SOW_Attachment_3_-_JBC_Cable_Management_Policy.pdf

PDF 99 KB Posted

Attached to
SABER IDIQ - Joint Base Charleston, SC Federal contract opportunity
Solicitation number
FA4418-16-R-0001
Issued by
Department of the Air Force Air Mobility Command

About this file

SOW ATCH 3

View the file

Other files for this federal contract opportunity

Other files attached to SABER IDIQ - Joint Base Charleston, SC, newest first.
File Type Posted
Amendment_0003 _FA4418-16-R-0001 _SABER_IDIQ.pdf PDF
_4_Qs_ _As _FA4418-16-R-0001 _SABER_IDIQ.pdf PDF
Atch_7 __1_Sample_Project_-_SOW_Atch_12_-_Bldg_84 _Roof_Survey.pdf PDF
Atch_7__1_Sample_Project_-_SOW_Atch_14_-_Bldg_84 _Roof__Summary_Rpt_2.pdf PDF
Atch_7 __1_Sample_Project_-_SOW_Atch_11-_Bldg_84 _Addendum__1 _7_Dec_15.pdf PDF
Atch_7 __1_Sample_Project_-_SOW_Atch_13_-_Bldg_84 _Roof_Summary_Rpt_1.pdf PDF
Amendment_0002 _FA4418-16-R-0001 _SABER_IDIQ.pdf PDF
Atch_8 __2_Sample_Project__-_SOW_Atch_6_-_Bldg_1 _Addendum__1 _7_Dec_15.pdf PDF
SOW__Attachment_12_-_Addendum__1 _7_Dec_15.pdf PDF
_2_Qs_ __As_FA4418-16-R-0001_SABER_IDIQ.pdf PDF
Arch_E-36x48-Border.dwg DWG drawing
_3_Qs_ _As_FA4418-16-R-0001_SABER_IDIQ.pdf PDF
Ansi_E-34x44-Border.dwg DWG drawing
Atch_8 __2_Sample_Project_-_SOW_Atch_4_-_Bldg_1_-_As-builts-Current.pdf PDF
Atch_8 __2_SampleProject_-_SOW_Atch_5_-_Bldg_1_-_As-builts-Original.pdf PDF
Atch_7 __1_Sample_Project_-_SOW_Atch_5_-_Bldg_84_-_As-builts_Pt_3.pdf PDF
Atch_7 __1_Sample_Project_-_SOW_Atch_8_Bldg_84_-_As-builts_Pt_6.pdf PDF
_1_Qs_ _As _FA4418-16-R-0001 _SABER_IDIQ.pdf PDF
Atch_7 __1_Sample_Project_-_SOW_Atch_7_Bldg_84_-_As-builts_Pt_5.pdf PDF
Atch_7 __1_Sample_Project_-_SOW_Atch_4_-_Bldg_84_-_As-builts_Pt_2.pdf PDF
Atch_7 ___1_Sample_Project_-_SOW_Atch_9_-_Bldg_84_-_As-builts_Pt_7.pdf PDF
Atch_7 __1_Sample_Project_-_SOW_Atch_3_-_Bldg_84_-_As-builts_Pt_1.pdf PDF
Amendment_0001 _FA4418-16-R-0001 _SABER_IDIQ.pdf PDF
Atch_7 __1_Sample_Project_-_SOW_Atch_6_-_Bldg_84_-_As-builts_Pt_4.pdf PDF
Atch_7 __1_Sample_Project_-_SOW_Atch_10_Bldg_84_-_As-builts_Pt_8.pdf PDF
Site_Visit_Min _Attendees-SABER.pdf PDF
FA4418-16-R-0001 _SABER_IDIQ.pdf PDF
Atch_4 _WD_SC30_Charleston_5-22-15.pdf PDF
SOW_Attachment_6_-_JBCGS_01572_-_Waste_Management.pdf PDF
SOW_Attachment_1_-_JBC_ACP.PDF PDF
Atch_7 __1_Sample_Project_-_SOW_-_Bldg_84 _1_Aug_15.pdf PDF
SOW_Attachment_4_-_JBCGS_01501_-_Environmental.pdf PDF
Atch_9 _Past_Performance_Projects_List.docx DOCX document
Atch_3 _WD_SC29_Berkeley_5-22-15.pdf PDF
SOW_Attachment_2_-_JBCGS_28_31_76_Interior_Fire_Alarm_System_ _Mass_Noti....pdf PDF
Atch_8 __2_Sample_Project_-_SOW_-_Bldg_1 _17_Aug_15.pdf PDF
SOW_Attachment_5_-_JBCGS_01540_-_Green_Procurement.pdf PDF
Atch_6 _Green_Procument_Form.pdf PDF
Atch_5 _WD_SC31_Dorchester_5-22-15.pdf PDF
SOW_Attachment_10_-_UFGS_01_45_00_-_Quality_Control.pdf PDF
SOW_Attachment_7_-_JBCGS_01575_-_Temporary_Environmental_Controls.pdf PDF
Atch_8 __2_Sample_Project_-_SOW_Atch_1_-_Bldg_1_Existing_Floor_Plan.pdf PDF
Atch_8 __2_Sample_Project_-_SOW_Atch_3_-_Bldg_1_Asbestos_Survey.pdf PDF
Atch_8 __2_Sample_Project_-_SOW_Atch_2_-_Bldg_1_Conceptual_Floor_Plan.pdf PDF
Atch_7 __1_Sample_Project_-_SOW_Atch_1_-_Bldg_84_Floorplan.pdf PDF
SOW_Attachment_11_-_UFGS_Contractor_Special_Conditions_Safety_Requirements.pdf PDF
Atch_2 _WD_SC23_Orangeburg_1-02-15.pdf PDF
SOW_Attachment_9_-_NPTU_Contractor_Special_Conditions.pdf PDF
Atch_7 __1_Sample_Project_-_SOW_Atch_2_-_Bldg_84_Asbestos_Survey.pdf PDF
SOW_Attachment_8_-_Brig_Security_Requirements.pdf PDF
Show all 50

