Attachment 2 Completed AF Form 813 Crooked Island Beach.pdf
PDF 4 MB Posted
- Solicitation number
- FA481920R0022
About this file
This federal solicitation requests proposals to restore access to Crooked Island at Tyndall Air Force Base. Offerors must provide an electronic copy of their proposal and all required information by email no later than 1:00 PM CDT on September 4, 2020. A site visit will be held on August 14, 2020 at 0830 at the Tyndall AFB Visitor Center. This solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses. The work includes repairing the washed out section of Crooked Island Beach Road, filling the resulting pond area with clean fill dirt, constructing a retention wall, repairing and extending the existing boardwalk, and restoring grades and surfaces in the parking area.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF FORM 813, 19990901 (EF-V1) Page 1 of 2THIS FORM CONSOLIDATES AF FORMS 813 AND 814.
PREVIOUS EDITIONS OF BOTH FORMS ARE OBSOLETE.
REQUEST FOR ENVIRONMENTAL IMPACT ANALYSIS
SECTION I - PROPONENT INFORMATION
INSTRUCTIONS: Section I to be completed by Proponent; Sections II and III to be completed by Environmental Planning Function.
Continue on separate sheets as necessary and reference appropriate item number(s).
1. TO (Environmental Planning Function)
325 CES/CEIEC
2. FROM (Proponent organization and functional address symbol)
325 CES/CENPD
2a. TELEPHONE NO.
(850) 283-4362
3. TITLE OF PROPOSED ACTION
Repair and Upgrade Crooked Island Facilities
4. PURPOSE AND NEED FOR ACTION (Identify decision to be made and need date)
The Purpose and Need For Action is attached. See Page 2.
5. DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES (DOPAA) (Provide sufficient details for evaluation of the total action)
The Description of Proposed Action and Alternatives is attached. See Page 2
6. PROPONENT APPROVAL (Name and Grade) Quentin Morales, GS-12
6a. SIGNATURE 6b. DATE 20200622
SECTION II - PRELIMINARY ENVIRONMENTAL SURVEY (Check appropriate box and describe potential environmental effects including cumulative effects) (+=positive effect; 0=no effect; - = adverse effect; U=unknown effect) + 0 - U
7. AIR INSTALLATION COMPATIBLE USE ZONE/LAND USE (Noise, accident potential, encroachment, etc.)
8. AIR QUALITY (Emissions, attainment status, state implementation plan, etc.)
9. WATER RESOURCES (Quality, quantity, source, etc.)
10. SAFETY AND OCCUPATIONAL HEALTH (Asbestos/radiation/chemical exposure, explosives safety quantity distance, bird/wildlife aircraft hazard, etc.)
11. HAZARDOUS MATERIALS/WASTE (Use/storage/generation, solid waste, etc.)
12. BIOLOGICAL RESOURCES (Wetlands/floodplains, threatened or endangered species, etc.)
13. CULTURAL RESOURCES (Native American burial sites, archaeological, historical, etc.)
14. GEOLOGY AND SOILS (Topography, minerals, geothermal, Installation Restoration Program, seismicity, etc.)
15. SOCIOECONOMIC (Employment/population projections, school and local fiscal impacts, etc.)
16. OTHER (Potential impacts not addressed above.)
SECTION III - ENVIRONMENTAL ANALYSIS DETERMINATION
17. ; OR PROPOSED ACTION QUALIFIES FOR CATEGORICAL EXCLUSION (CATEX) # A2.3.7
PROPOSED ACTION DOES NOT QUALIFY FOR A CATEX; FURTHER ENVIRONMENTAL ANALYSIS IS REQUIRED.
18. REMARKS
Conformity Determination not required, ACAM Modeling attached.
19. ENVIRONMENTAL PLANNING FUNCTION CERTIFICATION
(Name and Grade) Edwin Wallace,GS-12
19a. SIGNATURE 19b. DATE
MORALES-
PERRYMAN.QUENTIN.L.1090977500
Digitally signed by MORALES-
PERRYMAN.QUENTIN.L.1090977500
Date: 2020.06.22 17:21:50 -05'00'
WALLACE.EDWIN.
