5 of 056 - S000 - General Notes Rev 01 2021-07-13 (Q13).pdf
PDF 496 KB Posted
- Attached to
- Repair Maintenance Hanger, Bldg 700
- Solicitation number
- FA441821R0015
About this file
This document package includes general notes and drawings related to structural steel repairs for an aircraft maintenance hangar at Joint Base Charleston, along with the corresponding federal contract opportunity notice. The structural steel repair project involves repairing the existing aircraft maintenance hangar building 700 at Joint Base Charleston for the Department of the Air Force Air Mobility Command. The general notes and drawings provide design criteria, material specifications, welding and anchoring requirements, and other technical details for the structural steel repairs. The federal contract opportunity is solicited under solicitation number FA441821R0015 and involves repairing the aircraft maintenance hangar building 700 at an unspecified price. Responses are due on an unspecified date with award anticipated at an unspecified future date.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TCX TOP CHORD EXTENSION
E0S EDGE OF SLAB
OUT TO OUT
OUTSIDE DIAMETER
OUTSIDE FACE
ON CENTER
OPENING
PLATE
OPPOSITE
OPEN WEB
POWDER ACTUATED FASTENER
POUNDS PER LINEAL FOOT
RADIUS
REFERENCE
RIGHT
RADIUS POINT
ROOF TOP UNIT
REVISION
RETURN
REINFORCEMENT
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
PRESSURE TREATED
PROJECTION
O/O
OPNG
OC
OF
OD
OPP
0W
PLF
PAF
PL
ADJ
AB
AHU
AFF
ALUM
BUILDING
ARCH
APPD
B/
BLDG
APPROX
ALT
APPROXIMATE
APPROVED
ALTERNATE
ALUMINUM
ADJACENT
BOTTOM OF
ARCHITECT
AIR HANDLING UNIT
ABOVE FINISHED FLOOR
ANCHOR BOLT
PT
PSF
PSI
REF
RAD
RP
REV
RET
RTU
RT
BOTTOM
BEARING
BETWEEN
BLOCK
BRG
BOT
BRDG
BTWN
BLK
CLEAR
COLUMN
CHAM
CIRC
C/C
CLR
COL
CMU
CJ
CANT
BRIDGING
CANTILEVER
CONTROL JOINT
CIRCULAR
CHAMFER
CONCRETE MASONRY UNITS
CENTER TO CENTER
BEAMBM
PROJ
REINF
SLAB BOLSTER
STEP FOOTING
SPECIFICATIONS
SCHEDULE
SECTION
SIMILAR
SLEEVE ANCHOR
STEEL
STAINLESS STEEL
STANDARD
STIFFENERS
SPACING,ES
SQUARE
SHORT SLOTTED HOLES
TOP OF
SYMMETRICAL
TOP AND BOTTOM
TIE BEAM
TIE COLUMN
TYPICAL
TUBE STEEL
TRANSVERSE
TEMPORARY
UNLESS NOTED OTHERWISE
SB
SA
SIM
SPEC
SF-
SECT
SSL
SQ
SP
STIFF
STL
STD
SS
CONST
CONN
CONC
CTRD
COORD
CONTR
CONT
DOUBLE
DEPTH
DETAIL
D
DBL
DIA
DIM
DIAG
DET
CONSTRUCTION
COORDINATE
CONTINUOUS
CONTRACTOR
CENTERED
DIMENSION
DIAGONAL
DIAMETER
CONNECTION
CONCRETE
SYMM
TC
T&B
TB
T/
TYP
TS
TRAN
UNO
TEMP
EACH
EAST
DWGS
EB
EF
EA
E
EQUAL
EL
ELEV
EMBED
EJ
EQ
ENGR
EQUIP
DRAWINGS
EXPANSION BOLT
EACH FACE
EMBEDMENT
EQUIPMENT
ELEVATOR
ENGINEER
ELEVATION
EXPANSION JOINT
DEAD LOADDL
SCHED
WEST
WITH
WITHOUT
VERTICAL
WEIGHT
WORK POINT
WELDED WIRE MESH
W
VERT
W/ W/O
WT
WWM
WP
EXISTING
EXP
EW
ES
EXT
EXIST
FINISH
FLOOR
FEET
FOOTING
FRAMING
FF
FLR
FIN
FTG
FRMG
FT
FDN
FC
EXTERIOR
EXPANSION
FILLED CELL
EACH WAY
FOUNDATION
FINISHED FLOOR
EACH SIDE
GAUGE
FV
GA
GALV
HORIZ
HEIGHT
INCH
HSB
HT
IF
IN
ID
HSA
HORIZONTAL
GALVANIZED
INSIDE DIAMETER
INSIDE FACE
HIGH STRENGTH BOLT
HEADED STUD ANCHOR
FIELD VERIFY
EQUIVALENTEQUIV
SOUTHS
INTERIOR
LONG
POUND
INCL
INT
LL
LG
LB
LIGHT
LLV
LLH
LONG
LTWT
LT
LSL
LLBB
INCLUDE, ING
LIVE LOAD
LIGHTWEIGHT
LONGITUDINAL
LONG LEG BACK TO BACK
LONG SLOTTED HOLES
LONG LEG VERTICAL
LONG LEG HORIZONTAL
MINIMUM
MIDDLE
MAX
MAS
MECH
MID
MIN
MFR
MEZZ
NOMINAL
NUMBER
NORTH
MJ
MISC
MO
NOM
NO
NIC
N
MANUFACTURER
MEZZANINE
MECHANICAL
MAXIMUM
MASONRY
MASONRY JOINT
MISCELLANEOUS
NOT IN CONTRACT
MASONRY OPENING
NTS
NS
NOT TO SCALE
NEAR SIDE
AESS ARCHITECTURALLY EXPOSED STRUCTURAL STEEL
ABBREVIATIONS:
JOIST BEARING ELEVATIONJBE
DECK BEARING ELEVATIONDBE
1. FOUNDATION DESIGN VALUES:
ALLOWABLE BEARING CAPACITY 2000-PSF (FROM EXIST AS-BUILT
DWG'S)
2. GRAVITY LOAD DESIGN VALUES: IBC-2015 / ASCE 7-10 / IEBC-2015
LIVE LOADS:
GRATING 150-PSF
ROOF LIVE LOADS:
FLAT ROOF 30-PSF
GROUND SNOW LOADS:
SNOW 5-PSF
DEAD LOADS:
ACTUAL MATERIAL WEIGHTS PER ASCE 7-10, SEE
ARCHITECTURAL DRAWINGS FOR ROOF, WALL, AND FLOOR
CONSTRUCTION
3. SEISMIC DESIGN VALUES: IBC-2015 / ASCE 7-10 / IEBC-2015
Ss = 1.50 g S1 = 0.50 g Sds = 1.00 g Sd1 = 0.50 g
SITE CLASS: "D" (ASSUMED)
BUILDING RISK CATEGORY: "IV"
IMPORTANCE FACTOR: Ie = 1.5
SEISMIC DESIGN CATEGORY: "D"
ANALYSIS PROCEDURE: EQUIVALENT LATERAL FORCE METHOD
SEISMIC FORCE RESISTING SYSTEM:
-ORDINARY REINFORCED MASONRY SHEAR WALLS
RESPONSE MODIFICATION FACTOR: R = 2
DEFLECTION AMPLIFICATION FACTOR: Cd = 1.75
SYSTEM OVERSTRENGTH FACTOR: OMEGA = 2.5
-ORDINARY STEEL CONCENTRICALLY BRACED FRAMES
RESPONSE MODIFICATION FACTOR: R = 3.25
DEFLECTION AMPLIFICATION FACTOR: Cd = 3.25
SYSTEM OVERSTRENGTH FACTOR: OMEGA = 2
ALLOWABLE INTERSTORY DRIFT: 0.02 Hsx
4. WIND LOAD DESIGN VALUES: IBC-2015 / ASCE 7-10 / IEBC -2015
V = 154 mph (3-sec gust)
BUILDING RISK CATEGORY: "IV"
IMPORTANCE FACTOR: I = 1.00
EXPOSURE CATEGORY: "C"
ENCLOSURE CLASSIFICATION: OPEN
WIND DIRECTIONALITY FACTOR: Kd = 0.85 TOPOGRAPHIC FACTOR: Kzt = 1.0 VELOCITY EXPOSURE COEFFICIENT: Kz = 0.85 VELOCITY PRESSURE (ULTIMATE): q(ult) = 43.87-PSF VELOCITY PRESSURE (ASD): q(asd) = 26.32-PSF
INTERNAL PRESSURE COEFFICIENT: GCpi = +/- 0.18
ALLOWABLE INTERSTORY DRIFT: 0.0025 Hsx
STRUCTURAL DESIGN CRITERIA GENERAL NOTES
1. STRUCTURAL DRAWINGS ARE TO BE USED IN CONJUNCTION WITH THE ENTIRE SET OF PROJECT DRAWINGS, PROJECT MANUAL, AND ALL SHOP DRAWING SUBMITTALS.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING AND COORDINATING DIMENSIONS, CLEARANCES AND
ALL OTHER COORDINATION ISSUES WITH OTHER TRADES.
