Completed AF Form 813 Repair (Replace) Bonita Bay Docks.pdf
PDF 6 MB Posted
- Attached to
- Repair (restore) Bonita Bay Docks Federal contract opportunity
- Solicitation number
- FA481922R0010
About this file
This document package includes an AF Form 813 Request for Environmental Impact Analysis regarding a project to repair and restore recreational facilities at Bonita Bay on Tyndall Air Force Base in Florida.
The project involves demolishing and replacing damaged elements of three docks, converting a storage building to a restroom, and repairing another storage facility. Utilities would be installed by trenching. The Air Force proposes this project qualifies for a Categorical Exclusion under an Environmental Assessment conducted for hurricane recovery efforts at Tyndall AFB. Required permits and coordination with state and federal agencies are also addressed.
The related federal contract opportunity is a Design-Build solicitation from the Air Force to complete the dock repairs and restorations, including demolition, pylon installation, structural and utility replacements, sidewalk and ADA requirement updates, and retention wall repairs. The opportunity number is FA481922R0010.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
29 November 2021
MEMORANDUM FOR 325 CES/CEIEC
FROM: 325 FW/JA
SUBJECT: Legal Review – AF IMT 813 – Repair (Replace) Bonita Bay Docks
1. You requested a legal review and sufficiency determination of the proposed categorical exclusion (CATEX) from further environmental analysis for this proposed action. I have reviewed the Request for Impact Analysis (AF IMT 813) titled “Repair (Replace) Bonita Bay Docks” and find it legally sufficient.
2. Background. The purpose of the action is to repair by replacement the existing boat docks, (B5015, B5030, B5031), located at the Morale Welfare and Recreation Area at Bonita Bay. The proposed action will also convert Support Building, B5024, into a restroom. The action is needed to repair existing facilities that were severely damaged as a result of Hurricane Michael impacting Tyndall AFB in October 2018.
a. The proposed action involves the following projects:
(1). For the Boathouse (Facility 5015/5030), the action will remove the damaged elements of the boathouse. New pylons, as needed, will be installed within the existing footprint. Pylons will be placed up to 20 feet (ft.) deep. The roof, structural supports, and utility connections. Will be replaced or repaired.
(2). For the Boat Dock (Facility 5031), the action will demolish the damaged elements of the dock. New pylons, as needed, will be installed within the existing footprint. Pylons will be placed up to 20 ft. deep. Replace or repair the boardwalk and structural elements of the
(3). The Storage Building (Facility 5024) will be converted into a unisex restroom. The proposed action will install new utilities from the nearest connection point. Utilities will be connected and installed by trenching 3 feet wide at a depth of 4 feet.
(4). The Storage Facility (Facility 5018) will be repaired for the storage of an air compressor and dive equipment. The action will install new utilities from the nearest connection point. Utilities will be connected and installed by trenching 3 feet wide at a depth of 4 feet.
b. No alternative actions are identified. The no action alternative would result in maintaining the status quo in which case the existing MWR facilities would not be removed or replaced, which is not a feasible option due to the safety hazard associated with the damaged facilities.
DEPARTMENT OF THE AIR FORCE
325TH FIGHTER WING (ACC)
TYNDALL AIR FORCE BASE FLORIDA
c. The proposed action is described as meeting CATEX A2.3.11, “Action similar to other actions which have been determined to have an insignificant impact in a similar setting as established in an EA resulting in a FONSI.” The Environmental Assessment for Hurricane Recovery and Installation Development at Tyndall Air Force Base, April 2020, (hereafter “Recovery EA”) is the approved environmental document cited for use of this CATEX. This construction project is in the same general area, similar in nature and minor in scope as compared to projects evaluated in the EA. 325 CES/CEIE has conducted an evaluation of the EA to ensure the document is still valid in accordance with 32 CFR 989.20 (c), including an on-site survey, finding the methodology and analytical approach previously used is appropriate for the proposed action; the direct and indirect impacts of the proposed action are not significantly different from those identified in the existing document; the proposed action would not change the previous analysis of cumulative impacts; public involvement in the referenced analysis provides appropriate coverage for the proposed action; and there has been no significant change in circumstances or significant new information relevant to the proposed action.
3. Discussion. An AF IMT 813 Review Checklist is attached summarizing my review findings.
a. The Recovery EA resulting in a FONSI evaluated the proposed demolition, construction and renovation of numerous facilities throughout the installation that were severely damaged by Hurricane Michael in 2018. That proposed action included evaluation of 28 individual projects spanning six planning areas throughout the installation, as well as three additional projects that covered more than one planning area (Multi-Area projects). The action included demolition, redesign and construction of hundreds of thousands of square feet of new roadways, buildings and utilities necessary to their use in various base locations. Mitigation measures identified by the FONSI include: “Wherever possible as determined by final design, elevate all facilities above the base flood elevation, apply construction period erosion and sedimentation controls, and use pervious surfaces for stormwater retention and treatment.” The FONSI also identifies the need to obtain needed permits to include stormwater permits, while the EPF’s analysis of water resources for this AF 813 contains specific requirements to obtain the necessary permits and use of BMPs consistent with the Recovery EA & FONSI. The purpose of implementing the installation development projects at Tyndall AFB was to recover mission capabilities at Tyndall AFB impacted by Hurricane Michael, and rebuild Tyndall AFB to a fully operational base, thereby providing new facilities and infrastructure, as well as executing repair, demolition and functionality improvements necessary to support the mission of the 325 FW and tenant units.
That EA resulted in a finding of no significant impact. I find that the proposed action is sufficiently similar in nature and location to support application of A2.3.11 to this proposed action, taking into consideration the EPF’s updated environmental survey, tribal and historic consultation and analysis of the site finding no new information providing contrary indications or negative impacts, and assuming safeguards for environmental protection described in the proposed action are followed.
b. Portions of the proposed project will take place within waters that are jurisdictional to the Florida Department of Environmental Protection (FDEP) and/or the U.S. Army Corps of Engineers (USACE). These waters include tidal waters. Due to impacts caused by the construction of a structure within these waters, fill within waters, and/or excavation within waters, environmental permits will be required.
c. 32 C.F.R. 989 requires both air quality NEPA and General Conformity Rule assessments within the EIAP process. While 32 C.F.R. 989 Appendix B provides a list of CATEX actions that exclude further environmental analysis in an EA or an EIS, 32 C.F.R. 989.13(e) states that “application of a CATEX to an action does not eliminate the need to meet air conformity requirements”. Therefore, even if a proposed action has been excluded from further EIAP analysis based on a CATEX, further air quality analysis is required if a proposed action is located where General Conformity applies. Here, air conformity modeling resulted in a determination that a Conformity Determination is not required for this action. See Air Quality EIAP Guide Volume I, Table 5-2, List of General Conformity Exemptions; EIAP Guide p. 49;
40 CFR 93.153; Recovery EA, p. 4-2.
4. Recommendation. Proceed with the proposed action. The Request for Environmental Impact Analysis application of the cited categorical exclusion is legally sufficient. If you have any questions or concerns please contact me at 283-3238.
GERALD D. LAVER
Attorney-Advisor
Attachment:
AF IMT 813 Review Checklist, 29 Nov 2021
AF IMT 813 Review Checklist Repair-Replace Bonita Bay Docks at Tyndall AFB
Mr. Gerald Laver, 29 Nov 2021 This checklist provides an overview for conducting a legal review of an AF IMT 813, Request For Environmental Impact Analysis (Form 813). The Air Force uses Form 813 to document the need for environmental analysis under the National Environmental Policy Act (NEPA), 42 U.S.C. Sec. 4321-4370f, or for certain Categorical Exclusions (CATEX) determinations for proposed actions. Generally, the AF IMT 813 is the starting point that initiates the AF Environmental Impact Analysis Process (EIAP). An attorney reviews the AF IMT 813 to ensure the proposed project meets the requirements of NEPA and the EIAP. If after completing the checklist, any one of blocks 1-19 are not checked or marked N/A, the AF Form 813 will be legally insufficient.
The AF EIAP regulation can be found at 32 CFR Part 989. AFI 32-7061, The Environmental Impact Analysis Process which adopts 32 CFR Part 989, is the controlling instruction for AF EIAP. CATEX determinations and descriptions identified by number are found in 32 CFR Pt 989 Appendix B.
If you have questions not addressed by the checklist, or you are uncertain about the sufficiency of the analysis in any portion of the AF Form 813, please contact your MAJCOM-ELO (Maj Milott). If you are coordinating with the Environmental Law Field Support Center Planning and Sustainment Branch, they may be contacted at 210-395-8998, DSN 969-8998 or by email at afloa.jaceps@us.af.mil.
Check if Met
Comments
SECTION I - PROPONENT INFORMATION
1. Blocks 1-3, Blocks 6-6b have been completed
Blocks comprised of self-explanatory administrative data.
X
2. Block 4 - Proponent has included a purpose and need statement in block or in an attachment.
3. Purpose statement clearly describes what the proponent intends to accomplish with the action.
4. Need statement clearly identifies why the proposed action is necessary.
Examples could include mission requirements or legal/regulatory changes, etc.
5. Block 5- Description of Proposed Action and Alternatives Proposed Action (DOPAA)
Block includes description of what action the proponent wants to take.
6. Description of proposed action is sufficiently detailed to ensure it meets the purpose and need as articulated in Block 4.
Block 5 may contain reasonable alternatives to the proposed action along with the no action alternative. Those items will be addressed at a later point in the checklist.
SECTION II – PRELIMINARY ENVIRONMENTAL SURVEY
7. One of the columns under each Block 7-16
Checked.
8. Blocks 7-16 Assessment makes sense based upon the type of action
Use common sense, for instance, if the proposed action requires filling some portion of a wetland and block 12 no effect is checked there are likely questions that you need to ask the environmental planner.
9. Action assessed to have unknown environmental impacts If NO then mark as N/A.
If the action has any unknown effects, the decision maker cannot determine that unknown effects are not significant. A CATEX cannot be applied at this time and an Environmental Assessment (EA) or Environmental Impact Statement (EIS) should be considered.
N/A
10. Action assessed to have potential adverse effects in blocks 7-16.
If NO, then mark as N/A.
