Attachment 10 - LRAFB Information .pdf

PDF 245 KB Posted

Attached to
Little Rock AFB Base Pavements IDIQ FY25 - Amendment 7
Solicitation number
FA446025R0002
Issued by

About this file

Attachment 10 is a document providing administrative information for a Little Rock Air Force Base (LRAFB) contract opportunity. The document outlines critical contractor requirements including installation access restrictions based on criminal history and specific smoking policies. The Installation Access Review Table details disqualifying criminal offenses with corresponding minimum years since conviction, ranging from 2-25 years depending on the offense type.

The document also addresses utilities services, indicating that essential utilities will be provided at no cost to the contractor, with temporary connections to be installed at the contractor's expense. Additional key provisions include a potential pre-performance conference requirement, mandatory participation in government energy conservation programs, and specific guidelines for payments for materials, which will be limited to major high-cost items and require case-by-case review by the Contracting Officer.

View the file

Other files

File Type Posted
Solicitation Amendment FA446025R00020004 SF 30.pdf PDF
Solicitation Amendment - FA446025R00020004.pdf PDF
Solicitation Amendment - FA446025R00020003.pdf PDF
Solicitation Amendment FA446025R00020003 SF 30.pdf PDF
Attachment 25 - Arnold Gate Q and A 2 Sep 25.pdf PDF
Attachment 22 - Arnold Gate Pavement Bid Schedule 2 Sep 25.xlsx XLSX spreadsheet
Attachment 1 - Base Pavements Bid Schedule NKAK 23-1030 27 Aug 25.xlsx XLSX spreadsheet
Solicitation Amendment - FA446025R00020002.pdf PDF
Solicitation Amendment FA446025R00020002 SF 30.pdf PDF
Attachment 1 - Base Pavements Bid Schedule NKAK 23-1030 26 Aug 2025.xlsx XLSX spreadsheet
Solicitation Amendment FA446025R00020001 SF 30 CO signed.pdf PDF
Attachment 22 - Arnold Gate Pavement Bid Schedule .xlsx XLSX spreadsheet
Attachment 23 - Installation Pest Management Plan Jul 2025 .pdf PDF
Solicitation Amendment - FA446025R00020001.pdf PDF
Attachment 12 - Specifications NKAK 23-1030 (1-4) Base Pavements IDIQ 26 Aug 2025.pdf PDF
Attachment 17 - NKAK 23-1040 Arnold Gate Description of Work 22 Aug 25.pdf PDF
Attachment 24 - Base Pavements IDIQ Q and A 26 Aug 25 .pdf PDF
Site Visit 1 NKAK 231030 Sign-in Roster - 7 Aug 2025.pdf PDF
Site Visit 2 NKAK 231030 Sign-in Roster - 12 Aug 2025.pdf PDF
Attachment 2 - Wage Determination AR20250152 White 3 Jan 25 .pdf PDF
Attachment 4 - Wage Determination AR20250171 Pulaski 3 Jan 25 .pdf PDF
Attachment 7 - Memo of Agreement Regarding Environmental Laws and Regulation .pdf PDF
Attachment 13 - Financial Institution Reference Sheet .pdf PDF
Attachment 17 - NKAK 23-1040 Arnold Gate Description of Work .pdf PDF
Attachment 19 - Undercut Drawings .pdf PDF
Attachment 14 - Sub-Contractor Consent Form .pdf PDF
Attachment 15 - Past Performance Questionnaire (PPQ)-15 May 2025 signed.pdf PDF
Attachment 18 - Fence Specifications .pdf PDF
Attachment 20 - Geotechnical Report .pdf PDF
Attachment 8 - Contractor Construction and Demolition Report .pdf PDF
Attachment 9 - AF103 LRAFB Instructions .pdf PDF
Solicitation - FA446025R0002.pdf PDF
Attachment 1 - Base Pavements Bid Schedule NKAK 23-1030 14 MAY 25 .xlsx XLSX spreadsheet
Attachment 3 - Wage Determination AR20250168 Lonoke 3 Jan 25 .pdf PDF
Attachment 5 - Base Pavements IDIQ- Material Submittal Schedule .xlsx XLSX spreadsheet
Attachment 6 - EMIS Contractor Instruction Guide .pdf PDF
Attachment 11 - Base Pavements Drawings 4 Oct 24 .pdf PDF
Attachment 12 - Specifications NKAK 23-1030 (1-4) Base Pavements IDIQ 15 May 2025 .pdf PDF
Attachment 16 - NKAK 23-1040 Arnold Gate Pavement Improvements RFP - signed.pdf PDF
Attachment 21 - Design Drawings .pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No.: FA446025R0002

