Attachment 4 AF FORM 813.pdf
PDF 145 KB Posted
- Attached to
- Corrosion Facility Cleaning
- Solicitation number
- W50S6K22Q0002
- Issued by
-
Department of the Army National Guard
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combo Corrosion Facility Cleaning with Attachment 1.pdf | ||
| Attachment 2 PWS.pdf | ||
| Attachment 3 Environmental Controls.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8/3/22, 11:48 AM AF FORM 813
1/3
REQUEST FOR ENVIRONMENTAL IMPACT ANALYSIS Report Control Symbol (RCS):
22-015
INSTRUCTIONS: Section I to be completed by Proponent; Sections II and III to be completed by Environmental Planning Function. Continue on separate sheets as necessary. Reference appropriate item number(s).
SECTION I - PROPONENT INFORMATION
1. TO (Environmental Planning Function)
354 CES/CEI
2. FROM (Proponent organization and functional address symbol) Air Force - 168 MXS/MXMG
2a. TELEPHONE NO.
377-8652
3. TITLE OF PROPOSED ACTION
B1168 Corrosion Facility Hazardous Cleaning Services
4. PURPOSE AND NEED FOR ACTION (Identify decision to be made and need date)
1. What do you intend to accomplish and why is the action necessary?
Purpose: Work required includes cleaning of Corrosion Facility common area and blasting cabinet room. Remove blasting dust and debris from walls, floors, and other areas as specified.
Need: Hazardous hexavalent chromium dust may be in the material and debris requiring cleaning and removal.
2. What is currently being done to meet the need?
Media blasting facility operations has been limited and must be performed at alternate locations not under control of the 168 MXS.
3. Provide any additional details related to the Purpose and Need for Action.
Hazardous hexavalent chromium dust may be in the material and debris requiring cleaning and removal.
Need Date: 07/12/2022
5. DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES (DOPAA) (Provide sufficient details for evaluation of the total action.)
1. What other alternatives have been considered (to include the no action alternative)?
Currently blasting operations have to be done at alternate locations, leading to scheduling and coordination conflicts.
The no action alternative does not meet the need.
2. What alternatives were eliminated from consideration and why?
Cleaning the facility is imperitive to the operation of the corrosion control function.
3. Please provide a description of the construction action and timing when it will occur.
Work required includes cleaning of Corrosion Facility common area and blasting cabinet room. Remove blasting dust and debris from walls, floors, and other areas as specified. Hazardous hexavalent chromium dust may be in the material and debris requiring cleaning and removal.
This project will occur as soon as funds are available in FY22.
4. Describe the project location. Attach map(s)/diagram(s) – make sure to include an overview map of where your requested project area is on the installation.
Blasting room and corrosion control facility in B1168.
5. Describe additional project requirements: 1) Construction and site preparation requirements (include approx. area of ground to be disturbed); 2) Does the project require a laydown yard or storage area? If so, describe the location and groundwork required.
N/A
6. Describe additional project requirements: 3) Will soil boring/sampling/potholing occur during a design phase? If so, a separate dig permit will be required; 4) Detailed operational activities; 5) Equipment/material lists.
N/A
7. Provide any additional details related to the Description of the Proposed Action and Alternatives.
This project will be conducted by professional cleaning company.
Location Description / Justification:
Project is internal to B1168
6. PROPONENT APPROVAL (Name and Grade) Lipyanic Debbie DOD - debbie.m.lipyanic
6a. SIGNATURE Submitted on behalf of: Spencer, Dusty MSgt (dusty.spencer.1@us.af.mil - 377-8652) //Lipyanic Debbie DOD - debbie.m.lipyanic i:0e.t|fedvis|debbie.m.lipyanic//
6b. DATE 06/28/2022
SECTION II - PRELIMINARY ENVIRONMENTAL SURVEY (Check appropriate box and describe potential environmental effects including cumulative effects.) (+ = positive effect; 0 = no effect; - = adverse effect; U = unknown effect)
+ 0 - U
7. AIR INSTALLATION COMPATIBLE LAND USE/ZONE USE (Noise, accident potential, encroachment, etc.) X
8. AIR QUALITY (Emissions, Attainment status, state implementation plan, etc.) X
9. WATER RESOURCES (Drinking water, wastewater, quality, quantity, source, water features, etc.) X
10. SAFETY AND OCCUPATIONAL HEALTH (Asbestos/lead-based paint/radiation/chemical exposure, explosives safety quantity distance, bird/wildlife aircraft hazard, etc.)
X
11. HAZARDOUS MATERIALS/WASTE (Use/storage/generation, solid waste, toxic materials, etc.) X
12. BIOLOGICAL RESOURCES (Wetlands/floodplains, threatened or endangered species, etc.) X
13. CULTURAL RESOURCES (Burial sites, archaeological, historical, etc.) X
14. GEOLOGY AND SOILS (Topography, minerals, geothermal, Installation Restoration Program, seismicity, etc.) X
15. SOCIOECONOMIC (Employment/population projections, school and local fiscal impacts, etc.) X
2/3
16. OTHER (Potential impacts not addressed above, such as Host Nation considerations/concerns for non-US locations.) X
SECTION III - ENVIRONMENTAL ANALYSIS DETERMINATION
17. PROPOSED ACTION QUALIFIES FOR CATEGORICAL EXCLUSION (CATEX) #A2.3.10. ; OR
PROPOSED ACTION DOES NOT QUALIFY FOR A CATEX; FURTHER ENVIRONMENTAL ANALYSIS IS REQUIRED.
18. REMARKS
Secondary CATEX selections: A2.3.20.
• Please reference below comments from the 354 CES Environmental Planning Office. Compliance with the remarks/comments/requirements is mandatory. Substantial or significant changes in project scope will trigger the need for a new AF Form 813 to be submitted.
• Project proponents are also required to abide by all other relevant environmental requirements even if not specifically listed. Please follow up with the relevant Program Mangers or Subject Matter Experts (SMEs) for comment clarification and/or further advice, if necessary.
• Eielson AFB is not a non-attainment or maintenance area, therefore the Clean Air Act General Conformity Rule does not apply.
• The scope of this Preliminary Environmental Survey is based on the Description of Project Actions and Alternatives (DOPAA), as stated in Block 5 and the project is either:
o Eligible for this Categorical Exclusion (CATEX), as authorized under 32 CFR 989, provided that the proponent does not substantially change the scope of the project, follows the instructions listed in the remarks section, and any additional instructions, or o Ineligible for a CATEX, in which case either an Environmental Assessment (EA) or Environmental Impact Statement (EIS) is indicated as required (blocks 17/18).
Primary CATEX: A2.3.10. Routine facility maintenance and repair that does not involve disturbing significant quantities of hazardous materials such as asbestos and lead-based paint.
• This Environmental Impact Analysis (AFF813) expires one year from the date in block 19b. If expired, a new Air Force form 813 will be submitted to 354 CES/CENPL and 354 CES/CENPL must complete the form 813 before project may commence.
19. ENVIRONMENTAL PLANNING FUNCTION CERTIFICATION (Name and Grade) Burke, Jamie GS-11
19a. SIGNATURE //Burke Jamie DOD - jamie.l.burke i:0e.t|fedvis|jamie.l.burke//
19b. DATE 08/03/2022
AF IMT 813, 199990901, V1 THIS FORM CONSOLIDATES AF FORMS 813 AND 814.
PREVIOUS EDITIONS OF BOTH FORMS ARE OBSOLETE.
3/3
CONTINUATION SHEET
Review Comments:
Other (06/30/2022 - Kornowske Joseph DOD - joseph.kornowske) No impact to toxics program
Hazardous Materials/Waste (06/30/2022 - Kornowske Joseph DOD - joseph.kornowske) Hazardous Waste, All Contractors:
All contractors performing work on Eielson AFB are required to complete onsite hazardous waste training provided by 354 CES/CEIE. Contractor training must be completed two weeks prior to field work start date and prior to receiving the Environmental Element signature on the Work Clearance Request (AF Form 103). Please contact 377-4017 to schedule a training for handling hazardous wastes, including aerosol cans management. All costs associated with waste disposal are the responsibility of the contractor. Empty aerosol cans are the only waste accepted at the base Hazardous Waste Facility for disposal.
All Hazardous and Universal waste must be managed in accordance with the requirements for large quantity generators (40 CFR 262.17 and 40 CFR 273, respectively) under the Resource Conservation Recovery Act. Hazardous waste and non-regulated waste manifests must be signed by a designated AF POC prior to shipment off-base. Please coordinate signature through the base Hazardous Waste Facility (377-1668) 10-days prior to planned transport.
Vaccuum dust and cleaning supplies must undergo waste determination when being disposed of and must be managed as a hazardous waste until test results confirm otherwise.
Hazardous Materials/Waste (07/05/2022 - Mccord Lindsey DOD - lindsey.n.mccord) Submit an inventory of all hazardous materials listed in OSHA Hazard Communications Standard 29 CFR 1910.1200, Class I and II ozone depleting substances and all items, including medical supplies, covered under Emergency Planning and Community Right-to-Know Act (EPCRA) tracking requirements which shall be brought on site. The inventory shall include a table identifying the material, initial quantity, quantity used, unit of issue, manufacturer, and product code. This table must be updated and submitted quarterly during the project, unless additional quantities/materials are added, at which time the Contractor has seven days to provide the additional information and safety data sheet (SDS). At project completion, submit an updated inventory indicating quantities used, and disposed. See Appendix C Contractor Hazardous Materials Usage Tracking Form. Any hazardous materials transported on site shall have an SDS and a copy must be delivered to the Contracting Officer, the Hazardous Materials Program Manager at Bldg 2258, (377-2937), 354 CES, Base Civil Engineer. All usable hazardous material shall be removed from the site by the Contractor at project completion unless other provisions within the contract direct otherwise. HAZMAT Usage and Reporting: Provide the Contracting Office and the HAZMAT Program Manager with a list of proposed HAZMAT that is planned for use on the installation during the performance of the contract for review and approval. Obtain Air Force authorization prior to using HAZMAT on Eielson AFB. The initial hazardous materials inventory should list initial quantities for each material. Report the usage of all hazardous materials to the government for all work performed on Eielson AFB. Submit usage reports monthly to the HAZMAT Program Manager.
Safety and Occupational Health (07/05/2022 - Lawson Elaini DOD - elaini.m.lawson) All applicable personal protective equipment (PPE) must be worn/utilized.
Air Quality (07/11/2022 - Young Heidi DOD - heidi.j.young) All 168th operations are excluded from the EAFB Title V Operating Permit.
Legal (07/25/2022 - Murphy Patrick DOD - patrick.s.murphy3) The proposed action, as described above, qualifies for a CATEX and is legally sufficient. Specifically, A2.3.10. Routine facility maintenance and repair that does not involve disturbing significant quantities of hazardous materials such as asbestos and lead-based paint.