3. IN CASE OF CONFLICT BETWEEN VARIOUS STRUCTURAL DRAWINGS, STRUCTURAL PLANS, OR STRUCTURAL
DETAILS THE MORE STRINGENT SHALL GOVERN. THE CONTRACTOR SHALL MAKE ALLOWANCE IN HIS BID
FOR THE MORE COSTLY CONDITION.
4. IN CASE OF CONFLICT BETWEEN DRAWINGS, DRAWING NOTES, AND SPECIFICATIONS THE MORE STRINGENT
SHALL GOVERN. THE CONTRACTOR SHALL MAKE ALLOWANCE IN HIS BID FOR THE MORE COSTLY
CONDITION.
5. WORK NOT INDICATED ON THE DRAWINGS, BUT REASONABLY IMPLIED TO BE SIMILAR TO THAT SHOWN AT
CORRESPONDING PLACES SHALL BE REPEATED.
6. ALL NOTES, DETAILS AND SECTIONS ARE INTENDED TO BE TYPICAL FOR THE GENERAL CONDITIONS INDICATED OR REFERENCED. ALL NOTES, DETAILS AND SECTIONS SHALL APPLY TO ANY SIMILAR SITUATION THROUGHOUT THE ENTIRE PROJECT UNLESS A SEPARATE NOTE, DETAIL OR SECTION IS PROVIDED.
7. REVIEW ALL PROJECT DOCUMENTS PRIOR TO FABRICATION AND START OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE OWNER OR OWNER'S REPRESENTATIVE PRIOR TO PROCEEDING WITH WORK.
8. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROTECT EXISTING AND IN PLACE WORK OR UTILITIES DURING
CONSTRUCTION
9. COORDINATE STRUCTURAL DRAWINGS WITH OTHER CONTRACT DRAWINGS, SPECIFICATIONS, OR SHOP
DRAWINGS WHICH MAY AFFECT THE STRUCTURAL WORK.
10. USE OF REPRODUCED CONTRACT DRAWINGS IN PART OR WHOLE FOR THE PURPOSE OF SHOP DRAWING PREPARATION SHALL NOT RELIEVE THE CONTRACTOR OR SUBCONTRACTOR FROM THE REQUIREMENT TO ACCURATELY LAYOUT, COORDINATE, DETAIL, FABRICATE AND INSTALL A COMPLETE STRUCTURE.
11. ALL SUBMITTALS SHALL BE REVIEWED BY THE SUBCONTRACTOR AND CONTRACTOR FOR CONFORMANCE TO THE CONTRACT DOCUMENTS, FOR COMPLETENESS, AND TO RESPOND TO CONTRACTOR COORDINATION RELATED QUESTIONS PRIOR TO SUBMITTING FOR APPROVAL. ALL SHEETS SHALL BE STAMPED AND INITIALED BY THE CONTRACTOR INDICATING SUCH A REVIEW HAS BEEN COMPLETED PRIOR TO ISSUING
SUBMITTAL FOR APPROVAL.
12. CONTRACTOR SHALL MAKE NO DEVIATIONS FROM THE CONTRACT DOCUMENTS WITHOUT WRITTEN
APPROVAL.
13. ALL ELEVATIONS INDICATED IN STRUCTURAL DRAWINGS ARE IN REFERENCED TO A GROUND FLOOR FINISHED SLAB ELEVATION OF 0'-0" UNLESS NOTED OTHERWISE. SEE CIVIL FOR GROUND FLOOR FINISHED
SLAB ELEVATION.
14. ALL EXTERIOR COMPONENTS ARE SUBJECT TO COMPONENTS AND CLADDING LOADING AS DIRECTED BY THE IBC. IT IS THE G.C. AND COMPONENT MANUFACTURER'S RESPONSIBILITY TO ENSURE ALL COMPONENTS HAVE BEEN DESIGNED AND/OR TESTED TO MEET THE COMPONENTS AND CLADDING LOADING SPECIFIC TO
THIS SITE AS REQUIRED BY THE IBC.
