Text version
Repair (restore) Storm Water Drainage 1200 Area, AF Form 813 continuation sheet
4.0 Purpose and Need for Action:
The purpose of the proposed action is to repair and replace the failed stormwater system components in the 1200 area.
The action is needed to reduce the flooding around the 1200 area whenever there is a heavy rain event.
5.0 Description of the Proposed Action and Alternatives (DOPAA):
The proposed action will consist of removing and replacing the existing pipes, cleaning silt and sand from structures and pipe, removing and regrading swales and other sites damaged by past construction activities. No additional paving or impervious surfaces is included in the project.
Approximately 4700-ft of old piping will be removed and new piping will installed. The new piping may be trenched 4-ft deep X 4-ft wide. An estimated 250,000-sf of land may be regraded.
Any soil removed during the installation of new conduit may be redistributed on site. All swales and site work will have 4" of topsoil and sod restoration.
No Action Alternative: Status Quo. If the Status Quo is maintained, the 1200 Area will continue to flood during inclement weather.
5.1 Anticipated Environmental Issues:
None anticipated
5.2 Environmental Impacts:
AICUZ/ Noise:
The proposed actions would result in a localized and temporary increase in noise levels due to construction and demolition. This noise is not expected to be significant. The proposed action would not significantly contribute to the noise levels of the area
Air Quality:
Tyndall AFB is in an attainment area for National Ambient Air Quality Standard. The FESOP permit for Tyndall AFB will not be violated by the implementation of the proposed project.
Temporary minor exhaust emissions would occur in the immediate vicinity of the construction.
Fugitive dust would be controlled at the sites using best management practices (BMPs), such as periodic watering of cleared areas and stockpiled materials and mulching or vegetative cover for the cleared areas.
Many operations are subject to specific air quality regulations. State-specific emission standards are identified in Chapter 62-296 of the Florida Administrative Code (F.A.C.). Florida regulates hazardous air pollutants (HAP) in accordance with the National Emissions Standards for
Hazardous Air Pollutants (NESHAP) in Title 40 of the Code of Federal Regulations (CFR): Part 61 is regulation by HAP and Part 63 is regulation by industrial category. There are also federal New Source Performance Standards specified for criteria air pollutants in Title 40, Part 60 of the
CFR.
Permits are required for operations subject to applicable regulations or that emit air pollutants in sufficient quantities to warrant regulation. Projects utilizing regulated equipment are required to obtain permits prior to beginning construction on new emissions units, modifying an existing emissions unit or installing air pollution control equipment. These permits will specify applicable emissions standards and work practices to control the emissions of pollutants such as particulate matter, carbon monoxide, nitrogen oxides, sulfur oxides, volatile organic compounds, and hazardous air pollutants.
If concrete pipe is to be cut, recycled, or reused, it shall be tested for the presence of asbestos containing material.
ACAM modeling was performed, based off the results the air quality in the area would not be significantly impacted by the proposed project; therefore a conformity determination is not required.
Water Resources:
Coordination with the NWFWMD and/or the FDEP will be required prior to design. The project is proposed to modify/impact previously permitted stormwater basins. Please reference project number 473 and 473.01. Additional permitting would be required through the state as well as potentially through the USACE.
Although the project does appear to alleviate some issues, a regional system and/or new stormwater pond which was previously discussed on the south side of Beacon Beach would be preferred to incorporate in this project to resolve all issues. Modifying the conveyance system alone will not resolve all issues. The overall system is undersized and needs larger capacity areas to address flooding. Conveying the water somewhere else will only cause flooding of adjacent areas.
Best management practices for erosion control shall be implemented prior to construction activities and maintained at all times during construction to prevent siltation and turbid discharges. Install erosion control measures along the perimeter of all work areas to prevent the displacement of fill material outside the work area into waters of the United States. Immediately after completion of the final grading of the land surface, all slopes, land surfaces, and filled areas shall be stabilized using appropriate vegetation, degradable mats, barriers, or a combination of similar stabilizing materials to prevent erosion. Methods could also include, but are not limited to the use of staked hay bales, staked filter cloth, sodding, seeding, and mulching; staged construction; and the installation of turbidity screens around the immediate project site. Identify and cover Stormwater structures using protection devices before performing any work. Devices must remain in place until all work is complete and the area has been cleaned and free of construction potential discharges. The erosion control measures shall remain in place and be maintained until all work is completed and the work areas are stabilized.
There shall be no work, storage, or stockpiling of tools, materials (i.e. lumber, pilings, debris) within wetlands, ditches, swales, or elsewhere within waters of the state unless authorized by permit. All stormwater conveyance structures shall remain in operable condition and shall not be allowed to deteriorate or otherwise contribute to a water quality violation. Construction activities shall be conducted in a manner that does not cause or contribute to violations of state water quality standards.
An FDEP permit maybe required for the installation, maintenance, repair, and removal of underground utility lines, cable, conduit, or pipeline transmitting electricity, communication signals, potable water, raw water, reclaimed water, domestic wastewater, propane gas or natural gas. 62-330.453 within the Florida Administrative Code dictates that a General Permit is needed for Installation, Maintenance, Repair, and Removal of Utility Lines that cross a regulated surface of the state. In this case the ditches/swales maybe considered a regulated surface water.
All electric, gas, water, sewer, and other services lines should be shut off, capped, or otherwise properly controlled, at or outside the building before demolition work is started. In each case, any utility company that is involved should be notified in advance, and its approval or services, if necessary, shall be obtained. Coordinate with the 325 CES/CEIEC, GCEC, and Bioenvironmental regarding flushing and water quality sampling prior to and after performing any work.
If it is necessary to maintain any power, water, sewer, or other utilities during demolition, such lines shall be temporarily relocated as necessary and/or protected. The location of all power sources should also be determined, as they can prove especially hazardous during any machine demolition. All workers should be informed of the location of any existing or relocated utility service. Coordinate with the 325 CES/CEIC, GCEC, and Bioenvironmental regarding flushing and water quality sampling prior to and after performing any work.
All material used as fill shall be clean sand/fill dirt/shell material and shall not be contaminated with vegetation, garbage, trash, tires, hazardous waste, or other materials that are not suitable for construction.
A Construction Generic Permit (CGP)/Notice of Intent (NOI) will be required from the FDEP. Any act or process of developing or improving land, including demolition and renovation activity, which involves the disturbance of soils not limited to, clearing, grading, and excavation that reaches an acre of total disturbed area would require the CGP. This permit is different than an ERP. This permit does include dewatering. If dewatering is needed, please coordinate with the 325 CES/CEIEC, additional permits maybe required.
UFC 3-201-01 – Civil Engineering provides planning, design, construction, sustainment, restoration, and modernization criteria, and applies to the Military Departments, the Defense Agencies, and the DoD Field Activities in accordance with USD (AT&L) Memorandum dated 29 May 2002. This UFC will be used for all DoD projects and work for other customers where appropriate.
Section 3-3.2 – Erosion and Sediment Control states “Design erosion and sediment controls that minimize the discharge of pollutants from earth disturbing activities in conformance with the applicable requirements of the regulatory agency with jurisdiction over the Installation regarding erosion and sediment control. Where requirements do not exist, provide an erosion and sediment control plan in accordance with the requirements of Environmental Protection Agency’s (EPA’s) Construction General Permit.”
This project will require a completed Stormwater Pollution Prevention Plan (SWPPP) in accordance with the Florida Department of Environmental Protection (FDEP)/EPA standards. Please provide a SWPPP for review, prior to CGP submittal. The FDEP has generated a template to be used (https://floridadep.gov/sites/default/files/ConstructionSWPPP.pdf). Work specific Best Management Practices (BMP’s) shall be implemented prior to construction activities and maintained at all times during construction to prevent siltation and turbid discharges. Identify and cover Stormwater structures using protection devices before performing any work. The BMP’s are to be installed along the perimeter of all work areas to prevent the displacement of fill material outside the work area into surface waters, stormwater inlets, etc. Immediately after completion of the final grading of the land surface, all slopes, land surfaces, and filled areas shall be stabilized using approved sod, seeding, degradable mats, staked hay bales, staked filter cloth, barriers, turbidity screens, or a combination of similar stabilizing materials to prevent erosion.
The erosion control measures shall remain in place and be maintained until all authorized work is completed and the work areas are stabilized and verified by USAF personnel.
Soil Impact:
The action to repair/replace the culverts will occur within the ERP Site FR038 which has been cleaned to industrial standards and SR170 which is undergoing a contamination study. Any soils removed from ditches should be spread up the bank or on shoulder, and should not be removed off the site. Any excess excavated soil/sand must be applied to the excavation site but it must not create mounding or any elevation changes from the design. Otherwise, the soil must be managed in compliance with the AF/FDEP MOU.
Biological Resources:
The proposed action would occur in a developed area. The nature of the location results in poor habitat for threatened and endangered species. Therefore, proposed action would not adversely affect any federally protected species. Proposed action is not sited in the 100 year floodplain or wetlands.
Cultural Resources Impact:
The proposed undertakings has been coordinated with the State Historical Preservation Office and a finding of no adverse effect has been received. Tyndall AFB concluded that the proposed undertaking will have no adverse effect on any known historic properties. All work should cease and the Cultural Resources Manager should be contacted if archaeological deposits or human remains are encountered. Contractor must be trained on inadvertent discoveries, training pamphlet will be provided.
Hazardous Materials:
A letter of review from 325 CES/CEIEC Must be accomplished prior to commencement of work.
The contractor shall submit TAFB Form 81 (Contractor Questionnaire) and TAFB Form 82 (Chemical Inventory) if applicable (within 10 duty days after the Notice to Proceed is issued), for review.
The Contractor should note that Tyndall AFB is required to report chemicals used such as (but not limited to) compressed gases, adhesives, aerosol cans, sealants, paints, lubricants, oils, cleaners, degreasers, pesticides, Fuels. Copies of manufacturer-specific Safety Data Sheets (SDS) must be attached to TAFB Form 82. These SDSs shall also be readily accessible at the location of each hazardous material. After submission, 325 CES/CEIE will notify the Project Manager and/or CONS of the reportable chemicals and of any special instructions. As directed by the CO, the Contractor is required to submit TAFB Form 83 (Reporting Entry Form) showing material usage monthly until completion of the task order. The CO must be notified of any changes from the original submittal (i.e. new chemical is added, size of container or unit of issue changes or if the manufacturer changes), changes must be submitted using TAFB form 82. An updated letter of review indicating changes will be sent from CEIEC to the Contracting Office before the material can be brought onto the installation. Prime contractors shall be responsible to ensure all sub-contractors comply with this section.
No hazardous materials should be brought onto the installation prior to receiving a hazardous materials authorization letter from the 325 CES Hazardous Materials Office.
Hazardous Waste:
The Contractor shall identify, characterize, store and dispose of any hazardous waste generated during work in strict accordance with Federal and State guidelines found in the Code of Federal Regulations.
The proposed action may generate small quantities of hazardous materials/wastes. Disposal of hazardous waste must be completed in accordance with Tyndall AFB Hazardous Waste Management Plan. Additionally, management of hazardous waste must be completed in accordance with 40 CFR 260-279. Hazardous waste transportation and disposal shall be coordinated through 325 CES/CEIE. The transportation and disposal facilities shall be approved by 325 CES/CEIE prior to their use. Manifests shall be signed only by 325 CES/CEIE. Drums shall be disposed of within 90 days of placing the first drop in the container.
A Hazardous Waste Determination must be conducted/recorded for any material discarded for these projects. The personnel conducting Hazardous Waste Determinations and those individuals who may generate or manage Hazardous Waste must have annual Hazardous Waste Training that complies with 40 CFR 262.17(a)(7).
Any containerized waste must maintain compliance with EPA, DOT, and OSHA’s HAZCOM requirements.
Solid Waste:
Construction activities associated with the Proposed Action would result in a short-term increase in solid waste generated at Tyndall AFB. The contractor would be responsible for disposing of solid waste in accordance with all federal, state, and local laws.
The proceeds from recyclable materials generated during construction should be returned to Tyndall AFB Recycling Program.
Digging/Excavation:
Prior to any digging, an excavation permit will be required. An Air Force Form103, BCE Work Clearance Request, will be required. Form 103 will not be signed until required (SWPPP, CGP and other permits) have been submitted for review.
5.3 List of required permits:
Permits will be required for the proposed action. Contractor is responsible to ensure all permits are submitted to the 325 Civil Engineer Squadron for review.
5.4 CATEX Statement
The proposed project will not adversely impact Tyndall AFB environmental attributes; therefore, qualifies for Categorical Exclusions (CATEX) A2.3.12. Installing, operating, modifying, and routinely repairing and replacing utility and communications systems, data processing cable, and similar electronic equipment that use existing rights of way, easements, distribution systems, or facilities.
PROJECT ENVIRONMENTAL REVIEW SHEET
Project Title: Repair/Restore Stormwater Drainage 1200 Area Project Description:
1. Natural Resources
Reviewed By: ___e.wallace__________________ Does project affect BASH? YES ____ NO __X__ Does project affect wildlife management area? YES ____ NO _X___ Does project affect forestry management area? YES ____ NO __X__
2. Threatened and Endangered Species Reviewed By: ____e.wallace_________________ X__ Project has no potential for affecting threatened or endangered species or critical habitats.
__ Based on advice from USFWS _____, threatened or endangered species in the vicinity of the project will not be affected.
__ Consultation with USFWS underway in accordance with the Endangered Species Act.
__ Formal Consultation with the Regional Director, USFWS completed on ______.
__ Biological Assessment is required. Estimated completion date completion date is ______.
__ Biological opinion issued by USFWS on ______.
__ Informal consultation may be required if the impact to T & E’s is not likely to effect the species __ Formal consultation may be required if the impact may affect them, but not adversely __ Formal consultation will be required if it may affect them adversely Note: A Biological Evaluation will be required for Informal consultation and a Biological Assessment will be required for Formal consultations
3. Cultural Resources Cultural Resources Reviewed By: ____e.wallace_________________ X__ Consultation required with State Historical Preservation Officer (SHPO) and Federally Recognized Tribes. Letters notifying parties dated _3/16/2022_____.
__ Project area has not been surveyed for historic properties. Survey is required prior to project start.
__There are no cultural resources concerns with this project. The described actions of the project is exempted under the Programmatic Agreement.
__ Project area has been surveyed and no historic properties were identified.
__ Project area has been surveyed and identified historic properties but the project will have no adverse effect.
__ Project area identified historic properties will be adversely impacted. After consultation, project can proceed with specific mitigation guidelines.
__ Archeological Monitor is required. Please see attachment for monitoring guidance.
__ Mitigation measures can be found on attachment __ No MOA was developed and the formal comments of the Council are being sought or estimated date to execute the MOA is _______.
__ SHPO concurred that the project will have no adverse effect on historic properties dated ______.
__ Tribes_______________ concurred that the project will have no adverse effect on historic properties dated ______.
_X_There are no cultural resources concerns with this project. However, if unexpected discoveries, such as Native American graves or lost historic cemeteries are encountered, guidelines set forth in Chapter 872, Florida Statute (Florida’s Unmarked Burial Law) must be followed. If human remains or archaeological materials are encountered during construction, work should cease immediately and the area secured. Contact the Tyndall AFB Cultural Resources office within 24 hours.
4. Water Programs Reviewed By: _____e.wallace________________
a. Jurisdictional Waters: State and/or Federal (Wetlands, ditches, swales, ponds, open water, etc.):
_X_ Is a permit required from either the Florida Department of Environmental Protection (FDEP) and/or U.S. Army Corps of Engineers (USACE)? Coordinate with NWFWMD and or FDEP __ Delineation survey is required. Estimated completion date______________ __ Other: Project is not sited in a jurisdictional water
b. Flood Plain:
_X_ Project is not sited in a 100-year flood plain.
__ Requirements of EO 11990 in progress. Estimated completion date is ______ __ Project is sited in a 100-year flood plain. Requirements of EO 11990 completed on ______ __ Finding of "No Practicable Alternative signed ______
c. Water (Potable/Fire):
__ Construction permit required for extension of water system per 62.555, FAC.
__ No permit required because less than 2 in. diameter pipe and less than 100 if extension.
__ Backflow preventer(s) required. Must be field tested by licensed inspector upon installation.
__ Sprinkler system must have rain sensor device per FS 373.62.
__Well drilling/mod/abandonment must be conducted by a licensed contractor. Permit required per 4OC-
3, FAC.
