FA2521-13-R-0019_CLOIS_DRAFT_RFP_(25_Nov).doc

DOC document 1 MB Posted

Attached to
Cape Launch Operations and Infrastructure Support (CLOIS) Federal contract opportunity
Solicitation number
FA2521-13-R-0019
Issued by
Department of the Air Force Space Command

About this file

CLOIS Draft RFP

View the file

Other files for this federal contract opportunity

Other files attached to Cape Launch Operations and Infrastructure Support (CLOIS), newest first.
File Type Posted
CLOIS_QA_Working_Master_-_Posted_06_Feb_15.xlsx XLSX spreadsheet
L-04_TEP_Task_Ordering_Wrksht_-26_Jan.xlsx XLSX spreadsheet
CLOIS_QA_Working_Master_-_Posted_30_Jan_15.xlsx XLSX spreadsheet
CLOIS_QA_posted_16_Jan_15.xlsx XLSX spreadsheet
L-02_Sample_Mission_-_13_Jan_update_V2.xlsx XLSX spreadsheet
L-04_TEP_Task_Ordering_Wrksht_-Updated_13_Jan_14.xlsx XLSX spreadsheet
Section_L_-_29_Dec_with_Missing_Page.pdf PDF
L-06a_Fac_60650_Act-Deact_Sample_Work_Plan.docx DOCX document
L-06b_Facility_60650_Floor_Plans.pdf PDF
Sect_L_Update_22_Dec.docx DOCX document
L-04_TEP_Task_Ordering_Wrksht_-18_Dec.xlsx XLSX spreadsheet
Sect_B_update_22_Dec.doc DOC document
CLOIS_Q A_18_DEC_FBO_post.xlsx XLSX spreadsheet
CLOIS_DRAFT_CDRL_PORTFOLIO.pdf PDF
Section_M_Changes_Highlighted_25_Nov_14.docx DOCX document
Section_L_Changes_Highlighted_25_Nov_14.docx DOCX document
CLOIS_TEP_and_Task_Ordering_Worksheet_-Revised_21_Nov_14.xlsx XLSX spreadsheet
CLOIS_Q A_as_of_25_Nov_14.xlsx XLSX spreadsheet
CLOIS_Industry_Day_17_Nov_14_SLIDES_FINAL.pdf PDF
CLOIS_Industry_Day_Briefing_Attendee_List.pdf PDF
CLOIS_Industry_Day_-_Opening_Remarks.pdf PDF
Attachment_L-01_CLOIS_Q A_Form.xlsx XLSX spreadsheet
Draft_Section_L_-_28_Oct_14.docx DOCX document
Attachment__L-04_TEP_Worksheet_28_Oct_14.xlsx XLSX spreadsheet
Atch_11_CBA_Yang _TWA.pdf PDF
Atch_02_-_SCA_WD_2005-2118_Rev_17.pdf PDF
Atch_12_WD_CBA_Yang _TWA.pdf PDF
Atch_10_WD_CBA_SCLS _TWA.pdf PDF
Atch_04 _WD_CBA_Indyne_and_IAM.pdf PDF
Atch_08_WD_CBA_Yang _SPFPA.pdf PDF
Atch_07_CBA_Yang _SPFPA.pdf PDF
Atch_05__CBA__Indyne _TWA.pdf PDF
Atch_09_CBA_SLCS __TWA.pdf PDF
Atch_06_WD_CBA_Indyne _TWA.pdf PDF
Atch_03_-_CBA_-_Indyne_and_IAM.pdf PDF
CLOIS_DRAFT_Attachment_L-03_Work_Classification_Worksheet.xlsx XLSX spreadsheet
CLOIS_DRAFT_Attachment_L-01_Question_and_Answer_Template.docx DOCX document
CLOIS_DRAFT_Section_L.pdf PDF
CLOIS_DRAFT_Attachment_L-04_TEP_Worksheet.xlsx XLSX spreadsheet
CLOIS_DRAFT_Attachment_L-02_Sample_Mission.xlsx XLSX spreadsheet
CLOIS_DRAFT_Attachment_L-05_Labor_Rates_Listing.xlsx XLSX spreadsheet
CLOIS_DRAFT_Section_M.pdf PDF
1-CLOIS_RFI_Questions_-_25_April_2014.pdf PDF
7-Appendix_D_-_COLS_Definitions_-_25_April_2014.pdf PDF
6-Appendix_C_-_Facility_Tier_Definitions_-_25_April_2014.pdf PDF
3-RFI_Notional_CLIN_Structure_25_April_2015.pdf PDF
2-DRAFT_CLOIS_PWS_-_25_April_2014.pdf PDF
8-Appendix_E_-_Work_Classifications_-_25_April_2014.pdf PDF
5-Appendix_B_--__Communications_Systems_-_DRAFT_-_25_Apr_2014.pdf PDF
OMEU 1 .pdf PDF
Show all 50

Cape Launch Operations and Infrastructure Support (CLOIS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section B - Supplies or Services and Prices NOTE TO INDUSTRY: SECTION B is still a work in progress. Some quantities show as undefined. This occurs in places where a plug number will be used or where the quantity is not yet determined. This will be resolved before final RFP. Remember, the quantities in Section B do not always match the quantities on the Total Evaluated Price Worksheet. The quantities in Section B must be sufficient to cover the maximum amount anticipated to be ordered.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Program Mgt, General, GFP and Logistics

FFP

The contractor to perform program management, general requirements, government furnished property administration and logistics in accordance with Sections 1.1, 2.0, 3.0 and 4.0 (excluding 2.9 and 2.10) of the PWS.

FOB: Destination

SIGNAL CODE: A

MAX

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Cape Duty Office/Work Management

The contractor to perform all work identified in Section 1.2 (excluding 1.2.5) in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each Per Month

Emergency Management and Response

COST

Contractor to provide emergency management and response operations service as identified in section 1.2.5 of the PWS.

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Engineering Services

Contractor to provide engineering services in accordance with Section 1.7 of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
6,913,800
Square Foot

Tier 1 Facilities Maint/Rep Work

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 1.

Max Quantity = Projected Square footage (456,150) plus a buffer of 120,000 square footage for flexibility. Multiplied by 12 for a yearly square foot total of

6,913,800.

Unit Price = price per square foot per month for Tier 1 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
3,433,032
Square Foot

Tier 2 Facilities Maint/Rep Work

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 2.

Max Quantity = Projected square footage (206,086) plus a buffer of 80,000 square footage for flexibility. Multiplied by 12 for a yearly square foot total of

3,433,032

Unit Price = price per square foot per month for Tier 2 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
31,774,296
Square Foot

Tier 3 Facilities Maint/Rep Work

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 3.

Max Quantity = Projected square footage (2,357,858) plus a buffer of 290,000 square footage for flexibility. Multiplied by 12 for a yearly square foot total of 31,774,296.

Unit Price = price per square foot per month for Tier 3 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
2,399,160
Square Foot

Tier 4 Facilities Maint/Rep Work

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 4.

Max Quantity = Projected square footage (129,930) plus a buffer of 70,000 square footage for flexibility. Multiplied by 12 for a yearly square foot total of 2,399,160.

Unit Price = price per square foot per month for Tier 4 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
5,331,552
Square Foot

Tier 5 Facilities Maint/Rep Work

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 5.

Max Quantity = Projected square footage (344,296) plus a buffer of 100,000 square footage for flexibility. Multiplied by 12 for a yearly square foot total of 5,331,552.

Unit Price = price per square foot per month for Tier 5 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each Per Month

Emergency Response - Tier 0 Facilities

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 0 when requested by the government.

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,740
Each Per Month

Maintenance and Repair of Towers

Contractor to perform all work for the maintenance and repair of towers as identified in Section 1.4.12 of the PWS and identified in Appendix G.

Max Quantity = Total number of towers (145) per month multiplied by 12 for a yearly total of 1740.

