The file is a Schedule of Material Submittals template for a Base Pavements Indefinite-Delivery Indefinite-Quantity (IDIQ) contract at Little Rock Air Force Base. The document outlines detailed material submission requirements for two primary categories: Airfield Pavement Systems and Civil Works construction projects. The comprehensive submittal schedule includes 58 line items across multiple technical specifications, requiring contractors to provide various documentation such as certifications of compliance, shop drawings, samples, manufacturer's recommendations, warranties, catalog data, technical data, and test reports.

The related federal contract opportunity involves maintenance and repair of airfield pavements and civil works construction for the 19th Civil Engineer Squadron. Specific project scope includes airfield markings, erosion control, pavement repairs, surface treatments, concrete and asphalt work, demolition, landscaping, traffic control, underground utility modifications, and infrastructure improvements. The solicitation (FA446025R0002) is issued by the Department of the Air Force Air Mobility Command, with individual task orders potentially requiring phased completion to minimize disruption to base operations. The IDIQ contract will support a wide range of infrastructure maintenance and construction activities at Little Rock Air Force Base.

View the file

Other files

File Type Posted
Solicitation Amendment FA446025R00020004 SF 30.pdf PDF
Solicitation Amendment - FA446025R00020004.pdf PDF
Solicitation Amendment - FA446025R00020003.pdf PDF
Solicitation Amendment FA446025R00020003 SF 30.pdf PDF
Attachment 25 - Arnold Gate Q and A 2 Sep 25.pdf PDF
Attachment 22 - Arnold Gate Pavement Bid Schedule 2 Sep 25.xlsx XLSX spreadsheet
Attachment 1 - Base Pavements Bid Schedule NKAK 23-1030 27 Aug 25.xlsx XLSX spreadsheet
Solicitation Amendment - FA446025R00020002.pdf PDF
Solicitation Amendment FA446025R00020002 SF 30.pdf PDF
Attachment 1 - Base Pavements Bid Schedule NKAK 23-1030 26 Aug 2025.xlsx XLSX spreadsheet
Solicitation Amendment FA446025R00020001 SF 30 CO signed.pdf PDF
Attachment 22 - Arnold Gate Pavement Bid Schedule .xlsx XLSX spreadsheet
Attachment 23 - Installation Pest Management Plan Jul 2025 .pdf PDF
Solicitation Amendment - FA446025R00020001.pdf PDF
Attachment 24 - Base Pavements IDIQ Q and A 26 Aug 25 .pdf PDF
Attachment 12 - Specifications NKAK 23-1030 (1-4) Base Pavements IDIQ 26 Aug 2025.pdf PDF
Attachment 17 - NKAK 23-1040 Arnold Gate Description of Work 22 Aug 25.pdf PDF
Site Visit 1 NKAK 231030 Sign-in Roster - 7 Aug 2025.pdf PDF
Site Visit 2 NKAK 231030 Sign-in Roster - 12 Aug 2025.pdf PDF
Attachment 2 - Wage Determination AR20250152 White 3 Jan 25 .pdf PDF
Attachment 4 - Wage Determination AR20250171 Pulaski 3 Jan 25 .pdf PDF
Attachment 7 - Memo of Agreement Regarding Environmental Laws and Regulation .pdf PDF
Attachment 13 - Financial Institution Reference Sheet .pdf PDF
Attachment 17 - NKAK 23-1040 Arnold Gate Description of Work .pdf PDF
Attachment 19 - Undercut Drawings .pdf PDF
Attachment 14 - Sub-Contractor Consent Form .pdf PDF
Attachment 15 - Past Performance Questionnaire (PPQ)-15 May 2025 signed.pdf PDF
Attachment 18 - Fence Specifications .pdf PDF
Attachment 20 - Geotechnical Report .pdf PDF
Solicitation - FA446025R0002.pdf PDF
Attachment 1 - Base Pavements Bid Schedule NKAK 23-1030 14 MAY 25 .xlsx XLSX spreadsheet
Attachment 3 - Wage Determination AR20250168 Lonoke 3 Jan 25 .pdf PDF
Attachment 6 - EMIS Contractor Instruction Guide .pdf PDF
Attachment 11 - Base Pavements Drawings 4 Oct 24 .pdf PDF
Attachment 12 - Specifications NKAK 23-1030 (1-4) Base Pavements IDIQ 15 May 2025 .pdf PDF
Attachment 16 - NKAK 23-1040 Arnold Gate Pavement Improvements RFP - signed.pdf PDF
Attachment 21 - Design Drawings .pdf PDF
Attachment 8 - Contractor Construction and Demolition Report .pdf PDF
Attachment 9 - AF103 LRAFB Instructions .pdf PDF
Attachment 10 - LRAFB Information .pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Airfield Material Submittals SCHEDULE OF MATERIAL SUBMITTALS NKAK 23-1030(1-4) IDIQ Airfield Pavement Systems FA446007D00xx

