17 of 56 - AD100 - DEMOLITION PLAN Rev 01 2021-07-13 (Q10).pdf

PDF 225 KB Posted

Attached to
Repair Maintenance Hanger, Bldg 700
Solicitation number
FA441821R0015
Issued by

About this file

This demolition plan outlines work required to repair and renovate an aircraft maintenance hangar building at Joint Base Charleston-Air Force Base in South Carolina. Key elements include demolishing various walls, doors, fixtures and flooring; removing asbestos-containing caulk and lead-based paint; and prepping surfaces for new construction and finishes. Mechanical, plumbing and electrical documents should be referenced for additional demolition and capping of utility services. The related federal contract opportunity is a solicitation to repair the maintenance hangar building at a cost to be determined, with the Department of the Air Force Air Mobility Command listed as the agency. Interested vendors are instructed to review all attachments for full details on products, services and response requirements.

View the file

Other files

File Type Posted
Solicitation Amendment FA441821R00150002 SF 30.pdf PDF
18 of 56 - AD120 - DEMOLITION CEILING PLAN Rev 01 2021-07-13.pdf PDF
Roofing Q19.pdf PDF
23 of 56 - A101 - FLOOR PLANS - 1 STORY AREA Rev 01 2021-07-13 (Q10).pdf PDF
6 of 056 - S101 - Foundation Plan Rev 01 2021-07-13 (Q7 and Q10).pdf PDF
01 30 00 Rev01 2021-07-15.pdf PDF
5 of 056 - S000 - General Notes Rev 01 2021-07-13 (Q13).pdf PDF
8 of 056 - S201 - Typical Foundation Details Rev 01 2021-07-13.pdf PDF
22 of 056 - A100 - FIRST FLOOR PLAN Rev 01 2021-07-13.pdf PDF
B700 Pre-Proposal Questions and Answers 27 Jul 2021.xlsx XLSX spreadsheet
Solicitation Amendment FA441821R00150001 SF 30.pdf PDF
Q and A Attachment 1 233113 Metal Ducts - Rectangular Double Wall.pdf PDF
Q and A Attachment 2 Answer to Question 16.png PNG image
B700 Pre-Proposal Questions and Answers.xlsx XLSX spreadsheet
JB Charleston - Offeror Inquiry Form FA44182R0015.xlsx XLSX spreadsheet
Attachment 7 WD SC20210023.pdf PDF
Attachment 2 Design Narrative Maintenance Hangar B700.pdf PDF
Attachment 3 Repair Aircraft Maint Hanger Drawing Set.pdf PDF
Attachment 5 Repair Aircraft Maint Hangar Fire Systems B700 Drawing Set.pdf PDF
Attachment 8 Green Procurement Form.pdf PDF
Attachment 9 Past Performance Questionnaire.pdf PDF
Attachment 4 Design Narrative Repair Aircraft Maint Hangar Fire Systems B700.pdf PDF
Attachment 6 Asbestos and Lead Based Paint Survey Report.pdf PDF
Solicitation - FA441821R0015 FINAL.pdf PDF
Attachment 1 Specs Repair Aircraft Maint Hangar B700.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

DN

DN

DN

UP

R

EF

REF.

DN

GENERAL DEMOLITION NOTES:

1. ELEMENTS OR PORTIONS OF ELEMENTS TO BE REMOVED ARE SHOWN

DASHED. REFER TO KEY NOTES FOR ADDITIONAL CLARIFICATION FOR

PARTIALLY REMOVED OR REUSED ELEMENTS. RETURN UN-USED DOORS,

HARDWARE, AND ACCESSORIES TO OWNER.

2. VERIFY EXISTING CONDITIONS OF SPACE PRIOR TO DEMOLITION WORK.

3. AREAS OF DEMOLITION ARE APPROXIMATE; GENERAL CONTRACTOR TO

COORDINATE TO COORDINATE DEMOLITION WITH EXISTING CONDITIONS,

NEW CONSTRUCTION, AND ADDITIONAL SCOPE OF WORK INCLUDED

IN MECHANICAL, PLUMBING, AND ELECTRICAL DOCUMENTS.