Unit Price = Price per tower per month

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Storm Water Maintenance and Repair

The contractor to perform all work identified for storm water maintenance and repair as identified in Section 1.14.13 of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Base Operations and Infrastructure

The contractor to perform all work for base operations and infrastructure as specified in section 1.4 of the PWS (excluding paragraphs 1.4.12 and 1.4.13).

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Material

Any materials required for work as specified in all areas of the PWS.

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Base Services

CPFF

The contractor to provide all base services as identified in Section 1.5 of the PWS.

MAX COST

FIXED FEE

TOTAL MAX COST + FEE

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Planned Work

The contractor to provide any work identified in section 1.3 of the PWS for work identified with written authorization, beyond repair level of effort, and requires detailed planning or capitalization on the real property records.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Sustainment Projects

The contractor to provide any work identified in the PWS for work identified with written authorization, beyond repair level of effort, and requires detailed planning or capitalization on the real property records and requires design (architectural-engineering) prior to start.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Mission Support

The contractor shall provide mission operations support as required in support of launch campaigns as specified in section 1.6 of the PWS.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Munitions Customer and Launch Support

Contractor to provide munitions and flight hardware service as specified in sections 1.8.1, 1.8.2 and 1.8.3 of the PWS

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Mission Comm Configuration

The contractor to provide mission comm configuration service as specified in section 1.9.1 and 1.9.2 of the PWS.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

NOTU Specific Support

Contractor to provide NOTU unique port/wharf and crane service as specified in section 1.10 of the PWS.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

NASA Specific Support

Contractor to provide NASA unique service as specified in section 1.11 of the PWS.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

Phase-In Period

The contractor shall provide phase-in service as specified in section 2.8 of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

Phase -out

Only in FY 21

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Activation, Deactivation, Closeout

Contractor to provide facility activation, deactivation, closeout and/or turnover of facilities identified by the Government. Work to be accomplished as specified in section 1.7.11 of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

UNDEFINED

Contract Data Requirements List (CDRL)

Contractor to provide CDRLs as identified in the different sections listed in the Performance Work Statement. Cost identified in individual section CLINs.

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Program Mgt, General, GFP and Logistics

The contractor to perform program management, general requirements, government furnished property administration and logistics in accordance with Sections 1.1, 2.0, 3.0, and 4.0 (excluding 2.9 and 2.10) of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Cape Duty Office/Work Management

The contractor to perform all work identified in Section 1.2 (excluding 1.2.5) in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Emergency Management and Response

Contractor to provide emergency management and response operations service as identified in section 1.2.5 of the PWS

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Engineering Services

Contractor to provide engineering services in accordance with Section 1.7 of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
6,913,800
Square Foot

Tier 1 Facilities Maint/Rep Work

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 1.

Max Quantity = Projected Square footage (456,150) plus a buffer of 120,000 square footage for flexibility. Multiplied by 12 for a yearly square foot total of 6,913,800.

Unit Price = price per square foot per month for Tier 1 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
3,433,032
Square Foot

Tier 2 Facilities Maint/Rep Work

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 2.

Max Quantity = Projected square footage (206,086) plus a buffer of 80,000 square footage for flexibility. Multiplied by 12 for a yearly square foot total of

3,433,032

Unit Price = price per square foot per month for Tier 2 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
31,774,296
Square Foot

Tier 3 Facilities Maint/Rep Work

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 3.

Max Quantity = Projected square footage (2,357,858) plus a buffer of 290,000 square footage for flexibility. Multiplied by 12 for a yearly square foot total of 31,774,296.

Unit Price = price per square foot per month for Tier 3 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
2,399,160
Square Foot

Tier 4 Facilities Maint/Rep Work

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 4.

Max Quantity = Projected square footage (129,930) plus a buffer of 70,000 square footage for flexibility. Multiplied by 12 for a yearly square foot total of 2,399,160.

Unit Price = price per square foot per month for Tier 4 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
5,331,552
Square Foot

Tier 5 Facilities Maint/Rep Work

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 5.

