Atch 32 thru 35 Diagram 1 thru 4 for Building 703.pdf

PDF 748 KB Posted

Attached to
CREECH SABER IDIQ
Solicitation number
FA4861-11-R-A400
Issued by

About this file

CREECH AFB SABER ATTAHMENT 32 THRU 35

View the file

Other files

File Type Posted
12 Clarification QA 25 Aug 11.pdf PDF
Creech Conformed Copy Amend 2.pdf PDF
Creech Amend 2 MOD.pdf PDF
E_LP_003.TIF TIF image
Atch 32 Diagram 1 Bldg 703.pdf PDF
Atch 39a Drawing Bldg 703.jpg JPG image
Atch 39d Drawing Bldg 703.jpg JPG image
Creech SABER Amendment 1.pdf PDF
Atch 39e Drawing Bldg 703.jpg JPG image
Atch 39f Drawing Bldg 703.pdf PDF
Atch 35 Diagram 4 Bldg 703.pdf PDF
Atch 1 Specifications for Creech SABER REV 1.pdf PDF
Atch 39i Drawing Bldg 703.jpg JPG image
Atch 38 Performance Information Form.pdf PDF
Atch 39b Drawing Bldg 703.jpg JPG image
Atch 33 Diagram 2 Bldg 703.pdf PDF
Atch 31 SOO Demo Project Const. Bldg 703 GCS Compound.Pad.pdf PDF
Creech SABER Amend 1 Conformed Copy.pdf PDF
Atch 29 SOO - Demo Project Bldg 707 Rev 1.pdf PDF
Atch 39g Drawing Bldg 703.jpg JPG image
Atch 39h Drawing Bldg 703.jpg JPG image
Atch 34 Diagram 3 Bldg 703.pdf PDF
Atch 39c Drawing Bldg 703.jpg JPG image
Creech SABER Q A Final dtd 16 Aug 11.docx DOCX document
Creech PPQ Question and Answer 1.docx DOCX document
Atch 25 Past Performance Questionnaire.pdf PDF
Atch 26 Financial Information Request.pdf PDF
Atch 27 Bonding Information Request.pdf PDF
Atch 11 AF Form 3064 Progress Schedule.pdf PDF
Atch 15 AF Form 1477 Inspection Record.pdf PDF
Atch 16 AF Form 103 Dig Outage and Location Request.pdf PDF
Atch 12 AF Form 3000 Material Approval Submittal.pdf PDF
FA4861-11-R-A400_CREECH_SABER_Atch 36 Consent Letter dtd 15 Feb 10.doc DOC document
Atch 14 Range Pass NAFB 0-74.doc DOC document
Atch 7 UFC 3-580-01.pdf PDF
Atch 31 Statement of Objectives - Demo Porject Const. Bldg 703 GCS Compound Pad.doc DOC document
Atch 13 AF Form 3065 Contract Progress Report.xls XLS spreadsheet
Atch 5 Tech Spec SCIF May 5 2011.pdf PDF
Atch 19 UFC 1-300-08.pdf PDF
Atch 29 Statement of Objectives - Demo Project Ren. Int. Op Cell Bldg 707.doc DOC document
Atch 30A As Built Drawing Bldg 707.pdf PDF
Atch 18 Sample of DD1354.pdf PDF
Atch 26 Financial Information Request CREECH.pdf PDF
Atch 22 Wage Determination NV100022 - Heavy thru Mod 07.docx DOCX document
Atch 4 Engineering Technical Letter —
Atch 30B As Built Drawing Bldg. 707.pdf PDF
Atch 8 38EIGHTB33-01 Comm Infor 1st 400 Ft.doc DOC document
Atch 11 AF Form 3064 Progress Schedule.xfdl XFDL file
Atch 15 AF Form 1477 Inspection Record.xfdl XFDL file
Atch 23 Wage Determination NV100004 - Highway thru Mod 01.docx DOCX document
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

New North

Server

Room

Rm

South

Office

Addition

21 3

Generator External NEMA

Enclosure 1

External NEMA

Enclosure 2

External NEMA

Enclosure 3

External NEMA

Enclosure 4

UNCLASS

Comm

N

Mech

RoomNEMA

Enclosure

SECURE

NEMA

Enclosure

UNCLASS

Internal

NEMA 1

Internal

NEMA 2

Internal

NEMA 3

Internal

NEMA 4

Rm

Internal

NEMA 5

Diagram 1

Under raised floor cable trays

Under raised floor cable trays

Above ceiling space cable trays

Under raised floor cable trays

Comm

Handhole

Roof mount external NEMA enclosure

UNCLASSUNCLASS

30'-10 1/2"

/2

/2

4'-3"

26'-0"

/2

Power Requirements:

Racks 1-8 “EACH”

Qty 2: L530

Qty 2: L630

UPS Model:

HP R5500 VA 3U (L630P)

APC Smart-UPS XL 3000VA RM 3U

(L530P)

111111

1 1

NEMA 4

Wall 4x 115VAC1

Floor 4x 115VAC

NEMA 3NEMA 2

NEMA 1

Conduits to GCS pad

Data

Cabinets require 36" maintenance access on at least 2 sides, preferably all sides.

Diagram 2

Rm 106

6ft above raised floor

4x 115VAC

UNCLASS

Conduit leading thru

NEMA enclosure to roof top NEMA enclosure for radio antenna

4x CAT 6e STP Plenum

6x RG6 BNC

12str ST MM

4x CAT 6e STP Plenum

6x RG6 BNC

12str ST MM

6ft above raised floor

2x CAT 6e STP Plenum

2x RG6 BNC

4str ST MM

6ft above raised floor

2x CAT 6e STP Plenum

2x RG6 BNC

4str ST MM

Blue security light maryjo.wheeler Text Box New West Server Room

Floor 4x 115VAC

12 str Red ST MM

Terminate rack 3

3x CAT 6e plenum

6 str Green ST MM

Terminate rack 1

4 str Yellow SC MM

Terminate rack 2

6ft above raised floor

4x 115VAC

6ft above raised floor

2 str Red ST MM

Terminate rack 3

6ft above floor

2 str Green ST MM

Terminate rack 1

6ft above floor

2 str Yellow SC MM

Terminate rack 2

BLDG 703 South office addition

NS

E

W

6 7

N E

M A

B o x

13'-10 3/16" 36'-10 3/4"

Data Cabinets require 36" maintenance access on at least 2 sides, preferably 4.

Diagram 3

Blue security light

Storage Storage StorageStorage

Work Bench Work Bench

LN40C67 0

26'-0"

/2

LN40C67 0

55IN 1080P55IN 1080P 55IN 1080P

Additional Requirements:

Drop down projector screens will remain in place, existing projector audio/video cables routed to three single gang boxes.

Diagram 4 maryjo.wheeler Text Box Diagram 4 maryjo.wheeler Rectangle

B703 Renovation Comm Plan 26May.vsd
B703 Site Plan
B703 Server Room & Rm106 Ops Floor
B703 South Office Addition
Ops Floor

File details come from the government source that posted it. Updated .