BLAIR.1047698347
Digitally signed by
WALLACE.EDWIN.BLAIR.1047698
Date: 2020.07.22 13:06:05 -05'00'
Repair and Upgrade Crooked Island Facilities, AF Form 813 continuation sheet
4.0 Purpose and Need for Action:
The purpose of the proposed action is to repair the Crooked Island road and boardwalk. A large portion of Crooked Island Beach Road was washed away due to Hurricane Michael. There is now a standing pond/lake covering a large portion of the road. This has led to dangerous conditions for personnel who attempt to utilize the road. Restoring the road will allow for safe usage of the road. Hurricane Michael caused significant damage to the existing boardwalk. The proposed action will rebuild the existing boardwalk and extend the boardwalk to the permanent vegetative line to control pedestrian traffic through sensitive dune structures - reduce environmental impact.
The need for the action is to return the existing structures to pre-hurricane conditions and extend the boardwalk to enhance accessibility.
5.0 Description of the Proposed Action and Alternatives (DOPAA):
The pond that was created by the Hurricane washing out the road will be de-watered and filled in with clean fill dirt. Approximate amount of fill dirt is 3,500 cubic yards (CY) within an area of approximately 4,200 square yards (SY). A Retention wall will be constructed to prevent a future blow out of the road.
To put in the new road, sub-grade will be smoothed and compacted to 95% of Modified Proctor values. Geo-textile fabric will be placed on top of the compressed soil. Six inches of large gravel will be placed on fabric surface and then topped with six inches of small gravel, followed by one inch of crushed gravel as the top layer and compacted down. New road will be 12 feet wide.
Total road to be placed is approximately 740 SY.
Existing road and parking area will be graded to level ruts. Breakages along road base will be repaired in-place. Surface materials will be compacted. New gravel will be placed, graded, and compacted at approximately 0.8 CY of gravel per square yard service road. Total existing service area to be affected is approximately 9,200 SY. Roads would be restored to approximately 12 feet wide.
Crooked Island Beach Boardwalk will be repaired by replacement of the existing 420 ft. long boardwalk and add a 330 ft. long extension to the south end that will deliver users to the beach without traversing through the sensitive dune structures. Vertical posts supporting the structure will be installed approximately 8 ft. deep into the existing grade by means of jetting. The frame and decking will be installed in accordance with the U.S. Fish and Wildlife Service Conservation Measures for Dune Walkover Construction guidelines. Ramps will be used for entry and exit of the boardwalk and railing will be installed for user safety.
Alternatives Considered: An alternative route to construct the road was considered, however this option was not carried forward due to the impacts to the dunes would require more analysis.
No Action Alternative: Status Quo. If Status Quo is maintained, pedestrian traffic will continue to negatively impact the dune structures, stabilizing vegetation, nesting birds, and other valuable natural resources found in the area. The road would remain close if not restored.
5.1 Anticipated Environmental Issues:
5.2 Environmental Impacts:
ACUZ/ Noise:
The proposed actions would result in a localized and temporary increase in noise levels due to construction and demolition. This noise is not expected to be significant. The proposed action would not significantly contribute to the noise levels of the area.
Air Quality:
Tyndall AFB is in an attainment area for National Ambient Air Quality Standard. The FESOP permit for Tyndall AFB will not be violated by the implementation of the proposed project.
Temporary minor exhaust emissions would occur in the immediate vicinity of the construction.
Fugitive dust would be controlled at the sites using best management practices (BMPs), such as periodic watering of cleared areas and stockpiled materials and mulching or vegetative cover for the cleared areas. ACAM Modeling was performed and based off the results the air quality in the area would not be significantly impacted by the proposed project; therefore a conformity determination is not required.
Water Resources:
Contractor must identify locations of cut to restore boardwalk entry fill. Jurisdictional waters, which includes wetlands, should be identified prior to siting. Boardwalks over wetlands do not require wetland permitting, generally, but boardwalks within waters below the mean high water mark require permits. These structures, if considered detrimental to sensitive areas by the regulatory agencies will require permits. Recommend coordinating with the FDEP and USACE.