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

101 14 19 Coordenation 1.15 Radioactive MaterialXXX
201 45 00 Quality Control, Cultural Resource Management AND QC PlanXXX
301 33 00 1.05 Temporary Erosion Control MeasuresXXXXXXXXX
401 45 00 3.01 GIS AND AS-BUILTSXXX
501 57 23 Storm Water Pollution Prevention Plan 1.03XXX
631 23 10XXX
732 01 20XXXX
832 01 12XXXXXXX
932 01 15XXXXXXX
1032 01 17XXXXX
1132 01 18XXXXXX
1232 01 19XXXXXXX
1332 01 20XXXXXXX
1432 01 22XXXXXX
1532 11 23XXXX
1632 01 26XXXX
1732 11 30XXXXXXX
1832 11 36XXXXXXX
1932 12 20XXXXX
2032 12 15XXXXXXX
2132 17 24XXXXXXX
2232 22 00XXXXX
2332 92 00XXXXXX
2432 92 23XXXXXX
2533 46 16XXXXXXX
2634 73 13XXXXXXXX
Schedule of Material Submittals Template, Feb 2010 (SAF/AQCP) AF FROM 66

Civil Material Submittals

SCHEDULE OF MATERIAL SUBMITTALS NKAK 23-1030(1-4) IDIQ CIVIL WORKS

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

101 14 19 Coordenation 1.15 Radioactive MaterialXXX
201 45 00 Quality Control, Cultural Resource Management AND QC PlanXXX
301 45 00 1.05 Temporary Erosion Control MeasuresXXXXXXXXX
401 33 00 1.03 GIS AND AS-BUILTSXXX
501 57 23 Storm Water Pollution Prevention PlanXXX
602 42 00 Construction & Demolition Waste Reportsxx
703 20 01 Concrete ReinforcementXXX
803 31 00 Cast-In-Place ConcreteXXXXX
905 50 13 Metal FabricationsXXX
1005 50 90 Metal Screen WallXXXXXX
1105 52 13 HandrailsXXX
1226 05 19 Wire and CablesXXX
1326 05 43 Underground Electric ServiceXX
1426 05 48 Seismic ProtectionXXXX
1526 05 53 IdentificationXXX
1626 05 74 Transient Voltage Surge SuppresorXXXX
1726 09 13 MeteringXXXX
1826 23 05 Service DisconnectsXX
1926 23 10 Equipment DisconnectXXX
2026 24 00 Panel BoardsXXX
2126 27 26 Wiring DevicesXX
2226 50 00 LightingXXXXX
2331 00 00 Civil Works Earthwork: TopsoilXXXX
2432 01 17.63 Reflective Crack Pavement MembraneXXX
2532 01 19 Field Molded SealantXXXXXXX
2632 01 20 Hot-Applied Sealant For Asphalt Crack RepairXXXXXXX
2732 12 10 Bituminous Prime and Tack CoatXXXXX
2832 17 13 BollardsXXXXXXX
2932 17 26 Cast In Place Detectable Warning Surface TilesXXXXXXX
3032 17 26.10 Retrofit Detectable Warning Surface TilesXXXXXXX
3132 92 20 HydroseedingXXXX
3232 92 23 SoddingXXXX
3332 93 01 Trees, Shrubs, & GroundcoversXXXX
3433 31 00 Miscellaneous ConstructionXXXXX
35App. 303& 306 3" BaseXX
36App. 214 Subgrade PreparationXX
37App. 303, 306 Aggregate Base CourseXX
38App. 405 Asphalt Concrete Hot Mix Base CourseXXX
39App. m406 Asphalt Concrete Hot Mix Binder CourseXXX
40App. 407 Asphalt Concrete Hot Mix Surface CourseXXX
41App. 418 Slurry SealXXX
42App. 603 Maintenance of Traffic, Traffic Control Plan, Traffic Control SupervisorXXX
43App. 604 Traffic Control Devices in Construction ZonesXXXXX
44App. 606 Pipe CulvertsXXXX
45App. 609 Drop Inlets and Junction BoxesXXXX
46App. 610 Manholes, Drop Inlets and Junction Boxes Adjusted to GradeXXXX
47App. 611 Pipe Underdrains, Outlet Protectors, and CoversXXXX
48App. 625 Geotextile FabricXXX
49App. 633 Concrete Walks and Concrete StepsXXXXX
50App. 634 CurbingXXX
51App. 641 ABA RampsX
52App. 705 Loop Wiring DuctXXXXXX
53App. 718 Reflectorized Paint Pavement MarkingXXXXX
54App. 722 Plowable Pavement MarkingXXXX
55App. 726 Standard SignsXXXX
5632 13 13 6" & 8" CONCRETE PAVING (4,000 PSI)XXXX
5732 11 36 LOW COMPRESSION CONCRETE (2,500 PSI)XXXX
58Detectable Warning Safety Tiles 32 17 26XXXX

Schedule of Material Submittals Template, Feb 2010 (SAF/AQCP) AF FROM 66

File details come from the government source that posted it. Updated .