Amendment_0002 _FA4418-16-R-0001 _SABER_IDIQ.pdf
PDF 25 KB Posted
- Attached to
- SABER IDIQ - Joint Base Charleston, SC Federal contract opportunity
- Solicitation number
- FA4418-16-R-0001
About this file
Amendment 0001 FA4418-16-R-0001
View the file
Other files for this federal contract opportunity
Show all 50
SABER IDIQ - Joint Base Charleston, SC has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is as follows:
a. Incorporate 3 SOW Addendums #1, 7 Dec 15: SABER contract and both Sample Projects, Bldgs 1 and 84.
b. Incorporate Bldg 84 Roof Survey and Summary Reports.
c. Revised Section J list of attachments to include addendums, roof survey and summaries.
d. Change sentence in Section L, 3. Part III - Past Performance Information (a) Performance Surveys as follows: FROM: "Provide a list of no more than ten (10) of the most relevant contracts performed for Federal agencies and commercial customers within the last five (5) years from the issue date of this RFP". TO: "Provide a list of no more than ten (10) of the most relevant contracts performed for Federal and State agencies and commercial customers within the last five (5) years from the issue date of this RFP".
e. Questions and Answers #1, 2, and 3 are posted on fbo.gov.
f. Proposal due date is changed to 22 Dec 15 at 3:00 PM EST.
g. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Dec-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4418-16-R-0001
X 9B. DATED (SEE ITEM 11)
09-Nov-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Dec-2015
CODE
628 CONTRACTING SQUADRON
101 E HILL BLVD, B503
JOINT BASE CHARLESTON SC 29404 5021
FA4418 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4418-16-R-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 16-Dec-2015 03:00 PM to 22-Dec-2015 03:00 PM.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
SECTION J
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Statement of Work & Technical Specifications 55 16 Jul 2015 12 Attachments:
(1) Architectural Compatibility Plan 64
(2) Interior Fire Alarm & Mass Notification Sys 35
(3) Cable Management Policy 8
(4) Environmental 17
(5) Green Procurement 6
(6) Waste Management 6
(7) Temporary Environmental Controls 15
(8) Brig Security Requirements 11
(9) NPTU Special Conditions 12
(10) UFGS 01 45 00 Quality Control 8
(11) UFGS 01 35 26 Government SE Rqmnts 16
(12) Addendum #1, SOW & Tech Specs 1 07 Dec 2015 Attachment 2 Wage Determination SC 23 Orangeburg Co. 3 02 Jan 2015 Attachment 3 Wage Determination SC 29 Berkeley Co. 4 22 May 2015 Attachment 4 Wage Determination SC 30 Charleston Co. 4 22 May 2015 Attachment 5 Wage Determination SC 31 Dorchester Co. 4 22 May 2015 Attachment 6 Green Procurement Form 2 20 Jul 2015 Attachment 7* Sample Project Statement of Work #1: 18 1 Aug 2015 Repair Naval HQs Facility Bldg 84 (WS) 14 Attachments:
(1) Bldg Floor Plan 1
(2) Asbestos Survey 6
(3) As-builts (Part 1 of 8) 17
(4) As-builts (Part 2 of 8) 10
(5) As-builts (Part 3 of 8) 4
(6) As-builts (Part 4 of 8) 17
(7) As-builts (Part 5 of 8) 9
(8) As-builts (Part 6 of 8) 20
(9) As-builts (Part 7 of 8) 9
(10) As-builts (Part 8 of 8) 6
(11) Addendum #1, SOW Bldg 84 1 07 Dec 2015
(12) Roof Survey
(13) Roof Summary Rpt 1
FA4418-16-R-0001
(14) Roof Summary Rpt 2 Attachment 8* Sample Project Statement of Work #2: 7 17 Aug 2015 Renovate Bldg 1 (WS) 6 Attachments:
(1) Existing Floor Plan 1 30 Jul 2015
(2) Conceptual Floor Plan 1
(3) Asbestos & Lead Paint Surveys 26
(4) As-builts - Current 1
(5) As-builts - Original 6
(6) Addendum #1, SOW Bldg 1 1 07 Dec 2015 Attachment 9* Past Performance Projects List 1 2 Nov 2015
*Note: Attachment 7, 8 and 9 will not be included in the contract award.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .