PostingQuestions29May.xls

XLS spreadsheet 3 MB Posted

Attached to
Maxwell-Gunter AFB BOS FA3002-06-R-0004 Federal contract opportunity
Solicitation number
FA3002-06-R-0004
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

Questions and Answers Part II 29 May 07

View the file

Other files for this federal contract opportunity

Other files attached to Maxwell-Gunter AFB BOS FA3002-06-R-0004, newest first.
File Type Posted
BWS-SAG SDS Metric amend 0013.doc DOC document
19 06 MAX Custodial Maps Appendix 19C amendment 0013.doc DOC document
Amendment 0013 SF 30 26Mar08.pdf PDF
11-4 Housing DSW amemdment 0013.doc DOC document
25 05 MAX Transportation Appendix 25B Workload Data amendment 0013.doc DOC document
10-2 Housing Occupancy Rate amendment 0013.doc DOC document
CE-SAG SDS Metric amendment 0013.doc DOC document
19 01 Max Custodial Description of Services amend 0013.doc DOC document
19 02 Max Custodial Service Summary amend 0013.doc DOC document
05 05 MAX Resource Management Workload Appendix 5B amendment 0013.doc DOC document
ATTACH6ManpowerMatrix-21AUG08Amend0017.xls XLS spreadsheet
FA3002-06-R-0004Conformed copy Amend 0017.doc DOC document
FA3002-06-R-0004Conformed copy Amend 0016.doc DOC document
ATTACH7MaxwellCostModel-21Aug08Amend0017.xls XLS spreadsheet
AF 7115 Dec 2007.pdf PDF
PostingQuestions04Sep.pdf PDF
PostingQuestions30Aug.pdf PDF
Amend0010.zip ZIP file
Amend0009.zip ZIP file
Amend0008.zip ZIP file
Amend0006.zip ZIP file
FA3002-06-R-0004-0005Replacement95page.pdf PDF
Amend0004.zip ZIP file
PostingQuestions24May.xls XLS spreadsheet
MaxwellSiteVisit.doc DOC document
GunterSiteVisit.doc DOC document
FA3002-06-R-0004-0003Conformedcopy.pdf PDF
FA3002-06-R-0004-0003ReplacementPages.rtf RTF text file
HotelsMotelsMontgomeryPrattvilleAL.doc DOC document
ATTACH8-13PASTPERFORMANCE.zip ZIP file
ATTACH7MaxwellCostModel-26Mar07.xls XLS spreadsheet
ATTACH14SubktrPlanPlusQPIWorksheetV3.xls XLS spreadsheet
ATTACH5CBAs.zip ZIP file
Section7A.doc DOC document
HClause(EarnedandIncentiveProfit).doc DOC document
RFIDraftSectionHClause.doc DOC document
QuestionFormDraftSectionHClause.doc DOC document
1_NOTICETOOFFERORS.doc DOC document
7_QuestionFormDraftPWS.doc DOC document
ReadyCombinedSA28.doc DOC document
RFIDraftPWS17 23 and24.doc DOC document
ReadyCombinedSA21.doc DOC document
4_QuestionFormDraftPWS.doc DOC document
ReadyCombinedSA30.doc DOC document
NEWTABLEOFCONTENTS1.doc DOC document
ReadyCombinedSA13.doc DOC document
ReadyCombinedSA02.zip ZIP file
RFIDraftPWS1.doc DOC document
ReadyCombinedSA32.doc DOC document
ReadyCombinedSA3.doc DOC document
Show all 50

Maxwell-Gunter AFB BOS FA3002-06-R-0004 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP (00)

FINAL RFP
Tracking #RFP ReferenceComment/QuestionResponse
C-00-006Attachment 6, Manpower Matrix Amendment 02DISCUSSION: The manpower matrix, Attachment 6, is missing formulas that roll-up the staffing in the overall workforce tab. Additionally, there are tabs not identified in the workforce totals and some workforce totals that don’t have tabs. For instance, tabs missing for Community Services - APF and Community Services – NAF. Tab numbering does not correlate with the workforce totals such as Human Resources (6 & 30), Communications and Information Technology (not listed & 7), Forms and Pubs (not listed & 9), Energy and Utility Management (19 & 17), Custodial (not listed & 19), Transient Maintenance (not listed & 20), Airfield Management (not listed & 21), Survival Equipment Services (not listed & 22), Fuels Services (not listed & 24), Transportation Services (not listed & 25), Static Display (not listed & 26), Supply Services (17 & 23), etc.
QUESTION: Will guidance or an amendment be published to explain these findings?SEE AMENDMENT 0004

&RFA3002-06-R-0004 ATTACHMENT 6

&RSOLICITATION NUMBER F41689-02-R-0048

&LAs of 6 May 03&CAttachment 4 to Section J&RPage &P of &N

Cost Price

FINAL RFP
Tracking #RFP ReferenceComment/QuestionResponse
C-CP-002Section B, Paragraph B-006DISCUSSION: The very last sentence in the referenced paragraph seems to place some unquantifiable financial risk on bidders other than the incumbent.
QUESTION: Can the Government please clarify the intent of this language? Are there under-funded pension liabilities with the current contractor’s plan that would require a successor contractor to incur some hidden liabilities? If so, does the government intent to allow a one time adjustment to compensate for these costs after award?RESPONSE: The requirements of the Service Contract Act apply to this contract; the intent of the language is to clarify a successor contractors responsibility under Section 4(c ) of the Act. You are referred to the DOL regulations 29 CFR Part 4 for a full statement of the obligations of a successor contractor. Should you have specific questions regarding your obligations under the Act, you should address these questions to the US Department of Labor Wage and Hour Division.

