Tyndall AFB Storm Water Drainage Repair

Closed Solicitation Posted

This opportunity was awarded. See its 3 award notices in the notice history.

Solicitation number
FA481922R0011
Agency
Responses due
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

Place of performance
Tyndall AFB, Florida 32403, United States

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

***See Amendment 0003 dated 15 June 2022 for the following changes:

1. Extend the proposal due date from 16 June 2022 to 27 June 2022.

2. All other terms and conditions remain unchanged.

-------------------------------------------------------------------------------------

***See Amendment 0002 dated 14 June 2022 for the following changes:

1. Add the attachment: Q&A Consolidated Attachments

2. All other terms and conditions remain unchanged.

----------------------------------------------------------------------------------------------------------------------------------

***See Amendment 0001 dated 10 June 2022 for the following changes:

1. Incorporate the site visit sign-in sheet conducted on 01 June 2022.
2. Incorporate the Question and Answers.
3. Incorporate Attachment 1: Statement of Work without the reference error message.
4. All other terms and conditions remain unchanged.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

The purpose of the Tyndall Air Force Base (TAFB) Project XLWU211017, is to correct Flooding and long term standing water in the Storm Sewer System for the AFNORTH Complex, by repair or replace the piping, and regrade flooding areas to improve drainage. This project will repair, replace and/or clean silted pipes, increase pipe sizes with HDPE in sodded areas, and Class 3 Reinforced Concrete Pipe under parking lots and streets. Grading of the site shall be with the intent of proving sheet style water flow to swales. High flow swales are to have concrete trickle channels on the bottom to eliminate erosion. All disturbed areas shall have 4" of top soil and sod installed to prevent future damage. The Contractor shall be responsible to bid and build all portions of the contract, which includes providing all labor, equipment, tools, materials, and all other item's necessary to complete the project within the allotted time frame of 180 Calendar Days.
 

Update #3 ·

***See Amendment 0002 dated 14 June 2022 for the following changes:

1. Add the attachment: Q&A Consolidated Attachments

2. All other terms and conditions remain unchanged.

----------------------------------------------------------------------------------------------------------------------------------

***See Amendment 0001 dated 10 June 2022 for the following changes:

1. Incorporate the site visit sign-in sheet conducted on 01 June 2022.
2. Incorporate the Question and Answers.
3. Incorporate Attachment 1: Statement of Work without the reference error message.
4. All other terms and conditions remain unchanged.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

The purpose of the Tyndall Air Force Base (TAFB) Project XLWU211017, is to correct Flooding and long term standing water in the Storm Sewer System for the AFNORTH Complex, by repair or replace the piping, and regrade flooding areas to improve drainage. This project will repair, replace and/or clean silted pipes, increase pipe sizes with HDPE in sodded areas, and Class 3 Reinforced Concrete Pipe under parking lots and streets. Grading of the site shall be with the intent of proving sheet style water flow to swales. High flow swales are to have concrete trickle channels on the bottom to eliminate erosion. All disturbed areas shall have 4" of top soil and sod installed to prevent future damage. The Contractor shall be responsible to bid and build all portions of the contract, which includes providing all labor, equipment, tools, materials, and all other item's necessary to complete the project within the allotted time frame of 180 Calendar Days.
 

Update #2 ·

***See Amendment 0001 dated 10 June 2022 for the following changes:

1. Incorporate the site visit sign-in sheet conducted on 01 June 2022.
2. Incorporate the Question and Answers.
3. Incorporate Attachment 1: Statement of Work without the reference error message.
4. All other terms and conditions remain unchanged.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

The purpose of the Tyndall Air Force Base (TAFB) Project XLWU211017, is to correct Flooding and long term standing water in the Storm Sewer System for the AFNORTH Complex, by repair or replace the piping, and regrade flooding areas to improve drainage. This project will repair, replace and/or clean silted pipes, increase pipe sizes with HDPE in sodded areas, and Class 3 Reinforced Concrete Pipe under parking lots and streets. Grading of the site shall be with the intent of proving sheet style water flow to swales. High flow swales are to have concrete trickle channels on the bottom to eliminate erosion. All disturbed areas shall have 4" of top soil and sod installed to prevent future damage. The Contractor shall be responsible to bid and build all portions of the contract, which includes providing all labor, equipment, tools, materials, and all other item's necessary to complete the project within the allotted time frame of 180 Calendar Days.
 

Update #1 ·

The purpose of the Tyndall Air Force Base (TAFB) Project XLWU211017, is to correct Flooding and long term standing water in the Storm Sewer System for the AFNORTH Complex, by repair or replace the piping, and regrade flooding areas to improve drainage. This project will repair, replace and/or clean silted pipes, increase pipe sizes with HDPE in sodded areas, and Class 3 Reinforced Concrete Pipe under parking lots and streets. Grading of the site shall be with the intent of proving sheet style water flow to swales. High flow swales are to have concrete trickle channels on the bottom to eliminate erosion. All disturbed areas shall have 4" of top soil and sod installed to prevent future damage. The Contractor shall be responsible to bid and build all portions of the contract, which includes providing all labor, equipment, tools, materials, and all other item's necessary to complete the project within the allotted time frame of 180 Calendar Days.
 

Files

Show all 22

Notice history

Notice Type Posted
Parking Lot Improvements Latest pre-solicitation Pre-Solicitation
Tyndall AFB Storm Water Drainage Repair Award Notice
This notice Solicitation
Storm Water Drainage Repair, Tyndall AFB, FL Pre-Solicitation
Construct B15 & 29 Replacement/Consolidation Solicitation
FA481921C0006 - Construct Area Defense Counsel (ADC) Facility, Tyndall AFB Award Notice
FA481920P0070 (Award Notice) Award Notice
Paving Survey Solicitation
TAFB Emergency Alert System Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors