Attachment 19 - Undercut Drawings .pdf

PDF 316 KB Posted

Attached to
Little Rock AFB Base Pavements IDIQ FY25 - Amendment 7
Solicitation number
FA446025R0002
Issued by

About this file

This document is a detailed engineering drawing for pavement repair and construction at Little Rock Air Force Base in Arkansas. The drawing specifies a full depth asphalt repair section with multiple layers: a 2-inch asphalt concrete hot mix surface course, a 4-inch asphalt concrete hot mix binder course, a 12-inch Class 7 crushed stone base course, and an undercut section. The specification requires compaction to 95% standard Proctor, use of geotextile fabric (Mirafi 180N or equal), and a tack coat with full surface coverage. The contract includes an estimated 1,631 cubic yards of undercut, and key notes emphasize the need for traffic control, proof roll subgrade testing in the presence of a base engineer, and adherence to Arkansas Department of Transportation (ARDOT) standard specifications.

View the file

Other files

File Type Posted
Solicitation Amendment FA446025R00020004 SF 30.pdf PDF
Solicitation Amendment - FA446025R00020004.pdf PDF
Solicitation Amendment - FA446025R00020003.pdf PDF
Solicitation Amendment FA446025R00020003 SF 30.pdf PDF
Attachment 22 - Arnold Gate Pavement Bid Schedule 2 Sep 25.xlsx XLSX spreadsheet
Attachment 25 - Arnold Gate Q and A 2 Sep 25.pdf PDF
Solicitation Amendment FA446025R00020002 SF 30.pdf PDF
Solicitation Amendment - FA446025R00020002.pdf PDF
Attachment 1 - Base Pavements Bid Schedule NKAK 23-1030 27 Aug 25.xlsx XLSX spreadsheet
Attachment 24 - Base Pavements IDIQ Q and A 26 Aug 25 .pdf PDF
Attachment 22 - Arnold Gate Pavement Bid Schedule .xlsx XLSX spreadsheet
Attachment 23 - Installation Pest Management Plan Jul 2025 .pdf PDF
Solicitation Amendment - FA446025R00020001.pdf PDF
Attachment 1 - Base Pavements Bid Schedule NKAK 23-1030 26 Aug 2025.xlsx XLSX spreadsheet
Solicitation Amendment FA446025R00020001 SF 30 CO signed.pdf PDF
Attachment 12 - Specifications NKAK 23-1030 (1-4) Base Pavements IDIQ 26 Aug 2025.pdf PDF
Attachment 17 - NKAK 23-1040 Arnold Gate Description of Work 22 Aug 25.pdf PDF
Site Visit 1 NKAK 231030 Sign-in Roster - 7 Aug 2025.pdf PDF
Site Visit 2 NKAK 231030 Sign-in Roster - 12 Aug 2025.pdf PDF
Solicitation - FA446025R0002.pdf PDF
Attachment 1 - Base Pavements Bid Schedule NKAK 23-1030 14 MAY 25 .xlsx XLSX spreadsheet
Attachment 3 - Wage Determination AR20250168 Lonoke 3 Jan 25 .pdf PDF
Attachment 5 - Base Pavements IDIQ- Material Submittal Schedule .xlsx XLSX spreadsheet
Attachment 6 - EMIS Contractor Instruction Guide .pdf PDF
Attachment 11 - Base Pavements Drawings 4 Oct 24 .pdf PDF
Attachment 12 - Specifications NKAK 23-1030 (1-4) Base Pavements IDIQ 15 May 2025 .pdf PDF
Attachment 16 - NKAK 23-1040 Arnold Gate Pavement Improvements RFP - signed.pdf PDF
Attachment 21 - Design Drawings .pdf PDF
Attachment 14 - Sub-Contractor Consent Form .pdf PDF
Attachment 15 - Past Performance Questionnaire (PPQ)-15 May 2025 signed.pdf PDF
Attachment 18 - Fence Specifications .pdf PDF
Attachment 20 - Geotechnical Report .pdf PDF
Attachment 2 - Wage Determination AR20250152 White 3 Jan 25 .pdf PDF
Attachment 4 - Wage Determination AR20250171 Pulaski 3 Jan 25 .pdf PDF
Attachment 7 - Memo of Agreement Regarding Environmental Laws and Regulation .pdf PDF
Attachment 13 - Financial Institution Reference Sheet .pdf PDF
Attachment 17 - NKAK 23-1040 Arnold Gate Description of Work .pdf PDF
Attachment 8 - Contractor Construction and Demolition Report .pdf PDF
Attachment 9 - AF103 LRAFB Instructions .pdf PDF
Attachment 10 - LRAFB Information .pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12" OF CLASS 7 CRUSHED STONE BASE COURSE

(STANDARD SPECIFICATIONS FOR HIGHWAY

CONSTRUCTION, SECTION 303) COMPACTED TO

95% STANDARD PROCTOR (ASTM D698)

AP

PR

O X.

6"

TACK COAT, AHTD SPEC SECTION 401

FULL SURFACE COVERAGE

FULL DEPTH ASPHALT REPAIR SECTION DETAIL

UNDERCUT AS REQUIRED BY PROOF ROLL TEST

APPROX. 18" OF 3" BASE. DENSITIES REQUIRED PER

CLASS 7 BASE COURSE REQUIREMENTS.

GEOTEXTILE FABRIC - MIRAFI 180N OR EQUAL, TYPE 1,

MINIMUM 12" LAPS SHALL BE PLACED UNDER THE 3"

BASE.

2" ASPHALT CONCRETE HOT MIX

SURFACE COURSE (ARDOT

STANDARD SPECIFICATIONS

SECTION 407, 1/2-INCH, PG-70-22)

4" ASPHALT CONCRETE HOT MIX

BINDER COURSE (ARDOT

STANDARD SPECIFICATIONS

SECTION 406, 1-INCH, PG-70-22)

NOTES:

1. PROVIDE ALL TRAFFFIC CONTROL AS REQUIRED.

2. PROOF ROLL SUBGRADE PRIOR TO PLACEMENT OF

BASE COURSE IN PRESENCE OF BASE ENGINEER.

UNDERCUT

3. THIS CONTRACT INCLUDES AN ESTIMATED 1631

CUBIC YARDS OF UNDERCUT.

C1

AutoCAD SHX Text

BY

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

TECH REVIEWER

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

PROJECT NUMBER

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

LEAD DESIGNER

AutoCAD SHX Text

SHEET TITLE

AutoCAD SHX Text

PROJECT TITLE

AutoCAD SHX Text Revision/Issue

AutoCAD SHX Text Date

AutoCAD SHX Text

ARKANSAS

AutoCAD SHX Text

APP'D

AutoCAD SHX Text

LITTLE ROCK A.F.B.

AutoCAD SHX Text

CONSTRUCT ARNOLD GATE PAVEMENTS

AutoCAD SHX Text

NKAK 23-1040

AutoCAD SHX Text

ARNOLD PAVEMENT SECTION

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AS SHOWN

Sheets and Views
ARNOLD REPAIR

File details come from the government source that posted it. Updated .