_X_ Other: No water required for this project.
__ Coordination with Bay County required for connection to Bay County Utility __Coordination with GCEC required for connection to GCEC Utility
d. Wastewater:
__ Construction permit required to connect to collection system per 62-600, FAC.
__ No permit required per 62-604.1 10 (single facility, gravity service connection, no pretreatment, compatible discharge) _X_ Other: No wastewater required for this project.
e. Stormwater:
_X_ Stormwater permitting required?
a. Creates more than 4,000 ft2 impervious surface subject to vehicular traffic;
b. Creates more than 5,000 ft2 impervious surface; or
c. Project affects 5 acres or more (includes recreation areas, golf course, ball fields, etc.)
__ Site included in station stormwater master plan; permit required but may access existing stormwater treatment system. (Basin no. __________ pond no._________ ; approx ________________ s.f.)
X__ Construction contractor must obtain Construction Generic Permit (CGP) and implement Stormwater Pollution Prevention Plan (SWPPP).
__ Only a SWPPP required __ Upon completion site will be included in Base Stormwater Pollution Prevention Plan.
__ Other: No stormwater required for this project.
9. Potentially Regulated Substances
a. Asbestos:
__ Surveyed? (Y/N)_Date of survey: ____________ __ Asbestos present? (Testing required) _X_ If asbestos is present, and renovation impacts asbestos, abatement will be required.
_X_ 10 day notification (FDEP Form 62-257.900(1) to FDEP is required prior to demo.
__ FDEP Form 62-257.900(1) approval date:___________ ID #:_____________
b. Lead Based Paint:
__ Surveyed? (Y/N)_Date of survey: ____________ _X_ LBP present? (No) __ If LBP is present, and renovation impacts LBP, abatement will be required.
c. Ozone Depicting Substances:
X__ Not present: _________ survey underway.
__ Present (describe mitigation, or state why mitigation is not necessary).
d. Polychlorinated biphenyls (PCBs):
_X_ Not present: _________ survey underway.
__ Present (describe mitigation, or state why mitigation is not necessary).
e. Other known hazardous or toxic substances and pollutants (e.g. contaminated soils, PFAS):
__ Not present: _________ survey underway.
X__ Present (guidelines attached).
10. Hazardous Materials _X_ Will chemicals (such as, but not limited to, compressed gases, adhesives, aerosol cans, sealants, paints, lubricants, solvents, oils, cleaners, degreasers and pesticides) be used?
__ Submit TAFB Form 81 (Contractor Questionnaire) and TAFB Form 82 (Chemical Inventory) 7-10 days upon issuance of the notice to proceed and prior commencement of work on site.
_X_ Submit copies of manufacturer-specific Safety Data Sheets
__ Submit TAFB Form 83 (Reporting Entry Form) monthly throughout the duration of the project or as indicated by CEIE.
_X_ Notify CEIE if anything changes from the original submittal (i.e. new chemical is added, size of container or unit of issue changes or if the manufacturer changes).
__ Will not use chemicals
11. Air Pollutants
Reviewed By: ______e.wallace_______________ __ Will not be generated by the operation or construction of this facility.
__ Will be generated by the operation or construction of this facility. Describe type and amount of substance expected to be generated, existing control systems, and the need for additional controls.
_X_ Conformity determination not required.
__ Conformity determination required.
__ Air construction permit required
12. Solid and Hazardous Wastes
Reviewed By: _________e.wallace______________ _X_ Facility will not be used for generating/managing solid and/or hazardous wastes.
__ Facility will be for generating/managing solid and/or hazardous waste.
__ Will the work being performed on the project generate any wastes?
__ Has a solid waste plan been submitted?
13. Storage Tanks
Reviewed By: _______e.wallace______________ _X_ No storage tanks are involved.
__ New storage tanks will be installed.
__ Existing tanks on the project will be removed. Ensure regulatory agency has been notified.
__ Contamination exists.
__ Contamination unknown.
__ Existing tanks on project will be retained.
14. Environmental Impact Analysis Process Reviewed By: ___e.wallace_________________ _X_ Categorical exclusion number _A2.3.12__ applies.
__ Environmental Assessment under preparation. Expected completion date is __________.
__ Finding of No Significant Environmental Impact signed on __________.
__ Draft Environmental Impact Statement (EIS) under preparation. Expected completion date is ____. __ Draft EIS filed on ___________.
__ Final EIS filed on ___________.
__ Record of Decision signed on __________.
__ Foreign nation or protected global resource exemption number ___________ applies.
__ Environmental study (or review underway) under preparation. Expected completion date is __ Environmental study (or review) completed on ___________.
__ Requirements of EO11990 in progress. Estimated completion date is ______________ __ Requirements of EO 11990 completed on ______________ __ Finding of "No Practicable Alternative signed ______________
15. Interagency and Intergovernmental Coordination for Environmental Planning Reviewed By: ______e.wallace_______________ X__ Coordination of proposed project with the state Single Point of Contact or other agencies is not required.
__ Coordination with the state Single Point of Contact is in progress. Expected date of completion is __ Proposed project was coordinated with the state Single Point of Contact or other agencies on _
16. Environmental Permits Reviewed By: ____ e.wallace_________________ __ No permits are required unless dewatering is needed.
__ No permits required but regulatory agency notification required prior to construction (e.g.
underground storage tank removals).
_X_ Permits are required for this project.
17. Environmental Restoration Program (ERP)/Petroleum Contamination (PCA)
Reviewed By: ___ e.wallace__________________ _X_ Facility is not sited on or near an ERP/PCA site.
__ Facility is sited near an ERP/PCA site.
__ Facility is within the boundary of an IRP/PCA site.
__ The following activities must be coordinated with the IRP Manager:
excavation, sampling, and 40 hour H&S training.
__ The site is projected to be remediated and/or closed out on _________, prior to commencement of construction activities.
__ The nature of the site contamination does not preclude the type of construction activity proposed.
__ There is a Compliance Agreement associated with this site.
__ A Remedial Investigation/Feasibility Study was completed on _______ to accurately delineate the aerial extent of the contamination.
Comments
Mr. José J. Cintron Chief, Environmental Element 325th Civil Engineer Squadron 103 Mississippi Road (Building 36233) Tyndall Air Force Base, Florida 32403-5014
Billy Cypress, Chairman Miccosukee Tribe of Indians of Florida Tamiami Station PO Box 440021 Miami, Florida 33144
Re: 1200 Area Stormwater Renovation, Tyndall Air Force Base (AFB), Bay County, Florida
(TY-22-0015)
Dear Principal Chief Cypress, In accordance with the National Historic Preservation Act (NHPA) and its implementing regulations (36 CFR 800), Tyndall AFB is initiating consultation for a proposed undertaking.
The proposed undertaking will consist of the repair and renovation of the stormwater system in the 1200 area. This undertaking will reduce the flood water volume in the 1200 area during inclement weather.
The proposed undertaking will be located at the intersection of DeJarnette Drive and Beacon Beach Road (Atch 1). The undertaking will consist of the construction of the following features:
Replacement of approximately 4,700 linear feet of stormwater piping.
Trenching 4 ft. wide to a maximum depth of 4 ft.
Emplacement of 4 inches of topsoil and sod on all trenched areas.
Regrading of approximately 250,000 sq. ft. of existing trapezoidal drainage channels.
Based on the proposed activities, Tyndall AFB recommends that the total area of potential effect (APE) is approximately 300,000 sq. ft. or 7 acres in size and extends to a maximum depth of 4 ft. (Atch 1).
The entire APE was surveyed by the National Park Services Southeastern Archaeological Center (NPS SEAC) in 2006 (Archaeological Survey of TY-0058), by Prentice Thomas and Associates, Inc. (PTA) in 2016 and 2017 (Archaeological Survey of TY-141 and TY-155, respectively), and by Wood Environmental and Infrastructure, Inc. (Wood) in 2019
DEPARTMENT OF THE AIR FORCE
325TH CIVIL ENGINEER SQUADRON (ACC)
TYNDALL AIR FORCE BASE FLORIDA
(Archaeological Survey of TY-162). The only archaeological site within the APE is 8BY2381, a small portion of a WWII Skeet Range, which is listed as not yet evaluated. However, 8BY2381 was excavated and destroyed after Hurricane Michael in April 2019 as part of the environmental remediation effort entitled FR038 – Beacon Beach Skeet Range (USEPA ID: FL1570024124).
Tyndall AFB is not aware of any historic properties of religious or tribal significance located within the APE. However, we request the assistance of the Miccosukee Tribe of Indians of Florida in identifying these resources and any effect the undertaking will have on these properties.
Based on the results of the previous archaeological investigations, Tyndall AFB recommends that the undertaking will have no adverse effects on historic properties eligible for or listed on the National Register of Historic Places. However, Tyndall AFB will halt all ground disturbing activities and initiate consultation with your office if human remains or archaeological deposits are encountered during the project.
Tyndall AFB respectfully requests your review. Please contact me with any questions at jose.cintron.1@us.af.mil or 850-283-2713.
Sincerely
JOSÉ CINTRON, GS-13, DAF
Attachment:
1. Maps of Proposed Undertaking
Sent via email to:
kevind@miccosukeetribe.com; yalmeida@miccosukeetribe.com; hopel@miccosukeetribe.com
325th Civil Engineer Squadron 103 Mississippi Road (Building 36233) Tyndall Air Force Base, Florida 32403-5014
Ms. Corain Lowe-Zepeda Traditional Cultural Advisor Muscogee (Creek) Nation PO Box 580 Okmulgee, Oklahoma 74447
Re: 1200 Area Stormwater Renovation, Tyndall Air Force Base (AFB), Bay County, Florida
(TY-22-0015)
Dear Ms. Lowe-Zepeda, In accordance with the National Historic Preservation Act (NHPA) and its implementing regulations (36 CFR 800), Tyndall AFB is initiating consultation for a proposed undertaking.
The proposed undertaking will consist of the repair and renovation of the stormwater system in the 1200 area. This undertaking will reduce the flood water volume in the 1200 area during inclement weather.
The proposed undertaking will be located at the intersection of DeJarnette Drive and Beacon Beach Road (Atch 1). The undertaking will consist of the construction of the following features:
Replacement of approximately 4,700 linear feet of stormwater piping.
Trenching 4 ft. wide to a maximum depth of 4 ft.
Emplacement of 4 inches of topsoil and sod on all trenched areas.
Regrading of approximately 250,000 sq. ft. of existing trapezoidal drainage channels.
Based on the proposed activities, Tyndall AFB recommends that the total area of potential effect (APE) is approximately 300,000 sq. ft. or 7 acres in size and extends to a maximum depth of 4 ft. (Atch 1).
