Atch 13 AF Form 3065 Contract Progress Report.xls

Air Force Form XLS spreadsheet 45 KB Posted

Attached to
CREECH SABER IDIQ
Solicitation number
FA4861-11-R-A400
Issued by

About this file

CREECH AFB SABER ATTACHMENT 13

View the file

Other versions and copies of AF Form 3065

File Revision Posted Attached to
33 - AF Form 3065 Progress Report Template - 01 Apr 1996.pdf Apr 1, 1996 SABER IDIQ
33 - AF Form 3065 Progress Report Template - 01 Apr 1996.pdf Apr 1, 1996 SABER IDIQ
Attachment C - AF Form 3065.pdf Revision not stated Airfield Blast Shield
AF Form 3065.xlsx Revision not stated Demo B5276 & B8129 Amendment 0001
Attachment G - BLANK SAMPLE AF Form 3065.xlsx Revision not stated Robins AFB Paving Multi-Award IDIQ
SOW App 003 AF IMT 3065 Progress Report.pdf Revision not stated Amendment 002***Multiple Award Construction Contract (MACC), Joint Base Elmendorf-Richardson (JBER), AK – Solicitation
FNWZ 17-0021A - Att E - AF Form 3065.xlsx Revision not stated Demo B6142
FNWZ 21-0071 - Att E - AF Form 3065.xlsx Revision not stated Demo B6119
Attachment 5 - AF FORM 3065 Contract Progress Report.pdf Revision not stated Security System Upgrades
Atch 30-APPENDIX 28 AF Form 3065 Progress Report Template.pdf Revision not stated Nellis AFB Paving IDIQ
Attachment 4_AF IMT 3065_199600401_VI_Progress Report.pdf Revision not stated Hazardous Materials Abatement Contract - IDIQ
Attachment 10 - BLANK SAMPLE AF Form 3065.xlsx Revision not stated Dismantling of Modular Facility & Storage Racks
Attachment 2.8 - AF Form 3065 Progress Report Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Exhibit 7 - AF Form 3065 Contract Progress Report.pdf Revision not stated Multiple Award Task Order Contract (MATOC) Mechanical HVAC/Mechanical Maintenance, Repair and Minor Construction Work Amendment 2
BLANK SAMPLE AF Form 3065.xlsx Revision not stated Civil Engineering Multiple Award Construction Contract III, IDIQ
Atch 08 - AF Form 3065 Progress Report.xlsx Revision not stated B9992-Doc Stewart Playgrounds [AMENDED INVITATION FOR BID]
Atch BLANK SAMPLE AF Form 3065.xlsx Revision not stated Design/Build ANG ACS Weapons Facility
16. AF Form 3065 Contract Progress Report (1 page) - BLANK.pdf Revision not stated Simplified Acquisition of Base Engineer Requirements (SABER) IDIQ at Seymour Johnson AFB, Goldsboro, NC.
Atch 08 - AF Form 3065 Progress Report.xlsx Revision not stated B9992-Doc Stewart Playgrounds [PRE-SOLICITATION]
Attachment 11 - AF Form 3065.pdf Revision not stated Construct/Repair LOX Canopies
Show all 20

Who attaches AF Form 3065

Other files

File Type Posted
12 Clarification QA 25 Aug 11.pdf PDF
Creech Conformed Copy Amend 2.pdf PDF
Creech Amend 2 MOD.pdf PDF
E_LP_003.TIF TIF image
Atch 32 Diagram 1 Bldg 703.pdf PDF
Atch 39a Drawing Bldg 703.jpg JPG image
Atch 39d Drawing Bldg 703.jpg JPG image
Creech SABER Amendment 1.pdf PDF
Atch 39e Drawing Bldg 703.jpg JPG image
Atch 39f Drawing Bldg 703.pdf PDF
Atch 35 Diagram 4 Bldg 703.pdf PDF
Atch 1 Specifications for Creech SABER REV 1.pdf PDF
Atch 39i Drawing Bldg 703.jpg JPG image
Atch 38 Performance Information Form.pdf PDF
Atch 39b Drawing Bldg 703.jpg JPG image
Atch 33 Diagram 2 Bldg 703.pdf PDF
Atch 31 SOO Demo Project Const. Bldg 703 GCS Compound.Pad.pdf PDF
Creech SABER Amend 1 Conformed Copy.pdf PDF
Atch 29 SOO - Demo Project Bldg 707 Rev 1.pdf PDF
Atch 39g Drawing Bldg 703.jpg JPG image
Atch 39h Drawing Bldg 703.jpg JPG image
Atch 34 Diagram 3 Bldg 703.pdf PDF
Atch 39c Drawing Bldg 703.jpg JPG image
Creech SABER Q A Final dtd 16 Aug 11.docx DOCX document
Creech PPQ Question and Answer 1.docx DOCX document
Atch 25 Past Performance Questionnaire.pdf PDF
Atch 26 Financial Information Request.pdf PDF
Atch 27 Bonding Information Request.pdf PDF
Atch 11 AF Form 3064 Progress Schedule.pdf PDF
Atch 15 AF Form 1477 Inspection Record.pdf PDF
Atch 16 AF Form 103 Dig Outage and Location Request.pdf PDF
Atch 12 AF Form 3000 Material Approval Submittal.pdf PDF
Atch 32 thru 35 Diagram 1 thru 4 for Building 703.pdf PDF
FA4861-11-R-A400_CREECH_SABER_Atch 36 Consent Letter dtd 15 Feb 10.doc DOC document
Atch 14 Range Pass NAFB 0-74.doc DOC document
Atch 7 UFC 3-580-01.pdf PDF
Atch 31 Statement of Objectives - Demo Porject Const. Bldg 703 GCS Compound Pad.doc DOC document
Atch 5 Tech Spec SCIF May 5 2011.pdf PDF
Atch 19 UFC 1-300-08.pdf PDF
Atch 29 Statement of Objectives - Demo Project Ren. Int. Op Cell Bldg 707.doc DOC document
Atch 30A As Built Drawing Bldg 707.pdf PDF
Atch 18 Sample of DD1354.pdf PDF
Atch 26 Financial Information Request CREECH.pdf PDF
Atch 22 Wage Determination NV100022 - Heavy thru Mod 07.docx DOCX document
Atch 4 Engineering Technical Letter —
Atch 30B As Built Drawing Bldg. 707.pdf PDF
Atch 8 38EIGHTB33-01 Comm Infor 1st 400 Ft.doc DOC document
Atch 11 AF Form 3064 Progress Schedule.xfdl XFDL file
Atch 15 AF Form 1477 Inspection Record.xfdl XFDL file
Atch 23 Wage Determination NV100004 - Highway thru Mod 01.docx DOCX document
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W01