If an action has any potential adverse effect it will probably result in an Environmental Assessment (EA) or an Environmental Impact Statement (EIS) and will not qualify for a categorical exclusion
(CATEX)
If uncertain contact ELO or Planning and Sustainment Branch of ELFSC.
SECTION III – ENVIRONMENTAL ANALYSIS DETERMINATION
11. Block 17 indicates a CATEX is applicable.
If NO Mark Checklist Items 11-15 N/A and skip to
12. CATEX applied has been identified by number
CATEX descriptions identified by number are found in 32 CFR Pt 989 Appendix B
CATEX A2.3.11, “Action similar to other actions which have been determined to have an insignificant impact in a similar setting as established in an EA resulting in a FONSI.” The Environmental Assessment for Hurricane Recovery and Installation Development at Tyndall Air Force Base, April 2020, is the approved environmental document cited for CATEX.
13. CATEX applied is consistent with the description of the proposed action.
If NO, determine if another CATEX in Appendix B might apply. If one does discuss with environmental planner and have form accomplished again.
If uncertain about the proper application of a particular CATEX contact ELO or Planning and Sustainment Branch of ELFSC.
Proposed action is in the same general area and similar to proposed actions evaluated in the EA resulting in a FONSI.
14. Review 32 CFR 989, Appendix B, A2.2. Categories of Actions with “unique circumstances” described in subparagraphs have not been implicated.
If categories have been implicated, application of a CATEX may be legally insufficient and additional analysis may be required.
If uncertain whether A2.2 has been implicated or whether it precludes the application of a CATEX, contact ELO or Planning and Sustainment Branch of
ELFSC
Certain CATEX’s will require review of additional documents, you must be certain to review all necessary documentation that supports analysis. Two common instances are listed below. Review CATEX to determine if other documentation also needs review.
A2.3.7 requires proposal to have been originally evaluated in accordance with applicable regulations.
A2.3.11 requires proposal to be sufficiently similar to other project with EA/FONSI or EIS (an EBS is insufficient).
15. Use of CATEX is consistent with Preliminary
Environmental Survey
Checklist Item #9 MUST be marked N/A
Checklist Item #10 MUST be marked N/A OR you have consulted your environmental planner and/or ELO and are satisfied that the application of a CATEX is consistent with 32 CFR 989.13(b)
32 CFR 989.13 provides guidance regarding the applicability of a CATEX. Per 989.13(b) categories of actions that ordinarily do not require an EA or EIS include: “Minimal adverse environmental impacts.”
If adverse impacts are indicated further environmental study is then ordinarily done, however, if the action fits within CATEX and the adverse impacts are consistent with 32 CFR 989.13(b)(1) document may be considered legally sufficient.
16. Block 17 - indicates further environmental analysis required.
If NO mark as N/A then move to Checklist Item #17.
17. Block 17 – not completed
If Either box on Block 17 has been checked mark as N/A.
There may be instances where the AF Form 813 is being used to record the fact that environmental issues were considered but that neither a CATEX nor further study was required. In this instance you should see some further information in Block 18 of the form. If you encounter this situation, contact your ELO or the ELFSC Planning and Sustainment Branch to discuss prior to determining legal sufficiency.
18 Block 18 offers valid explanation how AF Form 813 is being used to create a record of environmental consideration when an action is not subject to a CATEX and does not require further environmental analysis.
An example of a situation where this would apply is where an action that does not fit into a CATEX and there will clearly be NO environmental impacts arising from the action but a record is required
Circumstances where this would occur are likely to be rare, please contact ELO or Planning and Sustainment Branch of ELFSC to discuss.
19. Block 18 includes a statement indicating that conformity requirements pursuant to Section 176(c) of the Clean Air Act have been addressed. See 32
CFR 989.30
Action will occur within an attainment area, making the action exempt from General Conformity (GC). See Air Quality EIAP Guide Volume I, Table 5- 2, List of GC Exemptions; EIAP Guide p. 49; 40 CFR 93.153.
Possible examples of an appropriate statement could be:
“The proposed action will occur in an area that is in attainment for all criteria pollutants and no conformity determination under the Clean Air Act is required”; or
“The proposed action will occur in an area that is in nonattainment for [insert criteria pollutant]; however emissions from the action will be de minimus so no conformity determination under the Clean Air Act is required.”
Note: If Block 17 indicates that further environmental analysis must be completed, conformity requirements will be addressed in the EA/EIS and this checklist Item may be checked.
If you have questions contact your ELO or the Planning and Sustainment Branch of ELFSC to discuss.
ACAM Modeling was performed, based on the results the air quality in the area would not be significantly impacted by the proposed project; therefore a conformity determination is not required.
If GC is otherwise required, conformity exemption based on CATEX A2.3.11 is available if the prior FONSI action evaluated air quality and identified air quality impact as not significant using the 2014 (or newer) version of ACAM, and the new proposed action’s scope, activity, and size are equal to or less than the prior FONSI action. Air conformity modeling was conducted for this project as part of the referenced EA, based upon which a Conformity Determination is not required for this action.
The Final Environmental Assessment for Hurricane Recovery and Installation Development at Tyndall Air Force Base, Florida meets these criteria, see vol. 1, pp. 4-1 to 4-5. Scope, activity and size of this action is less than that studied by referenced action which found for the actions studied that “Proposed Actions, all attainment criteria pollutants are below the significance indicators presented in Tables 4.1-1a through 4.1-1g.