Attachment 10

LRAFB Information

Smoking in Air Force Facilities

Contractors are advised that the Wing Commander has placed restrictions on the smoking of tobacco products in Air Force facilities. AFI 40-102, Tobacco Use in the Air Force outlines the procedures used by the commander to control smoking in our facilities. Contractor employees and visitors are subject to the same restrictions as government personnel. Smoking is permitted only in designated smoking areas.

Installation Access Review Table

Individuals will be denied entry to the base if they fall under one of the items in the below table:

Offense Type Description Minimum Date (In Years) Since Criminal Conviction

Active Wants/Warrants Until cleared Assault/Battery, Misdemeanor/Felony 2 / 10 Assault Aggravated 10 Assault: Milt/Civ Law Enforcer 5 Bomb Threat 10 Child Pornography 25 Drugs: Manufacture, Possess, Sell or Distribute 5 Firearm, Felony Offenses 2 Homicide 25 Criminal Acts With/To Child Felony 5 Criminal Acts With/To Child Misdemeanor 2 Kidnapping/Abduction (of an Adult) 25 Kidnapping: Child (Not Parent) 25 Known Gang/Hate Group Affiliation 10 Manslaughter 10 Other Felonies Not Listed Here 10 Prostitution/Solicitation Offenses 10 Rape 25 Registered Sex Offenders Until cleared Robbery, Armed 15 Terroristic Threatening, 2nd Degree/1st Degree 2/10 Theft, Misdemeanor/Felony 2 /10

NOTE: Individuals with unescorted access will have their unescorted privileges revoked upon learning of disqualifying information based on the Installation Access Review Matrix.

** Subject to Installation Policy Changes**

Solicitation No.: FA446025R0002

Attachment 10

Availability of Utilities Services

Notwithstanding the provisions of contract clause FAR 52.236-14, Availability and Use of Utility Services, all reasonable required amounts of water, gas, electricity, etc., essential to contract performance shall be made available, at no cost to the contractor, from existing systems, outlets, and supplies. All temporary connections, outlets, and distribution lines as may be required will be installed by the contractor at the contractor’s own expense.

Pre-Performance Conference

Offerors/bidders are hereby advised that if they are awarded a contract as a result of this solicitation, they may be required to appear at the 19th Contracting Squadron, 642 Thomas Ave, Little Rock AFB, AR 72099-4971 to attend a pre-performance conference prior to commencement of any work on the military installation.

Utilities Conservation

The contractor will be required to participate in government energy conservation programs. For the purpose of this contract, the government at no cost will furnish utilities such as water, electricity, etc., to the contractor. Long distance and Defense Switched Network (DSN) telephone services will not be provided.

PAYMENTS FOR MATERIALS

(a) The payment clause in construction contracts requires the Contracting Officer to make a case-by-case review of a contractor's need for progress payments for materials. Payment for materials will normally not be authorized. If they are authorized, they must be in accordance with paragraphs (b) and (c) below.

(b) It is not the policy of the Air Force to authorize payment for materials except when material represents a large, high cost, single line item(s) versus large quantities of small dollar materials.

Examples of low dollar value materials are lumber, paint, miscellaneous electrical or plumbing supplies, etc. To illustrate, the Air Force may authorize a large transformer valued at $20,000 for payment but will not authorize $17,000 worth of miscellaneous electrical components.

(c) Payment for materials will be limited to major high-cost items only. Work and materials must be stored on site and as such, become the property of the Government, but the contractor is responsible for all materials delivered and work performed until completion and acceptance of the entire construction work. Responsibility of safeguarding material until final inspection and acceptance rests with the contractor. Payment for materials in advance of installation must be made on a separate line item on the AF Form 3064, Contract Progress Schedule.

File details come from the government source that posted it. Updated .