Additional gravel may require Stormwater design and/or compensation. Need to coordinate design with the FDEP for potential exemption request. Installation of new or modification of utility lines through, under, or over a water of the state would require permitting.
Depending on the roadbed, placing new gravel on top without proper containment may not achieve the projects purpose. If the roadbed is stabilized and cannot be compacted, the gravel laid on top will not either. It is recommended to use geoweb where appropriate. Graveling the entire road surface is not recommended, rather just regrade and compact. With the addition of semi/impervious surface whether new or replacing, Stormwater design, permitting, and compensation may be required. Need to coordinate with the FDEP to determine exemption limits.
Best management practices for erosion control shall be implemented prior to construction activities and maintained at all times during construction to prevent siltation and turbid discharges. Install erosion control measures along the perimeter of all work areas to prevent the displacement of fill material outside the work area into waters of the United States. Immediately after completion of the final grading of the land surface, all slopes, land surfaces, and filled areas shall be stabilized using appropriate vegetation, degradable mats, barriers, or a combination of similar stabilizing materials to prevent erosion. Methods could also include, but are not limited to the use of staked hay bales, staked filter cloth, sodding, seeding, and mulching; staged construction; and the installation of turbidity screens around the immediate project site.
At a minimum, all work regardless of funding or project type is required at a minimum to complete a Stormwater Pollution Prevention Plan (SWPPP) in accordance with the Florida Department of Environmental Protection (FDEP)/EPA standards. The FDEP has generated a template to be used (https://floridadep.gov/sites/default/files/ConstructionSWPPP.pdf). Work specific Best Management Practices (BMP’s) shall be implemented prior to construction activities and maintained at all times during construction to prevent siltation and turbid discharges. Identify and cover Stormwater structures using protection devices before performing any work. The BMP’s are to be installed along the perimeter of all work areas to prevent the displacement of fill material outside the work area into surface waters, stormwater inlets, etc.
Immediately after completion of the final grading of the land surface, all slopes, land surfaces, and filled areas shall be stabilized using approved sod, seeding, degradable mats, staked hay bales, staked filter cloth, barriers, turbidity screens, or a combination of similar stabilizing materials to prevent erosion. The erosion control measures shall remain in place and be maintained until all authorized work is completed and the work areas are stabilized and verified by USAF personnel.
No surface waters which includes wetlands are authorized to be impacted without prior authorization from the 325 CES, FDEP, and USACE.
There shall be no work, storage, or stockpiling of tools, materials (i.e. lumber, pilings, debris) within wetlands, ditches, swales, or elsewhere within waters of the state.
All stormwater conveyance structures shall remain in operable condition and shall not be allowed to deteriorate or otherwise contribute to a water quality violation.
Construction activities shall be conducted in a manner that does not cause or contribute to violations of state water quality standards.
All permit applications must be reviewed by CEIEC and signed by the 325th CES Commander prior to submittal. All costs associated with permits will be paid for by the contractor. All costs associated with any environmental sampling will be paid for by the contractor. It is the contractor’s responsibility to verify with all necessary regulatory agencies if any permits are required and/or provide written concurrence from the necessary agencies that no permits would be required prior to starting work, unless a viable regulation is noted detailing the activity would not require prior authorization and is agreed upon by the 325 CES/CEIEC.
https://floridadep.gov/sites/default/files/ConstructionSWPPP.pdf
Soil Impact:
Soil disturbances should be minimal, area has been previous disturbed from previous actions.
Any excess excavated soil must be spread-out on land adjacent to the excavation site. Any fill used for the project must be certified clean
Biological Resources:
The proposed action will occur on a beach and consultation with the US. Fish and Wildlife Service (USFWS) was conducted. USFWS had no concerns but Conservation measures for Dune Walkover Construction must be adhered to. The proposed action would not adversely affect any federally-protected species as long as contract work within the approved areas.
Proposed action is sited in the 100-years floodplain.
Cultural Resources Impact:
The proposed undertaking has been coordinated with the State Historical Preservation Office and a finding of no adverse effect has been received. All work should cease and the Cultural Resources Manager should be contacted if archaeological deposits or human remains are encountered.