Therefore, the potential air quality impact from all criteria pollutants is insignificant.”
20. Block 18: information in block does not impact the previously reviewed information.
If Block 18 does impact previous analysis, reconcile questions before determining legal sufficiency.
If you are uncertain about whether comments included in Block 18 call into question the other Checklist Items previously reviewed, contact ELO or Planning and Sustainment Branch at ELFSC for assistance.
21. Return to Block 5 on Form 813
Block 5 Includes reasonable alternatives to the Proposed Action (ONLY REQUIRED IF
FURTHER ENVIRONMENTAL ANALYIS
REQUIRED)
AF must analyze reasonable alternatives for all EA’s and EIS’s. See 32 CFR 989.8(a). The Block 5 DOPAA will serve as the basis for the DOPAA in an EA/EIS if needed and should identify reasonable alternatives.
Sometimes proponent will include reasonable alternatives for projects subject to valid CATEX.
This is acceptable but not required.
22. Block 5 identifies that No action alternative is included in DOPAA.
Unless otherwise excused by law the no action alternative must be analyzed. See 32 CFR 989.8(a).
(ONLY REQUIRED IF FURTHER
ENVIRONMENTAL ANALYSIS REQUIRED)
Sometimes proponent will include no action alternative for projects subject to valid CATEX.
This is acceptable but not required.
If the Status Quo is maintained with no action, the facilities will not be repaired, which is not a feasible option due to the safety hazard associated with the damaged facilities.
AF FORM 813, 19990901 (EF-V1) Page 1 of 2THIS FORM CONSOLIDATES AF FORMS 813 AND 814.
PREVIOUS EDITIONS OF BOTH FORMS ARE OBSOLETE.
REQUEST FOR ENVIRONMENTAL IMPACT ANALYSIS
SECTION I - PROPONENT INFORMATION
INSTRUCTIONS: Section I to be completed by Proponent; Sections II and III to be completed by Environmental Planning Function.
Continue on separate sheets as necessary and reference appropriate item number(s).
1. TO (Environmental Planning Function)
325 CES/CEIEC
2. FROM (Proponent organization and functional address symbol)
325 CES/CENPD
2a. TELEPHONE NO.
(850) 283-2768
3. TITLE OF PROPOSED ACTION
XLWU218122 Repair (Replace) Bonita Bay Docks
4. PURPOSE AND NEED FOR ACTION (Identify decision to be made and need date)
The Purpose and Need For Action is attached. See Page 2.
5. DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES (DOPAA) (Provide sufficient details for evaluation of the total action)
The Description of Proposed Action and Alternatives is attached. See Page 2
6. PROPONENT APPROVAL (Name and Grade) Frisner Jean-Pierre, Jr.; GS-12
6a. SIGNATURE 6b. DATE 09/07/21
SECTION II - PRELIMINARY ENVIRONMENTAL SURVEY (Check appropriate box and describe potential environmental effects including cumulative effects) (+=positive effect; 0=no effect; - = adverse effect; U=unknown effect) + 0 - U
7. AIR INSTALLATION COMPATIBLE USE ZONE/LAND USE (Noise, accident potential, encroachment, etc.)
8. AIR QUALITY (Emissions, attainment status, state implementation plan, etc.)
9. WATER RESOURCES (Quality, quantity, source, etc.)
10. SAFETY AND OCCUPATIONAL HEALTH (Asbestos/radiation/chemical exposure, explosives safety quantity distance, bird/wildlife aircraft hazard, etc.)
11. HAZARDOUS MATERIALS/WASTE (Use/storage/generation, solid waste, etc.)
12. BIOLOGICAL RESOURCES (Wetlands/floodplains, threatened or endangered species, etc.)
13. CULTURAL RESOURCES (Native American burial sites, archaeological, historical, etc.)
14. GEOLOGY AND SOILS (Topography, minerals, geothermal, Installation Restoration Program, seismicity, etc.)
15. SOCIOECONOMIC (Employment/population projections, school and local fiscal impacts, etc.)
16. OTHER (Potential impacts not addressed above.)
SECTION III - ENVIRONMENTAL ANALYSIS DETERMINATION
17. PROPOSED ACTION QUALIFIES FOR CATEGORICAL EXCLUSION (CATEX) # ; ORA2.3.11
PROPOSED ACTION DOES NOT QUALIFY FOR A CATEX; FURTHER ENVIRONMENTAL ANALYSIS IS REQUIRED.
18. REMARKS
ACAM Modeling conducted and determined a conformity determination is not required.
19. ENVIRONMENTAL PLANNING FUNCTION CERTIFICATION
(Name and Grade) Edwin Wallace, GS-12
19a. SIGNATURE 19b. DATE
JEAN-
PIERRE.FRISNER.1591794015
Digitally signed by JEAN-
PIERRE.FRISNER.1591794015
Date: 2021.09.07 08:00:14 -05'00'
WALLACE.EDWIN.
