B700 Pre-Proposal Questions and Answers.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Repair Maintenance Hanger, Bldg 700 Federal contract opportunity
Solicitation number
FA441821R0015
Issued by
Department of the Air Force Air Mobility Command

About this file

This document contains questions and answers regarding Solicitation Number FA4418-21-R-0015 for repair and maintenance of Hangar B700 at an Air Force base. Required work includes repairing and replacing asphalt paving, installing new structural columns and foundations, and performing lead and asbestos abatement. Ductwork must meet specifications for double wall rectangular duct. Unit heater hydronic values require sizing for 85 GPM. The location of new valves and temperature sensors is provided in an attachment. The response due date was extended to August 2nd due to material pricing and availability challenges related to the COVID-19 pandemic.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Maintenance Hanger, Bldg 700, newest first.
File Type Posted
23 of 56 - A101 - FLOOR PLANS - 1 STORY AREA Rev 01 2021-07-13 (Q10).pdf PDF
17 of 56 - AD100 - DEMOLITION PLAN Rev 01 2021-07-13 (Q10).pdf PDF
8 of 056 - S201 - Typical Foundation Details Rev 01 2021-07-13.pdf PDF
5 of 056 - S000 - General Notes Rev 01 2021-07-13 (Q13).pdf PDF
B700 Pre-Proposal Questions and Answers 27 Jul 2021.xlsx XLSX spreadsheet
Solicitation Amendment FA441821R00150002 SF 30.pdf PDF
22 of 056 - A100 - FIRST FLOOR PLAN Rev 01 2021-07-13.pdf PDF
18 of 56 - AD120 - DEMOLITION CEILING PLAN Rev 01 2021-07-13.pdf PDF
01 30 00 Rev01 2021-07-15.pdf PDF
Roofing Q19.pdf PDF
6 of 056 - S101 - Foundation Plan Rev 01 2021-07-13 (Q7 and Q10).pdf PDF
Q and A Attachment 2 Answer to Question 16.png PNG image
Q and A Attachment 1 233113 Metal Ducts - Rectangular Double Wall.pdf PDF
Solicitation Amendment FA441821R00150001 SF 30.pdf PDF
JB Charleston - Offeror Inquiry Form FA44182R0015.xlsx XLSX spreadsheet
Attachment 9 Past Performance Questionnaire.pdf PDF
Attachment 1 Specs Repair Aircraft Maint Hangar B700.pdf PDF
Solicitation - FA441821R0015 FINAL.pdf PDF
Attachment 7 WD SC20210023.pdf PDF
Attachment 6 Asbestos and Lead Based Paint Survey Report.pdf PDF
Attachment 5 Repair Aircraft Maint Hangar Fire Systems B700 Drawing Set.pdf PDF
Attachment 4 Design Narrative Repair Aircraft Maint Hangar Fire Systems B700.pdf PDF
Attachment 3 Repair Aircraft Maint Hanger Drawing Set.pdf PDF
Attachment 2 Design Narrative Maintenance Hangar B700.pdf PDF
Attachment 8 Green Procurement Form.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 JB Charleston Bidder Inquiry Form DKFX 1051184 EXPLANATION TO PROSPECTIVE BIDDERS (APR 1984) Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all prospective bidders before the submission of their bids. Oral explanations or instructions given before the award of a contract will not be binding. Any information given a prospective bidder concerning a solicitation will be furnished promptly to all other prospective bidders as an amendment to the solicitation, if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective bidders. (Reference FAR 52.214-6)