Hazardous Materials:
A letter of review from 325 CES/CEIEC Must be accomplished prior to commencement of work.
The contractor shall submit TAFB Form 81 (Contractor Questionnaire) and TAFB Form 82 (Chemical Inventory) if applicable (within 10 duty days after the Notice to Proceed is issued), for review.
The Contractor should note that Tyndall AFB is required to report chemicals used such as (but not limited to) compressed gases, adhesives, aerosol cans, sealants, paints, lubricants, oils, cleaners, degreasers, pesticides, Fuels. Copies of manufacturer-specific Safety Data Sheets (SDS) must be attached to TAFB Form 82. These SDSs shall also be readily accessible at the location of each hazardous material. After submission, 325 CES/CEIE will notify the Project Manager and/or CONS of the reportable chemicals and of any special instructions. As directed by the CO, the Contractor is required to submit TAFB Form 83 (Reporting Entry Form) showing material usage monthly until completion of the task order. The CO must be notified of any changes from the original submittal (i.e. new chemical is added, size of container or unit of issue changes or if the manufacturer changes), changes must be submitted using TAFB form 82. An updated letter of review indicating changes will be sent from CEIEC to the Contracting Office before the material can be brought onto the installation. Prime contractors shall be responsible to ensure all sub-contractors comply with this section.
Hazardous Waste:
The Contractor shall identify, characterize, store and dispose of any hazardous waste generated during work in strict accordance with Federal and State guidelines found in the Code of Federal Regulations.
The proposed action may generate small quantities of hazardous materials/wastes. Disposal of hazardous waste must be completed in accordance with Tyndall AFB Hazardous Waste Management Plan. Additionally, management of hazardous waste must be completed in accordance with 40 CFR 260-279. Hazardous waste transportation and disposal shall be coordinated through 325 CES/CEIE. The transportation and disposal facilities shall be approved by 325 CES/CEIE prior to their use. Manifests shall be signed only by 325 CES/CEIE. Drums shall be disposed of within 90 days of placing the first drop in the container.
A Hazardous Waste Determination must be conducted/recorded for any material discarded for this project.
Solid Waste:
Construction activities associated with the Proposed Action would result in a short-term increase in solid waste generated at Tyndall AFB. The contractor would be responsible for disposing of solid waste in accordance with all federal, state, and local laws.
Digging/Excavation
Prior to any digging, an excavation permit will be required. An Air Force Form103, BCE Work Clearance Request, will be required.
5.4 List of required permits
Permits may be required for the proposed action. Contractor is responsible to ensure all permits are submitted to the 325 Civil Engineer Squadron for review.
5.5 CATEX Statement
The proposed project will not adversely impact Tyndall AFB environmental attributes; therefore, qualifies for Categorical Exclusions (CATEX) A2.3.7. Continuation or resumption of pre-existing actions, where there is no substantial change in existing conditions or existing land uses and where the actions were originally evaluated in accordance with applicable law and regulations, and surrounding circumstances have not changed.
The Environmental Assessment Implementation of the Tyndall Air Force Base Integrated Natural Resources Management Plan, dated April 2006, is the Air Force approve document which form the basis for using this CATEX. The construction project is in the same general area and is smaller in scope than the projects area evaluated in the EA. 325 CES/CEIE has conducted an evaluation of subject EA to ensure the document is still valid in accordance with 32 CFR 989.20 (c). As part of the re-evaluation, CEIE personnel conducted an on-site survey and found that the affected environment and environmental consequences:
1. The methodology/analytical approach previously used is appropriate for the proposed action.
2. The direct and indirect impacts of the proposed action are not significantly different than those identified in the existing document.
3. The proposed action would not change the previous analysis of cumulative impacts.
4. Public involvement in the referenced analysis provides appropriate coverage for the proposed action.
5. There has been no significant change in circumstances or significant new information relevant to the proposed action.
PROJECT ENVIRONMENTAL REVIEW SHEET
Project Title: Crooked Island Facilities Repair
Project Description:
Project Number:
1. Natural Resources
Reviewed By: _____ewallace________________ Does project affect flora? YES _ ___ NO _X__ Does project affect fauna? YES ____ NO ___X_ Does project affect BASH? YES ____ NO __X__ Does project affect wildlife management area? YES ____ NO _X___ Does project affect forestry management area? YES ____ NO _X___ Does project affect erosion? YES ____ NO _X___
2. Threatened and Endangered Species Reviewed By: _____ewallace________________ __ Project has no potential for affecting threatened or endangered species or critical habitats.