BLAIR.1047698347
Digitally signed by
WALLACE.EDWIN.BLAIR.1047698
Date: 2021.11.15 07:51:29 -06'00'
- 1 – Repair/Replace Bonita Bay Boat Docks, continuation sheet
4.0 Purpose and Need for Action
The purpose of the action is to repair by replacement the existing boat docks, (B5015, B5030, B5031), located at the Morale Welfare and Recreation Area at Bonita Bay. The proposed action will also convert Support Building, B5024, into a restroom.
The action is needed to repair existing facilities that were severely damaged as a result of Hurricane Michael impacting Tyndall AFB in October 2018.
5.0 Description of the Proposed Action and Alternatives (DOPAA)
The proposed action will involve the following:
Boathouse (Facility 5015/5030)
• Remove the damaged elements of the boathouse.
• Install new pylons, as needed, within the existing footprint. Pylons will be placed up to 20 feet (ft.) deep.
• Replace or repair the roof, structural supports, and utility connections.
Boat Dock (Facility 5031)
• Demolish the damaged elements of the dock.
• Install new pylons, as needed within the existing footprint. Pylons will be placed up to 20 ft. deep.
• Replace or repair the boardwalk and structural elements of the dock.
Storage Building (Facility 5024)
• Convert the existing building into a unisex restroom
• Install new utilities from the nearest connection point. Utilities will be installed by trenching a 3 ft. wide trench at a depth of 4 ft.
Storage Facility (Facility 5018)
• Repair the existing building for the storage of an air compressor and dive equipment.
• Install new utilities from the nearest connection point. Utilities will be installed by trenching a 3 ft. wide trench at a depth of 4 ft.
No Action Alternative: Status quo, do not repair damaged facilities. This is not a feasible option due to the safety hazard associated with the damaged facilities.
5.1 Environmental Impacts
AICUZ/Noise:
The proposed actions would result in a localized and temporary increase in noise levels due to construction and site preparation. This noise is not expected to be significant. The proposed action would not significantly contribute to the noise levels in the area.
- 2 –
Air Quality:
Tyndall AFB is in an attainment area for National Ambient Air Quality Standard. The FESOP permit for Tyndall AFB will not be violated by the implementation of the proposed project. Temporary minor exhaust emissions would occur in the immediate vicinity of the construction. Fugitive dust would be controlled at the sites using best management practices (BMPs), such as periodic watering of cleared areas and stockpiled materials and mulching or vegetative cover for the cleared areas.
Many operations are subject to specific air quality regulations. State-specific emission standards are identified in Chapter 62-296 of the Florida Administrative Code (F.A.C.).
Florida regulates hazardous air pollutants (HAP) in accordance with the National Emissions Standards for Hazardous Air Pollutants (NESHAP) in Title 40 of the Code of Federal Regulations (CFR): Part 61 is regulation by HAP and Part 63 is regulation by industrial category. There are also federal New Source Performance Standards specified for criteria air pollutants in Title 40, Part 60 of the CFR.
ACAM Modeling was performed, based off the results the air quality in the area would not be significantly impacted by the proposed project; therefore a conformity determination is not required.
Water Resources:
Portions of the proposed project will take place within Waters jurisdictional to the Florida Department of Environmental Protection (FDEP) and/or the U.S. Army Corps of Engineers (USACE). These waters include tidal waters. Due to impacts caused by the construction of a structure within waters, fill within waters, and/or excavation within waters environmental permits will be required.
An FDEP permit maybe required for the installation, maintenance, repair, and removal of underground utility lines, cable, conduit, or pipeline transmitting electricity, communication signals, potable water, raw water, reclaimed water, domestic wastewater, propane gas or natural gas. 62-330.453 within the Florida Administrative Code dictates that a General Permit is needed for Installation, Maintenance, Repair, and Removal of Utility Lines that cross a regulated surface of the state. In this case the ditches/swales maybe considered a regulated surface water.
All electric, gas, water, sewer, and other services lines should be shut off, capped, or otherwise properly controlled, at or outside the building before demolition work is started. In each case, any utility company that is involved should be notified in advance, and its approval or services, if necessary, shall be obtained. Coordinate with the 325 CES/CEIC, GCEC, and Bioenvironmental regarding flushing and water quality sampling prior to and after performing any work.
If it is necessary to maintain any power, water, sewer, or other utilities during demolition, such lines shall be temporarily relocated as necessary and/or protected. The location of all
- 3 – power sources should also be determined, as they can prove especially hazardous during any machine demolition. All workers should be informed of the location of any existing or relocated utility service. Coordinate with the 325 CES/CEIC, GCEC, and Bioenvironmental regarding flushing and water quality sampling prior to and after performing any work.
All material used as fill shall be clean sand/fill dirt/shell material and shall not be contaminated with vegetation, garbage, trash, tires, hazardous waste, or other materials that are not suitable for construction.
There shall be no storage or stockpiling of tools, materials (i.e. lumber, pilings, debris) within wetlands, ditches, swales, or elsewhere within waters of the state. All stormwater conveyance structures shall remain in operable condition and shall not be allowed to deteriorate or otherwise contribute to a water quality violation. Construction activities shall be conducted in a manner that does not cause or contribute to violations of state water quality standards.