Max Quantity = Projected square footage (344,296) plus a buffer of 100,000 square footage for flexibility. Multiplied by 12 for a yearly square foot total of 5,331,552.

Unit Price = price per square foot per month for Tier 5 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Emergency Response - Tier 0 Facilities

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C, and D for Tier 0 when requested by the government.

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,740
Each Per Month

Maintenance and Repair of Towers

Contractor to perform all work for the maintenance and repair of towers as identified in Section 1.4.12 of the PWS and identified in Appendix G.

Max Quantity = Total number of towers (145) per month multiplied by 12 for a yearly total of 1740.

Unit Price = Price per tower per month

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Storm Water Maintenance and Repair

The contractor to perform all work identified for storm water maintenance and repair as identified in Section 1.14.13 of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Base Operations and Infrastructure

The contractor to perform all work for base operations and infrastructure as specified in section 1.4 of the PWS (excluding paragraphs 1.4.12 and 1.4.13)

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Material

Any material required for work as specified in all areas of the PWS.

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Base Services

The contractor to provide all base services as identified in Section 1.5 of the PWS.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Planned Work

The contractor to provide any work identified in section 1.3 of the PWS for work identified with written authorization, beyond repair level of effort, and requires detailed planning or capitalization on real property records.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Sustainment Projects

The contractor to provide any work identified in the PWS for work identified with written authorization, beyond repair level of effort, and requires detailed planning or capitalization on real property records and requires design (architectural-engineering) prior to start.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Mission Support

The contractor shall provide mission operations support as required in support of launch campaigns as specified in Section 1.6 of the PWS.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Munitions Customer and Launch Support

Contractor to provide munitions and flight hardware service as specified in sections 1.8.1, 1.8.2, and 1.8.3 of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Mission Comm Configuration

The contractor to provide mission comm configuration service as specified in section 1.9.1 and 1.9.2 of the PWS.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

NOTU Specific Support

Contractor to provide NOTU unique port/wharf and crane service as specified in section 1.10 of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

NASA Specific Support

Contractor to provide NASA unique service as specified in section 1.11 of the PWS.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Reserved

Reserved

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Phase-out Reserved for FY21

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Activation, Deactivation, Closeout

Contractor to provide facility activation, deactivation, closeout and/or turnover of facilities as identified by the Government. Work to be accomplished as specified in section 1.7.11 of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

Contract Data Requirements List (CDRL)

Contractor to provide CDRLs as identified in the different sections listed in the PWS. Cost identified in individual section CLINs.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Program Mgt, General, GFP and Logistics

The contractor to perform program management, general requirements, government furnished property administration and logistics in accordance with Sections 1.1, 2.0, 3.0, and 4.0 (excluding 2.9 and 2.10) of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Cape Duty Office/Work Management

The contractor to perform all work identified in Section 1.2 (excluding 1.2.5) in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Emergency Management and Response

Contractor to provide emergency management and response operations service as identified in section 1.2.5 of the PWS.

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Engineering Services

Contractor to provide engineering services in accordance with Section 1.7 of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
6,913,800
Square Foot

Tier 1 Facilities Maint/Rep Work

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 1.

Max Quantity = Projected Square footage (456,150) plus a buffer of 120,000 square footage for flexability. Multiplied by 12 for a yearly square foot total of 6,913,800.

Unit Price = price per square foot per month for Tier 1 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
3,433,032
Square Foot

Tier 2 Facilities Maint/Rep Work

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 2.

Max Quantity = Projected square footage (206,086) plus a buffer of 80,000 square footage for flexability. Multiplied by 12 for a yearly square foot total of

3,433,032

Unit Price = price per square foot per month for Tier 2 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
31,774,296
Square Foot

Tier 3 Facilities Maint/Rep Work

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 3.

Max Quantity = Projected square footage (2,357,858) plus a buffer of 290,000 square footage for flexability. Multiplied by 12 for a yearly square foot total of 31,774,296.

Unit Price = price per square foot per month for Tier 3 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
2,399,160
Square Foot

Tier 4 Facilities Maint/Rep Work

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 4.