_X_ Based on advice from USFWS or host nation liaison _____, threatened or endangered species in the vicinity of the project will not be affected.
__ Consultation with USFWS underway in accordance with the Endangered Species Act.
__ Formal Consultation with the Regional Director, USFWS completed on ______.
__ Biological Assessment is required. Estimated completion date completion date is ______.
__ Biological opinion issued by USFWS on ______.
3. Cultural Resources Reviewed By: _______ewallace______________ __ Properties affected by project are addresses in a programmatic Agreement that was fully executed with the State Historic Preservation Officer and the ACHP on ______.
__ Project area has not been surveyed for historic properties. Survey requirements are identified in the A-
106 system and the estimated completion date is ______.
_ _ Project area has been surveyed and no historic properties were identified; the State Historic
Preservation Officer was notified by letter dated _ __ Survey identified historic properties but the project will have no effect on them; written concurrence by the State Historic Preservation Officer is dated ______.
_X_ After consultation, State Historical Preservation Officer concurred that the project will have no adverse effect on historic properties. The Advisory Council on Historic Preservation concurred in writing with this determination on _______.
_ _ Project will have no adverse effect on historic properties or archeological material.
__ Estimated sate to execute the MOA is _______ or no MOA was developed and the formal comments of the Council are being sought.
__Archeological Monitor must be present during any ground disturbance.
__ Appropriate Native American Tribe or Group contacted on _______.
1. Wetlands Reviewed By: ___ewallace__________________ _X_ Project is not sited in a wetland __ Requirements of EO11990 in progress. Estimated completion date is ______ __ Requirements of EO 11990 completed on ____.
__ Other
2. Flood Plain Reviewed By: ____ewallace_________________ _X_ Project is not sited in a 100-year flood plain.
__ Requirements of EO 11990 in progress. Estimated completion date is ______ _ _ Project is sited in a 100-year flood plain. Requirements of EO 11990 completed on ______ Finding of "No Practicable Alternative signed 18 April 2001______
3. Potentially Regulated Substances Reviewed By: __ewallace___________________
a. Water:
__ Construction permit required for extension of water system per 62.555, FAC.
_X_ No permit required because less than 2 in. diameter pipe and less than 100 if extension.
__ Backflow preventer(s) required. Must be field tested by licensed inspector upon installation.
__ Sprinkler system must have rain sensor device per FS 373.62.
__Well drilling/mod/abandonment must be conducted by a licensed contractor. Permit required per 4OC-3, FAC.
__ Other: Permits may be required for this project.
b. Wastewater:
__ Construction permit required to connect to collection system per 62-600, FAC.
__ No permit required per 62-604.1 10 (single facility, gravity service connection, no pretreatment, compatible discharge) _X_ Other: No Wastewater required for this project.
c. Stormwater:
__ Environmental Resource Permit required from: _______________
a. Creates more than 4,000 s.f. impervious surface subject to vehicular traffic;
b. Creates more than 5,000 s.f impervious surface; or
c. Project affects 5 acres or more (includes recreation areas, golf course, ball fields, etc.)
__ Site included in station stormwater master plan; permit required but may access existing stormwater treatment system. (Basin no. __________ pond no._________ ; approx ________________ s.f.)
__ NPDES 1-acre site; construction contractor must obtain permit and implement Stormwater Pollution Prevention Plan.
__ No permitting required. BMP’s must be installed during demolition/construction.
__ Upon completion site will be included in Base Stormwater Pollution Prevention Plan.
_X _ Other: Permits may be required
d. Asbestos:
_X_ Not present: _________ survey underway.
__ Survey required, If present must be abated prior to demolition
e. Lead Based Paint:
_X Not present: _________ survey underway.
