Attachment 17 - NKAK 23-1040 Arnold Gate Description of Work .pdf

PDF 160 KB Posted

Attached to
Little Rock AFB Base Pavements IDIQ FY25 - Amendment 7
Solicitation number
FA446025R0002
Issued by

About this file

This document is a Delivery Order for the NKAK 23-1040 Arnold Gate Pavement Improvements project, part of an Indefinite-Delivery Indefinite-Quantity (IDIQ) contract for base pavements at Little Rock Air Force Base. The work involves comprehensive pavement renovation at the Arnold Gate entrance, including demolition of existing pavements, constructing a new entrance road with elevation matching Arkansas Department of Transportation (ARDOT) highway improvements, installing new security fencing, performing utility relocations, and implementing a new storm drainage system.

The project scope encompasses multiple construction activities such as concrete and asphalt demolition, site earthwork, excavation, soil backfill, pavement layer compaction, roadway and sidewalk construction, pavement marking, topsoil and sod installation, and storm sewer system installation. Notable specifications include replacing 20 5-gallon trees, potential subgrade undercut of 489 cubic yards, and extensive coordination required with ARDOT to minimize Arnold Gate entrance closure. The delivery order includes attachments like fence specifications, undercut drawings, a geotechnical report, and design drawings, with the overall goal of improving the base's entrance infrastructure while maintaining operational continuity.

View the file

Other files

File Type Posted
Solicitation Amendment FA446025R00020004 SF 30.pdf PDF
Solicitation Amendment - FA446025R00020004.pdf PDF
Solicitation Amendment - FA446025R00020003.pdf PDF
Solicitation Amendment FA446025R00020003 SF 30.pdf PDF
Attachment 22 - Arnold Gate Pavement Bid Schedule 2 Sep 25.xlsx XLSX spreadsheet
Attachment 25 - Arnold Gate Q and A 2 Sep 25.pdf PDF
Solicitation Amendment FA446025R00020002 SF 30.pdf PDF
Attachment 1 - Base Pavements Bid Schedule NKAK 23-1030 27 Aug 25.xlsx XLSX spreadsheet
Solicitation Amendment - FA446025R00020002.pdf PDF
Attachment 24 - Base Pavements IDIQ Q and A 26 Aug 25 .pdf PDF
Attachment 1 - Base Pavements Bid Schedule NKAK 23-1030 26 Aug 2025.xlsx XLSX spreadsheet
Solicitation Amendment FA446025R00020001 SF 30 CO signed.pdf PDF
Attachment 22 - Arnold Gate Pavement Bid Schedule .xlsx XLSX spreadsheet
Attachment 23 - Installation Pest Management Plan Jul 2025 .pdf PDF
Solicitation Amendment - FA446025R00020001.pdf PDF
Attachment 12 - Specifications NKAK 23-1030 (1-4) Base Pavements IDIQ 26 Aug 2025.pdf PDF
Attachment 17 - NKAK 23-1040 Arnold Gate Description of Work 22 Aug 25.pdf PDF
Site Visit 1 NKAK 231030 Sign-in Roster - 7 Aug 2025.pdf PDF
Site Visit 2 NKAK 231030 Sign-in Roster - 12 Aug 2025.pdf PDF
Solicitation - FA446025R0002.pdf PDF
Attachment 1 - Base Pavements Bid Schedule NKAK 23-1030 14 MAY 25 .xlsx XLSX spreadsheet
Attachment 3 - Wage Determination AR20250168 Lonoke 3 Jan 25 .pdf PDF
Attachment 5 - Base Pavements IDIQ- Material Submittal Schedule .xlsx XLSX spreadsheet
Attachment 6 - EMIS Contractor Instruction Guide .pdf PDF
Attachment 11 - Base Pavements Drawings 4 Oct 24 .pdf PDF
Attachment 12 - Specifications NKAK 23-1030 (1-4) Base Pavements IDIQ 15 May 2025 .pdf PDF
Attachment 16 - NKAK 23-1040 Arnold Gate Pavement Improvements RFP - signed.pdf PDF
Attachment 21 - Design Drawings .pdf PDF
Attachment 2 - Wage Determination AR20250152 White 3 Jan 25 .pdf PDF
Attachment 4 - Wage Determination AR20250171 Pulaski 3 Jan 25 .pdf PDF
Attachment 7 - Memo of Agreement Regarding Environmental Laws and Regulation .pdf PDF
Attachment 13 - Financial Institution Reference Sheet .pdf PDF
Attachment 19 - Undercut Drawings .pdf PDF
Attachment 14 - Sub-Contractor Consent Form .pdf PDF
Attachment 15 - Past Performance Questionnaire (PPQ)-15 May 2025 signed.pdf PDF
Attachment 18 - Fence Specifications .pdf PDF
Attachment 20 - Geotechnical Report .pdf PDF
Attachment 8 - Contractor Construction and Demolition Report .pdf PDF
Attachment 9 - AF103 LRAFB Instructions .pdf PDF
Attachment 10 - LRAFB Information .pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Controlled by: 19 CES/CEN CUI Category: SP-PROCURE Distribution/Limited Dissemination Control: FED POC: James Shelden, 501-987-1085