The predecessor contractor is responsible for all benefit liabilities incurred as a result of the Service Contract Act through the last date of their performance of the contract.

C-CP-003Collective Bargaining Agreements, Vacation Articles in CBA’sDISCUSSION: The CBAs provided with the solicitation require that current union employees receive vacation entitlement based upon their years of service. The incorrect application of accrued vacation in the cost model will cause an erroneous labor estimate.
QUESTION: Does the Government intend to provide accrued vacation summaries to bidders?RESPONSE: No, the government does not have this information. IAW FAR 22.1020 a seniority list will be provided to the new contractor upon commencement of the new contract.
C-CP-013Section J, Attachment 5 – Collective Bargaining AgreementsDISCUSSION:The successful offeror will be bound by the terms of the CBA to honor workforce longevity for benefits administration.
QUESTION:Please provide the average seniority of the workforce (by labor category, if available).RESPONSE: The government does not have this information. IAW FAR 22.1020 a seniority list will be provided to the new contractor upon commencement of the new contract.
C-CP-017Collective Bargaining Agreements, RFP pg. 52 of 124DISCUSSION: Section B-006 states in part, “The obligation of the successor contractor is limited to the wage and fringe benefit requirements of the predecessor’s collective bargaining agreement and does not extend to other items such as seniority, grievance procedures, work rules, overtime, etc." However, the CBA states that “Seniority shall be established by the date of hire/re-hire with the current contractor or predecessor contractor, whichever is earlier…”
QUESTION: Please clarify the obligation of the successor contractor in terms of recognizing continuity of service i.e. workforce seniority.RESPONSE A successor contractor is obligated to comply with the Service Contract Act 29 CFR Part 4.173 with regard to employee seniority for vacation eligibility. The successor contractor is not obligated to the terms of the incumbent CBA other than the wages and fringe benefits. You are referred to the DOL regulations 29 CFR Part 4 for a full statement of the obligations of a successor contractor. Should you have specific questions regarding your obligations under the Act, you should address these questions to the US Department of Labor Wage and Hour Division.

PAST PERFORMANCE (PP)

FINAL RFP
Tracking #RFP ReferenceComment/QuestionResponse
C-PP-011SECTION L 3.2 and 3.10, Page 2 of the RFPDISCUSSION: Past Performance submittal on page 2 discusses sending to Randolph AFB address. Paragraph L.3.2 references to L.3.10 which states submitting the Past Performance to Maxwell AFB address.
QUESTION: Which address and POC is the Past Performance to be submitted to?IAW SECTION L 3.2 and 3.10 submit the Past Performance Volume to the Contracting Officer at the address specified in Section L paragraph 3.10. Page 2 of the RFP discusses only sending questions or communications concerning this solicitation directly to the Contracting Officer, Mr. Myles Rellstab and Mr. Ron Mortag at AETC CONS/LGCK, 2021 FIRST STREET WEST, RANDOLPH AFB TX 78150-4302, tel. (210) 652-7998 and e-mail myles.rellstab@randolph.af.mil and ron.mortag@randolph.af.mil.to Randolph AFB address.

&RFA3002-06-R-0004 ATTACHMENT 6

&RSOLICITATION NUMBER F41689-00-R-0048

&CAttachment 4&RPage &P of &N

ALL-SERVICE REQUIREMENTS (2)

FINAL RFP
Tracking #RFP ReferenceComment/QuestionResponse
T-02-0012-3-1, RFP page 61, 2.3.5, H-017Will the cost of Government provided fuel be excluded from the 30% of proposed total contract value (Fixed Price CLIN) calculation for small business goals/targets?No, this will be a cost attributable to a Fixed Price CLIN and will have to be used in the calcualtion of dollars spent.

&RFA3002-06-R-0004 ATTACHMENT 6

Communications and IT (7)

FINAL RFP
Tracking #RFP ReferenceComment/QuestionResponse
T-07-0017-1-6 7.1.2.6.3Will the Government provide the workload data and tier level support for this function?Yes, the government will provide a list of currently approved software in usage on the Maxwell-Gunter Metropolitan Area Network (MAN) (approximately 1345 software products) and will be available for viewing at the Maxwell Library. Data is sensitive and will have to be viewed by making an appointment with Linda Lowmiller, linda.lowmiller@maxwell.af.mil and will not be copied..
T-07-0027-1-3 and 7-1-3Does the Government intend to provide and GFE for both PA and video presentation, if applicable?Reference: Appendix 2FC, pages 2FC-32 thru 2FC-38 identifies the list of PA and Video equipment. However, this list does not include laptops, monitors or projectors; since these items are loaned from AU/TV to customers for use.
T-07-0037-1-12Will the Government provide workload data for this scope of work?No workload data currently exists for this PWS reference.
T-07-0047B-8Does the government intend for work to be performed in this work section?Yes, PWS Section 07 01, paragraph 7.1.2. was modified and a new paragraph was added to describe this work.(paragraph 7.1.2.1.9.). a. Modified paragraph: 7.1.2. TELECOMMUNICATIONS/TELEPHONE/WIRE SERVICES b. New paragraph (added): 7.1.2.1.9. Telecommunications Center processes formatted messages for Maxwell AFB. Message handling includes transmitting formatted messages, receiving incoming, formatted messages and distributing formatted messages to Maxwell AFB customers.

&RFA3002-06-R-0004 ATTACHMENT 6

Yes, the government will provide a list of currently approved software in usage on the Maxwell-Gunter Metropolitan Area Network (MAN) (approximately 1345 software products) and will be available for viewing at the Maxwell Library. Data is sensitive and will have to be viewed by making an appointment with Linda Lowmiller, linda.lowmiller@maxwell.af.mil and will not be copied..

HOUSING (10)

FINAL RFP
Tracking #RFP ReferenceComment/QuestionResponse
T-10-00110,11, and 22Is there a requirement for any grassing cutting associated with this contract other than what is stated in Paragraph 11.1.2.6 Military Family Housing and 13.1.2.7 Site Maintenance?RESPONSE: 42 MSG/CEO provides primary grass cutting for the entire base except those areas identified in the PWS. The contractor will be expected to perform grass cutting on grounds associated with vacant family housing (11.1.2.6.1) and, grass cutting in association with preparing and maintaining playing fields seasonally for all sports programs (28.1.2.3.1.) This excludes the Officer Training School (OTS) parade ground and the flicker ball fields of the Squadron Officer School (SOC). The BOS contractor will also be expected to perform lawn maintenance as outlined in 13.1.3.8.- Schedule and perform weed control maintenance to eliminate weeds and vegetation on airfield, installation fences, perimeter fences, fences around ball fields, security areas, joints and cracks in pavements, airfield pavements, roads, sidewalks, storage, and parking areas free of vegetation, as required. Maintain the entire area inside electrical transformer stations that do not belong to Cooperative Utility Services (CUS) and the petroleum oil lubricant areas and section 13.1.3.9.- Remove and take action to prevent return of vegetation on airfield pavements, roads, sidewalks and playgrounds.
T-10-00210,11, and 22Who maintains/cuts the grass on the airfield?RESPONSE: 42 MSG/CEO provides primary grass cutting for the entire base except those areas identified in the PWS. The contractor will be expected to perform grass cutting on grounds associated with vacant family housing (11.1.2.6.1) and, grass cutting in association with preparing and maintaining playing fields seasonally for all sports programs (28.1.2.3.1.) This excludes the Officer Training School (OTS) parade ground and the flicker ball fields of the Squadron Officer School (SOC). The BOS contractor will also be expected to perform lawn maintenance as outlined in 13.1.3.8.- Schedule and perform weed control maintenance to eliminate weeds and vegetation on airfield, installation fences, perimeter fences, fences around ball fields, security areas, joints and cracks in pavements, airfield pavements, roads, sidewalks, storage, and parking areas free of vegetation, as required. Maintain the entire area inside electrical transformer stations that do not belong to Cooperative Utility Services (CUS) and the petroleum oil lubricant areas and section 13.1.3.9.- Remove and take action to prevent return of vegetation on airfield pavements, roads, sidewalks and playgrounds.
T-10-00310C-1Will the government provide a physical description of the Military Family Housing Units, i.e. age, construction type, roofing types etc?RESPONSE: Attached is the existing roofing database (Maxwell Gunter roofing data. PDF) and applicable Housing data (Housing Data Sheet.XLS).

&RFA3002-06-R-0004 ATTACHMENT 6

O & M (11)