Max Quantity = Projected square footage (129,930) plus a buffer of 70,000 square footage for flexability. Multiplied by 12 for a yearly square foot total of 2,399,160.

Unit Price = price per square foot per month for Tier 4 facilities.

MAX

TEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
5,331,552
Square Foot

Tier 5 Facilities Maint/Rep Work

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 5.

Max Quantity = Projected square footage (344,296) plus a buffer of 100,000 square footage for flexability. Multiplied by 12 for a yearly square foot total of 5,331,552.

Unit Price = price per square foot per month for Tier 5 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Emergency Response - Tier 0 Facilities

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C, and D for Tier 0 when requested by the government.

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,740
Each Per Month

Maintenance and Repair of Towers

Contractor to perform all work for the maintenance and repair of towers as identified in Section 1.4.12 of the PWS and identified in Appendix G.

Max Quantity = Total number of towers (145) per month multiplied by 12 for a yearly total of 1740.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Storm Water Maintenance and Repair

The contractor to perform all work identified for storm water maintenance and repair as identified in Section 1.14.13 of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Base Operations and Infrastructure

The contractor to perform all work for base operations and infrastructure as specified in section 1.4 of the PWS (excluding paragraphs 1.4.12 and 1.4.13)

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Material

Any materials required for work as specified in all areas of the PWS.

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Base Services

The contractor to provide all base services as identified in Section 1.5 of the PWS.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Planned Work

The contractor to provide any work identified in section 1.3 of the PWS for work identified with written authorization, beyond repair level of effort, and requires detailed planning or capitalization on the real property records.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Sustainment Projects

The contractor to provide any work identified in the PWS for work identified with written authorization, beyond repair level of effort, and requires detailed planning or capitalization on the real property records and requires design (architectural-engineering) prior to start.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Mission Support

The contractor shall provide mission operations support as required in support of launch campaigns as specified in section 1.6 of the PWS.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Munitions Customer and Launch Support

Contractor to provide munitions and flight hardware service as specified in sections 1.8.1, 1.8.2 and 1.8.3 of the PWS

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Mission Comm Configuration

The contractor to provide mission comm configuration service as specified in section 1.9.1 and 1.9.2 of the PWS.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

NOTU Specific Support

Contractor to provide NOTU unique port/wharf and crane service as specified in section 1.10 of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

NASA Specific Support

Contractor to provide NASA unique service as specified in section 1.11 of the PWS.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

RESERVED

Reserved for future use.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Phase-out Reserved for FY21

PHASE-OUT FY21

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Activation, Deactivation, Closeout

Contractor to provide facility activation, deactivation, closeout and/or turnover of facilities identified by the Government. Work to be accomplished as specified in section 1.7.11 of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

Contact Data Requirements List (CDRL)

Contractor to provide CDRLs as identified in the different sections listed in the Performance Work Statement. Cost identified in individual section CLINs.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Program Mgt, General, GFP and Logistics

The contractor to perform program management, general requirements, government furnished property administration and logistics in accordance with Sections 1.1, 2.0, 3.0, and 4.0 (excluding 2.9 and 2.10) of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Cape Duty Office/Work Management

The contractor to perform all work identified in Section 1.2 (excluding 1.2.5) in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Emergency Management and Response

Contractor to provide emergency management and response operations service as identified in section 1.2.5 of the PWS.

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Engineering Services

Contractor to provide engineering services in accordance with Section 1.7 of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
6,913,800
Square Foot

Tier 1 Facilities Maint/Rep Work

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 1.

Max Quantity = Projected Square footage (456,150) plus a buffer of 120,000 square footage for flexability. Multiplied by 12 for a yearly square foot total of 6,913,800.

Unit Price = price per square foot per month for Tier 1 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
3,433,032
Square Foot

Tier 2 Facilities Maint/Rep Work

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 2.

Max Quantity = Projected square footage (206,086) plus a buffer of 80,000 square footage for flexability. Multiplied by 12 for a yearly square foot total of

3,433,032

Unit Price = price per square foot per month for Tier 2 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
31,774,296
Square Foot

Tier 3 Facilities Maint/Rep Work

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 3.