CUI

BLACK KNIGHTS…MOVE OUT!

Delivery Order

CONTRACT NO.

IDIQ, BASE PAVEMENTS, NKAK 23-1030

DELIVERY ORDER NO.

DESCRIPTION OF WORK: NKAK 23-1040 Arnold Gate Pavement Improvements

The work shall consist of furnishing all plant, labor and material in performing all operations in connection with concrete slab replacements. All work shall be completed in strict accordance with the specifications and drawings of NKAK 23-1040 Arnold Gate Pavement Improvements.

The work includes demolition of existing pavements in the vicinity of the Arnold Gate Entrance.

Construction of a new entrance road at Arnold Gate. New pavement elevation will match proposed ARDOT improvements on Highway 107. Work shall also include the removal and installation of new security fencing to maintain a secure perimeter. Miscellaneous utility construction and relocations as shown on the construction plans. Installation of new storm drainage system and retention structure(s) as shown on the plans.

In lieu of the requirement for tree replacements per 32 93 01 para 3.08 Tree Replacement, this project will only include replacement of 20 5-gallon trees.

Possible undercut may be required depending on results of a proof roll of the subgrade. Include 489 CY of undercut in proposal. See attached drawings that shows undercut section details.

Includes excavation, 3” base and geotextile fabric line items.

This project will require LRAFB and the IDIQ Contractor to do extensive coordination with ARDOT and their selected Contractor to finalize delineation and timing of our project with ARDOT’s project. This may cause this project to have to be phased. The goal is to minimize closure of Arnold Gate entrance.

Construction will generally consist of:

1. Concrete and asphalt demolition

2. Site earthwork

3. Excavation of existing base, subbase, and undercut of unsuitable subgrade

4. Soil backfill and placement of new base and subbase

5. Compaction of pavement layers

6. Roadway and sidewalk construction

7. Pavement marking and signage

8. 4” top soil and Sod installation

9. Installing new storm sewer system

10. SWPPP, silt fence, etc.

11. Tree replacement

Controlled by: 19 CES/CEN CUI Category: SP-PROCURE Distribution/Limited Dissemination Control: FED POC: James Shelden, 501-987-1085

BLACK KNIGHTS…MOVE OUT!

12. Subgrade preparation

13. GIS, asbuilts

14. Proof roll subgrade, Undercut (489 CY)

15. Installing security fence (non-priced item, NPI)

16. 18” curb and gutter (NPI)

17. Demo of existing fence as shown on drawings (NPI)

18. Welcome sign

19. Clearing and Grubbing (6” to 24” in diameter

20. Tree Replacement (20 5-gallon trees)

ITEM LOCATION AMOUNT

1 ARNOLD GATE PAVEMENT $

ATTACHMENTS:

18. Fence Specifications

19. Drawings showing section of undercut

20. Geotechnical Report

21. Design Drawings