22 of 056 - A100 - FIRST FLOOR PLAN Rev 01 2021-07-13.pdf

PDF 250 KB Posted

Attached to
Repair Maintenance Hanger, Bldg 700
Solicitation number
FA441821R0015
Issued by

About this file

This set of architectural drawings and federal contract opportunity solicitation provide details for repair and maintenance work at Hangar 700 at Joint Base Charleston - Air Base Charleston in South Carolina. The architectural drawings show the existing first floor plan and include notes specifying finishes, materials, and scope of work such as removing and replacing caulk containing asbestos. The related solicitation FA441821R0015 from the Department of the Air Force Air Mobility Command is for repair and maintenance of the hangar building. The opportunity involves general repairs and upgrades to building systems along with hazardous material abatement activities. The response date is not stated.

View the file

Other files

File Type Posted
Solicitation Amendment FA441821R00150002 SF 30.pdf PDF
18 of 56 - AD120 - DEMOLITION CEILING PLAN Rev 01 2021-07-13.pdf PDF
Roofing Q19.pdf PDF
23 of 56 - A101 - FLOOR PLANS - 1 STORY AREA Rev 01 2021-07-13 (Q10).pdf PDF
17 of 56 - AD100 - DEMOLITION PLAN Rev 01 2021-07-13 (Q10).pdf PDF
6 of 056 - S101 - Foundation Plan Rev 01 2021-07-13 (Q7 and Q10).pdf PDF
01 30 00 Rev01 2021-07-15.pdf PDF
5 of 056 - S000 - General Notes Rev 01 2021-07-13 (Q13).pdf PDF
8 of 056 - S201 - Typical Foundation Details Rev 01 2021-07-13.pdf PDF
B700 Pre-Proposal Questions and Answers 27 Jul 2021.xlsx XLSX spreadsheet
Solicitation Amendment FA441821R00150001 SF 30.pdf PDF
Q and A Attachment 1 233113 Metal Ducts - Rectangular Double Wall.pdf PDF
Q and A Attachment 2 Answer to Question 16.png PNG image
B700 Pre-Proposal Questions and Answers.xlsx XLSX spreadsheet
JB Charleston - Offeror Inquiry Form FA44182R0015.xlsx XLSX spreadsheet
Attachment 7 WD SC20210023.pdf PDF
Attachment 2 Design Narrative Maintenance Hangar B700.pdf PDF
Attachment 3 Repair Aircraft Maint Hanger Drawing Set.pdf PDF
Attachment 5 Repair Aircraft Maint Hangar Fire Systems B700 Drawing Set.pdf PDF
Attachment 8 Green Procurement Form.pdf PDF
Attachment 9 Past Performance Questionnaire.pdf PDF
Attachment 4 Design Narrative Repair Aircraft Maint Hangar Fire Systems B700.pdf PDF
Attachment 6 Asbestos and Lead Based Paint Survey Report.pdf PDF
Solicitation - FA441821R0015 FINAL.pdf PDF
Attachment 1 Specs Repair Aircraft Maint Hangar B700.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

DN

DN

DN

UP

R

EF

REF.

DN

A200

A200

A201

A201

HANGAR

SECTION CHIEFS

3FLIGHT LEADERSHIP

TOOL ROOM

STORAGE

WOMENS RESTROOM

BREAK ROOM

RESERVES OFFICE

MENS RESTROOM

BOILER ROOM

STORAGE

FOAM ROOM

SHEET METAL SHOP

515.24 SF

COORDINATORS

SHACK

A420

A421

A100 A101

A100 A101

CONFERENCE / BREAK

JETS ADMIN.

OFFICE

13' - 8"

9.31

EXISTING

2.32

EXISTING

2.32

9.32

2.38

2.38

2.38

2.38

2.38

2.38 2.38

2.38

9.34

REFER TO GEN. NOTE 11,

THIS SHEET.

REFER TO GEN. NOTE 11,

THIS SHEET.

REFER TO GEN. NOTE 11,

THIS SHEET.

GENERAL FLOOR PLAN NOTES:

1. DIMENSIONS INDICATED ARE FROM FACE OF STUD AND TO FACE OF

MASONRY, U.O.N. REFER TO ENLARGED PLANS FOR ADDITIONAL

DIMENSIONS NOT INDICATED ON OVERALL PLANS.

2. DIMENSIONS TO EXISTING WALLS ARE TO FACE OF FINISH, U.O.N.

3. CONTRACTOR TO COORDINATE LOCATIONS OF ADDITIONAL

PENETRATIONS THROUGH WALLS AND FLOORS NOT INDICATED ON

ARCHITECTURAL DRAWINGS. RE: MECHANICAL, PLUMBING AND

ELECTRICAL. REFER TO STRUCTURAL FOR LINTEL OR FRAMING

REQUIREMENTS.

4. ALL NEW WALLS ARE TO BE TYPE H2, U.O.N.

5. CONTRACTOR TO PAINT ALL INTERIOR WALLS OF ONE STORY BUILDING.

PATCH AND REPAIR ANY DAMAGE TO GYPSUM BOARD WALLS PRIOR

TO PAINTING.