Max Quantity = Projected square footage (2,357,858) plus a buffer of 290,000 square footage for flexability. Multiplied by 12 for a yearly square foot total of 31,774,296.

Unit Price = price per square foot per month for Tier 3 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
2,399,160
Square Foot

Tier 4 Facilities Maint/Rep Work

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 4.

Max Quantity = Projected square footage (129,930) plus a buffer of 70,000 square footage for flexability. Multiplied by 12 for a yearly square foot total of 2,399,160.

Unit Price = price per square foot per month for Tier 4 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
5,331,552
Square Foot

Tier 5 Facilities Maint/Rep Work

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 5.

Max Quantity = Projected square footage (344,296) plus a buffer of 100,000 square footage for flexability. Multiplied by 12 for a yearly square foot total of 5,331,552.

Unit Price = price per square foot per month for Tier 5 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Emergency Response - Tier 0 Facilities

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C, and D for Tier 0 when requested by the government.

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,740
Each Per Month

Maintenance and Repair of Towers

Contractor to perform all work for the maintenance and repair of towers as identified in Section 1.4.12 of the PWS and identified in Appendix G.

Max Quantity = Total number of towers (145) per month multiplied by 12 for a yearly total of 1740.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Storm Water Maintenance and Repair

The contractor to perform all work identified for storm water maintenance and repair as identified in Section 1.14.13 of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Base Operations and Infrastructure

The contractor to perform all work for base operations and infrastructure as specified in section 1.4 of the PWS (excluding paragraphs 1.4.12 and 1.4.13)

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Material

Any materials required for work as specified in all areas of the PWS.

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Base Services

The contractor to provide all base services as identified in Section 1.5 of the PWS.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Planned Work

The contractor to provide any work identified in section 1.3 of the PWS for work identified with written authorization, beyond repair level of effort, and requires detailed planning or capitalization on the real property records.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Sustainment Projects

The contractor to provide any work identified in the PWS for work identified with written authorization, beyond repair level of effort, and requires detailed planning or capitalization on the real property records and requires design (architectural-engineering) prior to start.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Mission Support

The contractor shall provide mission operations support as required in support of launch campaigns as specified in section 1.6 of the PWS.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Munitions Customer and Launch Support

Contractor to provide munitions and flight hardware service as specified in sections 1.8.1, 1.8.2 and 1.8.3 of the PWS

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Mission Comm Configuration

The contractor to provide mission comm configuration service as specified in section 1.9.1 and 1.9.2 of the PWS.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

NOTU Specific Support

Contractor to provide NOTU unique port/wharf and crane service as specified in section 1.10 of the PWS.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

NASA Specific Support

Contractor to provide NASA unique service as specified in section 1.11 of the PWS.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

RESERVED

Reserved for future use.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Phase-out FY21

PHASE-OUT FY21

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Activation, Deactivation, Closeout

Contractor to provide facility activation, deactivation, closeout and/or turnover of facilities identified by the Government. Work to be accomplished as specified in section 1.7.11 of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

Contract Data Requirements List (CDRL)

Contractor to provide CDRLs as identified in the different sections listed in the Performance Work Statement. Cost identified in individual section CLINs.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Program Mgt, General, GFP and Logistics

The contractor to perform program management, general requirements, government furnished property administration and logistics in accordance with Sections 1.1, 2.0, 3.0, and 4.0 (excluding 2.9 and 2.10) of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Cape Duty Office/Work Management

The contractor to perform all work identified in Section 1.2 (excluding 1.2.5) in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Emergency Management and Response

Contractor to provide emergency management and response operations service as identified in section 1.2.5 of the PWS.

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Engineering Services

Contractor to provide engineering services in accordance with Section 1.7 of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
6,913,800
Square Foot

Tier 1 Facilities Maint/Rep Work

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 1.

