Atch 29 SOO - Demo Project Bldg 707 Rev 1.pdf

PDF 56 KB Posted

Attached to
CREECH SABER IDIQ
Solicitation number
FA4861-11-R-A400
Issued by

About this file

CREECH SABER IDIQ

View the file

Other files

File Type Posted
12 Clarification QA 25 Aug 11.pdf PDF
Creech Conformed Copy Amend 2.pdf PDF
Creech Amend 2 MOD.pdf PDF
E_LP_003.TIF TIF image
Atch 32 Diagram 1 Bldg 703.pdf PDF
Atch 39a Drawing Bldg 703.jpg JPG image
Atch 39d Drawing Bldg 703.jpg JPG image
Creech SABER Amendment 1.pdf PDF
Atch 39e Drawing Bldg 703.jpg JPG image
Atch 39f Drawing Bldg 703.pdf PDF
Atch 35 Diagram 4 Bldg 703.pdf PDF
Atch 1 Specifications for Creech SABER REV 1.pdf PDF
Atch 39i Drawing Bldg 703.jpg JPG image
Atch 38 Performance Information Form.pdf PDF
Atch 39b Drawing Bldg 703.jpg JPG image
Atch 33 Diagram 2 Bldg 703.pdf PDF
Atch 31 SOO Demo Project Const. Bldg 703 GCS Compound.Pad.pdf PDF
Creech SABER Amend 1 Conformed Copy.pdf PDF
Atch 39g Drawing Bldg 703.jpg JPG image
Atch 39h Drawing Bldg 703.jpg JPG image
Atch 34 Diagram 3 Bldg 703.pdf PDF
Atch 39c Drawing Bldg 703.jpg JPG image
Creech SABER Q A Final dtd 16 Aug 11.docx DOCX document
Creech PPQ Question and Answer 1.docx DOCX document
Atch 25 Past Performance Questionnaire.pdf PDF
Atch 26 Financial Information Request.pdf PDF
Atch 27 Bonding Information Request.pdf PDF
Atch 11 AF Form 3064 Progress Schedule.pdf PDF
Atch 15 AF Form 1477 Inspection Record.pdf PDF
Atch 16 AF Form 103 Dig Outage and Location Request.pdf PDF
Atch 12 AF Form 3000 Material Approval Submittal.pdf PDF
Atch 32 thru 35 Diagram 1 thru 4 for Building 703.pdf PDF
FA4861-11-R-A400_CREECH_SABER_Atch 36 Consent Letter dtd 15 Feb 10.doc DOC document
Atch 14 Range Pass NAFB 0-74.doc DOC document
Atch 7 UFC 3-580-01.pdf PDF
Atch 31 Statement of Objectives - Demo Porject Const. Bldg 703 GCS Compound Pad.doc DOC document
Atch 13 AF Form 3065 Contract Progress Report.xls XLS spreadsheet
Atch 5 Tech Spec SCIF May 5 2011.pdf PDF
Atch 19 UFC 1-300-08.pdf PDF
Atch 29 Statement of Objectives - Demo Project Ren. Int. Op Cell Bldg 707.doc DOC document
Atch 30A As Built Drawing Bldg 707.pdf PDF
Atch 18 Sample of DD1354.pdf PDF
Atch 26 Financial Information Request CREECH.pdf PDF
Atch 22 Wage Determination NV100022 - Heavy thru Mod 07.docx DOCX document
Atch 4 Engineering Technical Letter —
Atch 30B As Built Drawing Bldg. 707.pdf PDF
Atch 8 38EIGHTB33-01 Comm Infor 1st 400 Ft.doc DOC document
Atch 11 AF Form 3064 Progress Schedule.xfdl XFDL file
Atch 15 AF Form 1477 Inspection Record.xfdl XFDL file
Atch 23 Wage Determination NV100004 - Highway thru Mod 01.docx DOCX document
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4861-11-R-A400

Attachment #29

SABER

STATEMENT OF OBJECTIVES

FOR

Renovate Interior for Operations Cell Bldg. 707

LKTC 11-1040B

CREECH AIR FORCE BASE, NEVADA

17 August 2011

OFFICE OF THE BASE CIVIL ENGINEER

NELLIS AIR FORCE BASE, NEVADA

STATEMENT OF OBJECTIVES

1. SCOPE: Contractor shall furnish all design, labor, equipment, material, transportation, administration, supervision and all else necessary to perform all operations in connection with successfully completing this project LKTC11-1040B, Renovate Interior for Operations Cell

Bldg.707 atCreech AFB, Indian Springs, Nevada. When complete, the project shall be as shown below (either in the attached sketch or work description). Include in the submittal, reference to the specifications that apply to this project and identification of material items required to be submitted to the government for approval (use AF Form 66), both will be incorporated in the construction project.