FINAL RFP
Tracking #RFP ReferenceComment/QuestionResponse
T-11-00111B-2The chart show a total of 1,918 COMs a year but when added manually they total 959 for three years translating to an average of 319 plus a year, can you confirm which of these figures are correct?The correct number is 319.6 average COM’s per year.
T-11-00211-1This paragraph states "Maintain all lawns for vacant family housing units to include the Maxwell Heights Housing Annex". Are there other requirement to maintain ground in the MFH areas i.e. parks, picnic areas and paygrounds?42 MSG/CEO provides primary grass cutting for the entire base except those areas identified in the PWS. The contractor will be expected to perform grass cutting on grounds associated with vacant family housing (11.1.2.6.1) and, grass cutting in association with preparing and maintaining playing fields seasonally for all sports programs (28.1.2.3.1.) This excludes the Officer Training School (OTS) parade ground and the flicker ball fields of the Squadron Officer School (SOC). The BOS contractor will also be expected to perform lawn maintenance as outlined in 13.1.3.8.- Schedule and perform weed control maintenance to eliminate weeds and vegetation on airfield, installation fences, perimeter fences, fences around ball fields, security areas, joints and cracks in pavements, airfield pavements, roads, sidewalks, storage, and parking areas free of vegetation, as required. Maintain the entire area inside electrical transformer stations that do not belong to Cooperative Utility Services (CUS) and the petroleum oil lubricant areas and section 13.1.3.9.- Remove and take action to prevent return of vegetation on airfield pavements, roads, sidewalks and playgrounds.
T-11-00311-1Is there a Grounds Maintenance Contractor and do they maintain all public areas on the installations to include Military Family Housing Areas?42 MSG/CEO provides primary grass cutting for the entire base except those areas identified in the PWS. The contractor will be expected to perform grass cutting on grounds associated with vacant family housing (11.1.2.6.1) and, grass cutting in association with preparing and maintaining playing fields seasonally for all sports programs (28.1.2.3.1.) This excludes the Officer Training School (OTS) parade ground and the flicker ball fields of the Squadron Officer School (SOC). The BOS contractor will also be expected to perform lawn maintenance as outlined in 13.1.3.8.- Schedule and perform weed control maintenance to eliminate weeds and vegetation on airfield, installation fences, perimeter fences, fences around ball fields, security areas, joints and cracks in pavements, airfield pavements, roads, sidewalks, storage, and parking areas free of vegetation, as required. Maintain the entire area inside electrical transformer stations that do not belong to Cooperative Utility Services (CUS) and the petroleum oil lubricant areas and section 13.1.3.9.- Remove and take action to prevent return of vegetation on airfield pavements, roads, sidewalks and playgrounds.
T-11-004Section11 appendix 11BAre the RWP, Emergency, Urgent, Routine work requests and operation tasks listed in paragraphs 11B.1.4 through paragraph 11B1.14 included in the workload data provided in the 11B.1.1 table?RESPONSE: None of the workload described in 11B.1.4. through 11B.1.14 is included in the table of 11B1.1. with the exception of two paragraphs. The workload for paragraphs 11B.1.11, Cooling Towers and, 11B.1.13, Cathodic Protection are already reflected in the RWP work load estimates.
T-11-005Section 11,11-1-1Is there a cooling plant operation controlled by EMCS at Maxwell? At GunterRESPONSE: Bldg 1410 at Maxwell is controlled and monitored by the EMCS. None at Gunter.

&RFA3002-06-R-0004 ATTACHMENT 6

TRANSIENT MAINTENANCE (20)

FINAL RFP
Tracking #RFP ReferenceComment/QuestionResponse
T-20-00120-1,21-1, and 32-1Are the weather / base operations / transient alert personnel covered under a CBA? If so, can the CBA be provided to the offerors?The base operations and transient alert personnel are covered under CBA 2004-2520 effective date 16 Jun 06, Attachment 5 to this solicitation. The weather personnel fall under wage determination 05-2011, Attachment 2 to this solicitation.

&RFA3002-06-R-0004 ATTACHMENT 6

AIRFIELD MANAGEMENT (21)

FINAL RFP
Tracking #RFP ReferenceComment/QuestionResponse
T-21-00121-1Is this vehicle currently GFE or CFE?RESPONSE: The vehicle is currently GFE.
T-21-00221BIs there workload data for airfield special events (ie. airshow, flybys, graduations, etc.)?RESPONSE: Special Events workload data is in paragraph 2B.1.2. Support for Special Events

&RFA3002-06-R-0004 ATTACHMENT 6

SUPPLY SERVICES (23)

FINAL RFP
Tracking #RFP ReferenceComment/QuestionResponse
T-23-001RFP Section B and Section 23Please clarify Section B CLIN references to PWS Section 23All except CLIN X027 were corrected in Amendment 2, posted 11 May 2007. CLIN X027 will change to 23.1.2.5. in the next Amendment.

&RFA3002-06-R-0004 ATTACHMENT 6

TRANSPORTATION SERVICES (25)

FINAL RFP
Tracking #RFP ReferenceComment/QuestionResponse
T-25-001Appendix 25FFWhat is the make and model of each of the Government Furnished Vehicles/Equipment listed in Appendix 25FF.1.1 through 25FF.1.5. Furthermore, what does the data represent in the M/H/U, Current, Veh Eq, and ASC columns?
T-25-002Appendix 25FFHow many generators and what types support Maxwell / Gunter under this RFP?RESPONSE: Two (2) types of generators are on Maxwell/Gunter, Real Property Install Equipment (RPIE) and portable. See Service Area 2 and Appendix 2FC for specifics.

&RFA3002-06-R-0004 ATTACHMENT 6

STATIC DISPLAY (26)

FINAL RFP
Tracking #RFP ReferenceComment/QuestionResponse
T-26-00126BThe table presented with a listing of aircraft paint dates indicates that the following aircraft are over due painting -- T-38, F-4, F-105, F-86, C-47; and the following aircraft are due painting at or before the new contract award – B-25, F-100, F-101. Will these be completed prior to contract start, and if so, can you provide a revised/updated listing as this could be a major cost in personnel and supplies at start up
T-26-00226BThe table presented with a listing of aircraft radiation survey dates indicates that the following aircraft are over due a radiation survey -- T-38, F-4, B-25, F-86, F-100, & BT-15. Will these surveys be completed prior to contract start, and if so, can you provide a revised/updated listing.The aircraft listed above, with the exception of the BT-15, have had all radiated parts/instruments removed and radiation surveys (external and internal) are no longer required. Only aircraft with radiated parts, that can’t be removed, are surveyed every three years. The BT-15’s external radiation surveys were performed but not the internal surveys because the aircraft’s canopy is sealed. The aircraft’s canopy seals will be removed and an internal radiation survey will be performed when the aircraft is re-painted in March 2008. Aircraft radiation surveys are performed by the Base Bioenvironmental Engineer (BEE), not the Contractor. The contractor only notifies the BEE when radiations surveys are due.

