WALLS AS

SHOWN ON DEMOLITION PLAN. IF UNABLE TO REMOVE WALL AS SHOWN ON PLAN.

CONTACT GOVERNMENT AUTHORIZED TECHNICAL REPRESENTATIVE TO COME TO A

RESOLUTION.

B. OBTAIN AND VERIFY FIELD MEASUREMENTS FOR THE EXECUTION OF THE WORK AND

PRIOR TO FABRICATION OF THE VARIOUS COMPONENTS OF THE WORK.

C. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS TO DETERMINE QUANTITIES

OF DIFFUSERS, GRILLES, LIGHT FIXTURES, ETC.

D. PAINT ALL EXPOSED ELECTRICAL PANELS, ACCESS PANELS, SUPPORTS ETC. TO MATCH

ADJACENT WALL OR CEILING FINISH.

E. PROVIDE BLOCKING IN WALLS, SOFFITS, AND CEILINGS RECEIVING MOUNTED ITEMS.

F. VERIFY ALL GRADES AND THEIR RELATIONSHIP TO THE BUILDING AND FINISH FLOOR

ELEVATIONS.

G. VERIFY SIZE AND LOCATION FOR SURFACE MOUNTED ITEMS, PROVIDE ALL OPENINGS

THROUGH FLOORS AND WALLS, FURRING, CURBS, ANCHORS, INSERTS, MACHINE BASES

AND ROUGH BUCKS/BACKING FOR SURFACE MOUNTED ITEMS.

H. PROVIDE FURRING AS REQUIRED TO CONCEAL MECHANICAL AND/OR ELECTRICAL

WORK/HARDWARE IN FINISHED AREAS.

I. REPETITIVE FEATURES ARE OFTEN DRAWN ONLY ONCE AND SHALL BE PROVIDED AS IF

DRAWN IN FULL.

J. CONSTRUCTION FLOOR DIMENSIONS AND ELEVATIONS ARE FROM TOP OF FINISHED

FLOOR SLAB

K. THIS IS A PHASED PROJECT. DEMOLITION AND NEW WORK SHALL OCCUR IN PHASES AS

DEFINED BY THE PHASING PLANS. ALL WORK IN ONE PHASE SHALL BE COMPLETE AND

TURNED OVER TO THE GOVERNMENT BEFORE BEGINNING WORK IN THE NEXT PHASE

UNLESS OTHERWISE NOTED.

L. REFER TO SHEETS-001 FOR SEISMIC AND WIND LOAD INFORMATION.

M. PATCH AND REPAIR GYPSUM BOARD AT SOFFITS AND WALLS DAMAGED BY THE

REMOVAL OF EXISTING REFRIGERATED CABINETS, CLOSURE PANEL, AND EQUIPMENT

AS PART OF…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.