2. LOCATION: The project site is located atCreech AFB, Nevada. The Main base is located approximately 55 miles north of Las Vegas on Highway US 95 (Las Vegas

Blvd.).

3. CODES: All design and construction must be in compliance with the International Building

Code (UBC-2006) (or most recent edition), Department of Defense Unified Facilities Criteria

Standards (UFC), all Public Laws, Executive Orders, Code of Federal Regulations, Department of Defense Instructions, (DODI), Department of Defense Directives, NAFB Design

Compatibility Guidelines, Clark County, State of Nevada and Federal standards, codes and laws or other higher authority documents as applicable.

4. DRAWING STANDARDS: All drawings submitted shall be prepared in accordance with the applicable provisions of the Architectural/Engineering/Construction (A/E/C) Computer-Aided

Design and Drafting (CADD) standard. All drawings shall comply with the specifications in

Attachment #1 for Simplified Acquisition of Base Engineering Requirements (SABER) dated 26

June 2011. Contractor shall maintain one set of drawings on site and record all changes and any hidden or subsurface data discovered during construction. Construction drawings shall be submitted to government with Red Line Marks.

5. ENVIRONMENTAL PROTECTION: All work and contractor operations shall comply with the requirements imposed by all applicable Federal, State, local and NAFB laws, regulations, codes and permits (including NAFB Management Plan12) concerning environmental protection.

6. DESCRIPTION OF WORK: The work to be accomplished includes but is not limited to the following description:

DEMO/Construction:

7. Remove approximately 8 feet of ceiling grid and tiles off all walls in GCS training rooms.

8. Remove two (2) existing main entrance wooden doors in both GCS training rooms.

9. Demo only one (1) GCS training room at a time. User will identify which room to start first at site visit.

10. Demo all locks off main entrance doors and return to government.

11. Remove all face plates, receptacles and all wall mount devices, in both GCS rooms. All materials will be saved for re-installation.

12. Construct pony wall on existing walls, extending wall to the bottom of roof deck and seal edge of wall and roof meets, in accordance with Open Storage to security level requirement.

13. Install all walls box extension in accordance with current National Electrical Code, (NEC).

14. Re-install all devices and receptacles that were removed to add the additional layer of 527 quiet sheetrock.

15. Install 5/8” quiet sheetrock from true floor to true ceiling and seal the edge of roof line and new wall, in accordance with Open Storage to security level requirement.

16. Mud, tape and finish all walls to match existing wall finishes and texture, color to be selected by the Government.

17. Prime all walls with one coat of prime and two coats of paint. Paint color to be selected by the government.

18. Install two (2) STC-50 doors and frame with threshold and magnetic seals around door jamb for the two GCS training rooms. Door measurement will measured by the contractor at site visit. Door must be tall and wide, as existing opening, enough to allow the removal and re-installation of similar sized existing equipment.

19. Install two (2) card access / card swipe with pin access system on each GCS trainer rooms. This system will be tied into the same system being installed in Bldg 703 and the new GCS pad area. Contractor shall submit all plans and materials to the Government prior to purchase and installation for approval of type of unit and placement of the system.

20. Install Magnetic locks on both doors on the inside of the room. Magnetic will work with the card access system for the users to gain access and exit the rooms. (no electric latches).

21. Install 180 degree motion sensors above the doors to act as release device for magnetic lock for exiting the GCS rooms.

22. Install two (2) LKM 7000 or equal combination locks without key override for each of the GCS training rooms in Bldg 707. See Tech Spec for ICD 705.

23. All existing penetrations made in the two (2) rooms will be sealed and insulated in accordance with IC Tech Spec for ICD 705.

24. All walls below the raised floor will be sealed in accordance to open storage security level.

25. Constructor shall refer to ICD 705 and 5200 1-R appendix G, Physical Security

Standards, Para 2 Secure room.

26. Only one of the GCS trainers may be renovated at a time; work will need to be planned/performed in phases.

End of Statement of Objectives