&RFA3002-06-R-0004 ATTACHMENT 6

MBD0003B34D/T-25-001.pdf

RESPONSE: Section 25FF.1.1 Basic knowledge of OLVIMS format is derived from T.O. 36-1-191, AFCSM 24-1 and AFI 23-302, working an interface with SBSS and REMS.

Reg # Cmd Use Org Veh RC/CC Std Price

RpC d OTR FC M/H/U

Curren t

Veh Eq

ASC

Make and model of each of the Government Furnished Vehicles/Equipment: Under column marked “VEH” is the Vehicle Make/Type - A short nomenclature that identifies the vehicle by manufacturer and design.

M/H/U: Mile/Hour/Kilometer/Unit Code - A code that identifies how the vehicle/equipment utilization is recorded.

Current: Current Miles/Hours/Kilometers - The most current miles/hours/ kilometers on a vehicle at any given time.

Veh Eq: Vehicle Equivalent - A unit of measure that denotes the maintenance complexity of a vehicle or item of equipment.

Used to determine manning, shop space, and shop equipment requirements.

ASC columns: Allowance Source Code - Supply data element which passes through OLVIMS in the "REM" and "FCI" transaction. Allows the "FCI" transaction to be input to the SBSS without change.

MBD001DD2B8.doc

AIRCRAFT

LAST COMPLETED PAINTING

BT-15

15 Mar 02---Due 15 Mar 08

B-52

20 Aug 03---Due 20 Aug 09

C-47

31 Mar 01----1 May 2007 (Completed)

F-105

26 Jan 02---Due 26 Jan 08

F-101

24 Dec 01--- Due 24 Dec 07

B-25

23 Sept 01---Sep 2007*

F-4

28 Dec 00----May 2007* (Work in progress)

F-100

13 Nov 01--- Due 13 Nov 07

F-86

20 Feb01----Jun 2007* (Work in progress)

T-38

27 Oct 00----4 Jan 2007 (Completed)

*Proposed completion dates

MBD000214C8/Housing Data Sheet.xls Sheet 1

Facility Number Rc Cat Nbr Heritage Cd Net Floor Area Type Construction Year Built Dt