6. GC TO PROVIDE SAMPLES OF ALL INTERIOR AND EXTERIOR COLORS AND

FINISHES. SAMPLES TO INCLUDE MANUFACTURER, BRAND, PATTERN,

NUMBER, AND COLOR.

7. WALL FINISH IN SHOWER 20 TO BE WFP1.

8. WHERE CT-1 AND CT-2 OCCUR, GROUT COLOR SHALL MATCH LATTICRETE

COLOR "RAVEN".

9. ALL PENETRATIONS THROUGH FIRE RATED WALL TO BE SEALED WITH

FIRE CAULK.

10. CAULK CONTAINING ASBESTOS IS PRESENT AROUND EXISTING EXTERIOR

WALL LOUVERS. REFER TO SPECIFICATION SECTION 02 82 16.00 FOR

DETAILS. SCOPE INCLUDES REMOVING AND REPLACING CAULK.

11. HANGAR DOOR BUMPERS AND WALL GUARDS AT THRESHOLD OF SMALL

ROLL-UP DOOR ON WEST SIDE ARE COATED WITH LEAD-BASED PAINT.

EMPLOY WET METHODS TO PREPARE SURFACES FOR REPAINTING.

PAINT WASTE FROM SURFACE PREPARATIONS SHALL BE DISPOSED AS

HAZARDOUS WASTE. REFER TO LIMITED ASBESTOS AND LEAD-BASED

PAINT ASSESSMENT REPORT AND SUPPLEMENTAL ASBESTOS AND LEAD-

BASED PAINT TESTING REPORT FOR LOCATIONS.

INDICATES 1-HR FIRE RATED WALL

OFFICE

CONFERENCE

H1 NON-RATED METAL STUD WALL

SOUND RATING: STC ____

EXTEND TO STRUCTURE ABOVE

FIRE RATING: N/A

5/8" GYP. BD.

3 5/8" METAL

STUD @ 16" O.C.,

U.O.N.

H2 NON-RATED METAL STUD WALL

EXTEND TO 6" ABOVE CEILING

SOUND RATING: ____

FIRE RATING: N/A

5/8" GYP. BD.

3 5/8" METAL

STUD @ 16" O.C.,

U.O.N.

CHARLESTON

NO. 2676

GARY J. BOEHMST

AT

E OF SOUTH CAROLINA

REGISTERED A RCHITECT

G

E W

BAIR AS

I N62 8T H

IR

A D

MAN

COM

MO

IT Y

B I L

SEAL AREA

DA

TE

P R E P

B Y

A P P R 'D

RECORD DRAWING DATE

DRAWING SIZE:

PROJECT NO.

DE

PA

RT

M

EN

T

OF

T H E

AI

R

FO

RC

E

AI

R M

OB

IL

IT

Y C

OM

M

AN

D

R E V

D A

TE

D E S C R

IP

TI

O N

D R A W

IN

G

R E V

IS

IO

N S

CH

K B

Y:

DR

AW

N

BY

DS

GN

BY

SU

PV

CH

EN

GR

GL

IC

K/

BO

EH

M

AS

SO

CI

AT

ES

, IN

C

3 K

IN

G

ST

RE

ET

, S

UI

TE

CH

AR

LE

ST

ON

, S

C

JO

IN

T B A S E

C H A R

LE

S

TO

N

A B

C H A R

LE

S

TO

N S C

ARCH30 E(30X42)

OF 056SHEET

A100

FI

RS

T

FL

OO

R

PL

AN

De sig ne r

Au tho r Ch ec ke r

/27

/17

JB

C

AB

B

RE

PA

IR

A

IR

C

RA

FT

M

AI

NT

EN

AN

C E H

AN

GE

R

DKGV:DKFX 11-1171

SCALE: 1/16" = 1'-0"A101 A100

1 FIRST FLOOR PLAN

PROJ.TRUE

0' 8' 16' 32' 64'

KEYNOTE LEGEND

Key Value Keynote Text

2.32 EXISTING STEEL LADDER, TO REMAIN. PAINT.

2.38 EXISTING HVAC UNIT, RE: MECH.

9.31 ROUGH, NON-SKID FLOOR SURFACE: EF-1 WITH COVE

BASE.

9.32 INDUSTRIAL NON-SKID, ROUGH SURFACE TILE

FLOORING, QT-1. PROVIDE MATCHING BASE.

9.34 INFILL AND PATCH WALL AT LOCATIONS OF DUCT

REMOVAL, RE: MECH. MATCH CONSTRUCTION AND

FINISH OF EXISTING WALL.

SCALE: 1/16" = 1'-0"A201 A100

2 SECOND FLOOR PLAN

SCALE: 1 1/2" = 1'-0"

WALL TYPE H1 - H2

AD

DE

ND

UM

7/

/2

Sheets
A100 - FIRST FLOOR PLAN
A101 - FLOOR PLANS - 1 STORY AREA

File details come from the government source that posted it. Updated .