__ Present
f. Ozone Depicting Substances:
_X_ Not present: _________ survey underway.
__ Present (describe mitigation, or state why mitigation is not necessary).
g. Polychlorinated biphenyls (PCBs):
X__ Not present: _________ survey underway.
__ Present (describe mitigation, or state why mitigation is not necessary).
h. Other known hazardous or toxic substances and pollutants (e.g. contaminated soils):
X_ Not present: _________ survey underway.
__ Present (guidelines attached).
4. Hazardous Materials _X__ Will chemicals (such as, but not limited to, compressed gases, adhesives, aerosol cans, sealants, paints, lubricants, solvents, oils, cleaners, degreasers and pesticides) be used ____ Submit TAFB Form 81 (Contractor Questionnaire) and TAFB Form 82 (Chemical Inventory) 7-10 days upon issuance of the notice to proceed and prior commencement of work on site.
____ Submit copies of manufacturer-specific Material Safety Data Sheets ____ Submit TAFB Form 83 (Reporting Entry Form) at the end of the project or as indicated by CEV.
____ Notify CEV if anything changes from the original submittal (i.e. new chemical is added, size of container or unit of issue changes or if the manufacturer changes).
_ _ Will not use chemicals
5. Air Pollutants
Reviewed By: _____________________ __ Will not be generated by the operation or construction of this facility.
__ Will be generated by the operation or construction of this facility. Describe type and amount of substance expected to be generated, existing control systems, and the need for additional controls.
X__ Conformity determination not required.
__ Conformity determination required.
6. Solid and Hazardous Wastes
Reviewed By: _______________________ X _Facility will not be used for generating/managing solid and/or hazardous wastes.
__ Facility will be for generating/managing solid and/or hazardous waste.
_Yes Will the work being performed on the project generate any wastes?
7. Storage Tanks (Check all that apply)
Reviewed By: _____________________ _X_ No storage tanks are involved.
__ New storage tanks will be installed.
__ Material to be stored, quantity ____________.
__ Existing tanks on the project will be relocated. Ensure regulatory agency has been notified.
__ Contamination exists.
__ Contamination unknown.
__ Existing tanks on projects it will be retained.
1. Environmental Impact Analysis Process
_X_ Categorical exclusion number _A2.3.7_______ __________ applies.
__ Environmental Assessment under preparation. Expected completion date is __________.
__ Finding of No Significant Environmental Impact signed on __________.
__ Draft Environmental Impact Statement (EIS) under preparation. Expected completion date is ________. __ Draft EIS filed on ___________.
__ Final EIS filed on ___________.
__ Record of Decision signed on __________.
__ Foreign nation or protected global resource exemption number ___________ applies.
__ Environmental study (or review underway) under preparation. Expected completion date is __ Environmental study (or review) completed on ___________.
2. Interagency and Intergovernmental Coordination for Environmental Planning
Reviewed By: _______ewallace______________ X__ Coordination of proposed project with the state Single Point of Contact or other agencies is not required.
__ Coordination with the state Single Point of Contact is in progress. Expected date of completion is __ Proposed project was coordinated with the state Single Point of Contact or other agencies on _
3. Environmental Permits
Reviewed By: ____ewallace_________________ _ No permits are required unless dewatering is needed.
__ No permits required but regulatory agency notification required prior to construction (e.g.
underground storage tank removals).
X_ Permits may be required for this project.
1. Environmental Restoration Program (ERP)/Petroleum Contamination (PCA)
_X_ Facility is not sited on or near an ERP/PCA site.
__ Facility is sited near an ERP/PCA site.
__ Facility is within the boundary of an IRP/PCA site ERP Guidelines must be followed.
__ The following activities must be coordinated with the IRP Manager:
excavation, sampling, and 40 hour H&S training.
__ The site is projected to be remediated and/or closed out on _________, prior to commencement of construction activities.
__ The nature of the site contamination does not preclude the type of construction activity proposed.
__ There is a Compliance Agreement associated with this site.
__ A Remedial Investigation/Feasibility Study was completed on _______ to accurately delineate the aerial extent of the contamination.
