Attachment 8 - AF FORM 813 B1120.pdf

PDF 113 KB Posted

Attached to
Wake Island (WI) B. 1120 Restoration
Solicitation number
FA521525R0009
Issued by

About this file

This is an Air Force Form 813 Request for Environmental Impact Analysis for renovating Building 1120 at Wake Island Airfield. The project involves extensive renovation of a billeting facility that was previously taken out of service due to substantial mold, termite, and corrosion damage. The renovation will include replacing exterior and interior walls, electrical and plumbing systems, and installing a new central air conditioning system. The primary purpose is to increase Wake Island's billeting capacity and support mission readiness, particularly for the airfield's role as a divert base for TransPac flights.

The proposed action is scheduled for July 2025-July 2026, with a need date of 12/09/2024. Two alternatives were considered and rejected: demolishing the building (too costly and time-consuming) and taking no action (which would further degrade the facility and negatively impact mission capabilities). The environmental analysis determined the project qualifies for Categorical Exclusion (CATEX) under codes 12.3.8 and A2.3.10, with no significant environmental impacts anticipated. The project will utilize existing Wake Island utilities and focuses on interior renovation with minimal exterior modifications.

View the file

Other files

File Type Posted
25 AUG 25- RENO Questions.pdf PDF
25 AUG 25- RENO Questions.xlsx XLSX spreadsheet
Bldg B_C_1120 1963.pdf PDF
1120 (C 520) Air Conditioning.pdf PDF
20170412 Wake Island Assessment Pre-Final Report 2017.pdf PDF
1118 and 1120 Structural Assessment and Repairs 2022.pdf PDF
Questions Answered Reno.xlsx XLSX spreadsheet
c_520_1120_Mechanical 1967.pdf PDF
Electrial Site Plan.PDF PDF
1120 Photo Log.pdf PDF
Wake Island Concrete and Masonry Structures Feb 2020.pdf PDF
Utilities.pdf PDF
A_All Buildings 1963 (C_520_1120).pdf PDF
B1120 floorplan draft V3_Redacted Update.pdf PDF
Location Map c_1120.PDF PDF
Amendment 01 - Question Set 1.docx DOCX document
Solicitation - FA521525R0009.pdf PDF
Attachment 1 - WI Restor Building 1120 SOW.pdf PDF
Attachment 2B - AF 103 Template.pdf PDF
Attachment 4 - eSSS PRSC Commercial Satellite Terminal Policy Memorandum.pdf PDF
Attachment 10A - SAR Request.pdf PDF
Attachment 3 - 11 AF Satellite and Ground Terminal Request (Fillable).pdf PDF
Attachment 5 - 611th Tank Inventory Template.docx DOCX document
Attachment 6 - AF3000-3064-3065.pdf PDF
Attachment 9 - B1120 floorplan.pdf PDF
Attachment 10B - Wake Island Cargo Processing Guide.pdf PDF
Attachment 10C - WI Base Support Letter.pdf PDF
Attachment 12A - B1120 Exterior photos portfilio.pdf PDF
Attachment 2A - 611 CES Dig Permit Process 2024.pdf PDF
Attachment 7 - DD Form 1354.pdf PDF
Attachment 11 - WI Master Plan and Design Guide.pdf PDF
Attachment 12B - B1120 Interior photos portfolio.pdf PDF
Attachment 13 - Wage Determination.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR ENVIRONMENTAL IMPACT ANALYSIS Report Control Symbol (RCS):

[RCS Needed]

INSTRUCTIONS: Section I to be completed by Proponent; Sections II and III to be completed by Environmental Planning Function. Continue on separate sheets as necessary. Reference appropriate item number(s).

SECTION I - PROPONENT INFORMATION

1. TO (Environmental Planning Function)

PACAF/CFPE

2. FROM (Proponent organization and functional address symbol) Air Force - 611 CES/CEN

2a. TELEPHONE NO.

907-552-1979

3. TITLE OF PROPOSED ACTION

Renovate B1120

4. PURPOSE AND NEED FOR ACTION (Identify decision to be made and need date)

1. State the purpose of this action.

Building 1120 at Wake Island Airfield was taken out of service due to substantial mold, termite and corrosion damage. This project shall bring B1120 up to usable standards to increase Wake Island's billeting capacity.

2. State the need for this action.

Lack of suitable billeting options on Wake Island. This project will increase mission readiness.

3. What do you intend to accomplish and why is the action necessary?

Work includes replacing all exterior infill walls and many interior walls, corroded and unsafe electrical system completely, leaking and corroded plumbing piping completely, non-functional AC mini-splits with new central AC. This action is necessary because further deferred maintenance will result in the building being degraded beyond repair. Furthermore, due to mission requirements additional billeting is needed on Wake Island; Concerns of structural inadequacy of one of the three other remaining in service USAF dorms on the island, building 1116, could lead to it being abandoned as unsafe. This would decrease the amount of bed spaces available on the island to below what is required. Since one of Wake Island Airfield's primary missions is as a divert base for TransPac flights, the mission would be significantly adversely affected by not performing this work

4. What is currently being done to meet the need?

Tents have been utilized to meet billeting needs. However this is not a practical long term solution.