All permit applications must be reviewed by CEIEC and signed by the 325th CES Commander prior to submittal. All costs associated with permits will be paid for by the contractor. All costs associated with any environmental sampling will be paid for by the contractor. It is the contractor’s responsibility to verify with all necessary regulatory agencies if any permits are required and/or provide written concurrence from the necessary agencies that no permits would be required prior to starting work, unless a viable regulation is noted detailing the activity would not require prior authorization and is agreed upon by the 325 CES/CEIEC.
Soil Impact:
Any excess excavated soil/sand must be spread-out on land adjacent to the excavation site but it must not create mounding or any elevation changes from the design. Otherwise, it must be tested using TCLP Analysis for all Toxicity Characteristics found in 40CFR
261.24 for disposal at a RCRA Facility. If reuse is desired, the soil must be tested using the “Clean Criteria” in the NonERP Soil Management Guidelines to verify it doesn’t have any contamination.
Any fill material brought in for project use must be certified clean.
Biological Resources:
The proposed action would not impact biological resources no federally-protected species will be impacted by this proposed action.
Cultural and Historical Resources:
The proposed undertakings has been coordinated with the State Historical Preservation Office and a finding of no adverse effect has been received. Tyndall AFB concluded that
- 4 – the proposed undertaking will have no adverse effect on any known historic properties.
All work should cease and the Cultural Resources Manager should be contacted if archaeological deposits or human remains are encountered. Contractor must be trained on inadvertent discoveries, training pamphlet will be provided.
Hazardous Materials:
A letter of review from 325 CES/CEIEC must be accomplished prior to commencement of work. The contractor shall submit TAFB Form 81 (Contractor Questionnaire) and TAFB Form 82 (Chemical Inventory) if applicable (within 10 duty days after the Notice to Proceed is issued), for review.
The Contractor should note that Tyndall AFB is required to report chemicals used such as (but not limited to) compressed gases, adhesives, aerosol cans, sealants, paints, lubricants, oils, cleaners, degreasers, pesticides, Fuels. Copies of manufacturer-specific Safety Data Sheets (SDS) must be attached to TAFB Form 82. These SDSs shall also be readily accessible at the location of each hazardous material. After submission, 325 CES/CEIE will notify the Project Manager and/or CONS of the reportable chemicals and of any special instructions. As directed by the CO, the Contractor is required to submit TAFB Form 83 (Reporting Entry Form) showing material usage monthly until completion of the task order. The CO must be notified of any changes from the original submittal (i.e. new chemical is added, size of container or unit of issue changes or if the manufacturer changes), changes must be submitted using TAFB form 82. An updated letter of review indicating changes will be sent from CEIEC to the Contracting Office before the material can be brought onto the installation. Prime contractors shall be responsible to ensure all sub-contractors comply with this section.
Hazardous Waste:
The Contractor shall identify, characterize, store and dispose of any hazardous waste generated during work in strict accordance with Federal and State guidelines found in the Code of Federal Regulations. Any containerized waste must maintain compliance with EPA, DOT, and OSHA’s HAZCOM requirements.
A Hazardous Waste Determination must be conducted/recorded for all wastes generated during the execution of this project IAW 40 CFR 262.11. A worksheet is attached to accomplish the requirement.
The personnel conducting Hazardous Waste Determinations and who may generate or manage Hazardous Waste must have annual Hazardous Waste Training that complies with 40 CFR 262.17(a)(7).
Solid Waste:
Construction activities associated with the Proposed Action would result in a short-term increase in solid waste generated at Tyndall AFB. The contractor would be responsible for disposing of solid waste in accordance with all federal, state, and local laws.
- 5 –
Digging/Excavation:
Prior to any digging, an excavation permit will be required. An Air Force Form103, BCE Work Clearance Request, will be required. AF Form 103 will not be signed until permits are approved.
5.3 List of required permits:
Permits will be required for the proposed action. Contractor is responsible to ensure all permits are submitted to the 325 Civil Engineer Squadron for review.
5.4 CATEX Statement:
The proposed project will not adversely impact Tyndall AFB environmental attributes;
therefore, qualifies for Categorical Exclusions (CATEX) A2.3.11. Actions similar to other actions which have been determined to have an insignificant impact in a similar setting as established in an EIS or an EA resulting in a FONSI. The EPF must document application of this CATEX on AF Form 813, specifically identifying the previous Air Force approved environmental document which provides the basis for this determination.
The Environmental Assessment Hurricane Recovery and Installation Development, dated April 2020, is the Air Force approve document which form the basis for using this CATEX. The construction project is in the same area and is similar in scope to the projects area evaluated in the EA. 325 CES/CEIE has conducted an evaluation of subject EA to ensure the document is still valid in accordance with 32 CFR 989.20 (c). As part of the re-evaluation, CEIE personnel conducted an on-site survey and found that the affected environment and environmental consequences:
1. The methodology/analytical approach previously used is appropriate for the proposed action.
2. The direct and indirect impacts of the proposed action are not significantly different than those identified in the existing document.
