Attachment 17 AF Form 813 Honor Guard Facility.pdf

Air Force Form PDF 1 MB Posted

Attached to
Construct Honor Guard Facility
Solicitation number
FA481922R0032
Issued by

View the file

Other versions and copies of AF Form 813

File Revision Posted Attached to
Attachment 4 - Cathodic Protection AF Form 813 - 23 May 24.pdf May 23, 2024 Cathodic Protection Beale AFB
Attach. 8 - Appendix G AF Form 813.pdf Revision not stated Storm Drain Study Cantonment Area Phase 2
Attach. 7 - Appendix G AF Form 813.pdf Revision not stated SOURCES SOUGHT - Storm Drain Study Cantonment Area Phase 2
Attachment 8 - AF FORM 813 B1120.pdf Revision not stated Wake Island (WI) B. 1120 Restoration
Attachment 3 - AF Form 813.pdf Revision not stated Replace Utility Well #9 Beale AFB
AF FORM 813.pdf Revision not stated Cathodic Protection, Wells
Attachment 4 AF FORM 813.pdf Revision not stated Corrosion Facility Cleaning
Attachment 14 Completed AF Form 813 - Design-Build Car Wash.pdf Revision not stated Design-Build Car Wash
Attachment 15 - Completed AF Form 813 Construct Expeditionary South Fence.pdf Revision not stated Construct Expeditionary Road South Fence
Completed AF Form 813 Repair (Replace) Bonita Bay Docks.pdf Revision not stated Repair (restore) Bonita Bay Docks
Attachment 15 AF Form 813 Demolish and Construct Pest Management Facility.pdf Revision not stated Repair/Restore Pest Management Facility
Attachment 13 AF Form 813 Repair Stormwater Drainage.pdf Revision not stated Tyndall AFB Storm Water Drainage Repair
Attachment 15 AF Form 813 Demolish and Construct Pest Management Facility.pdf Revision not stated Construct Pest Management Facility
3. Attachment I_AF Form 813 Request for Environmental Impact Analysis.pdf Revision not stated Science, Innovation and Technology Partnership Intermediary Agreement
Attachment 15 Completed AF form 813 Construct Park and Ride.pdf Revision not stated Construct Park and Ride Area
AF Form 813 CEMIRT Facilities.pdf Revision not stated Restore CEMIRT Parking Area
Attachment 13 AF Form 813 Construct ADC Facility.pdf Revision not stated FA481921R0005 - Construct Area Defense Counsel (ADC) Facility, Tyndall AFB
Attachment 2 Completed AF Form 813 Crooked Island Beach.pdf Revision not stated FA481920R022, Restore Crooked Island Access, Tyndall AFB
Attachment I_ AF Form 813.pdf Revision not stated Future Scholars for Science, Technology, Engineering, and Mathematics (STEM) Workforce Development Programs
Attachment I_ AF Form 813.pdf Revision not stated Future Scholars for Science, Technology, Engineering, and Mathematics (STEM) Workforce Development Programs
Show all 20

Who attaches AF Form 813

Other files

File Type Posted
Solicitation Amendment FA481922R00320004 SF 30.pdf PDF
Attachment 27 - Appendix S - Location of Primary Transformer.pdf PDF
Solicitation Amendment - FA481922R00320003.pdf PDF
Attachment 1- APPA Honor Guard XLWU 21-8120 - Sep 2022 - Rev D.pdf PDF
Solicitation Amendment FA481922R00320003 SF 30.pdf PDF
Attachment 21-XLWU 21-8120 Honor Questions and Answers Rev C - 30 Aug 2022.xlsx XLSX spreadsheet
Attachment 26 Electrical Lines.pdf PDF
Solicitation Amendment FA481922R00320002 SF 30.pdf PDF
Attachment 25 - FRCS Guide 22 Sept 2021.pdf PDF
Attachment 22 - APPA Honor Guard XLWU 21-8120 - Aug 2022 - Rev C.docx DOCX document
Attachment 23 -XLWU 21-8120 Site Utilities.pdf PDF
Attachment 24- 2022_0630_TAFBHonorGuard_ExEquip.pdf PDF
Attachment 1 - SOW Honor Guard XLWU 21-8120 Sept 2022 - Rev C.docx DOCX document
Solicitation Amendment - FA481922R00320002.pdf PDF
Attachment 19 Section L and M v2.pdf PDF
Solicitation Amendment - FA481922R00320001.pdf PDF
Solicitation - FA481922R0032.pdf PDF
Attachment 11 AF Form 3000.pdf PDF
Attachment 7- SITE PLAN A Rev A.pdf PDF
Attachment 2 - Floor Plan 813 Construct Honor Guard Facility Rev A.pdf PDF
Attachment 4 - Conceptual A Construct Honor Guard Facility Rev A.pdf PDF
Attachment 15 Base Access Request EAL.xlsx XLSX spreadsheet
Attachment 14 Sample RFI.PDF PDF
Attachment 5 - Conceptual B Construct Honor Guard Facility Rev A.pdf PDF
Attachment 10 AF Form 66.xlsx XLSX spreadsheet
Attachment 20 Wage Determinations.pdf PDF
Attachment 1 SOW Honor Guard XLWU 21-8120 - Jun 2022 - Rev A.pdf PDF
Attachment 3 - COAs 813 Construct Honor Guard Facility Rev A.pdf PDF
Attachment 16 Proof of Financial Responsibility.pdf PDF
Attachment 19 Section L and M 21.pdf PDF
Attachment 13 AF3065.pdf PDF
Attachment 6 - HG Topo Area Rev A.pdf PDF
Attachment 18 Division Cost Estimate Worksheet.xlsx XLSX spreadsheet
Attachment 12 AF 3064.pdf PDF
Attachment 9 - Other Contract Requirements.pdf PDF
Attachment 8 - SITE PLAN B Rev A.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF FORM 813, 19990901 (EF-V1) Page 1 of 2THIS FORM CONSOLIDATES AF FORMS 813 AND 814.