Max Quantity = Projected Square footage (456,150) plus a buffer of 120,000 square footage for flexibility. Multiplied by 12 for a yearly square foot total of 6,913,800.

Unit Price = price per square foot per month for Tier 1 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
3,433,032
Square Foot

Tier 2 Facilities Maint/Rep Work

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 2.

Max Quantity = Projected square footage (206,086) plus a buffer of 80,000 square footage for flexibility. Multiplied by 12 for a yearly square foot total of

3,433,032

Unit Price = price per square foot per month for Tier 2 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
31,774,296
Square Foot

Tier 3 Facilities Maint/Rep Work

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 3.

Max Quantity = Projected square footage (2,357,858) plus a buffer of 290,000 square footage for flexibility. Multiplied by 12 for a yearly square foot total of 31,774,296.

Unit Price = price per square foot per month for Tier 3 facilities.

MAX

TEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
2,399,160
Square Foot

Tier 4 Facilities Maint/Rep Work

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 4.

Max Quantity = Projected square footage (129,930) plus a buffer of 70,000 square footage for flexibility. Multiplied by 12 for a yearly square foot total of 2,399,160.

Unit Price = price per square foot per month for Tier 4 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
5,331,552
Square Foot

Tier 5 Facilities Maint/Rep Work

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 5.

Max Quantity = Projected square footage (344,296) plus a buffer of 100,000 square footage for flexibility. Multiplied by 12 for a yearly square foot total of 5,331,552.

Unit Price = price per square foot per month for Tier 5 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Emergency Response - Tier 0 Facilities

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C, and D for Tier 0 when requested by the government.

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,740
Each Per Month

Maintenance and Repair of Towers

Contractor to perform all work for the maintenance and repair of towers as identified in Section 1.4.12 of the PWS and identified in Appendix G.

Max Quantity = Total number of towers (145) per month multiplied by 12 for a yearly total of 1740.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Storm Water Maintenance and Repair

The contractor to perform all work identified for storm water maintenance and repair as identified in Section 1.14.13 of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months

Base Operations and Infrastructure

The contractor to perform all work for base operations and infrastructure as specified in section 1.4 of the PWS (excluding paragraphs 1.4.12 and 1.4.13)

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Materials

Any materials required for work as specified in all areas of the PWS.

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Base Services

The contractor to provide all base services as identified in Section 1.5 of the PWS.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Planned Work

The contractor to provide any work identified in section 1.3 of the PWS for work identified with written authorization, beyond repair level of effort, and requires detailed planning or capitalization on the real property records.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Sustainment Projects

The contractor to provide any work identified in the PWS for work identified with written authorization, beyond repair level of effort, and requires detailed planning or capitalization on the real property records and requires design (architectural-engineering) prior to start.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Mission Support

The contractor shall provide mission operations support as required in support of launch campaigns as specified in section 1.6 of the PWS.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Munitions Customer and Launch Support

Contractor to provide munitions and flight hardware service as specified in sections 1.8.1, 1.8.2 and 1.8.3 of the PWS

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Mission Comm Configuration

The contractor to provide mission comm configuration service as specified in section 1.9.1 and 1.9.2 of the PWS.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

NOTU Specific Support

Contractor to provide NOTU unique port/wharf and crane service as specified in section 1.10 of the PWS..

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

NASA Specific Support

Contractor to provide NASA unique service as specified in section 1.11 of the PWS.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

RESERVED

Reserved for future use.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Phase-out FY21

PHASE-OUT FY21.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each

Activation, Deactivation, Closeout

Contractor to provide facility activation, deactivation, closeout and/or turnover of facilities identified by the Government. Work to be accomplished as specified in section 1.7.11 of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

Contract Data Requirements List (CDRL)

Contractor to provide CDRLs as identified in the different sections listed in the Performance Work Statement. Cost identified in individual section CLINs.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months
OPTION
Program Mgt, General, GFP and Logistics

FFP

The contractor to perform program management, general requirements, government furnished property administration and logistics in accordance with Sections 1.1, 2.0, 3.0, and 4.0 (excluding 2.9 and 2.10) of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months
OPTION
Cape Duty Office/Work Management

FFP

The contractor to perform all work identified in Section 1.2 (excluding 1.2.5) in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each
OPTION
Emergency Management and Response

COST

Contractor to provide emergency management and response operations service as identified in section 1.2.5 of the PWS.