The entire APE was surveyed by the National Park Services Southeastern Archaeological Center (NPS SEAC) in 2006 (Archaeological Survey of TY-0058), by Prentice Thomas and Associates, Inc. (PTA) in 2016 and 2017 (Archaeological Survey of TY-141 and TY-155, respectively), and by Wood Environmental and Infrastructure, Inc. (Wood) in 2019
DEPARTMENT OF THE AIR FORCE
small portion of a WWII Skeet Range, which is listed as not yet evaluated. However, 8BY2381 was excavated and destroyed after Hurricane Michael in April 2019 as part of the environmental remediation effort entitled FR038 – Beacon Beach Skeet Range (USEPA ID: FL1570024124).
Tyndall AFB is not aware of any historic properties of religious or tribal significance located within the APE. However, we request the assistance of the Muscogee (Creek) Nation in identifying these resources and any effect the undertaking will have on these properties.
Based on the results of the previous archaeological investigations, Tyndall AFB recommends that the undertaking will have no adverse effects on historic properties eligible for or listed on the National Register of Historic Places. However, Tyndall AFB will halt all ground disturbing activities and initiate consultation with your office if human remains or archaeological deposits are encountered during the project.
Sent via email to: Section106@mcn-nsn.gov; clowe@mcn-nsn.gov
325th Civil Engineer Squadron 103 Mississippi Road (Building 36233) Tyndall Air Force Base, Florida 32403-5014
Larry D. Haikey, MS, Tribal Historic Preservation Officer Poarch Band of Creek Indians 5811 Jack Springs Road Atmore, Alabama 36502
Re: 1200 Area Stormwater Renovation, Tyndall Air Force Base (AFB), Bay County, Florida
(TY-22-0015)
Dear Mr. Haikey, In accordance with the National Historic Preservation Act (NHPA) and its implementing regulations (36 CFR 800), Tyndall AFB is initiating consultation for a proposed undertaking.
The proposed undertaking will consist of the repair and renovation of the stormwater system in the 1200 area. This undertaking will reduce the flood water volume in the 1200 area during inclement weather.
The proposed undertaking will be located at the intersection of DeJarnette Drive and Beacon Beach Road (Atch 1). The undertaking will consist of the construction of the following features:
Replacement of approximately 4,700 linear feet of stormwater piping.
Trenching 4 ft. wide to a maximum depth of 4 ft.
Emplacement of 4 inches of topsoil and sod on all trenched areas.
Regrading of approximately 250,000 sq. ft. of existing trapezoidal drainage channels.
Based on the proposed activities, Tyndall AFB recommends that the total area of potential effect (APE) is approximately 300,000 sq. ft. or 7 acres in size and extends to a maximum depth of 4 ft. (Atch 1).
The entire APE was surveyed by the National Park Services Southeastern Archaeological Center (NPS SEAC) in 2006 (Archaeological Survey of TY-0058), by Prentice Thomas and Associates, Inc. (PTA) in 2016 and 2017 (Archaeological Survey of TY-141 and TY-155, respectively), and by Wood Environmental and Infrastructure, Inc. (Wood) in 2019
DEPARTMENT OF THE AIR FORCE
small portion of a WWII Skeet Range, which is listed as not yet evaluated. However, 8BY2381 was excavated and destroyed after Hurricane Michael in April 2019 as part of the environmental remediation effort entitled FR038 – Beacon Beach Skeet Range (USEPA ID: FL1570024124).
Tyndall AFB is not aware of any historic properties of religious or tribal significance located within the APE. However, we request the assistance of the Poarch Band of Creek Indians in identifying these resources and any effect the undertaking will have on these properties.
Based on the results of the previous archaeological investigations, Tyndall AFB recommends that the undertaking will have no adverse effects on historic properties eligible for or listed on the National Register of Historic Places. However, Tyndall AFB will halt all ground disturbing activities and initiate consultation with your office if human remains or archaeological deposits are encountered during the project.
Tyndall AFB respectfully requests your review. Please contact me with any questions at
Sent via email to: THPO@pci-nsn.gov; Lhaikey@pci-nsn.gov
325th Civil Engineer Squadron 103 Mississippi Road (Building 36233) Tyndall Air Force Base, Florida 32403-5014
Mr. Lewis J. Johnson Principal Chief Seminole Nation of Oklahoma PO Box 1498 Wewoka, Oklahoma 74884
Re: 1200 Area Stormwater Renovation, Tyndall Air Force Base (AFB), Bay County, Florida
(TY-22-0015)
Dear Principal Chief Johnson, In accordance with the National Historic Preservation Act (NHPA) and its implementing regulations (36 CFR 800), Tyndall AFB is initiating consultation for a proposed undertaking.
The proposed undertaking will consist of the repair and renovation of the stormwater system in the 1200 area. This undertaking will reduce the flood water volume in the 1200 area during inclement weather.
The proposed undertaking will be located at the intersection of DeJarnette Drive and Beacon Beach Road (Atch 1). The undertaking will consist of the construction of the following features:
Replacement of approximately 4,700 linear feet of stormwater piping.
Trenching 4 ft. wide to a maximum depth of 4 ft.
Emplacement of 4 inches of topsoil and sod on all trenched areas.
Regrading of approximately 250,000 sq. ft. of existing trapezoidal drainage channels.
Based on the proposed activities, Tyndall AFB recommends that the total area of potential effect (APE) is approximately 300,000 sq. ft. or 7 acres in size and extends to a maximum depth of 4 ft. (Atch 1).