PREVIOUS EDITIONS OF BOTH FORMS ARE OBSOLETE.

REQUEST FOR ENVIRONMENTAL IMPACT ANALYSIS

SECTION I - PROPONENT INFORMATION

INSTRUCTIONS: Section I to be completed by Proponent; Sections II and III to be completed by Environmental Planning Function.

Continue on separate sheets as necessary and reference appropriate item number(s).

1. TO (Environmental Planning Function)

325 CES/CEIEC

2. FROM (Proponent organization and functional address symbol)

325 CES/CENP

2a. TELEPHONE NO.

850-283-2763

3. TITLE OF PROPOSED ACTION

XLWU218120 Construct Honor Guard Facility

4. PURPOSE AND NEED FOR ACTION (Identify decision to be made and need date)

The Purpose and Need For Action is attached. See Page 2.

5. DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES (DOPAA) (Provide sufficient details for evaluation of the total action)

The Description of Proposed Action and Alternatives is attached. See Page 2.

6. PROPONENT APPROVAL (Name and Grade) Quentin Morales, GS-12

6a. SIGNATURE 6b. DATE 09 May 22

SECTION II - PRELIMINARY ENVIRONMENTAL SURVEY (Check appropriate box and describe potential environmental effects including cumulative effects) (+=positive effect; 0=no effect; - = adverse effect; U=unknown effect) + 0 - U

7. AIR INSTALLATION COMPATIBLE USE ZONE/LAND USE (Noise, accident potential, encroachment, etc.)

8. AIR QUALITY (Emissions, attainment status, state implementation plan, etc.)

9. WATER RESOURCES (Quality, quantity, source, etc.)

10. SAFETY AND OCCUPATIONAL HEALTH (Asbestos/radiation/chemical exposure, explosives safety quantity distance, bird/wildlife aircraft hazard, etc.)

11. HAZARDOUS MATERIALS/WASTE (Use/storage/generation, solid waste, etc.)

12. BIOLOGICAL RESOURCES (Wetlands/floodplains, threatened or endangered species, etc.)

13. CULTURAL RESOURCES (Native American burial sites, archaeological, historical, etc.)

14. GEOLOGY AND SOILS (Topography, minerals, geothermal, Installation Restoration Program, seismicity, etc.)

15. SOCIOECONOMIC (Employment/population projections, school and local fiscal impacts, etc.)

16. OTHER (Potential impacts not addressed above.)

SECTION III - ENVIRONMENTAL ANALYSIS DETERMINATION

17. PROPOSED ACTION QUALIFIES FOR CATEGORICAL EXCLUSION (CATEX) # ; OR

PROPOSED ACTION DOES NOT QUALIFY FOR A CATEX; FURTHER ENVIRONMENTAL ANALYSIS IS REQUIRED.

18. REMARKS

19. ENVIRONMENTAL PLANNING FUNCTION CERTIFICATION

(Name and Grade)

19a. SIGNATURE 19b. DATE

AF IMT 813, SEP 99, CONTINUATION SHEET

Block 4. PURPOSE AND NEED FOR ACTION

Purpose of the Proposed Action:

Construct a new facility to support Honor Guard training and equipment storage to include all supporting infrastructure such as parking and utilities.