SABER IDIQ - Joint Base Charleston, SC has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

628TH COMMUNICATIONS SQUADRON

Cable Management Policy

Cable Management Policy

Telecommunications System, SECTION 16900

Cable Management Policy his document clearly defines the 628th Communications Squadron’s Cable Management Policy and establishes Charleston’s cabling standards. It primarily references the EIA/TIA 568A, 568B Premise Wiring Standard, as well as information from commercial sources. All new and existing cable installation projects are affected by this plan.

This paper outlines the following items:

Responsibilities

Requirements

To ensure that the information reflected within is accurate, review this document for currency every six months.

1. RESPONSIBILITIES.

1.1. Commander, 628 CS: The 628 CS/CC has approval authority over the Charleston AFB Cable Management Policy and provides direction as required to ensure continued operations and minimal downtime.

1.2. Plans Flight Chief, 628 CS/SCX: The 628 CS Plans Flight Chief is the focal point for all new cable installations on Charleston. They coordinate, plan, and ensure every aspect of a project follows prescribed standards.

1.3. Information Systems Flight Commander/Superintendent, 628 CS/SCB: The Information Systems Flight Commander and Superintendent interface with SCX and SCBNM to ensure successful completion of all jobs.

1.4. NCOIC, Network Management 628 CS/SCBNM: The Network Management NCOIC ensures any cabling installation provides correct network connectivity. They should be keep abreast of all networking standards to ensure the best possible result for the customer.

Introduction

T

1.5 Telephone Systems Personnel, 628 CS/SCMP: The Telephone Systems shop will ensure all voice and data related cabling installation will be installed up to standards. They should be contacted for any questions and/or possible changes to voice related installation.

2. REQUIREMENTS.

2.1. Appendix B contains the recommended equipment to maintain a standardized configuration on Charleston AFB.

2.2. Cabling

2.2.1. Data/Voice. All installations will consist of Category 6a Plenum-rated, Purple Unshielded Twisted Pair (UTP) cables with RJ45 connectors. Telephone House cable will be terminated from the Building Entrance Terminal (BET) to a S110 19 inch rack mount panel. If Shielded Twisted Pair (STP) is installed, both connector ends must be grounded to prevent electromagnetic interference.

