18 of 56 - AD120 - DEMOLITION CEILING PLAN Rev 01 2021-07-13.pdf
PDF 215 KB Posted
- Attached to
- Repair Maintenance Hanger, Bldg 700
- Solicitation number
- FA441821R0015
About this file
This document package includes demolition plans and specifications for repairing an aircraft maintenance hangar at Joint Base Charleston-Air Base Charleston in South Carolina. The project involves demolishing interior ceilings, lighting fixtures, mechanical grilles and diffusers, and other features throughout the first and second floors of Building 700 to prepare for renovations. Specific demolition and preparation work is identified on the ceiling plans through keynotes. The related federal contract opportunity is solicitation number FA441821R0015 for repair and maintenance services at the hangar. The Department of the Air Force Air Mobility Command is the contracting agency. The response due date and award date are not provided in this document set.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B
C
D
E
F
G
H
FLIGHT LEADERSHIP
SECTION CHIEFS
TOOL ROOM
STORAGE
WOMENS RESTROOM
BREAK ROOM
RESERVES OFFICE
MENS RESTROOM
BOILER ROOM
STORAGE
FOAM ROOM
HANGAR
SHEET METAL SHOP
COORDINATORS
SHACK
CONFERENCE / BREAK
JETS ADMIN.
OFFICE
D23
D23
D22
D22
D19D19
D22
D22
D23
D19
D22
D23
D19
TYP.
2.022.02
D45
D22 D23
D22
D23
D23
D22
D23
D23
D22
D23
GENERAL DEMOLITION NOTES:
1. ELEMENTS OR PORTIONS OF ELEMENTS TO BE REMOVED ARE SHOWN
DASHED. REFER TO KEY NOTES FOR ADDITIONAL CLARIFICATION FOR
PARTIALLY REMOVED OR REUSED ELEMENTS. RETURN UN-USED DOORS,
HARDWARE, AND ACCESSORIES TO OWNER.
2. VERIFY EXISTING CONDITIONS OF SPACE PRIOR TO DEMOLITION WORK.
3. AREAS OF DEMOLITION ARE APPROXIMATE; GENERAL CONTRACTOR TO
COORDINATE TO COORDINATE DEMOLITION WITH EXISTING CONDITIONS,
NEW CONSTRUCTION, AND ADDITIONAL SCOPE OF WORK INCLUDED
IN MECHANICAL, PLUMBING, AND ELECTRICAL DOCUMENTS.
4. WALL DEMOLITION TO INCLUDE FRAMING, SHEATHING, FINISHES AND ALL
APPURTENANCES.
5. ANY HIDDEN STRUCTURAL COLUMNS OR SUPPORT IS TO BE BROUGHT
TO THE ATTENTION OF THE ARCHITECT PRIOR TO REMOVAL. ANY
BUILDING SUPPORT WHICH DEVIATES FROM THAT SHOWN OR IS IN
QUESTION IS TO BE BROUGHT TO ARCHITECT'S ATTENTION IMMEDIATELY.
6. REFER TO MECHANICAL, PLUMBING, AND ELECTRICAL DOCUMENTS FOR
REMOVAL AND CAPPING OF SERVICES FOR ITEMS SHOWN TO BE
REMOVED.
7. CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO PROTECT
EXISTING FLOORING AND FINISHES TO REMAIN.
8. REMOVE ALL ABANDONED ACCESSORIES AND DEVICES NOT OTHERWISE
NOTED. PATCH DRYWALL AND PREP FOR NEW FINISHES.
9. CONTRACTOR TO REMOVE FLOORING IN ALL ROOMS WITHIN SCOPE, U.O.N.
10. CAULK CONTAINING ASBESTOS IS PRESENT AROUND EXTERIOR WALL
LOUVERS. REFER TO SPECIFICATION SECTION 02 82 16.00 FOR DETAILS.
SCOPE INCLUDES REMOVING AND REPLACING CAULK.
11. HANGAR DOOR BUMPERS AND WALL GUARDS AT THRESHOLD OF SMALL ROLL-
UP DOOR ON WEST SIDE ARE COATED WITH LEAD-BASED PAINT. EMPLOY WET
METHODS TO PREPSARE SURFACES FOR REPAINTING. PAINT WASTE FROM
SURFACE PREPARATIONS SHALL BE DISPOSED AS HAZARDOUS WASTE. REFER
TO LIMITED ASBESTOS AND LEAD-BASED PAINT ASSESSMENT REPORT AND
SUPPLEMENTAL ASBESTOS AND LEAD-BASED PAINT TESTING REPOR FOR
LOCATIONS.
D
D22
D23
D19
CHARLESTON
NO. 2676
GARY J. BOEHMST
AT
E OF SOUTH CAROLINA
REGISTERED A RCHITECT
G
E W
BAIR AS
I N62 8T H
IR
A D
MAN
COM
MO
IT Y
B I L
SEAL AREA
DA
TE
P R E P
B Y
A P P R 'D
RECORD DRAWING DATE
DRAWING SIZE:
PROJECT NO.
DE
PA
RT
M
EN
T
OF
T H E
AI
R
FO
RC
E
AI
R M
OB
IL
IT
Y C
OM
M
AN
D
R E V
D A
TE
D E S C R
IP
TI
O N
D R A W
IN
G
R E V
IS
IO
N S
CH
K B
Y:
DR
AW
N
BY
DS
GN
BY
SU
PV
CH
EN
GR
GL
IC
K/
BO
EH
M
AS
SO
CI
AT
ES
, IN
C
3 K
IN
G
ST
RE
ET
, S
UI
TE
CH
AR
LE
ST
ON
, S
C
JO
IN
T B A S E
C H A R
LE
S
TO
N
A B
C H A R
LE
S
TO
N S C
ARCH30 E(30X42)
OF 056SHEET
AD120
DE
M
OL
IT
IO
N
C
EI
LI
NG
P
LA
N
De sig ne r
Au tho r Ch ec ke r
/27
/17
JB
C
AB
B
RE
PA
IR
A
IR
C
RA
FT
M
AI
NT
EN
AN
C E H
AN
GE
R
DKGV:DKFX 11-1171
SCALE: 1/16" = 1'-0"A101AD120
1 FIRST FLOOR DEMOLITION CEILING PLAN
KEYNOTE LEGEND
Key Value Keynote Text
2.02 EXISTING STRUCTURE, RE: STRUCT.
D19 DEMOLISH MECHANICAL GRILLE/DIFFUSER. TYPICAL OF
ALL GRILLES AND DIFFUSERS IN THIS AREA. RE:
MECHANICAL
D22 DEMOLISH CEILING. TYPICAL OF ALL INTERIOR
CEILINGS IN THIS AREA. RE: CEILING PLAN.
COORDINATE WITH OTHER DISCIPLINES.
D23 DEMOLISH LIGHTING FIXTURE. TYPICAL OF ALL
LIGHTING FIXTURES IN THIS AREA. RE: ELECTRICAL.
D45 REMOVE KITCHEN HOOD, RE: MECH. PATCH AND
REPAIR WALL.
PROJ.TRUE
0' 8' 16' 32' 64'
SCALE: 1/16" = 1'-0"A201AD120
2 SECOND FLOOR DEMO
AD
DE
ND
UM
7/
/2
| Sheets |
| A100 - FIRST FLOOR PLAN |
| A101 - FLOOR PLANS - 1 STORY AREA |
| AD100 - DEMOLITION PLAN |
| AD120 - DEMOLITION CEILING PLAN |
File details come from the government source that posted it. Updated .