Need for the Proposed Action:

The Honor Guard was displaced from their previous facility (B1015) due to demolition driven by damage caused by Hurricane Michael and the Tyndall Recovery Master Plan. The Honor Guard is still a functioning entity at the base under the 325 FW managed by FSS and is authorized space per AFMAN 32-1084.

Location:

Proposed location is near Mississippi Rd, immediately adjacent to B1701. See attachment 1 for details.

Scope of Analysis:

There are no anticipated issues or concerns with respect to contamination, cultural resources, air quality, waste, threatened and endangered species, air operations/compatible use zones, land use, or wetlands. Based on the amount of impervious surface area, a storm water management plan will be needed. We will bring in clean fill in order to elevate the site to meet the 19-foot design flood elevation. Site development associated with construction will also consist of utility work.

Block 5. DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES

Description and Ground Impacts:

This project will be to construct a new facility approximately 3,250 SF. The facility will include administrative and maintenance services complete with associated utilities to include communications; electric; heating, ventilation, and air conditioning; lightning protection;

and fire protection/alarm system. Additional pavement to support training and to accommodate parking will be approximately 15,100 SF. Utilities will be run to the facility to include communications, electric, sewer, and water. Existing lines running beneath the site will be moved as needed to accommodate the facility. Digging and trenching is expected. Trenches will be 2 feet wide by 3 feet deep. All disturbed materials will remain on site. The estimated elevation of the site is 15-16 feet above sea level. Enough fill material will be brought in and placed on site to elevate the facility to the minimum 19-foot design flood elevation. Volume of fill is estimated at a maximum of 3,000 CY. Exterior paving and sidewalks, curbs, gutters, access drives, exterior lighting, grading, and physical security requirements are also included. Two locations were selected for potential stormwater ponds. Each pond would be approximately 3,000 SF. A comprehensive storm sewer system shall be designed to facilitate positive drainage of the facility and general site. The design shall be for a 10-year, 24-hour storm occurrence. All storm drainage system piping shall be reinforced concrete pipe. All gutters and downspouts shall connect to the storm sewer system.

Alternatives Considered:

A total of 7 sites were evaluated for feasibility. The other COAs proved to be unsuitable for various reasons such as noise concerns from the Honor Guard mission, incompatible surrounding uses, locations being within ERP sites, or conflicts with other Tyndall Rebuild activities.

The additional sites considered were: Undeveloped lot North of Sabre Dr., South of Road 31B, and West of Road 31; Undeveloped Lot North of Beacon Beach Rd between AFNORTH and Education Center; Undeveloped Lot North of Beacon Beach Rd and North of Education Center; Undeveloped Lot South of Beacon Beach Rd and West of Archer’s Range; Undeveloped Lot South of Beacon Beach Rd and East of Archer’s Range; Undeveloped lot North of Mississippi Rd and West of Score Booth (Building #1126); Undeveloped lot North of Mississippi Rd and West of Pest Management (Building #1701). See attachment 2 for additional details.

No Action Alternative: Status Quo.

If the facility is not constructed, the Honor Guard will be without a home to perform it's functions. This would lead to a degradation of services.

AF FORM 813, 19990901 (EF-V1)

Page of

THIS FORM CONSOLIDATES AF FORMS 813 AND 814.

PREVIOUS EDITIONS OF BOTH FORMS ARE OBSOLETE.

Page of

REQUEST FOR ENVIRONMENTAL IMPACT ANALYSIS

SECTION I - PROPONENT INFORMATION

INSTRUCTIONS: Section I to be completed by Proponent; Sections II and III to be completed by Environmental Planning Function.

Continue on separate sheets as necessary and reference appropriate item number(s).

SECTION II - PRELIMINARY ENVIRONMENTAL SURVEY (Check appropriate box and describe potential environmental effects including cumulative effects) (+=positive effect; 0=no effect; - = adverse effect; U=unknown effect) U

7. AIR INSTALLATION COMPATIBLE USE ZONE/LAND USE (Noise, accident potential, encroachment, etc.)

8. AIR QUALITY (Emissions, attainment status, state implementation plan, etc.)

9. WATER RESOURCES (Quality, quantity, source, etc.)

10. SAFETY AND OCCUPATIONAL HEALTH (Asbestos/radiation/chemical exposure, explosives safety quantity distance, bird/wildlife aircraft hazard, etc.)