There will be a minimum of one quad connector faceplate located on each wall that is eight feet long in every room. If a wall is over eight feet in length a second quad faceplate is required and the quad jacks will be evenly distributed along the wall unless previously agreed upon by the Infrastructure shop in the Communications Squadron. The Cat6a cable will be terminated to RJ45 jacks in the office and run back to the communication room patch panel.

2.2.2. Wiring Pattern. Charleston uses the T568B wiring pattern. See Appendix A for the actual wiring diagram. All connectors will be securely attached to the cable for added strength and prevention of signal loss.

2.2.3. Fiber Optic. Fiber optic cables on Charleston use the duplex SC-type connectors. Any new Single mode fiber will be 8.1/125-micron cable.

2.2.4. Coaxial Cable. Any coaxial installations will use a 75-ohm plenum broadband cable rated for the correct distance requirements. The table below, took from the USAFE Premise Wiring Standard, lists the cable type with corresponding distance limitations:

Cable Type Maximum Distance

RG-6 <=250 Feet RG-11 <=400 Feet RG-59 <=150 Feet

2.2.5. Patch Cables. NIPRNET patch cables will be less than 3m (9ft) from the switch to the patch panel and less than 6m (18ft) from the workstation to the wall jack. Cables will be blue for LAN and white for phone, to denote unclassified/encrypted traffic. SIPRNET cable length will depend on the location but must be STP, conform to the overall distance requirements, and be red in color to denote its classified nature.

2.2.5.1 Phone patch cables will have an RJ45 connector on one end and S110 1 or 2 pair connector on the apposing end.

2.3. Telecommunications Rooms (TRs), Hallways, and Office Installations

2.3.1. Cabinets/Racks. All cabinets will be properly bolted to the floor and grounded to a 6mm x 103mm solid copper grounding buss bar with insulated standoffs. This bar must be connected to the central building ground by a 6 AWG insulated copper cable. If a rack is used instead of a cabinet, it must also be securely mounted to the ceiling to prevent possible bending. Although discouraged for use, wall cabinets follow the same grounding requirements as racks and full cabinets.

Additionally, the cabinet/rack will contain a 15A, 110VAC power strip for equipment use.

2.3.2. Cable Supports. Cable ladders (or trays) are the preferred distribution system throughout the facility. If ring or hook supports are used, cable sags must be minimized to reduce stress and avoid interference with the ceiling tiles.

2.3.3. Electromagnetic Interference (EMI). Care must be taken to ensure EMI sources do not interfere with installed cabling. Ensure that all telecommunications cabling cross lighting and power cables at right angles only. Per the EIA/TIA 569, minimum distances from EMI sources are:

a) 1.3 m (4 feet) from large motors or transformers

b) 27cm (1 foot) from electrical power cables

c) 129mm (5 inches) from fluorescent lighting

2.3.4. Patch Panels. All patch panels will contain vertical and horizontal cable management systems.

Route all cabling through these and the switch cable management. Large amounts of cables traversing equipment racks should use a reusable tie strap (i.e. Velcro straps) to facilitate changes, present a professional appearance, and aid in troubleshooting.

2.3.5. Power. Every TR must contain two (2) 15A, 110VAC outlets on the wall closest to the cabinet/rack. Furthermore, Uninterruptible Power Supplies (UPS) will be installed in every TR for backup power. These UPS must supply 110V single-phase power to all equipment for 15 minutes after commercial power loss.

2.3.6. Heating, Ventilation, and Air Conditioning (HVAC). Per the AMC Premise Wiring Standard, the TR will be environmentally controlled at 64 – 75 degrees Fahrenheit and 30% - 55% humidity 24 hours/day, 365 days/year.

2.3.7. Panduit. Ensure a uniform and professional appearance is maintained throughout the facility.

Install wall boxes at same height as electrical outlets, place caps over all joints, and ensure raceways are level.

