Amendment_0001 _FA4418-16-R-0001 _SABER_IDIQ.pdf

PDF 25 KB Posted

Attached to
SABER IDIQ - Joint Base Charleston, SC Federal contract opportunity
Solicitation number
FA4418-16-R-0001
Issued by
Department of the Air Force Air Mobility Command

About this file

Amendment 0001 FA4418-16-R-0001

View the file

Other files for this federal contract opportunity

Other files attached to SABER IDIQ - Joint Base Charleston, SC, newest first.
File Type Posted
_4_Qs_ _As _FA4418-16-R-0001 _SABER_IDIQ.pdf PDF
Amendment_0003 _FA4418-16-R-0001 _SABER_IDIQ.pdf PDF
Atch_7__1_Sample_Project_-_SOW_Atch_14_-_Bldg_84 _Roof__Summary_Rpt_2.pdf PDF
Atch_7 __1_Sample_Project_-_SOW_Atch_11-_Bldg_84 _Addendum__1 _7_Dec_15.pdf PDF
Atch_7 __1_Sample_Project_-_SOW_Atch_13_-_Bldg_84 _Roof_Summary_Rpt_1.pdf PDF
Amendment_0002 _FA4418-16-R-0001 _SABER_IDIQ.pdf PDF
Atch_8 __2_Sample_Project__-_SOW_Atch_6_-_Bldg_1 _Addendum__1 _7_Dec_15.pdf PDF
SOW__Attachment_12_-_Addendum__1 _7_Dec_15.pdf PDF
Atch_7 __1_Sample_Project_-_SOW_Atch_12_-_Bldg_84 _Roof_Survey.pdf PDF
_2_Qs_ __As_FA4418-16-R-0001_SABER_IDIQ.pdf PDF
Arch_E-36x48-Border.dwg DWG drawing
_3_Qs_ _As_FA4418-16-R-0001_SABER_IDIQ.pdf PDF
Ansi_E-34x44-Border.dwg DWG drawing
Atch_7 __1_Sample_Project_-_SOW_Atch_7_Bldg_84_-_As-builts_Pt_5.pdf PDF
Atch_7 __1_Sample_Project_-_SOW_Atch_4_-_Bldg_84_-_As-builts_Pt_2.pdf PDF
Atch_7 ___1_Sample_Project_-_SOW_Atch_9_-_Bldg_84_-_As-builts_Pt_7.pdf PDF
Atch_7 __1_Sample_Project_-_SOW_Atch_3_-_Bldg_84_-_As-builts_Pt_1.pdf PDF
Atch_7 __1_Sample_Project_-_SOW_Atch_6_-_Bldg_84_-_As-builts_Pt_4.pdf PDF
Atch_7 __1_Sample_Project_-_SOW_Atch_10_Bldg_84_-_As-builts_Pt_8.pdf PDF
Atch_8 __2_Sample_Project_-_SOW_Atch_4_-_Bldg_1_-_As-builts-Current.pdf PDF
Atch_8 __2_SampleProject_-_SOW_Atch_5_-_Bldg_1_-_As-builts-Original.pdf PDF
Atch_7 __1_Sample_Project_-_SOW_Atch_5_-_Bldg_84_-_As-builts_Pt_3.pdf PDF
Atch_7 __1_Sample_Project_-_SOW_Atch_8_Bldg_84_-_As-builts_Pt_6.pdf PDF
_1_Qs_ _As _FA4418-16-R-0001 _SABER_IDIQ.pdf PDF
Atch_9 _Past_Performance_Projects_List.docx DOCX document
Atch_3 _WD_SC29_Berkeley_5-22-15.pdf PDF
SOW_Attachment_2_-_JBCGS_28_31_76_Interior_Fire_Alarm_System_ _Mass_Noti....pdf PDF
SOW_Attachment_3_-_JBC_Cable_Management_Policy.pdf PDF
Atch_8 __2_Sample_Project_-_SOW_-_Bldg_1 _17_Aug_15.pdf PDF
SOW_Attachment_5_-_JBCGS_01540_-_Green_Procurement.pdf PDF
Atch_6 _Green_Procument_Form.pdf PDF
Atch_5 _WD_SC31_Dorchester_5-22-15.pdf PDF
SOW_Attachment_10_-_UFGS_01_45_00_-_Quality_Control.pdf PDF
SOW_Attachment_7_-_JBCGS_01575_-_Temporary_Environmental_Controls.pdf PDF
Atch_8 __2_Sample_Project_-_SOW_Atch_1_-_Bldg_1_Existing_Floor_Plan.pdf PDF
Atch_8 __2_Sample_Project_-_SOW_Atch_3_-_Bldg_1_Asbestos_Survey.pdf PDF
Atch_8 __2_Sample_Project_-_SOW_Atch_2_-_Bldg_1_Conceptual_Floor_Plan.pdf PDF
Atch_7 __1_Sample_Project_-_SOW_Atch_1_-_Bldg_84_Floorplan.pdf PDF
SOW_Attachment_11_-_UFGS_Contractor_Special_Conditions_Safety_Requirements.pdf PDF
Atch_2 _WD_SC23_Orangeburg_1-02-15.pdf PDF
SOW_Attachment_9_-_NPTU_Contractor_Special_Conditions.pdf PDF
Atch_7 __1_Sample_Project_-_SOW_Atch_2_-_Bldg_84_Asbestos_Survey.pdf PDF
SOW_Attachment_8_-_Brig_Security_Requirements.pdf PDF
Atch_1 _SOW__Tech_Specs _16_Jul_15 _FA4418-16-R-0001 _SABER.pdf PDF
FA4418-16-R-0001 _SABER_IDIQ.pdf PDF
Atch_4 _WD_SC30_Charleston_5-22-15.pdf PDF
SOW_Attachment_6_-_JBCGS_01572_-_Waste_Management.pdf PDF
SOW_Attachment_1_-_JBC_ACP.PDF PDF
Atch_7 __1_Sample_Project_-_SOW_-_Bldg_84 _1_Aug_15.pdf PDF
SOW_Attachment_4_-_JBCGS_01501_-_Environmental.pdf PDF
Show all 50