CONTRACT PROGRESS REPORT
0
CONTRACTORADDRESS
00
0
0
REPORT NO.PERIOD COVEREDPROJECT NO.COMPLETION DATE
FROMTO0OriginalChange OrderTotalCONTRACT NO.031-Dec-99
131 Dec 9931 Dec 99$0.00$0.00$0.000
LINE NO.OriginalChange OrderTotal% of Total JobContractor %

Completed This Period Contractor % Completed Cumulative CE % Completed This Period CE % Completed Cumulative

00$0.00$0.00$0.000.00%0.00%0.00%0.00%0.00%
00$0.00$0.00$0.000.00%0.00%0.00%0.00%0.00%
00$0.00$0.00$0.000.00%0.00%0.00%0.00%0.00%
00$0.00$0.00$0.000.00%0.00%0.00%0.00%0.00%
00$0.00$0.00$0.000.00%0.00%0.00%0.00%0.00%
00$0.00$0.00$0.000.00%0.00%0.00%0.00%0.00%
00$0.00$0.00$0.000.00%0.00%0.00%0.00%0.00%
00$0.00$0.00$0.000.00%0.00%0.00%0.00%0.00%
00$0.00$0.00$0.000.00%0.00%0.00%0.00%0.00%
00$0.00$0.00$0.000.00%0.00%0.00%0.00%0.00%
00$0.00$0.00$0.000.00%0.00%0.00%0.00%0.00%
00$0.00$0.00$0.000.00%0.00%0.00%0.00%0.00%
00$0.00$0.00$0.000.00%0.00%0.00%0.00%0.00%
00$0.00$0.00$0.000.00%0.00%0.00%0.00%0.00%
00$0.00$0.00$0.000.00%0.00%0.00%0.00%0.00%
00$0.00$0.00$0.000.00%0.00%0.00%0.00%0.00%
00$0.00$0.00$0.000.00%0.00%0.00%0.00%0.00%
00$0.00$0.00$0.000.00%0.00%0.00%0.00%0.00%
00$0.00$0.00$0.000.00%0.00%0.00%0.00%0.00%
00$0.00$0.00$0.000.00%0.00%0.00%0.00%0.00%
00$0.00$0.00$0.000.00%0.00%0.00%0.00%0.00%
00$0.00$0.00$0.000.00%0.00%0.00%0.00%0.00%
00$0.00$0.00$0.000.00%0.00%0.00%0.00%0.00%
00$0.00$0.00$0.000.00%0.00%0.00%0.00%0.00%
SUBTOTAL:$0.00$0.00$0.00100.00%0.00%0.00%0.00%0.00%
REMARKS: (If CE/Inspector agrees to percentages submitted by the contractor, CE percentage columns do not have to be completed. Complete only when a difference occurs.)
WORK IN PROGRESS.SCHEDULED %
0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications
SUBMITTED BY CONTRACTOR
TYPE OR PRINT NAME AND TITLESIGNATUREDATE
SUBMITTED BY OR FOR CIVIL ENGINEERING APPROVED DISAPPROVED
TYPE OR PRINT NAME AND TITLESIGNATUREDATE
REVIEWED BY OR FOR CONTRACTING OFFICER APPROVED DISAPPROVED
TYPE OR PRINT NAME AND TITLESIGNATUREDATE
AF Form 3065U.S. Government Printing Office:

&CFA4861-11-R-A400, Attachment #13

File details come from the government source that posted it. Updated .