5. Provide any additional details related to the Purpose and Need for Action.

N/A

Need Date: 12/09/2024

5. DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES (DOPAA) (Provide sufficient details for evaluation of the total action.)

1. Describe the proposed action.

Renovate B1120 to current billeting standards.

2. Describe alternatives to the proposed action.

Option 1: Demolish B1120 and construct a new billeting facility.

Option 2: No Action; continue to defer maintenance and allow B1120 to degrade.

3. What alternatives were eliminated from consideration and why?

Option 1: Not acceptable. This option is to costly and will not happen in a timely manner.

Option 2: Not acceptable. This option will cost the Air force more money in the long term. Furthermore, this option will damage mission readiness.

4. Describe what will happen if no action is taken.

See option 2 in question 3 of this section.

5. Please provide a description of the construction action and timing when it will occur.

July2025-July2026

6. Describe the project location. Attach map(s)/diagram(s) – make sure to include an overview map of where your requested project area is on the installation.

B1120 on Wake Island. All work will be done in/on B1120.

11/20/24, 7:57 AM AF FORM 813

about:blank 1/4

Attachment 8

7. Describe additional project requirements: 1) Construction and site preparation requirements (include approx. area of ground to be disturbed); 2) Does the project require a laydown yard or storage area? If so, describe the location and groundwork required.

N/A

8. Describe additional project requirements: 3) Will soil boring/sampling/potholing occur during a design phase? If so, a separate dig permit will be required; 4) Detailed operational activities; 5) Equipment/material lists.

N/A

9. Will the project require utilities? How will those utilities be provided to the facility?

If utilities are required they will be utilized from existing Wake Island utilities.

10. Provide any additional details related to the Description of the Proposed Action and Alternatives (e.g., outline mitigation measures and other issues).

N/A

Location Description / Justification:

B1120 on Wake Island

6. PROPONENT APPROVAL (Name and Grade) theodore.j.peters1

6a. SIGNATURE //theodore.j.peters1 i:0e.t|fedvis|theodore.j.peters1//

6b. DATE 11/14/2024

SECTION II - PRELIMINARY ENVIRONMENTAL SURVEY (Check appropriate box and describe potential environmental effects including cumulative effects.) (+ = positive effect; 0 = no effect; - = adverse effect; U = unknown effect)

+ 0 - U

7. AIR INSTALLATION COMPATIBLE LAND USE/ZONE USE (Noise, accident potential, encroachment, etc.)

X

8. AIR QUALITY (Emissions, Attainment status, state implementation plan, etc.) X

9. WATER RESOURCES (Drinking water, wastewater, quality, quantity, source, water features, etc.) X

10. SAFETY AND OCCUPATIONAL HEALTH (Asbestos/lead-based paint/radiation/chemical exposure, explosives safety quantity distance, bird/wildlife aircraft hazard, etc.)

X

11. HAZARDOUS MATERIALS/WASTE (Use/storage/generation, solid waste, toxic materials, etc.) X

12. BIOLOGICAL RESOURCES (Wetlands/floodplains, threatened or endangered species, etc.) X

13. CULTURAL RESOURCES (Burial sites, archaeological, historical, etc.) X

14. GEOLOGY AND SOILS (Topography, minerals, geothermal, Installation Restoration Program, seismicity, etc.)

X

15. SOCIOECONOMIC (Employment/population projections, school and local fiscal impacts, etc.) X

16. OTHER (Potential impacts not addressed above, such as Host Nation considerations/concerns for non-US locations.)

X

SECTION III - ENVIRONMENTAL ANALYSIS DETERMINATION

17. PROPOSED ACTION QUALIFIES FOR CATEGORICAL EXCLUSION (CATEX) #A2.3.8. ; OR

PROPOSED ACTION DOES NOT QUALIFY FOR A CATEX; FURTHER ENVIRONMENTAL ANALYSIS IS REQUIRED.

18. REMARKS

Secondary CATEX selections: A2.3.10.

Rennovation of Building 1120 at WIA qualifies for CATEX 12.3.8 and A2.3.10, as most of work will be interior aside from replaceing exterior infill walls, which are within five feet form the building.

19. ENVIRONMENTAL PLANNING

FUNCTION CERTIFICATION (Name and Grade)

19a. SIGNATURE //sean.p.palmer i:0e.t|fedvis|sean.p.palmer//

19b. DATE 11/20/2024

11/20/24, 7:57 AM AF FORM 813

about:blank 2/4

Palmer, Sean CIV

AF IMT 813, 199990901, V1 THIS FORM CONSOLIDATES AF FORMS 813 AND 814.

PREVIOUS EDITIONS OF BOTH FORMS ARE OBSOLETE.

about:blank 3/4

CONTINUATION SHEET

about:blank 4/4