Attachment 17 - NKAK 23-1040 Arnold Gate Description of Work 22 Aug 25.pdf

PDF 160 KB Posted

Attached to
Little Rock AFB Base Pavements IDIQ FY25 - Amendment 7
Solicitation number
FA446025R0002
Issued by

About this file

This document is a Delivery Order for the NKAK 23-1040 Arnold Gate Pavement Improvements project at Little Rock Air Force Base. The work involves demolishing existing pavements, constructing a new entrance road at Arnold Gate with elevation matching ARDOT Highway 107 improvements, installing new security fencing, relocating utilities, and constructing a new storm drainage system. Key construction activities include concrete and asphalt demolition, site earthwork, excavation, soil backfill, pavement layer compaction, roadway and sidewalk construction, pavement marking, topsoil and sod installation, and tree replacement.

The project requires extensive coordination between LRAFB and the IDIQ Contractor with ARDOT, potentially necessitating phased implementation to minimize Arnold Gate entrance closure. The scope includes 1,631 cubic yards of potential undercut, replacement of 20 5-gallon trees, and various non-priced items such as security fence installation, curb and gutter, and conduit work. Attached documents include fence specifications, undercut section drawings, a geotechnical report, and design drawings. The project is controlled by 19 CES/CEN and marked as Controlled Unclassified Information (CUI) with federal distribution limitations.

View the file

Other files

File Type Posted
Solicitation Amendment - FA446025R00020004.pdf PDF
Solicitation Amendment FA446025R00020004 SF 30.pdf PDF
Solicitation Amendment - FA446025R00020003.pdf PDF
Solicitation Amendment FA446025R00020003 SF 30.pdf PDF
Attachment 22 - Arnold Gate Pavement Bid Schedule 2 Sep 25.xlsx XLSX spreadsheet
Attachment 25 - Arnold Gate Q and A 2 Sep 25.pdf PDF
Solicitation Amendment - FA446025R00020002.pdf PDF
Solicitation Amendment FA446025R00020002 SF 30.pdf PDF
Attachment 1 - Base Pavements Bid Schedule NKAK 23-1030 27 Aug 25.xlsx XLSX spreadsheet
Solicitation Amendment - FA446025R00020001.pdf PDF
Attachment 12 - Specifications NKAK 23-1030 (1-4) Base Pavements IDIQ 26 Aug 2025.pdf PDF
Attachment 23 - Installation Pest Management Plan Jul 2025 .pdf PDF
Solicitation Amendment FA446025R00020001 SF 30 CO signed.pdf PDF
Attachment 22 - Arnold Gate Pavement Bid Schedule .xlsx XLSX spreadsheet
Attachment 24 - Base Pavements IDIQ Q and A 26 Aug 25 .pdf PDF
Attachment 1 - Base Pavements Bid Schedule NKAK 23-1030 26 Aug 2025.xlsx XLSX spreadsheet
Site Visit 1 NKAK 231030 Sign-in Roster - 7 Aug 2025.pdf PDF
Site Visit 2 NKAK 231030 Sign-in Roster - 12 Aug 2025.pdf PDF
Attachment 14 - Sub-Contractor Consent Form .pdf PDF
Attachment 4 - Wage Determination AR20250171 Pulaski 3 Jan 25 .pdf PDF
Attachment 11 - Base Pavements Drawings 4 Oct 24 .pdf PDF
Attachment 21 - Design Drawings .pdf PDF
Attachment 17 - NKAK 23-1040 Arnold Gate Description of Work .pdf PDF
Attachment 13 - Financial Institution Reference Sheet .pdf PDF
Attachment 7 - Memo of Agreement Regarding Environmental Laws and Regulation .pdf PDF
Attachment 12 - Specifications NKAK 23-1030 (1-4) Base Pavements IDIQ 15 May 2025 .pdf PDF
Attachment 6 - EMIS Contractor Instruction Guide .pdf PDF
Solicitation - FA446025R0002.pdf PDF
Attachment 20 - Geotechnical Report .pdf PDF
Attachment 16 - NKAK 23-1040 Arnold Gate Pavement Improvements RFP - signed.pdf PDF
Attachment 1 - Base Pavements Bid Schedule NKAK 23-1030 14 MAY 25 .xlsx XLSX spreadsheet
Attachment 15 - Past Performance Questionnaire (PPQ)-15 May 2025 signed.pdf PDF
Attachment 2 - Wage Determination AR20250152 White 3 Jan 25 .pdf PDF
Attachment 3 - Wage Determination AR20250168 Lonoke 3 Jan 25 .pdf PDF
Attachment 19 - Undercut Drawings .pdf PDF
Attachment 18 - Fence Specifications .pdf PDF
Attachment 5 - Base Pavements IDIQ- Material Submittal Schedule .xlsx XLSX spreadsheet
Attachment 8 - Contractor Construction and Demolition Report .pdf PDF
Attachment 10 - LRAFB Information .pdf PDF
Attachment 9 - AF103 LRAFB Instructions .pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Controlled by: 19 CES/CEN CUI Category: SP-PROCURE Distribution/Limited Dissemination Control: FED POC: James Shelden, 501-987-1085