4. WALL DEMOLITION TO INCLUDE FRAMING, SHEATHING, FINISHES AND ALL

APPURTENANCES.

5. ANY HIDDEN STRUCTURAL COLUMNS OR SUPPORT IS TO BE BROUGHT

TO THE ATTENTION OF THE ARCHITECT PRIOR TO REMOVAL. ANY

BUILDING SUPPORT WHICH DEVIATES FROM THAT SHOWN OR IS IN

QUESTION IS TO BE BROUGHT TO ARCHITECT'S ATTENTION IMMEDIATELY.

6. REFER TO MECHANICAL, PLUMBING, AND ELECTRICAL DOCUMENTS FOR

REMOVAL AND CAPPING OF SERVICES FOR ITEMS SHOWN TO BE

REMOVED.

7. CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO PROTECT

EXISTING FLOORING AND FINISHES TO REMAIN.

8. REMOVE ALL ABANDONED ACCESSORIES AND DEVICES NOT OTHERWISE

NOTED. PATCH DRYWALL AND PREP FOR NEW FINISHES.

9. CONTRACTOR TO REMOVE FLOORING IN ALL ROOMS WITHIN SCOPE, U.O.N.

10. CAULK CONTAINING ASBESTOS IS PRESENT AROUND EXTERIOR WALL

LOUVERS. REFER TO SPECIFICATION SECTION 02 82 16.00 FOR DETAILS.

SCOPE INCLUDES REMOVING AND REPLACING CAULK.

11. HANGAR DOOR BUMPERS AND WALL GUARDS AT THRESHOLD OF SMALL ROLL-

UP DOOR ON WEST SIDE ARE COATED WITH LEAD-BASED PAINT. EMPLOY WET

METHODS TO PREPSARE SURFACES FOR REPAINTING. PAINT WASTE FROM

SURFACE PREPARATIONS SHALL BE DISPOSED AS HAZARDOUS WASTE. REFER

TO LIMITED ASBESTOS AND LEAD-BASED PAINT ASSESSMENT REPORT AND

SUPPLEMENTAL ASBESTOS AND LEAD-BASED PAINT TESTING REPOR FOR

LOCATIONS.

A200

A201

A A

B B

C C

D D

E E

F F

G G

H H

HANGAR

SECTION CHIEFS

FLIGHT LEADERSHIP

TOOL ROOM

STORAGE

WOMENS RESTROOM

BREAK ROOM

RESERVES OFFICE

MENS RESTROOM

BOILER ROOM

STORAGE

FOAM ROOM

SHEET METAL SHOP

AD200

AD200

AD201

AD201

A420

A421

D21

D21

D21COORDINATORS

SHACK

D20

D20 2.38

2.38

2.38

2.38 2.38

2.38

2.38

2.38

CONFERENCE / BREAK

JETS ADMIN.

OFFICE

D7

D43

D43

D45

D43

D44 D43

D41

D26

D26D26

D26D26D26D26

D26

D26D26D26D26

D26

D46

22.11B

REFER TO GENERAL NOTE 11, THIS SHEET

REFER TO GENERAL NOTE 11, THIS SHEET

REFER TO GENERAL NOTE 11, THIS SHEET

D49

D48

D50

OIL INTERCEPTOR VENTS SHALL

REMAIN PROTECTED DURING

CONSTRUCTION PROCESS

OIL INTERCEPTOR ACCESS HATCH

AND TANK SHALL REMAIN PROTECTED

DURING CONSTRUCTION PROCESS

D

CONFERENCE

OFFICE

CHARLESTON

NO. 2676

GARY J. BOEHMST

AT

E OF SOUTH CAROLINA

REGISTERED A RCHITECT

G

E W

BAIR AS

I N62 8T H

IR

A D

MAN

COM

MO

IT Y

B I L

SEAL AREA

DA

TE

P R E P

B Y

A P P R 'D

RECORD DRAWING DATE

DRAWING SIZE:

PROJECT NO.