11. HAZARDOUS MATERIALS/WASTE (Use/storage/generation, solid waste, etc.)

12. BIOLOGICAL RESOURCES (Wetlands/floodplains, threatened or endangered species, etc.)

13. CULTURAL RESOURCES (Native American burial sites, archaeological, historical, etc.)

14. GEOLOGY AND SOILS (Topography, minerals, geothermal, Installation Restoration Program, seismicity, etc.)

15. SOCIOECONOMIC (Employment/population projections, school and local fiscal impacts, etc.)

16. OTHER (Potential impacts not addressed above.)

SECTION III - ENVIRONMENTAL ANALYSIS DETERMINATION

17.

8.2.1.4029.1.523496.503679

CurrentPage:
PageCount:
TextField2: 325 CES/CEIEC
TextField2: 325 CES/CENP
TextField2: Quentin Morales, GS-12
TextField3: 850-283-2763
TextField3: 09 May 22
TextField4: XLWU218120 Construct Honor Guard Facility
TextField7: The Purpose and Need For Action is attached. See Page 2.
TextField7: The Description of Proposed Action and Alternatives is attached. See Page 2.
SignatureField1:
CheckBox1: 0
CheckBox1: 1
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox1: 0
CheckBox2: 0
TextField5:
CheckBox3: 0
TextField6: Block 4. PURPOSE AND NEED FOR ACTION

Purpose of the Proposed Action:

Construct a new facility to support Honor Guard training and equipment storage to include all supporting infrastructure such as parking and utilities.

Need for the Proposed Action:

The Honor Guard was displaced from their previous facility (B1015) due to demolition driven by damage caused by Hurricane Michael and the Tyndall Recovery Master Plan. The Honor Guard is still a functioning entity at the base under the 325 FW managed by FSS and is authorized space per AFMAN 32-1084.

Location:

Proposed location is near Mississippi Rd, immediately adjacent to B1701. See attachment 1 for details.

Scope of Analysis:

There are no anticipated issues or concerns with respect to contamination, cultural resources, air quality, waste, threatened and endangered species, air operations/compatible use zones, land use, or wetlands. Based on the amount of impervious surface area, a storm water management plan will be needed. We will bring in clean fill in order to elevate the site to meet the 19-foot design flood elevation. Site development associated with construction will also consist of utility work.

Block 5. DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES

Description and Ground Impacts:

This project will be to construct a new facility approximately 3,250 SF. The facility will include administrative and maintenance services complete with associated utilities to include communications; electric; heating, ventilation, and air conditioning; lightning protection; and fire protection/alarm system. Additional pavement to support training and to accommodate parking will be approximately 15,100 SF. Utilities will be run to the facility to include communications, electric, sewer, and water. Existing lines running beneath the site will be moved as needed to accommodate the facility. Digging and trenching is expected. Trenches will be 2 feet wide by 3 feet deep. All disturbed materials will remain on site. The estimated elevation of the site is 15-16 feet above sea level. Enough fill material will be brought in and placed on site to elevate the facility to the minimum 19-foot design flood elevation. Volume of fill is estimated at a maximum of 3,000 CY. Exterior paving and sidewalks, curbs, gutters, access drives, exterior lighting, grading, and physical security requirements are also included. Two locations were selected for potential stormwater ponds. Each pond would be approximately 3,000 SF. A comprehensive storm sewer system shall be designed to facilitate positive drainage of the facility and general site. The design shall be for a 10-year, 24-hour storm occurrence. All storm drainage system piping shall be reinforced concrete pipe. All gutters and downspouts shall connect to the storm sewer system.

Alternatives Considered:

A total of 7 sites were evaluated for feasibility. The other COAs proved to be unsuitable for various reasons such as noise concerns from the Honor Guard mission, incompatible surrounding uses, locations being within ERP sites, or conflicts with other Tyndall Rebuild activities.

The additional sites considered were: Undeveloped lot North of Sabre Dr., South of Road 31B, and West of Road 31; Undeveloped Lot North of Beacon Beach Rd between AFNORTH and Education Center; Undeveloped Lot North of Beacon Beach Rd and North of Education Center; Undeveloped Lot South of Beacon Beach Rd and West of Archer’s Range; Undeveloped Lot South of Beacon Beach Rd and East of Archer’s Range; Undeveloped lot North of Mississippi Rd and West of Score Booth (Building #1126); Undeveloped lot North of Mississippi Rd and West of Pest Management (Building #1701). See attachment 2 for additional details.

No Action Alternative: Status Quo.

If the facility is not constructed, the Honor Guard will be without a home to perform it's functions. This would lead to a degradation of services.