CUI

BLACK KNIGHTS…MOVE OUT!

Delivery Order

CONTRACT NO.

IDIQ, BASE PAVEMENTS, NKAK 23-1030

DELIVERY ORDER NO.

DESCRIPTION OF WORK: NKAK 23-1040 Arnold Gate Pavement Improvements

The work shall consist of furnishing all plant, labor and material in performing all operations in connection with concrete slab replacements. All work shall be completed in strict accordance with the specifications and drawings of NKAK 23-1040 Construct Arnold Base Pavement Improvements.

The work includes demolition of existing pavements in the vicinity of the Arnold Gate Entrance.

Construction of a new entrance road at Arnold Gate. The new pavement elevation will match proposed ARDOT improvements on Highway 107. Work shall also include the removal and installation of new security fencing to maintain a secure perimeter. Miscellaneous utility construction and relocations as shown on the construction plans. Installation of new storm drainage system and retention structure(s) as shown on the plans.

In lieu of the requirement for tree replacements per 32 93 01 para 3.08 Tree Replacement, this project will only include replacement of 20 5-gallon trees.

Possible undercut may be required depending on results of a proof roll of the subgrade. Include 1,631 CY of undercut in proposal. See attached drawings that show undercut section details.

Includes excavation, 3” base and geotextile fabric line items.

This project will require LRAFB and the IDIQ Contractor to do extensive coordination with ARDOT and their selected Contractor to finalize delineation and timing of our project with ARDOT’s project. This may cause this project to have to be phased. The goal is to minimize closure of Arnold Gate entrance.

Construction will generally consist of:

1. Concrete and asphalt demolition

2. Site earthwork

3. Excavation of existing base, subbase, and undercut of unsuitable subgrade

4. Soil backfill and placement of new base and subbase

5. Compaction of pavement layers

6. Roadway and sidewalk construction

7. Pavement marking and signage

8. 4” topsoil and Sod installation

9. Installing new storm sewer system

10. SWPPP, silt fence, etc.

Controlled by: 19 CES/CEN CUI Category: SP-PROCURE Distribution/Limited Dissemination Control: FED POC: James Shelden, 501-987-1085

BLACK KNIGHTS…MOVE OUT!

11. Tree replacement

12. Subgrade preparation

13. GIS, as-builts

14. Proof roll subgrade, Undercut (1,631 CY)

15. Installing security fence (non-priced item, NPI)

16. 18” curb and gutter (NPI)

17. Demo of existing fence as shown on drawings (NPI)

18. 4” Conduit (NPI)

19. Welcome sign

20. Clearing and Grubbing (6” to 24” in diameter)

21. Tree Replacement (20 5-gallon trees)

ITEM LOCATION AMOUNT

1 ARNOLD GATE PAVEMENT $

ATTACHMENTS:

1. Fence Specifications

2. Drawings showing section of undercut

3. Geotechnical Report

4. Design Drawings