DE

PA

RT

M

EN

T

OF

T H E

AI

R

FO

RC

E

AI

R M

OB

IL

IT

Y C

OM

M

AN

D

R E V

D A

TE

D E S C R

IP

TI

O N

D R A W

IN

G

R E V

IS

IO

N S

CH

K B

Y:

DR

AW

N

BY

DS

GN

BY

SU

PV

CH

EN

GR

GL

IC

K/

BO

EH

M

AS

SO

CI

AT

ES

, IN

C

3 K

IN

G

ST

RE

ET

, S

UI

TE

CH

AR

LE

ST

ON

, S

C

JO

IN

T B A S E

C H A R

LE

S

TO

N

A B

C H A R

LE

S

TO

N S C

ARCH30 E(30X42)

OF 056SHEET

AD100

DE

M

OL

IT

IO

N

PL

AN

De sig ne r

Au tho r Ch ec ke r

/27

/17

JB

C

AB

B

RE

PA

IR

A

IR

C

RA

FT

M

AI

NT

EN

AN

C E H

AN

GE

R

DKGV:DKFX 11-1171

KEYNOTE LEGEND

Key Value Keynote Text

2.38 EXISTING HVAC UNIT, RE: MECH.

22.11B FLOOR SLAB TO BE GROUND. DONE TO ALLOW 1"

RECCESS. INTENT IS FOR LIP ON SHOWER UNIT TO BE NO

MORE THAN 1/2" A.F.F. ADD METAL FURRING STRIPS

AROUND SHOWER UNIT AS NECESSARY. COORDINATE

WITH MANUFACTURER'S INSTRUCTIONS.

D7 DEMOLISH DOOR. FRAME TO REMAIN.

D20 REMOVE CARPET. CLEAN, PATCH, REPAIR TO PREP FOR

NEW FLOORING. RE: ARCH.

D21 CLEAN, PATCH AND REPAIR CONCRETE FLOOR. PREP

FOR NEW FLOORING. RE: ARCH.

D26 DEMOLISH PLUMBING FIXTURE, RE: PLUMB.

D41 REMOVE SECTION OF WALL FOR NEW OPENING. RE:

ARCH.

D43 REMOVE SECTION OF WALL FOR NEW DUCTWORK, RE:

MECH. FOR SIZE OF DUCT. COORDINATE OPENING SIZE

AND LOCATION IN FIELD.

D44 REMOVE FLOORING. PATCH, REPAIR, AND PREP FOR

NEW PREMANUFACTURED SHOWER AND FLOORING.

REMOVE GYPSUM WALL. INSTALL NEW CEMENT BOARD.

COORDINATE WITH REQUIREMENTS OF SHOWER

MANUFACTURER.

D45 REMOVE KITCHEN HOOD, RE: MECH. PATCH AND REPAIR

WALL.

D46 REMOVE PORTION OF CONCRETE SLAB, RE: STRUCT

D48 DEMOLISH ASPHALT WALKWAY

D49 DEMOLISH ALL BALLARDS

D50 DEMOLISH PLANTINGS

SCALE: 1/16" = 1'-0"A101AD100

1 FIRST FLOOR DEMOLITION PLAN

TRUEPROJ.

SCALE: 1/16" = 1'-0"A201AD100

2 SECOND FLOOR DEMO

0' 8' 16' 32' 64'

AD

DE

ND

UM

7/

/2

Sheets
A100 - FIRST FLOOR PLAN
A101 - FLOOR PLANS - 1 STORY AREA
AD100 - DEMOLITION PLAN
AD120 - DEMOLITION CEILING PLAN

File details come from the government source that posted it. Updated .