4 711144 Y NULL P 1941

5 711144 Y NULL P 1941

6 711144 Y NULL P 1941

9 711144 Y NULL P 1941

10 711144 Y NULL P 1941

11 711144 Y NULL P 1941

12 711144 Y NULL P 1941

13 711144 Y NULL P 1941

14 711144 N NULL P 1941

15 711144 Y NULL P 1941

16 711144 Y NULL P 1941

29 711144 Y NULL P 1941

30 711144 Y NULL P 1941

31 711144 N NULL P 1941

32 711144 Y NULL P 1941

33 711144 Y NULL P 1941

34 711144 Y NULL P 1941

35 711144 Y NULL P 1941

53 711142 N NULL P 1996

54 711142 N NULL P 1996

55 711142 N NULL P 1996

56 711142 N NULL P 1996

57 711142 N NULL P 1996

58 711142 N NULL P 1996

59 711142 N NULL P 1996

60 711142 N NULL P 1996

61 711142 N NULL P 1996

63 711142 N NULL P 1996

65 711142 N NULL P 1996

67 711142 N NULL P 1996

68 711142 N NULL P 1996

70 711142 N NULL P 1996

71 711142 N NULL P 1996

73 711142 N NULL P 1996

74 711142 N NULL P 1996

100 714431 Y 473 P 1934

101 711144 Y 2931 P 1934

102 711144 Y 2853 P 1934

103 714431 Y 437 P 1934

104 711144 Y 3003 P 1934

105 711144 Y 3003 P 1934

106 714431 Y 516 P 1934

107 711144 Y 3003 P 1934

108 711144 Y 3484 P 1934

109 714431 Y 473 P 1934

110 711144 Y 3484 P 1934

111 711144 Y 3426 P 1934

112 714431 Y 473 P 1934

113 711144 Y 3426 P 1934

114 711144 Y 3484 P 1934

115 714431 Y NULL P 1934

116 711144 Y 3484 P 1934

122 714431 Y 1328 P 1934

123 711144 Y 3623 P 1934

124 714433 N NULL P 1933

125 711144 Y 3003 P 1932

126 714431 Y 437 P 1933

127 711144 Y 2853 P 1932

128 711144 Y 3003 P 1932

129 714431 Y 437 P 1933

130 711144 Y 3003 P 1932

131 711144 Y 2931 P 1934

132 714431 Y 473 P 1934

133 711144 Y 2931 P 1934

134 711144 Y 2931 P 1934

136 711142 N 0 P 2001

137 711142 N 0 P 2001

138 711142 N 0 P 2001

139 711142 N 0 P 2001

140 711142 N 0 P 2001

141 711142 N 0 P 2001

146 711142 N 3269 P 2001

148 711142 N 3340 P 2001

149 711142 N 3181 P 2001

150 714433 N NULL P 1953

150 711142 N 2540 P 2001

151 714433 N NULL P 1953

152 714433 N NULL P 1953

152 711142 N 3896 P 2001

153 711142 N 3181 P 2001

154 711142 N 3269 P 2001

155 711142 N 3269 P 2001

156 711142 N 3340 P 2001

157 711142 N 3340 P 2001

158 711142 N 3181 P 2001

159 711142 N 3181 P 2001

160 711142 N 3269 P 2001

161 711142 N 3269 P 2001

162 711142 N 3181 P 2001

163 711142 N 3181 P 2001

164 711142 N 1867 P 2001

165 711142 N 3269 P 2001

170 711142 N 1746 P 2001

170 711142 N NULL P 1975

171 711142 N NULL P 1975

171 711142 N 1760 P 2001

172 711142 N NULL P 1975

173 711142 N 1743 P 2001

173 711142 N NULL P 1975

174 711142 N NULL P 1975

175 711142 N NULL P 1975

175 711142 N 1912 P 2001

176 711142 N NULL P 1975

177 711142 N 1746 P 2001

177 711142 N NULL P 1975

178 711142 N NULL P 1996

179 711142 N 1743 P 2001

179 711142 N NULL P 1996

180 711142 N 1746 P 2001

180 711142 N NULL P 1996

181 711142 N 1912 P 2001

181 711142 N NULL P 1996

182 711142 N 1743 P 2001

182 711142 N NULL P 1996

183 711142 N NULL P 1996

183 711142 N 1746 P 2001

184 711142 N NULL P 1996

184 711142 N 1912 P 2001

185 711142 N 1596 P 2001

186 711142 N NULL P 1996

186 711142 N 1746 P 2001

187 711142 N 1746 P 2001

188 711142 N 1912 P 2001

189 711142 N 1956 P 2001

190 711142 N 1743 P 2001

191 711142 N 1743 P 2001

192 711142 N 1912 P 2001

193 711142 N 1912 P 2001

194 711142 N 1912 P 2001

195 711142 N 1760 P 2001

196 711142 N 1743 P 2001

197 711142 N 1912 P 2001

200 711144 Y 2931 P 1934

201 714431 Y 473 P 1934

202 711144 Y 2931 P 1934

203 711144 Y 2931 P 1934

204 714431 Y 516 P 1934

205 711144 Y 2931 P 1934

206 711144 Y 2931 P 1934

207 714431 Y 437 P 1934

208 711144 Y 2931 P 1934

209 711144 Y 2853 P 1934

210 714431 Y 473 P 1934

211 711144 Y 2853 P 1934

212 711144 Y 3003 P 1934

213 714431 Y 437 P 1933

214 711144 Y 3003 P 1932

215 711144 Y 2853 P 1932

216 714431 Y 437 P 1933

217 711144 Y 3003 P 1932

218 711144 Y 3003 P 1934

219 714431 Y 437 P 1933

220 711144 Y 2853 P 1932

221 711144 Y 3484 P 1934

222 714431 Y 437 P 1933

223 711144 Y 2853 P 1934

224 711144 Y 3003 P 1932

225 714431 Y 0 P 1933

226 711142 N 3181 P 2001

226 714431 Y 437 P 1933

227 711144 Y 3003 P 1932

227 711142 N 2138 P 2001

228 711142 N 3269 P 2001

228 711144 Y 2853 P 1932

229 714431 Y 437 P 1933

229 711142 N 3340 P 2001

230 711142 N 3269 P 2001

230 711144 Y 3003 P 1932

231 711142 N 3269 P 2001