The entire APE was surveyed by the National Park Services Southeastern Archaeological Center (NPS SEAC) in 2006 (Archaeological Survey of TY-0058), by Prentice Thomas and Associates, Inc. (PTA) in 2016 and 2017 (Archaeological Survey of TY-141 and TY-155, respectively), and by Wood Environmental and Infrastructure, Inc. (Wood) in 2019
DEPARTMENT OF THE AIR FORCE
small portion of a WWII Skeet Range, which is listed as not yet evaluated. However, 8BY2381 was excavated and destroyed after Hurricane Michael in April 2019 as part of the environmental remediation effort entitled FR038 – Beacon Beach Skeet Range (USEPA ID: FL1570024124).
Tyndall AFB is not aware of any historic properties of religious or tribal significance located within the APE. However, we request the assistance of the Seminole Nation of Oklahoma in identifying these resources and any effect the undertaking will have on these properties.
Based on the results of the previous archaeological investigations, Tyndall AFB recommends that the undertaking will have no adverse effects on historic properties eligible for or listed on the National Register of Historic Places. However, Tyndall AFB will halt all ground disturbing activities and initiate consultation with your office if human remains or archaeological deposits are encountered during the project.
Sent via email to: Lincoln.s@sno-nsn.gov, Franks.D@sno-nsn.gov
325th Civil Engineer Squadron 103 Mississippi Road (Building 36233) Tyndall Air Force Base, Florida 32403-5014
Paul N. Backhouse, Ph.D., Tribal Historic Preservation Officer Seminole Tribe of Florida 30290 Josie Billie Highway, PMB 1004 Clewiston, Florida 33440
Re: 1200 Area Stormwater Renovation, Tyndall Air Force Base (AFB), Bay County, Florida
(TY-22-0015)
Dear Dr. Backhouse, In accordance with the National Historic Preservation Act (NHPA) and its implementing regulations (36 CFR 800), Tyndall AFB is initiating consultation for a proposed undertaking.
The proposed undertaking will consist of the repair and renovation of the stormwater system in the 1200 area. This undertaking will reduce the flood water volume in the 1200 area during inclement weather.
The proposed undertaking will be located at the intersection of DeJarnette Drive and Beacon Beach Road (Atch 1). The undertaking will consist of the construction of the following features:
Replacement of approximately 4,700 linear feet of stormwater piping.
Trenching 4 ft. wide to a maximum depth of 4 ft.
Emplacement of 4 inches of topsoil and sod on all trenched areas.
Regrading of approximately 250,000 sq. ft. of existing trapezoidal drainage channels.
Based on the proposed activities, Tyndall AFB recommends that the total area of potential effect (APE) is approximately 300,000 sq. ft. or 7 acres in size and extends to a maximum depth of 4 ft. (Atch 1).
The entire APE was surveyed by the National Park Services Southeastern Archaeological Center (NPS SEAC) in 2006 (Archaeological Survey of TY-0058), by Prentice Thomas and Associates, Inc. (PTA) in 2016 and 2017 (Archaeological Survey of TY-141 and TY-155, respectively), and by Wood Environmental and Infrastructure, Inc. (Wood) in 2019
DEPARTMENT OF THE AIR FORCE
small portion of a WWII Skeet Range, which is listed as not yet evaluated. However, 8BY2381 was excavated and destroyed after Hurricane Michael in April 2019 as part of the environmental remediation effort entitled FR038 – Beacon Beach Skeet Range (USEPA ID: FL1570024124).
Tyndall AFB is not aware of any historic properties of religious or tribal significance located within the APE. However, we request the assistance of the Seminole Tribe of Florida in identifying these resources and any effect the undertaking will have on these properties.
Based on the results of the previous archaeological investigations, Tyndall AFB recommends that the undertaking will have no adverse effects on historic properties eligible for or listed on the National Register of Historic Places. However, Tyndall AFB will halt all ground disturbing activities and initiate consultation with your office if human remains or archaeological deposits are encountered during the project.
Sent via email to: THPOCompliance@semtribe.com
325th Civil Engineer Squadron 103 Mississippi Road (Building 36233) Tyndall Air Force Base, Florida 32403-5014
Dr. Timothy A. Parsons, Ph.D.
State Historic Preservation Officer Division of Historic Resources R.A. Gray Building 500 South Bronough Street Tallahassee, Florida 32399-0250
Re: 1200 Area Stormwater Renovations, Tyndall Air Force Base (AFB), Bay County, Florida
(TY-22-0015)
Dear Dr. Parsons, In accordance with the National Historic Preservation Act (NHPA) and its implementing regulations (36 CFR 800), Tyndall AFB is initiating consultation for a proposed undertaking.
The proposed undertaking will consist of the repair and renovation of the stormwater system in the 1200 area. This undertaking will reduce the flood water volume in the 1200 area during inclement weather.
The proposed undertaking will be located at the intersection of DeJarnette Drive and Beacon Beach Road (Atch 1). The undertaking will consist of the construction of the following features:
Replacement of approximately 4,700 linear feet of stormwater piping.
Trenching 4 ft. wide to a maximum depth of 4 ft.
Emplacement of 4 inches of topsoil and sod on all trenched areas.
Regrading of approximately 250,000 sq. ft. of existing trapezoidal drainage channels.
Based on the proposed activities, Tyndall AFB recommends that the total area of potential effect (APE) is approximately 300,000 sq. ft. or 7 acres in size and extends to a maximum depth of 4 ft. (Atch 1).
The entire APE was surveyed by the National Park Services Southeastern Archaeological Center (NPS SEAC) in 2006 (Archaeological Survey of TY-0058), by Prentice Thomas and
DEPARTMENT OF THE AIR FORCE
Associates, Inc. (PTA) in 2016 and 2017 (Archaeological Survey of TY-141 and TY-155, respectively), and by Wood Environmental and Infrastructure, Inc. (Wood) in 2019 (Archaeological Survey of TY-162). The only archaeological site within the APE is 8BY2381, a small portion of a WWII Skeet Range, which is listed as not yet evaluated. However, 8BY2381 was excavated and destroyed after Hurricane Michael in April 2019 as part of the environmental remediation effort entitled FR038 – Beacon Beach Skeet Range (USEPA ID: FL1570024124).
Based on the results of the previous archaeological investigations, Tyndall AFB recommends that the undertaking will have no adverse effects on historic properties eligible for or listed on the National Register of Historic Places. However, Tyndall AFB will halt all ground disturbing activities and initiate consultation with your office if human remains or archaeological deposits are encountered during the project.
Sincerely, Sent via email to:
Kelly.Chase@dos.myflorida.com Timothy.Parsons@dos.myflorida.com CompliancePermits@dos.myflorida.com
325th Civil Engineer Squadron 103 Mississippi Road (Building 36233) Tyndall Air Force Base, Florida 32403-5014
Mr. Galen Cloud Tribal Historic Preservation Officer Thlopthlocco Tribal Town PO Box 188 Okemah, Oklahoma 74859-0188
Re: 1200 Area Stormwater Renovation, Tyndall Air Force Base (AFB), Bay County, Florida
(TY-22-0015)
Dear Mr. Cloud, In accordance with the National Historic Preservation Act (NHPA) and its implementing regulations (36 CFR 800), Tyndall AFB is initiating consultation for a proposed undertaking.
The proposed undertaking will consist of the repair and renovation of the stormwater system in the 1200 area. This undertaking will reduce the flood water volume in the 1200 area during inclement weather.
The proposed undertaking will be located at the intersection of DeJarnette Drive and Beacon Beach Road (Atch 1). The undertaking will consist of the construction of the following features:
Replacement of approximately 4,700 linear feet of stormwater piping.
Trenching 4 ft. wide to a maximum depth of 4 ft.
Emplacement of 4 inches of topsoil and sod on all trenched areas.
Regrading of approximately 250,000 sq. ft. of existing trapezoidal drainage channels.
Based on the proposed activities, Tyndall AFB recommends that the total area of potential effect (APE) is approximately 300,000 sq. ft. or 7 acres in size and extends to a maximum depth of 4 ft. (Atch 1).
The entire APE was surveyed by the National Park Services Southeastern Archaeological Center (NPS SEAC) in 2006 (Archaeological Survey of TY-0058), by Prentice Thomas and Associates, Inc. (PTA) in 2016 and 2017 (Archaeological Survey of TY-141 and TY-155, respectively), and by Wood Environmental and Infrastructure, Inc. (Wood) in 2019
DEPARTMENT OF THE AIR FORCE
small portion of a WWII Skeet Range, which is listed as not yet evaluated. However, 8BY2381 was excavated and destroyed after Hurricane Michael in April 2019 as part of the environmental remediation effort entitled FR038 – Beacon Beach Skeet Range (USEPA ID: FL1570024124).
Tyndall AFB is not aware of any historic properties of religious or tribal significance located within the APE. However, we request the assistance of the Thlopthlocco Tribal Town in identifying these resources and any effect the undertaking will have on these properties.
Based on the results of the previous archaeological investigations, Tyndall AFB recommends that the undertaking will have no adverse effects on historic properties eligible for or listed on the National Register of Historic Places. However, Tyndall AFB will halt all ground disturbing activities and initiate consultation with your office if human remains or archaeological deposits are encountered during the project.
Sent via email to: thpo@tttown.org
Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
0 0.15 0.30.075 Miles
1200 Area Stormwater APE Cultural Buffer Zone
1200 Area Stormwater Renovation APE
Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
0 0.15 0.30.075 Miles
Cultural Survey
1200 Area Stormwater Renovation APE
TY-141 TY-155
TY-155
TY-162
TY-0058
Silted pipes and Structures ---------------
Remove and Replace ---------------
Trapezoidal Channel =========
Trickle Channel ---------------
General Grading
Google Link https://earth.google.com/earth/d/1rbpvROqSpufxVODmKgyBokWZ6z1VxaeT?usp=sharing
SOLAR ARRAY
Pipes and structures to be cleaned
Construct approx. 890 Feet of 4’ Trapezoidal channel with 2‘ concrete trickle channel in bottom
Remove and replace approx. 60’ of crossroad pipe with a 32”x49” elliptical pipe
Remove and replace approx. 270’ of 15” pipe with a 18”x24” elliptical pipe
Construct approx. 470 of Trapezoidal channel w/ 2’ Trickle channel in bottom. Replace 4 foot sidewalk and 22”x34” elliptical pipe.
Construct a 6’x6’ concrete FDOT junction box. Include outlets for new 32”x49”, 18”x24” pipe and trapezoidal channel
Install approx. 650’ of trapezoidal channel with varying width between road and parking lot with 2’ trickle channel in bottom
Remove and replace the two parking lot entrance pipes with 22” x 34” elliptical pipes
Remove and replace entrance pipe with an 18”x24” elliptical pipe Construct approx. 200’ of trapezoidal channel
Reconstruct approx. 700’ of trapezoidal channel
Install 32”x49” entrance pipe at
Fire Station
| 1200 Area Stormwater Renovation - Attachment 1.pdf |
| 1200 area ape |
| 1200 area survey |
| 3-3-22 pipe - channels |
| Detail pipe and channels |
File details come from the government source that posted it. Updated .