3. The proposed action would not change the previous analysis of cumulative impacts.
4. Public involvement in the referenced analysis provides appropriate coverage for the proposed action.
5. There has been no significant change in circumstances or significant new information relevant to the proposed action.
PROJECT ENVIRONMENTAL REVIEW SHEET
Project Title: Repair/Replace Beacon Beach Docks and Facilities
Project Description:
Project Number:
1. Natural Resources
Reviewed By: _____ewallace________________ Does project affect flora? YES _ ___ NO _X__ Does project affect fauna? YES ____ NO ___X_ Does project affect BASH? YES ____ NO __X__ Does project affect wildlife management area? YES ____ NO _X___ Does project affect forestry management area? YES ____ NO _X___ Does project affect erosion? YES ____ NO _X___
2. Threatened and Endangered Species Reviewed By: _____ewallace________________ _X_ Project has no potential for affecting threatened or endangered species or critical habitats.
__ Based on advice from USFWS or host nation liaison _____, threatened or endangered species in the vicinity of the project will not be affected.
__ Consultation with USFWS underway in accordance with the Endangered Species Act.
__ Formal Consultation with the Regional Director, USFWS completed on ______.
__ Biological Assessment is required. Estimated completion date completion date is ______.
__ Biological opinion issued by USFWS on ______.
3. Cultural Resources Reviewed By: _______ewallace______________ __ Properties affected by project are addresses in a programmatic Agreement that was fully executed with the State Historic Preservation Officer and the ACHP on ______.
__ Project area has not been surveyed for historic properties. Survey requirements are identified in the A-
106 system and the estimated completion date is ______.
_ _ Project area has been surveyed and no historic properties were identified; the State Historic
Preservation Officer was notified by letter dated _ __ Survey identified historic properties but the project will have no effect on them; written concurrence by the State Historic Preservation Officer is dated ______.
__ After consultation, State Historical Preservation Officer concurred that the project will have no adverse effect on historic properties. The Advisory Council on Historic Preservation concurred in writing with this determination on _______.
_ X_ Project will have no adverse effect on historic properties or archeological material.
__ Estimated sate to execute the MOA is _______ or no MOA was developed and the formal comments of the Council are being sought.
__Archeological Monitor must be present if boring location changes.
__ Appropriate Native American Tribe or Group contacted on _______.
1. Wetlands Reviewed By: ___ewallace__________________ _X_ Project is sited in a wetland __ Requirements of EO11990 in progress. Estimated completion date is ______ __ Requirements of EO 11990 completed on ____.
__ Finding of "No Practicable Alternative signed March 2020
2. Flood Plain Reviewed By: ____ewallace_________________ _X_ Project is sited in a 100-year flood plain.
__ Requirements of EO 11990 in progress. Estimated completion date is ______ _ _ Project is sited in a 100-year flood plain. Requirements of EO 11990 completed on ______ ___Finding of "No Practicable Alternative signed March 2020______
3. Potentially Regulated Substances Reviewed By: __ewallace___________________
a. Water:
__ Construction permit required for extension of water system per 62.555, FAC.
_ No permit required because less than 2 in. diameter pipe and less than 100 if extension.
__ Backflow preventer(s) required. Must be field tested by licensed inspector upon installation.
__ Sprinkler system must have rain sensor device per FS 373.62.
__Well drilling/mod/abandonment must be conducted by a licensed contractor. Permit required per 4OC-3, FAC.
X__ Other: Permits are required for this project.
b. Wastewater:
_X_ Construction permit required to connect to collection system per 62-600, FAC.
__ No permit required per 62-604.1 10 (single facility, gravity service connection, no pretreatment, compatible discharge) __ Other: No Wastewater required for this project.
c. Stormwater:
__ Environmental Resource Permit required from: _______________
a. Creates more than 4,000 s.f. impervious surface subject to vehicular traffic;
b. Creates more than 5,000 s.f impervious surface; or
c. Project affects 5 acres or more (includes recreation areas, golf course, ball fields, etc.)
__ Site included in station stormwater master plan; permit required but may access existing stormwater treatment system. (Basin no. __________ pond no._________ ; approx ________________ s.f.)
__ Construction contractor must submit a SWPPP to 325 CES for review.
X__ No permitting required.
__ Upon completion site will be included in Base Stormwater Pollution Prevention Plan.
_ _ Other:
d. Asbestos:
X__ Not present: _________ survey underway.
__ If Present, must be abated prior to demolition
e. Lead Based Paint:
_X Not present: _________ survey underway.
__ Present
f. Ozone Depicting Substances:
_X_ Not present: _________ survey underway.
__ Present (describe mitigation, or state why mitigation is not necessary).
g. Polychlorinated biphenyls (PCBs):
X__ Not present: _________ survey underway.
__ Present (describe mitigation, or state why mitigation is not necessary).
h. Other known hazardous or toxic substances and pollutants (e.g. contaminated soils):
X_ Not present: _________ survey underway.
__ Present (guidelines attached).
4. Hazardous Materials _X__ Will chemicals (such as, but not limited to, compressed gases, adhesives, aerosol cans, sealants, paints, lubricants, solvents, oils, cleaners, degreasers and pesticides) be used ____ Submit TAFB Form 81 (Contractor Questionnaire) and TAFB Form 82 (Chemical Inventory) 7-10 days upon issuance of the notice to proceed and prior commencement of work on site.
____ Submit copies of manufacturer-specific Material Safety Data Sheets ____ Submit TAFB Form 83 (Reporting Entry Form) at the end of the project or as indicated by CEV.