231 711144 Y 3003 P 1932

232 714431 Y 437 P 1933

232 711142 N 3181 P 2001

233 711142 N 2540 P 2001

233 711144 Y 3003 P 1934

234 711142 N 1867 P 2001

234 711144 Y 3003 P 1934

235 711142 N 3269 P 2001

235 714431 Y 473 P 1934

236 711144 Y 3003 P 1934

238 714433 N NULL P 1953

239 714433 N NULL P 1953

240 714433 N NULL P 1953

241 714433 N NULL P 1953

300 711144 Y 2853 P 1932

301 714431 Y 437 P 1933

302 711144 Y 2853 P 1934

303 711144 Y 3003 P 1932

304 714431 Y 437 P 1933

305 711144 Y 3003 P 1932

306 711144 Y 2853 P 1934

307 714431 Y 437 P 1933

308 711144 Y 3003 P 1932

309 711144 Y 3484 P 1934

310 714431 Y 473 P 1934

311 711144 Y 3484 P 1934

312 711144 Y 3426 P 1934

313 714431 Y 473 P 1934

314 711144 Y 3426 P 1934

315 711144 Y 3623 P 1934

316 714431 Y 473 P 1934

317 711144 Y 3623 P 1934

318 711144 Y 3623 P 1934

319 714431 Y 473 P 1934

320 711144 Y 3623 P 1934

321 714431 Y 473 P 1934

322 711144 Y 3484 P 1934

323 711144 Y 3426 P 1934

324 714431 Y 473 P 1934

325 711144 Y 3426 P 1934

326 711144 Y 3484 P 1934

327 714431 Y 516 P 1934

328 711144 Y 3484 P 1934

329 711144 Y 3665 P 1934

329 711142 N 1867 P 2001

330 714431 Y 473 P 1934

331 711142 N 3340 P 2001

331 711144 Y 3526 P 1934

332 711142 N 3269 P 2001

332 711144 Y 3426 P 1934

333 711142 N 3181 P 2001

333 714431 Y 473 P 1934

334 711144 Y 3426 P 1934

334 711142 N 3269 P 2001

335 714431 Y 258 P 1934

336 711144 Y 3484 P 1934

336 711142 N 3181 P 2001

337 711142 N 3340 P 2001

337 711144 Y 4827 P 1934

338 711142 N 3269 P 2001

339 711144 Y 3484 P 1934

339 711142 N 3181 P 2001

340 711142 N 1867 P 2001

340 714431 Y 473 P 1934

341 711144 Y 3426 P 1934

341 711142 N 3269 P 2001

342 711142 N 3181 P 2001

342 711144 Y 3623 P 1934

343 714431 Y 516 P 1934

344 711144 Y 3623 P 1934

345 711144 Y 3484 P 1934

346 714431 Y 605 P 1934

347 711144 Y 3623 P 1934

350 714433 N NULL P 1933

350 711142 N 3896 P 2001

351 711142 N 3340 P 2001

351 714433 N NULL P 1953

352 711142 N 3340 P 2001

352 714433 N NULL P 1953

353 714433 N NULL P 1953

353 711142 N 3269 P 2001

354 711142 N 3181 P 2001

354 714433 N NULL P 1953

355 711142 N 3181 P 2001

355 714433 N NULL P 1959

356 711142 N 3269 P 2001

357 711142 N 3269 P 2001

358 711142 N 1867 P 2001

360 711142 N 3181 P 2001

370 711142 N 3896 P 2001

371 711142 N 3269 P 2001

372 711142 N 3269 P 2001

373 711142 N 3269 P 2001

374 711142 N 3181 P 2001

375 711142 N 3296 P 2001

376 711142 N 1893 P 2001

400 711144 Y 2505 P 1935

401 714431 Y 473 P 1934

402 711144 Y 2408 P 1935

403 714431 Y 258 P 1934

404 711144 Y 2408 P 1935

405 711144 Y 2505 P 1935

406 714431 Y 473 P 1934

407 711144 Y 2408 P 1935

408 711144 Y 2408 P 1935

409 714431 Y 473 P 1934

410 711144 Y 2408 P 1935

411 711144 Y 2505 P 1935

412 714431 Y 473 P 1934

413 711144 Y 2505 P 1935

414 711144 Y 2505 P 1935

415 714431 Y 473 P 1934

416 711144 Y 2505 P 1935

417 711144 Y 2408 P 1935

418 714431 Y 516 P 1934

419 711144 Y 2408 P 1935

420 711144 Y 2408 P 1935

421 714431 Y 473 P 1934

422 711144 Y 2505 P 1935

423 711144 Y 2505 P 1935

424 714431 Y 516 P 1934

425 711144 Y 2408 P 1935

426 711144 Y 2408 P 1935

427 711144 Y 2505 P 1935

428 714431 Y 473 P 1934

429 711144 Y 2505 P 1935

430 714431 Y 473 P 1934

431 711144 Y 2505 P 1935

432 711144 Y 2408 P 1935

433 714431 Y 473 P 1934

434 711144 Y 2505 P 1935

435 711144 Y 2408 P 1935

436 711144 Y 3484 P 1935

437 714431 Y 473 P 1934

438 714431 Y 473 P 1934

443 714433 N NULL P 1953

444 714433 N NULL P 1953

445 714433 N NULL P 1953

446 714433 N NULL P 1953

447 714433 N NULL P 1953

503 711144 N NULL P 1942

504 711144 N NULL P 1942

510 711144 N NULL P 1941

511 711144 N NULL P 1941

512 711144 N NULL P 1941

513 711144 N NULL P 1941

520 711144 N NULL P 1941

521 711144 N NULL P 1941

522 711144 N NULL P 1941

523 711144 N NULL P 1941

524 711144 N NULL P 1941

525 711144 N NULL P 1941

526 711144 N NULL P 1941

527 711144 N NULL P 1941

528 711144 N NULL P 1941

529 711144 N NULL P 1941

530 711144 N NULL P 1941

531 711144 N NULL P 1941

532 711144 N NULL P 1941

533 711144 N NULL P 1941

534 711144 N NULL P 1941

535 711144 N NULL P 1941

536 711144 N NULL P 1941

537 711144 N NULL P 1941

560 711142 N NULL P 1975

561 711142 N NULL P 1975

562 711142 N NULL P 1975

