PostingQuestions04June.xls

XLS spreadsheet 89 KB Posted

Attached to
Maxwell-Gunter AFB BOS FA3002-06-R-0004 Federal contract opportunity
Solicitation number
FA3002-06-R-0004
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

Questions and Answers Part III 04 June 07

View the file

Other files for this federal contract opportunity

Other files attached to Maxwell-Gunter AFB BOS FA3002-06-R-0004, newest first.
File Type Posted
10-2 Housing Occupancy Rate amendment 0013.doc DOC document
CE-SAG SDS Metric amendment 0013.doc DOC document
19 01 Max Custodial Description of Services amend 0013.doc DOC document
19 02 Max Custodial Service Summary amend 0013.doc DOC document
05 05 MAX Resource Management Workload Appendix 5B amendment 0013.doc DOC document
BWS-SAG SDS Metric amend 0013.doc DOC document
19 06 MAX Custodial Maps Appendix 19C amendment 0013.doc DOC document
Amendment 0013 SF 30 26Mar08.pdf PDF
ATTACH7MaxwellCostModel-21Aug08Amend0017.xls XLS spreadsheet
ATTACH6ManpowerMatrix-21AUG08Amend0017.xls XLS spreadsheet
FA3002-06-R-0004Conformed copy Amend 0017.doc DOC document
AF 7115 Dec 2007.pdf PDF
ATTACH7MaxwellCostModel-5May08Amend0014.xls XLS spreadsheet
PostingQuestions04Sep.pdf PDF
PostingQuestions30Aug.pdf PDF
Amend0010.zip ZIP file
Amend0009.zip ZIP file
Amend0008.zip ZIP file
Amend0006.zip ZIP file
FA3002-06-R-0004-0005Replacement95page.pdf PDF
PostingQuestions29May.xls XLS spreadsheet
Amend0004.zip ZIP file
GunterSiteVisit.doc DOC document
MaxwellPPMaster11May07.ppt PPT presentation
MaxwellSiteVisit.doc DOC document
FA3002-06-R-0004-0003Conformedcopy.pdf PDF
HotelsMotelsMontgomeryPrattvilleAL.doc DOC document
ATTACH5CBAs.zip ZIP file
ATTACH8-13PASTPERFORMANCE.zip ZIP file
ATTACH7MaxwellCostModel-26Mar07.xls XLS spreadsheet
ATTACH14SubktrPlanPlusQPIWorksheetV3.xls XLS spreadsheet
Section7A.doc DOC document
1_QUESTIONFORM5.doc DOC document
RFIDraftPWSSection7.doc DOC document
RFIDraftSectionHClause.doc DOC document
QuestionFormDraftSectionHClause.doc DOC document
ReadyCombinedSA14.doc DOC document
ReadyCombinedSA28.doc DOC document
RFIDraftPWS10 15 and28.doc DOC document
ReadyCombinedSA21.doc DOC document
4_QuestionFormDraftPWS.doc DOC document
ReadyCombinedSA30.doc DOC document
RFIDraftPWS1.doc DOC document
ReadyCombinedSA16.doc DOC document
NEWTABLEOFCONTENTS1.doc DOC document
ReadyCombinedSA13.doc DOC document
1_QuestionFormDraftPWS.doc DOC document
ReadyCombinedSA22.doc DOC document
ReadyCombinedSA3.doc DOC document
NOTICETOOFFERORS.doc DOC document
Show all 50

Maxwell-Gunter AFB BOS FA3002-06-R-0004 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP (00)

FINAL RFP
Tracking #RFP ReferenceComment/QuestionResponse
C-00-003L.5.4.8 and M.7.0DISCUSSION: Paragraph L.5.4.8 talks about Proposal Risk within Volume III – Contingency Operations Response. However, paragraph M.7.0 Factor 4 – Proposal Risk, is a separate evaluation factor.
QUESTION: Is Proposal Risk found within Section L.5.4.8 correct or is it supposed to be separated?SEE AMENDMENT 0004
C-00-007RFP Section IDISCUSSION: The RFP contains cost reimbursable CLINs; however, some cost FAR clauses have not been incorporated.
QUESTION: Request the Government to incorporate all applicable cost reimbursable FAR clauses in the RFP, e.g., 52.245-5, Government Property (Cost-Reimbursement, Time-and-Material, or Labor-Hour Contracts).Clause 52.245-5, Government Property is inserted when a Cost-Reimbursement, Time-and-Material, or Labor-Hour Contract is contemplated. This acquisition is being procured as a Fixed Priced Incentive contract. Clause 52.245-5, Government Property and additional cost reimbursable clauses will not be included into the RFP at this time.
C-00-008Paragraph h., Small Business (SB) GoalsIn Clause H-031, paragraph h, the small business goal is expressed as 35%. This goal conflicts with the 30% goal set forth in Section L, Paragraph 6.3 on page 106 and Section M, Paragraph 8.2 on page 122.IAW H-031(h). The small business goal to obtain the "Earned Profit" is 30% however to earn the 20 small business incentive profit points, all of the earned profit percentage goals must be achieved and a percentage of at least 35 percent for small business overall must be achieved."
C-00-009RFP Section L.2.1DISCUSSION: When discussing page count the NOTE states, “Page count does not include… documentation required by L-901 (g)(2)(e.).”
QUESTION: Where is the reference to L-901 (g)(2)(e) and what documentation does it require? There is also a similar concern in Section L.3.2 which references a clause L-904, where is this clause located.SEE AMENDMENT 0001

&RFA3002-06-R-0004 ATTACHMENT 6

&RSOLICITATION NUMBER F41689-02-R-0048

&LAs of 6 May 03&CAttachment 4 to Section J&RPage &P of &N

Cost Price

FINAL RFP
Tracking #RFP ReferenceComment/QuestionResponse
C-CP-005Section H, Paragraph H-003 and Section I, DFARS Clause 252.228-7001DISCUSSION: The Insurance Clause in Section H makes no reference to required Ground and Flight Risk Insurance, although the DFARS Clause dealing with this topic is included within Section I. QUESTION: Will the Government please confirm that bidders are required to have General and Flight Risk Insurance?Ground And Flight Risk Clause 252.228-7001 will remain in the RFP
C-CP-010Section J, Attachment 7, Cost ModelDISCUSSION: The guidance on the referenced page states in part: “Provide the worksheets on which you combine the costs for each subcontractor, breaking out the costs for each subcontractor.” Because some subcontractors used in one proposal may be competitors in a subsequent proposal, industry practice is that a subcontractor will provide their pricing to a prime at only the summary (CLIN) level, with no supporting detail, in order to protect their business sensitive Indirect Rates and pricing methodology. Of course the subcontractor’s sealed package to the Government will make full disclosure of their pricing. Given these facts, a prime will only be able to provide a single line of support for subcontractor costs, presenting the subcontractor’s price by CLIN on the line identified as “Subcontracts.” QUESTION: Will the above stated methodology be acceptable to the Government in light of the fact that subcontractor teammates will not make full disclosure to their prime partners?See Amendment 0002 for revised price/cost proposal instructions.
C-CP-025PWS paragraph 2.3.5 and RFP Section H, Clause H-017DISCUSSION: The contractor will be authorized to use the military service station, and if the contractor chooses to use the military service station the contractor will be charged by the Government for the Government provided fuel. QUESTION: Should cost of fuel be included where applicable in fixed priced CLINs?Price of fuel is to be included with the fixed priced CLIN X031, Fuel Service.

File details come from the government source that posted it. Updated .