____ Notify CEV if anything changes from the original submittal (i.e. new chemical is added, size of container or unit of issue changes or if the manufacturer changes).
_ _ Will not use chemicals
5. Air Pollutants
Reviewed By: _____________________ __ Will not be generated by the operation or construction of this facility.
__ Will be generated by the operation or construction of this facility. Describe type and amount of substance expected to be generated, existing control systems, and the need for additional controls.
X__ Conformity determination not required.
__ Conformity determination required.
6. Solid and Hazardous Wastes
Reviewed By: _______________________ X _Facility will not be used for generating/managing solid and/or hazardous wastes.
__ Facility will be for generating/managing solid and/or hazardous waste.
_Yes Will the work being performed on the project generate any wastes?
7. Storage Tanks (Check all that apply)
Reviewed By: _____________________ _X_ No storage tanks are involved.
__ New storage tanks will be installed.
__ Material to be stored, quantity ____________.
__ Existing tanks on the project will be removed. Ensure regulatory agency has been notified.
__ Contamination exists.
__ Contamination unknown.
__ Existing tanks on projects it will be retained.
1. Environmental Impact Analysis Process
_X_ Categorical exclusion number _A2.3.11_______ __________ applies.
__ Environmental Assessment under preparation. Expected completion date is __________.
__ Finding of No Significant Environmental Impact signed on __________.
__ Draft Environmental Impact Statement (EIS) under preparation. Expected completion date is ________. __ Draft EIS filed on ___________.
__ Final EIS filed on ___________.
__ Record of Decision signed on __________.
__ Foreign nation or protected global resource exemption number ___________ applies.
__ Environmental study (or review underway) under preparation. Expected completion date is __ Environmental study (or review) completed on ___________.
2. Interagency and Intergovernmental Coordination for Environmental Planning
Reviewed By: _______ewallace______________ X__ Coordination of proposed project with the state Single Point of Contact or other agencies is not required.
__ Coordination with the state Single Point of Contact is in progress. Expected date of completion is __ Proposed project was coordinated with the state Single Point of Contact or other agencies on _
3. Environmental Permits
Reviewed By: ____ewallace_________________ _ No permits are required unless dewatering is needed.
__ No permits required but regulatory agency notification required prior to construction (e.g.
underground storage tank removals).
X_ Permits are required for this project.
1. Environmental Restoration Program (ERP)/Petroleum Contamination (PCA)
X__ Facility is not sited on or near an ERP/PCA site.
__ Facility is sited near an ERP/PCA site.
__ Facility is within the boundary of an IRP/PCA site ERP Guidelines must be followed.
__ The following activities must be coordinated with the IRP Manager:
excavation, sampling, and 40 hour H&S training.
__ The site is projected to be remediated and/or closed out on _________, prior to commencement of construction activities.
__ The nature of the site contamination does not preclude the type of construction activity proposed.
__ There is a Compliance Agreement associated with this site.
__ A Remedial Investigation/Feasibility Study was completed on _______ to accurately delineate the aerial extent of the contamination.
14. Comments
RON DESANTIS
Governor
LAUREL M. LEE
Secretary of State
Division of Historical Resources
R.A. Gray Building • 500 South Bronough Street• Tallahassee, Florida 32399
850.245.6300 • 850.245.6436 (Fax) • FLHeritage.com
Mr. José J. Cintron November 9, 2021 Chief, Environmental Element 325th Civil Engineer Squadron 103 Mississippi Avenue (Building 36234) Tyndall Air Force Base, Florida 32403
Re: DHR Project No.: 2021-6515
TY-2021-102 - Proposed Repair and Replace the Recreational Facilities at Bonita Bay Recreation Area Tyndall Air Force Base, Bay County
Dear Mr. Cintron:
This office reviewed the referenced project for possible impact to historic properties listed, or eligible for listing, in the National Register of Historic Places. The review was conducted in accordance with Section 106 of the National Historic Preservation Act of 1966, as amended and 36 CFR Part 800: Protection of Historic Properties.
This office has previously determined that facilities 5018, 5024, and 5030 do not appear to meet the criteria for listing in the National Register. It is also our opinion that facilities 5015 and 5031 do not appear to meet the criteria for listing in the National Register. Therefore, based on the information provided and the conditions outlined in your letter concerning fortuitous finds or unexpected archaeological discoveries, it is the opinion of this office that the proposed undertakings will have no effect on historic properties.
If you have any questions concerning our comments, please contact Scott Edwards, Historic Preservationist, by electronic mail scott.edwards@dos.myflorida.com, or at 850.245.6333 or 800.847.7278.
Sincerely, Timothy A. Parsons, Ph.D.
Director, Division of Historical Resources and State Historic Preservation Officer
Site Location
95,000‐SF
50,000‐SF
B5015
B5030
B5031
B5018
B5024
Unknown (Not RP)
FSS Ancillary B5024 (Storage)
Unknown (Not RP)
Bay
HWY 98
FSS Ancillary Bldg (Storage)
FSS Ancillary B5018 (Storage)
FSS Ancillary B5018 (Storage)
| LR 813 Repair-Replace Bonita Bay Docks.pdf |
| DEPARTMENT OF THE AIR FORCE |