563 711142 N NULL P 1975

564 711142 N NULL P 1975

565 711142 N NULL P 1975

566 711142 N NULL P 1975

568 711142 N NULL P 1975

569 711142 N NULL P 1975

570 711142 N NULL P 1975

571 711142 N 0 P 2001

626 714431 Y NULL P 1931

629 714431 Y NULL P 1931

631 714431 Y 0 P 1934

632 714431 Y 0 P 1934

635 711144 Y NULL P 1934

636 711144 Y NULL P 1928

637 711144 Y NULL P 1934

638 711144 Y NULL P 1928

639 711144 Y NULL P 1928

640 711144 Y NULL P 1928

641 711144 Y NULL P 1928

642 711144 Y NULL P 1928

643 711144 Y NULL P 1928

644 711144 Y NULL P 1928

645 711144 Y NULL P 1928

646 711144 Y NULL P 1928

647 711144 Y NULL P 1928

648 711144 Y NULL P 1928

649 711144 Y NULL P 1928

650 711144 Y NULL P 1931

651 711144 Y NULL P 1934

652 711144 Y NULL P 1931

653 711144 Y NULL P 1934

654 714431 Y NULL P 1934

655 714431 Y NULL P 1934

656 714431 Y NULL P 1934

657 714431 Y NULL P 1934

658 714431 Y NULL P 1934

659 714431 Y NULL P 1934

660 714431 Y NULL P 1934

661 714431 Y NULL P 1934

662 714431 Y NULL P 1934

663 714431 Y NULL P 1934

664 714431 Y NULL P 1934

665 714431 Y NULL P 1934

669 711144 Y NULL P 1934

670 711144 Y NULL P 1934

671 711144 Y NULL P 1934

672 711144 Y NULL P 1934

673 711144 Y NULL P 1934

674 711144 Y NULL P 1934

675 711144 Y NULL P 1934

676 711144 Y NULL P 1934

715 711144 Y NULL P 1931

716 711144 Y NULL P 1931

717 711144 Y NULL P 1931

718 711144 Y NULL P 1931

719 711144 Y NULL P 1931

720 711144 Y NULL P 1931

721 711144 Y NULL P 1931

722 711144 Y NULL P 1931

723 711144 Y NULL P 1931

724 711144 Y NULL P 1931

725 711144 Y NULL P 1934

726 711144 Y NULL P 1934

727 711144 Y NULL P 1934

728 711144 Y NULL P 1934

729 711144 Y NULL P 1934

730 711144 Y NULL P 1934

731 711144 Y NULL P 1934

732 711144 Y NULL P 1934

733 714431 Y NULL P 1934

734 714431 Y NULL P 1934

735 714431 Y NULL P 1934

736 714431 Y NULL P 1934

1601 711142 N 3414 P 1975

1602 711142 N NULL P 1975

1603 711142 N 3538 P 1975

1604 711142 N 3538 P 1975

1605 711142 N 3414 P 1975

1606 711142 N 3538 P 1975

1607 711142 N 3538 P 1975

1608 711142 N 3414 P 1975

1609 711142 N 3414 P 1975

1611 711142 N 3538 P 1975

1612 711142 N 3538 P 1975

1613 711142 N 3414 P 1975

1614 711142 N 3414 P 1975

1615 711142 N 3538 P 1975

1616 711142 N 3538 P 1975

1617 711142 N 3414 P 1975

1618 711142 N 3414 P 1975

1619 711142 N 3538 P 1975

1620 711142 N 3538 P 1975

1621 711142 N 3414 P 1975

1622 711142 N 3414 P 1975

1623 711142 N 3538 P 1975

1624 711142 N 3538 P 1975

1625 711142 N 3414 P 1975

1627 711142 N 3538 P 1975

1628 711142 N 3414 P 1975

1629 711142 N 3414 P 1975

1630 711142 N 3538 P 1975

1631 711142 N 3538 P 1975

1632 711142 N 3414 P 1975

1633 711142 N 3538 P 1975

1634 711142 N 3538 P 1975

1635 711142 N 3414 P 1975

1636 711142 N 3538 P 1975

1637 711142 N 3538 P 1975

1638 711142 N 3538 P 1975

1640 711142 N 3414 P 1975

1642 711142 N 3414 P 1975

1643 711142 N 3414 P 1975

1644 711142 N 3414 P 1975

1645 711142 N 3538 P 1975

1646 711142 N 3414 P 1975

1647 711142 N 3538 P 1975

1648 711142 N 3414 P 1975

1649 711142 N 3414 P 1975

1650 711142 N 3538 P 1975

1652 711142 N 3414 P 1975

1654 711142 N 3414 P 1975

1655 711142 N 3414 P 1975

1656 711142 N 3538 P 1975

1657 711142 N NULL P 1975

1658 711142 N NULL P 1975

1659 711142 N NULL P 1975

1660 711142 N NULL P 1975

1661 711142 N NULL P 1975

1663 711142 N NULL P 1975

1665 711142 N NULL P 1975

1666 711142 N NULL P 1975

1667 711142 N NULL P 1975

1668 711142 N NULL P 1975

1669 711142 N NULL P 1975

1671 711142 N NULL P 1975

1672 711142 N NULL P 1975

1673 711142 N NULL P 1975

1674 711142 N NULL P 1975

1675 711142 N NULL P 1975

1677 711142 N NULL P 1975

1678 711142 N NULL P 1975

1679 711142 N NULL P 1975

1681 711142 N NULL P 1975

1682 711142 N NULL P 1975

1683 711142 N NULL P 1975

1684 711142 N NULL P 1975

1685 711142 N NULL P 1975

1687 711142 N NULL P 1975

1688 711142 N NULL P 1975

1689 711142 N NULL P 1975

1690 711142 N NULL P 1975

1691 711142 N NULL P 1975

1693 711142 N NULL P 1975

1695 711142 N NULL P 1975

1696 711142 N NULL P 1975

1697 711142 N NULL P 1975

1698 711142 N NULL P 1975

1699 711142 N NULL P 1975

MBD00021B72/Max Gunter Roof Information.pdf

File details come from the government source that posted it. Updated .