2.4. Telecommunications Systems Administration and Labeling

2.4.1. Jacks are numbered numerically clockwise around the room starting at the door.

2.4.2. All fiber optic patch cabling labels will show the From/To Building number – Patch Panel port number – switch port number

Example: Fr 203 to 214 – 5 – 8/1

2.4.3. Provide layout cut sheets to the 628 CS/SCX offices upon installation completion.

2.4.4 Numbering and Testing Communication Outlets: All jacks must be numbered, mapped, distance of the run determined, and tested to meet current EIA/TIA 568A standards. Identify each jack as to circuit number on face of wall jack and patch panel. Three copies of the building floor plan showing the location of the jack numbers and run distance and a test report shall be given to the Contracting Officer upon completion of all testing. Contact the 628th Communications Squadron Plans Flight (843) 963-3982 at least 24 hours prior to performing tests. Any system, equipment, or hardware that does not meet Department of Defense (DOD) manufacturers or requirement standards shall not be accepted. All discrepancies must be re-tested/re-inspected and the results certified correct in writing by the 628th Communications Squadron. All copper twisted pair cable must include tests for the following: Opens, Shorts, Grounds, Continuity, Polarity,. Provide a copy of the circuit test printout. The circuit shall be tested for proper pinout, dB loss, Near-End Cross Talk (NEXT), cable length, and overall category rating.

Any circuit that has improper pinout, dB loss, NEXT, cable length, or does not meet the Category 6 rating shall be re-installed until it passes all tests.

2.4.5 The contractor shall provide at least one on-site supervisor who has a minimum of 2 years experience in wiring, terminating, and testing telephone and data transmission systems. Proof of qualification will be provided upon request of the government contracting office. The Telephone and Local Area Network (LAN) cabling/wiring systems shall be complete and functional. The contractor shall provide all labor and materials for installation of the voice and data communications system as noted on drawings and in the specifications. The contractor will provide and install jacks, cables, backboards, appropriate connection blocks and patch panels; label and test all installed cables. The contractor shall also submit as-built drawings that reflect the installed cable route, port location, receptacle location by room number or area and labeling information prior to project completion.

2.4.6 Terminating space for telecommunications entrance facilities. Never run more than 50 ft. of exposed non-fire rated entrance cable within a building. If more than 50 ft. of cable is required between entry point and the termination point, use rigid metallic conduit to enclose the cable to within 50 ft. or less of the termination. Conduit shall be grounded

2.4.7 Designated buildings for Information Transfer Node (ITN). All buildings designated as ITN’s or secondary ITN’s will have generator backup. An Uninterrupted Power Supply (UPS) will protect all networki8ng equipment.

2.4.7 Splicing .The installer shall terminate/splice all cable pairs adhering to standard color code regardless of bad pair conditions. Splice connectors shall not be mixed within a splice. Splices shall be accomplished using 3M 4000-DMP Module and Sealant Box splice connectors or 710 Module splice connectors. PIC- A-BOND splice connectors shall not be used except to correct splicing errors as specified in BSP 032- 205-220. Splice closures shall be Preformed Line Products stainless steel type enclosure, re-seal-able, filled with a re-enterable jell, and weather proofed using method dictated by REA Standards.

2.4.9 Any digging of excavating on government property shall be accomplished with the authority of an Air Force Form 103, Digging Permit. The contractor must follow the provisions of the Digging Permit before any digging of excavating may be authorized. Requests for marking areas to dig must be made 72 hours prior to digging. If any communications cables or other government property is damaged by the contractor by unauthorized digging or other excavation, the contractor shall provide, where applicable, an estimate and plan for making the repairs to the Contracting Officer and Communications Squadron Focal Point at 963-2932 within four (4) hours. If the contractor fails to respond within this time frame, the Government may repair the damage and deduct all costs associated with the repair of the damage from the contract price. Repairs of Government owned communications cable shall be in accordance with AFTO 31W3-10-13 standards. A copy of these standards can be obtained from the Contracting Officer.

The contractor shall coordinate with the Contracting Officer on material and downtime prior to beginning any work. All work will undergo a final inspection by the Contracting Officer and representative of the Communications Squadron before acceptance. In accordance with Air Force Instruction 112-1, Chapter 13 (claims in favor of the Government), a copy of the invoice for repairs shall be submitted to the Contracting Officer for administrative purposes.

Appendix A

T568B wiring pattern:

From left to right in the RJ45 connector with the tab facing away from you.