STRUCTURAL STEEL FRAMING
1. ALL STRUCTURAL STEEL FRAMING SHALL CONFORM TO SPECIFICATION SECTION 051200-"STRUCTURAL
STEEL FRAMING".
2. ALL STRUCTURAL STEEL FRAMING AND ARCHITECTURALLY EXPOSED STRUCTURAL STEEL FRAMING SHALL
CONFORM TO SPECIFICATION SECTION 051200-"STRUCTURAL STEEL FRAMING".
3.
4. ALL STRUCTURAL STEEL ERECTION SHALL COMPLY WITH AISC 360-10 AND AISC 303-10.
5. CUTS OR BURNING OF HOLES IN STRUCTURAL STEEL MEMBERS IN THE FIELD WILL NOT BE PERMITTED.
6. THE CONTRACTOR SHALL PROVIDE TEMPORARY BRACING OR GUYS TO PROVIDE LATERAL SUPPORT OF THE
STRUCTURAL STEEL UNTIL THE PERMANENT LATERAL FORCE RESISTING SYSTEM IS COMPLETED.
7. THE ERECTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH THE OWNER'S SPECIAL INSPECTOR FOR
PRE-INSTALLATION VERIFICATION OF SLIP CRITICAL BOLT TIGHTENING PROCEDURES.
8. FIELD TESTING AND INSPECTION OF STRUCTURAL STEEL MATERIALS AND STRUCTURAL STEEL
INSTALLATION SHALL BE COMPLETED BY AN INDEPENDENT TESTING AGENCY COMMISSIONED BY THE
OWNER, AND SHALL BE IN ACCORDANCE WITH THE SCHEDULE OF SPECIAL INSPECTIONS.
FIELD WELDING
1. ALL FIELD WELDING SHALL CONFORM TO SPECIFICATION SECTION 051200-"STRUCTURAL STEEL FRAMING"
FOR WELDING STRUCTURAL STEEL FRAMING
2. ALL FIELD WELDING SHALL CONFORM TO SPECIFICATION SECTION 052100-"STEEL JOIST FRAMING" FOR
WELDING STEEL JOIST FRAMING
3. ALL FIELD WELDING SHALL CONFORM TO SPECIFICATION SECTION 053100-"STEEL DECKING" FOR WELDING
STEEL DECKING
4. ALL FIELD WELDING SHALL CONFORM TO SPECIFICATION SECTION 054000-"COLD FORMED METAL FRAMING", 054100-"ENGINEERED COLD FORMED METAL FRAMING", AND 054400-"ENGINEERED COLD FORMED METAL
TRUSSES" FOR WELDING COLD FORMED MEMBERS
5. ALL FIELD WELDING SHALL BE IN ACCORDANCE WITH AWS D1.1, "STRUCTURAL WELDING CODE-STEEL" AND
AWS D1.3, "STRUCTURAL WELDING CODE-SHEET STEEL", LATEST EDITIONS.
6. ALL FIELD WELDING SHALL BE IN STRICT ACCORDANCE WITH WRITTEN WELD PROCEDURE (WPS) FOR THE
GIVEN WELD CONDITION
7. REPAIR ALL DAMAGED GALVANIZING, PRIMER OR PAINT ONCE WELDING IS COMPLETE
8. ELECTRODES SHALL BE STORED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S REQUIREMENTS.
9. ALL PERSONNEL COMPLETING FIELD WELDS SHALL BE CERTIFIED IN ACCORDANCE WITH AWS TO PERFORM
THE GIVEN WELD.
10. FIELD TESTING AND INSPECTION OF FIELD WELDING MATERIALS AND FIELD WELDING SHALL BE COMPLETED
BY AN INDEPENDENT TESTING AGENCY COMMISSIONED BY THE OWNER, AND SHALL BE IN ACCORDANCE
WITH THE SCHEDULE OF SPECIAL INSPECTIONS.
POST INSTALLED STRUCTURAL ANCHORS
1. ALL POST INSTALLED STRUCTURAL ANCHORS SHALL CONFORM TO SPECIFICATION SECTION 050520-"POST
INSTALLED STRUCTURAL ANCHORS"
2. NOTED EMBEDMENT DEPTHS ARE FROM FACE OF CMU OR FACE OF CONCRETE
3. ALL INSTALLATION SHALL BE IN STRICT ACCORDANCE WITH THE MANUFACTURER'S DATA AND THE
ASSOCIATED ICC REPORT.