14. Comments
RON DESANTIS
Governor
LAUREL M. LEE
Secretary of State
Division of Historical Resources
R.A. Gray Building • 500 South Bronough Street• Tallahassee, Florida 32399
850.245.6300 • 850.245.6436 (Fax) • FLHeritage.com
Mr. José J. Cintron July 20, 2020 Chief, Environmental Element 325th Civil Engineer Squadron 540 Mississippi Avenue, Mail Stop 42 Tyndall Air Force Base, Florida 32403-5014
Re: DHR Project No.: 2020-4058 – Received by DHR: July 16, 2020
Proposed Repairs to Crooked Island Beach Facilities Tyndall Air Force Base, Bay County
Dear Mr. Cintron:
This office reviewed the referenced project for possible impact to historic properties listed, or eligible for listing, in the National Register of Historic Places. The review was conducted in accordance with Section 106 of the National Historic Preservation Act of 1966, as amended and 36 CFR Part 800: Protection of Historic Properties.
Based on the information provided and the conditions outlined in your letter concerning fortuitous finds or unexpected archaeological discoveries, it is the opinion of this office that the proposed undertaking will have no effect on historic properties.
If you have any questions concerning our comments, please contact Scott Edwards, Historic Preservationist, by electronic mail scott.edwards@dos.myflorida.com, or at 850.245.6333 or 800.847.7278.
Sincerely, Timothy A. Parsons, Ph.D.
Director, Division of Historical Resources and State Historic Preservation Officer
Site Diagram - Crooked Island Beach Road
June 22, 2020 0 210 420105 ft
0 60 12030 m
1:4513*Location/Area estimates are based on satellite imagery
Total Road Area: 15,560 SY Road Width: 12 Feet Pond Area: 4,200 SY
Road Area
Pond Area
TYNDALL AIR FORCE BASE, FLORIDA
DEPARTMENT OF THE AIR FORCE
TYNDALL AIR FORCE BASE
325TH CIVIL ENGINEERING SQUADRON
119 ALABAMA AVENUE
TYNDALL AFB, FLORIDA 32403
TEL: (850) 283-6486
FAX: (850) 283-0233
DESCRIPTION
REVISIONS
SYMBOLNo.DATEBY
CONCEPT PLAN
SC
AL
E H
V
XL
W
U
-8
NT
S
PR
OJ
EC
T:
NT
S
SH
EE
T
OF
DESIGNED BY:
SHARKEY
REVIEWED BY:
SHARKEY
DRAWN BY:
SHARKEY
CO
NC
EP
T
ON
LY
NO
T
FO
R
CO
NS
TR
UC
TI
ON
ST
A
0+
01 JUNE 2020
CROOKED ISLAND BOARDWALK
C3APPENDIX A
ST
A
1+
ST
A
2+
ST
A
3+
ST
A
4+
BO
AR
DW
AL
K
NO
TE
S:
CO
NS
TR
UC
T
NE
W B
OA
RD
W
AL
K
AN
D
RA
MP
S
(A
PP
RO
XI
MA
TE
LY
LF
5,2
S
F) S
IM
ILA
R
TO
IM
AG
ES
A
BO
VE
. C
ON
CE
PT
D
ET
AI
LS
A
RE
P
RO
VI
DE
D
IN
TH
E
FO
LL
OW
IN
G
PA
GE
S.
DU
NE
W
AL
KO
VE
R
TO
B E
CO
NS
TR
UC
TE
D
3 F T
AB
OV
E
GR
AD
E
BO
AR
DW
AL
K W
ID
TH
S
HA
LL
B
E +7
'-4
IN
CL
UD
E
(4 ) I
NT
EG
RA
TE
D
BE
NC
HE
S
AT
S
OU
TH
E
ND
N
EA
R
RA
MP
DE
CK
S
HA
LL
B
E
PR
EC
AS
T
CO
NC
RE
TE
P
AN
EL
SI
DE
R
AI
LIN
G
SH
AL
L B E
PR
OV
ID
ED
A
LO
NG
E
NT
IR
E
LE
NG
TH
AL
UM
IN
UM
H
AD
R
AI
L S
HA
LL
B
E
PR
OV
ID
ED
A
T
RA
MP
S
EC
TI
ON
S
W
HE
RE
RE
QU
IR
ED
BO
AR
DW
AL
K
EN
TR
Y
FI
LL
1.