1 White/Orange

2 Orange

3 White/Green

4 Blue

5 White/Blue

6 Green

7 White/Brown

8 Brown

Appendix B

RECOMMENDED LIST OF MATERIALS:

Ref Material Manufacturer Part Number

A EQUIPMENT CABINETS

1 Rack W/ cble mngmnt 84”HX19”W Siemon RS3-07 2 Horizontal Wire Managers Siemon RS3-RWM-2 3 Frame Coupler, 84" S.W. Data Products SWE731

Wire, Ground, 6-1C THHN/THWN 19

STR BC

Anixter 6G-0601-04-500

B SM FIBER ITEMS

Cable, Fiber Optic, Riser, 12-strand

MM

Optical Cable

DX12\-055D-W3EB\1UC-900-

OFNR

2 Connector, SC SM Unicam Siecor 95-200-41

C DISTRIBUTION ELECTRONICS

Fiber Optic Panel, 12/48-F Rack Mount, 19"

Corning CCH-01U

2 Panel, 6 Port Loaded with SC SM Siecor FDCCP1P-39 3 Patch Panel, 568B Cat 6 48 Port Siemon 10GHD-48

110 Terminal Block, 50 pr, w/Legs 110 Terminal Block, 100 pr, w/Legs 19’’ Rack Mount 110 Panels 110 Connecting Blocks

Siemon Siemon Siemon Siemon

S110AA1-50FT

S110AA1-100FT

S110DA2-100RWM

S110C-5

D WORK AREA ITEMS

1 One-hole Clamp, 1/2" ARCO Industries 2718C 2 Nail-In Anchor, 1 1/4" Fastenal 50506 3 Ground Rod Clamp FCI GRC34 4 Ground Terminal FCI YAV6C-L2 BOX 4 Hex-Head Bolt, 1/2"-13 x 2" Condux 8384800 5 Hex Nut, 1/2"-13 Condux 2125103 6 Flat Washer, 1/2" Condux 12008303 7 Lock Washer, 1/2" Condux 210003 8 Category 6A, UTP, 4pr (Purple) Comscope 5EN5P4P24-GY-P-CMS-PV 9 S110 Patch Cord 1 pr 7’ Siemon S110P1-U4-07 10 S110 Patch Cord 2 pr 7’ Siemon S110P2-UT-07 11 Patch Cord, Cat 6, 7' Siemon 10GBP0706 12 Surface Raceway, adhesive backed Panduit TG70IW8 13 Back Feed Fitting Panduit TGBFIW 14 TG70 Base Coupler Fitting Panduit TG70BCIW-X 15 TG70 End Cap Fitting Panduit TGECIW 16 TG70 Transition Fitting Panduit TGTRIW 17 Surface Mount Box, 4 Port, Ivory Siemon CT4BOX-20 18 Faceplate, Quad, Ivory Siemon 10GMX-FPS0420 19 1 Port Modular Jack 110 8W8P UTP Siemon 10GMX-20

Raceway Fitting, Outside Corner, Ivory

Panduit T45OCIW

21 Entrance Fitting, Ivory Panduit T45RLDIW

Ref Material Manufacturer Part Number 22 Surface Raceway, adhesive backed Panduit T45BIW8-A 23 Cover, Raceway, Ivory Panduit T45CIW8 24 Raceway, Coupler Fitting, Elec. Ivory Panduit T45CCIW-X 25 Raceway, Inside Corner, Elec. Ivory Panduit T45ICIW 26 Raceway, Right Angle, Elec. Ivory Panduit T45RAIW 27 Raceway, T Fitting, Ivory Panduit T45TIW 28 Cable Tray Cablofil CF 54/300 EZ 29 Cable Tray Cablofil CF 30/300 EZ 30 Splice Assembly Cablofil SWKB 31 Center Hanger, 12" Cablofil FAS P300 CH 32 Washer, Flat 3/8" Cablofil EZ FW 1/4 B 33 Nut, 3/8" Cablofil EZ HN 1/4 B 34 Threaded Rod, 1/4" 20 x 72" Cablofil THRD 1/4 35 Coupling Nut, 1/4" Cablofil EZ CN 1/4 B 36 Cable Exit Cablofil EZ CABLEXIT 37 J-BOLT Cablofil EZ JB 5/16 38 Wall Termination Bracket Cablofil HB2 39 Bolt Cutter Cablofil COUP FIL 40 Concrete Anchor, 1/2" X 2 3/4" Fastenal 52009 41 Cable Management Panel Leviton 49252-PO2 42 Cable Management D-ring CPI 10942-000