4. ALL PERSONNEL INSTALLING ANCHORS SHALL HAVE ATTENDED INSTALLER TRAINING PER THE
SPECIFICATIONS
5. FIELD TESTING AND INSPECTION OF POST INSTALLED ANCHOR MATERIALS AND POST INSTALLED ANCHOR
INSTALLATION SHALL BE COMPLETED BY AN INDEPENDENT TESTING AGENCY COMMISSIONED BY THE
OWNER, AND SHALL BE IN ACCORDANCE WITH THE SCHEDULE OF SPECIAL INSPECTIONS.
CONTRACTOR NOTES
1. ALL EXPOSED STRUCTURAL STEEL SHALL BE HOT DIP GALVANIZED, G90 FINISH. THIS SHALL
ALSO INCLUDE TUBES, CHANNELS, AND ANGLES. THE G.C. SHALL PROVIDE TOUCH-UP
COATINGS AS REQUIRED AT LOCATIONS OF SCRATCHES, WELDS, AND ANY OTHER DAMAGED
OR UNCOATED AREAS DUE TO A CONNECTION OR CONTACT WITH AN ALTERNATE METERIAL,
ETC.
2. THE G.C. SHALL FIELD VERIFY ALL EXISTING FRAMING ELEVATIONS AND DIMENSIONS.
3. THE G.C. SHALL COORDINATE NEW EQUIPMENT LAYOUT WITH EXISTING STRUCTURE AND
EXISTING MECH'L EQUIPMENT.
4. THE G.C. SHALL COORDINATE HVAC EQUIPMENT LAYOUT AND ATTACHMENT TO NEW STEEL
PRIOR TO STEEL FABRICATION.
5. NEW STEEL LOCATIONS MAY BE ADJUSTED SLIGHTLY TO ACCOMMODATE NEW MEP EQUIPMENT
SUPPORT & ATTACHMENT LOCATION/REQUIREMENTS.
6. ALL ITEMS SHALL BE VERIFIED PRIOR TO NEW STEEL FABRICATION.
7. ALL FLASHING AND WATERPROOFING IS BY OTHERS, NOT APART OF ADC'S SCOPE OF WORK.
C E
R T
IF
ICATE OF AUTHOR
I Z A
T I O
NENGINEERING
ADC
NO. 00253
INC.
S O
U
T H
C A R O L
I N
A
G
E W
B
A IR AS
I N 62 8
T H
IR
A
D
MAN
CO
M
MO
IT Y
B I L
SEAL AREA
OFSHEET
D
AT
E
P R E P
B Y
A P P R 'D
RECORD DRAWING DATE
DRAWING SIZE:
PROJECT NO.
DE
PA
RT
M
EN
T O F
TH
E
AI
R
FO
RC
E
AI
R M O B
IL
IT
Y C O M M
AN
D
R E V
D A T E
D E S C R
IP
T
IO
N
D R A W
IN
G
R E V
IS
IO
N S
C H
K
BY
D
R
AW
N B
Y:
D
SG
N
B Y:
SU
PV
C H
E N
G R
G
LI
C K
/B O
E H
M
A S
S O
C
IA
TE
S
, I N
C
K
IN
G
S
TR
E E
T, S
U
IT
E
C H
A R
LE
S
TO
N
, S C
J O
IN
T
B A S E
C H A R L E S T O N
C H A R L E S T O N S C
ARCH E(30X42)
07/27/2017
R E V
IS
IO
N
C J G
C J G
S000
GE
N
ER
AL
N
O
TE
S
A C P
A C P
C J G
JB
C
AB
B R
EP
AI
R A
IR
C R
AF
T
M
AI
N
TE
N
AN
C E H
AN
GE
R
ADC #17005.0
WIND PRESSURE ZONES DIAGRAM
a = 3-FT
DRAWING LIST
SHEET
NUMBER SHEET NAME
S000 GENERAL NOTES
S101 FOUNDATION PLAN
S102 PLATFORM FRAMING PLAN
S201 TYPICAL FOUNDATION DETAILS
S221 TYPICAL STEEL DETAILS
S222 TYPICAL STEEL DETAILS
S231 TYPICAL CMU DETAILS
S241 ATFP DETAILS
No. 28196
S O
UTH CAROL INA
L
IC
E
N S
E D
P
R O
F E S S I ON
A
L E
N G
I N
E E
R
C H
R
IS
TOPHER J .
G
I L G
E R