Solicitation NumberFA4418-21-R-0015
Project Name:Rpr. Maintenance Hangar B.700
#Specification Reference (Section & Paragraph Reference, i.e. 23 00 00, para 1.3)Drawing Reference (Sheet and Detail or Note Reference, i.e. M-101, Detail 2)Solicitation Reference (Section, paragraph, sub-paragraph Reference, i.e. Section M, Paragraph 2.3)Attachments or Other (i.e. Submittal Register, Wage Determination, Site Visit Note, etc.)
1Question
00 31 26 para 1.2Spec section 00 31 26 para 1.2 Proposers Responsibility states that the document produced by S&ME is for the Proposers information. The Government shall not be responsible for any interpretation of, or conclusion drawn from , the data or information by the proposer. Is the successful offerer to propose to complete a full lead and asbestos survey on the facility?
Answer
A survey for the presence of Lead/Asbestos is required in all areas that will be affected by work on the project. The contractor shall remove/dispose of material in accordance with all laws and regulations.
2Question
01 45 00 1.5.1.2Spec section 01 45 00 para 1.5.1.2 states that an individual with a minimum 10 years combined experience as a Superintendent, inspector, QC Manager, or Construction Manager on similar size and type consturction. Will the government entertain an individual with 5 years experience?
Answer
Bid in accordense with contract documents.
3Question
01 45 35SD-01 Preconstruction Submittals calls for the submission of a Special Insections Project Manual. Is there an example of this available?
Answer
Referrence page 199, Schendule of Special Inspection Services
4Question
01 50 00, para 2.2.2, and, 3.5.3Spec 01 50 00 para 2.2.3a. Enclose the entire contractor lay-down area with a 8ft high chain link fence and gates with brown, UV light resistant, plastic mech netting (similar to tennis court or other screening) Remove the fence upon completion and aceptance of the work. Intent is to bloc (screen) public view of construction. Para 3.5.3 calls for 6' high chain link fence around trailers and materials. Inculde plastic strip inserts colored brown, so that visibility through the fenc is obstructed. Can mesh fabric screen be used in lieu of plastic inserts? Is fence required to be 6ft or 8ft high? Since alot of the work will be abouve the height of the fence wouldbarriers be better solution? Fences on the fligh line are huge wind catchers and difficult to maintain.
Answer
1. If the contractor proposed material is of equal or better quality, the contractor may use the proposed material. 2. Bid in accordense with contract documents. 3. Bid in accordense with contract documents.
5Question
03 30 00 1.6.7Spec 03 30 00 1.6.7 States submit American Concrete Institute Certification for the Following: A) cqc personnel responsible for insepction of concrete operations. B) Lead forman or Journeyman of the Concrete Placing, Finishing, and Cring Crews. C) Field Testing Technicians: ACI Concrete Field Testing Technician, Grade I. Can this be part of the special inspections? Can this inspection be completed by the regular QC Manager?
Items A, B, and C are not part of the Special Inspection Services (referrence page 345). QC Manager must meet the qualifications in section 03 30 00 1.6.7.1 Quality Manager Quaificatoins.
6Question
03 30 00 1.6.7.1Spec 03 30 00 1.6.7.1 States the quality manager must hold a curent license as a professional engineeer in a U.S. State or territory with experieince on at at least (5) similer projects. Will someone with experience without a PE be accepted?
Answer
Bid in accordense with contract documents.
7Question
S-101, Spread Footing ScheduleSheet S-101 Spread Footing Schedule has no information provided in it. Will a Spread Footing Schedule be Provided?
Answer
JBC will contact the designer for the schedule.
8Question
05 50 13, Para2.3S102Spec 05 50 13 Para 2.3 states design steel grating in accordance with NAAMM MGB 531NAAMM MBG 532 for bar type grating or manufactureres charts for plang grating. Galvanize steel floor gratings. Sheet S102 states Provide 1- 1/4" open metal grating (HDG). Non-Serated. Grating loading req's = 150-PSF LL, 300-LB concentrated load at any point. Is a engineered design required for this material?
Answer
Contract must verify Floor Gratings is in accordance with NAAM MBG 531NAAMM MBG 532.
9Question
09 90 00 Para 1.3.2Spec 09 90 00 Para 1.3.2 states all contractors and subcontractors that perform surface preparation or coating application shall be certified by the Society fro Protective Coatings to the requirements of SSPC QP1 prior to contract award and shall remain certified while accomplishing any surface preparation or coating applicaiton. Is this required for all painting?
Answer
Yes
10Question
Sheet S101, Note 102Sheet 101, Note 102 States remove and replace existing asphalt paving as needed to install new columns and foundations. Provide new asphalt to match existing adjacent asphalt. Coordinate with Arch'ls and civil for slopes and drainage requirements. There are no civil drawings included with the bid documents. Will one be provided? There is existing vegetation in the area that will likely need to be removed as well as existing bollards, a vent pipe, and pit with lid, none of which are not shown on the plans. Are the bollards to remain and the footings and slab be poured around them?
Answer
JBC will contact the designer for the answer.
11Question
Sheet S000, Post Installed Structural Notes #1Sheet S000 Post Installed Structural Anchors, Note 1. All post installed structural anchors shall conform to specification section 050520="post installed structural anchors". I don't see this section in the bid documents please clarify.
Answer
JBC will contact the designer for Specificatio Section 05 05 20.
12Question
Sheet S000, Contractor Notes, Note #7Sheet S000, Contractor Notes, Note7. All Flashing and Waterproofing is by others, not apart of ADC's Scope of Work. Is this a part of another scope?
Answer
Yes
13Question
Sheet S000 Stuctural Steel Framng Note #3.Sheet S000, Structural Steel Framing, Note 3. States All Architecturally Exposed Structural Steel (AESS) Shall conform to specification section 051213-"Architecturally exposed structural steel framing" This spection is not in the bid documents.
Answer
JBC will contact the designer for Specificatio Section 05 12 13 Architecturally Exposed Structural Steel Framing.
14Question
•Attachment 2 Design Narrative Maintenance Hangar B700
•Attachment 1 Specs Repair Aircraft Maint Hangar B700Question 1: See attachment 2; page 41 of 62 “Exposed ductwork shall be double wall with a solid inner core and 1” liner insulation”. The Exposed duct in Building 700 (See drawing M501 for example) is rectangular.Attachment 1 Division 23 only provides specifications for “Double Wall Round Duct”Please provide specification for “Double Wall Rectangular Duct”
•Attachment 1 Specs Repair Aircraft Maint Hangar B700Answer
Specificaton for "Double Wall Rectangular" will be provided.
15Question
Can you please provide GPMs for the existing unit heaters for appropriate control valve sizing?
Answer
As-builts indicate Unit Heater hydronic heating value at 85 GPM.
16Question
On M101, note 1, it says "Provide new valves, temperature sensors go. Can you please expain where these will be located.
Answer
See Attachment.
17Question
SF 1442, #13Several manufacturers that produce what is necessary to produce the hanger suppression ugrades are either shutting down or going to skeleton shifts next week and not reopening with full support until the 5th, with this in mind we do not believe there is enough time between now and the 5th to get all material pricing needed. Is the government willing and or able to post-pone solicitation bid date?
Answer
Yes, see amendent # 1. Extending the due date form July 14 to August 2.
18Question

Answer

19 Question

Answer

File details come from the government source that posted it. Updated .