SABER IDIQ - Joint Base Charleston, SC has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is as follows:

a. Incorporate eight as-builts attachments as listed in Section J under Attachment 7 for #1 Sample Project, Bldg 84, and two as-builts attachments under Attachment 8 for #2 Sample Project, Bldg 1.

b. Revised Section J list of attachments to include as-builts.

c. Incorporate updated FAR Clause 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations.

d. Proposal due date remains unchanged, 16 Dec 15 at 3:00 PM EST.

e. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Nov-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4418-16-R-0001

X 9B. DATED (SEE ITEM 11)

09-Nov-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Nov-2015

CODE

628 CONTRACTING SQUADRON

101 E HILL BLVD, B503

JOINT BASE CHARLESTON SC 29404 5021

FA4418 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA4418-16-R-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION I - CONTRACT CLAUSES

The following have been added by reference:

52.209-10 Prohibition on Contracting With Inverted Domestic

Corporations

NOV 2015

The following have been deleted:

52.209-10 Prohibition on Contracting With Inverted Domestic

Corporations

DEC 2014

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

SECTION J

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Statement of Work & Technical Specifications 55 16 Jul 2015 11 Attachments:

(1) Architectural Compatibility Plan 64

(2) Interior Fire Alarm & Mass Notification Sys 35

(3) Cable Management Policy 8

(4) Environmental 17

(5) Green Procurement 6

(6) Waste Management 6

(7) Temporary Environmental Controls 15

(8) Brig Security Requirements 11

(9) NPTU Special Conditions 12

(10) UFGS 01 45 00 Quality Control 8

(11) UFGS 01 35 26 Government SE Rqmnts 16 Attachment 2 Wage Determination SC 23 Orangeburg Co. 3 02 Jan 2015 Attachment 3 Wage Determination SC 29 Berkeley Co. 4 22 May 2015 Attachment 4 Wage Determination SC 30 Charleston Co. 4 22 May 2015 Attachment 5 Wage Determination SC 31 Dorchester Co. 4 22 May 2015 Attachment 6 Green Procurement Form 2 20 Jul 2015 Attachment 7* Sample Project Statement of Work #1: 18 1 Aug 2015 Repair Naval HQs Facility Bldg 84 (WS) 10 Attachments:

(1) Bldg Floor Plan 1

FA4418-16-R-0001

(2) Asbestos Survey 6

(3) As-builts (Part 1 of 8) 17

(4) As-builts (Part 2 of 8) 10

(5) As-builts (Part 3 of 8) 4

(6) As-builts (Part 4 of 8) 17

(7) As-builts (Part 5 of 8) 9

(8) As-builts (Part 6 of 8) 20

(9) As-builts (Part 7 of 8) 9

(10) As-builts (Part 8 of 8) 6 Attachment 8* Sample Project Statement of Work #2: 7 17 Aug 2015 Renovate Bldg 1 (WS) 5 Attachments:

(1) Existing Floor Plan 1 30 Jul 2015

(2) Conceptual Floor Plan 1

(3) Asbestos & Lead Paint Surveys 26

(4) As-builts - Current 1

(5) As-builts - Original 6 Attachment 9* Past Performance Projects List 1 2 Nov 2015

*Note: Attachment 7, 8 and 9 will not be included in the contract award.