IM
AG
E
SH
OW
S
PO
ST
S
TO
RM
C
ON
DI
TI
ON
S
OF
B
OA
RD
W
AL
K
AT
P
AR
KI
NG
LO
T 2.
IN
ST
AL
L A
PP
RO
XI
MA
TE
LY
C
Y
OF
W
HI
TE
B
EA
CH
S
AN
D
FI
LL
T
O
RE
ST
OR
E
GR
AD
E
AT
T
HE
W
AS
HO
UT
LO
CA
TE
D
AT
T
HE
B
EG
IN
NI
NG
O
F
TH
E
BO
AR
DW
AL
K.
3.
IN
ST
AL
L A
PP
RO
XI
MA
TE
LY
C Y
OF
G
RA
VE
L (
SI
MI
LA
R
TO
E
XI
ST
IN
G)
IN
T
HE
PA
RK
IN
G
LO
T
TO
R
ES
TO
RE
S
UR
FA
CE
A
T
TH
E
BO
AR
DW
AL
K
4.
IN
ST
AL
L N
EW
P
ON
E
ST
AT
IO
N
HA
RD
W
AR
E
ST
A
7+
ST
A
6+
PH
ON
E
ST
AT
IO
N (W
AS
HE
D
AW
AY
STT
AS
Ex te ns io n Lo ca tio n sh al lb e w ith in th e sh ad ed ar ea (8 Ar ea
U.S. Fish and Wildlife Service 1601 Balboa Avenue Panama City, Florida 32405
(850) 769-0552 http://www.fws.gov/panamacity/
UNITED STATES DEPARTMENT OF COMMERCE
National Oceanic and Atmospheric Administration
NATIONAL MARINE FISHERIES SERVICE
Southeast Regional Office 263 13th Avenue South St. Petersburg, FL 33701
SEA TURTLE AND SMALLTOOTH SAWFISH CONSTRUCTION CONDITIONS
The permittee shall comply with the following protected species construction conditions:
a. The permittee shall instruct all personnel associated with the project of the potential presence of these species and the need to avoid collisions with sea turtles and smalltooth sawfish. All construction personnel are responsible for observing water-related activities for the presence of these species.
b. The permittee shall advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing sea turtles or smalltooth sawfish, which are protected under the Endangered Species Act of 1973.
c. Siltation barriers shall be made of material in which a sea turtle or smalltooth sawfish cannot become entangled, be properly secured, and be regularly monitored to avoid protected species entrapment. Barriers may not block sea turtle or smalltooth sawfish entry to or exit from designated critical habitat without prior agreement from the National Marine Fisheries Service’s Protected Resources Division, St. Petersburg, Florida.
d. All vessels associated with the construction project shall operate at “no wake/idle” speeds at all times while in the construction area and while in water depths where the draft of the vessel provides less than a four-foot clearance from the bottom. All vessels will preferentially follow deep-water routes (e.g., marked channels) whenever possible.
e. If a sea turtle or smalltooth sawfish is seen within 100 yards of the active daily construction/dredging operation or vessel movement, all appropriate precautions shall be implemented to ensure its protection. These precautions shall include cessation of operation of any moving equipment closer than 50 feet of a sea turtle or smalltooth sawfish. Operation of any mechanical construction equipment shall cease immediately if a sea turtle or smalltooth sawfish is seen within a 50-ft radius of the equipment. Activities may not resume until the protected species has departed the project area of its own volition.
f. Any collision with and/or injury to a sea turtle or smalltooth sawfish shall be reported immediately to the National Marine Fisheries Service’s Protected Resources Division (727-824- 5312) and the local authorized sea turtle stranding/rescue organization.
g. Any special construction conditions, required of your specific project, outside these general conditions, if applicable, will be addressed in the primary consultation.
Revised: March 23, 2006 O:\forms\Sea Turtle and Smalltooth Sawfish Construction Conditions.doc
File details come from the government source that posted it. Updated .