17 of 56 - AD100 - DEMOLITION PLAN Rev 01 2021-07-13 (Q10).pdf
PDF 225 KB Posted
- Attached to
- Repair Maintenance Hanger, Bldg 700
- Solicitation number
- FA441821R0015
About this file
This demolition plan outlines work required to repair and renovate an aircraft maintenance hangar building at Joint Base Charleston-Air Force Base in South Carolina. Key elements include demolishing various walls, doors, fixtures and flooring; removing asbestos-containing caulk and lead-based paint; and prepping surfaces for new construction and finishes. Mechanical, plumbing and electrical documents should be referenced for additional demolition and capping of utility services. The related federal contract opportunity is a solicitation to repair the maintenance hangar building at a cost to be determined, with the Department of the Air Force Air Mobility Command listed as the agency. Interested vendors are instructed to review all attachments for full details on products, services and response requirements.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
DN
DN
DN
UP
R
EF
REF.
DN
GENERAL DEMOLITION NOTES:
1. ELEMENTS OR PORTIONS OF ELEMENTS TO BE REMOVED ARE SHOWN
DASHED. REFER TO KEY NOTES FOR ADDITIONAL CLARIFICATION FOR
PARTIALLY REMOVED OR REUSED ELEMENTS. RETURN UN-USED DOORS,
HARDWARE, AND ACCESSORIES TO OWNER.
2. VERIFY EXISTING CONDITIONS OF SPACE PRIOR TO DEMOLITION WORK.
3. AREAS OF DEMOLITION ARE APPROXIMATE; GENERAL CONTRACTOR TO
COORDINATE TO COORDINATE DEMOLITION WITH EXISTING CONDITIONS,
NEW CONSTRUCTION, AND ADDITIONAL SCOPE OF WORK INCLUDED
IN MECHANICAL, PLUMBING, AND ELECTRICAL DOCUMENTS.
4. WALL DEMOLITION TO INCLUDE FRAMING, SHEATHING, FINISHES AND ALL
APPURTENANCES.
5. ANY HIDDEN STRUCTURAL COLUMNS OR SUPPORT IS TO BE BROUGHT
TO THE ATTENTION OF THE ARCHITECT PRIOR TO REMOVAL. ANY
BUILDING SUPPORT WHICH DEVIATES FROM THAT SHOWN OR IS IN
QUESTION IS TO BE BROUGHT TO ARCHITECT'S ATTENTION IMMEDIATELY.
6. REFER TO MECHANICAL, PLUMBING, AND ELECTRICAL DOCUMENTS FOR
REMOVAL AND CAPPING OF SERVICES FOR ITEMS SHOWN TO BE
REMOVED.
7. CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO PROTECT
EXISTING FLOORING AND FINISHES TO REMAIN.
8. REMOVE ALL ABANDONED ACCESSORIES AND DEVICES NOT OTHERWISE
NOTED. PATCH DRYWALL AND PREP FOR NEW FINISHES.
9. CONTRACTOR TO REMOVE FLOORING IN ALL ROOMS WITHIN SCOPE, U.O.N.
10. CAULK CONTAINING ASBESTOS IS PRESENT AROUND EXTERIOR WALL
LOUVERS. REFER TO SPECIFICATION SECTION 02 82 16.00 FOR DETAILS.
SCOPE INCLUDES REMOVING AND REPLACING CAULK.
11. HANGAR DOOR BUMPERS AND WALL GUARDS AT THRESHOLD OF SMALL ROLL-
UP DOOR ON WEST SIDE ARE COATED WITH LEAD-BASED PAINT. EMPLOY WET
METHODS TO PREPSARE SURFACES FOR REPAINTING. PAINT WASTE FROM
SURFACE PREPARATIONS SHALL BE DISPOSED AS HAZARDOUS WASTE. REFER
TO LIMITED ASBESTOS AND LEAD-BASED PAINT ASSESSMENT REPORT AND
SUPPLEMENTAL ASBESTOS AND LEAD-BASED PAINT TESTING REPOR FOR
LOCATIONS.
A200
A201
A A
B B
C C
D D
E E
F F
G G
H H
HANGAR
SECTION CHIEFS
FLIGHT LEADERSHIP
TOOL ROOM
STORAGE
WOMENS RESTROOM
BREAK ROOM
RESERVES OFFICE
MENS RESTROOM
BOILER ROOM
STORAGE
FOAM ROOM
SHEET METAL SHOP
AD200
AD200
AD201
AD201
A420
A421
D21
D21
D21COORDINATORS
SHACK
D20
D20 2.38
2.38
2.38
2.38 2.38
2.38
2.38
2.38
CONFERENCE / BREAK
JETS ADMIN.
OFFICE
D7
D43
D43
D45
D43
D44 D43
D41
D26
D26D26
D26D26D26D26
D26
D26D26D26D26
D26
D46
22.11B
REFER TO GENERAL NOTE 11, THIS SHEET
REFER TO GENERAL NOTE 11, THIS SHEET
REFER TO GENERAL NOTE 11, THIS SHEET
D49
D48
D50
OIL INTERCEPTOR VENTS SHALL
REMAIN PROTECTED DURING
CONSTRUCTION PROCESS
OIL INTERCEPTOR ACCESS HATCH
AND TANK SHALL REMAIN PROTECTED
DURING CONSTRUCTION PROCESS
D
CONFERENCE
OFFICE
CHARLESTON
NO. 2676
GARY J. BOEHMST
AT
E OF SOUTH CAROLINA
REGISTERED A RCHITECT
G
E W
BAIR AS
I N62 8T H
IR
A D
MAN
COM
MO
IT Y
B I L
SEAL AREA
DA
TE
P R E P
B Y
A P P R 'D
RECORD DRAWING DATE
DRAWING SIZE:
PROJECT NO.
DE
PA
RT
M
EN
T
OF
T H E
AI
R
FO
RC
E
AI
R M
OB
IL
IT
Y C
OM
M
AN
D
R E V
D A
TE
D E S C R
IP
TI
O N
D R A W
IN
G
R E V
IS
IO
N S
CH
K B
Y:
DR
AW
N
BY
DS
GN
BY
SU
PV
CH
EN
GR
GL
IC
K/
BO
EH
M
AS
SO
CI
AT
ES
, IN
C
3 K
IN
G
ST
RE
ET
, S
UI
TE
CH
AR
LE
ST
ON
, S
C
JO
IN
T B A S E
C H A R
LE
S
TO
N
A B
C H A R
LE
S
TO
N S C
ARCH30 E(30X42)
OF 056SHEET
AD100
DE
M
OL
IT
IO
N
PL
AN
De sig ne r
Au tho r Ch ec ke r
/27
/17
JB
C
AB
B
RE
PA
IR
A
IR
C
RA
FT
M
AI
NT
EN
AN
C E H
AN
GE
R
DKGV:DKFX 11-1171
KEYNOTE LEGEND
Key Value Keynote Text
2.38 EXISTING HVAC UNIT, RE: MECH.
22.11B FLOOR SLAB TO BE GROUND. DONE TO ALLOW 1"
RECCESS. INTENT IS FOR LIP ON SHOWER UNIT TO BE NO
MORE THAN 1/2" A.F.F. ADD METAL FURRING STRIPS
AROUND SHOWER UNIT AS NECESSARY. COORDINATE
WITH MANUFACTURER'S INSTRUCTIONS.
D7 DEMOLISH DOOR. FRAME TO REMAIN.
D20 REMOVE CARPET. CLEAN, PATCH, REPAIR TO PREP FOR
NEW FLOORING. RE: ARCH.
D21 CLEAN, PATCH AND REPAIR CONCRETE FLOOR. PREP
FOR NEW FLOORING. RE: ARCH.
D26 DEMOLISH PLUMBING FIXTURE, RE: PLUMB.
D41 REMOVE SECTION OF WALL FOR NEW OPENING. RE:
ARCH.
D43 REMOVE SECTION OF WALL FOR NEW DUCTWORK, RE:
MECH. FOR SIZE OF DUCT. COORDINATE OPENING SIZE
AND LOCATION IN FIELD.
D44 REMOVE FLOORING. PATCH, REPAIR, AND PREP FOR
NEW PREMANUFACTURED SHOWER AND FLOORING.
REMOVE GYPSUM WALL. INSTALL NEW CEMENT BOARD.
COORDINATE WITH REQUIREMENTS OF SHOWER
MANUFACTURER.
D45 REMOVE KITCHEN HOOD, RE: MECH. PATCH AND REPAIR
WALL.
D46 REMOVE PORTION OF CONCRETE SLAB, RE: STRUCT
D48 DEMOLISH ASPHALT WALKWAY
D49 DEMOLISH ALL BALLARDS
D50 DEMOLISH PLANTINGS
SCALE: 1/16" = 1'-0"A101AD100
1 FIRST FLOOR DEMOLITION PLAN
TRUEPROJ.
SCALE: 1/16" = 1'-0"A201AD100
2 SECOND FLOOR DEMO
0' 8' 16' 32' 64'
AD
DE
ND
UM
7/
/2
| Sheets |
| A100 - FIRST FLOOR PLAN |
| A101 - FLOOR PLANS - 1 STORY AREA |
| AD100 - DEMOLITION PLAN |
| AD120 - DEMOLITION CEILING PLAN |
File details come from the government source that posted it. Updated .