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months
OPTION
Engineering Services

FFP

Contractor to provide engineering services in accordance with Section 1.7 of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
6,913,800
Square Foot
OPTION
Tier 1 Facilities Maint/Rep Work

FFP

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 1.

Max Quantity = Projected Square footage (456,150) plus a buffer of 120,000 square footage for flexibility. Multiplied by 12 for a yearly square foot total of 6,913,800.

Unit Price = price per square foot per month for Tier 1 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
3,433,032
Square Foot
OPTION
Tier 2 Facilities Maint/Rep Work

FFP

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 2.

Max Quantity = Projected square footage (206,086) plus a buffer of 80,000 square footage for flexibility. Multiplied by 12 for a yearly square foot total of

3,433,032

Unit Price = price per square foot per month for Tier 2 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
31,774,296
Square Foot
OPTION
Tier 3 Facilities Maint/Rep Work

FFP

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 3.

Max Quantity = Projected square footage (2,357,858) plus a buffer of 290,000 square footage for flexibility. Multiplied by 12 for a yearly square foot total of 31,774,296.

Unit Price = price per square foot per month for Tier 3 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
2,399,160
Square Foot
OPTION
Tier 4 Facilities Maint/Rep Work

FFP

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 4.

Max Quantity = Projected square footage (129,930) plus a buffer of 70,000 square footage for flexibility. Multiplied by 12 for a yearly square foot total of 2,399,160.

Unit Price = price per square foot per month for Tier 4 facilities.

MAX

TEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
5,331,552
Square Foot
OPTION
Tier 5 Facilities Maint/Rep Work

FFP

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 5.

Max Quantity = Projected square footage (344,296) plus a buffer of 100,000 square footage for flexibility. Multiplied by 12 for a yearly square foot total of 5,331,552.

Unit Price = price per square foot per month for Tier 5 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each
OPTION
Emergency Response - Tier 0 Facilities

COST

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C, and D for Tier 0 when requested by the government.

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,740
Each
OPTION
Maintenance and Repair of Towers

FFP

Contractor to perform all work for the maintenance and repair of towers as identified in Section 1.4.12 of the PWS and identified in Appendix G.

Max Quantity = Total number of towers (145) per month multiplied by 12 for a yearly total of 1740.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months
OPTION
Storm Water Maintenance and Repair

FFP

The contractor to perform all work identified for storm water maintenance and repair as identified in Section 1.14.13 of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months
OPTION
Base Operations and Infrastructure

FFP

The contractor to perform all work for base operations and infrastructure as specified in section 1.4 of the PWS (excluding paragraphs 1.4.12 and 1.4.13)

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each
OPTION
Materials

COST

Any materials required for work as specified in all areas of the PWS.

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each
OPTION
Base Services

CPFF

The contractor to provide all base services as identified in Section 1.5 of the PWS.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each
OPTION
Planned Work

CPFF

The contractor to provide any work identified in section 1.3 of the PWS for work identified with written authorization, beyond repair level of effort, and requires detailed planning or capitalization on the real property records.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each
OPTION
Sustainment Projects

FFP

The contractor to provide any work identified in the PWS for work identified with written authorization, beyond repair level of effort, and requires detailed planning or capitalization on the real property records and requires design (architectural-engineering) prior to start.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each
OPTION
Mission Support

CPFF

The contractor shall provide mission operations support as required in support of launch campaigns as specified in section 1.6 of the PWS.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each
OPTION
Munitions Customer and Launch Support

CPFF

Contractor to provide munitions and flight hardware service as specified in sections 1.8.1, 1.8.2 and 1.8.3 of the PWS

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each
OPTION
Mission Comm Configuration

CPFF

The contractor to provide mission comm configuration service as specified in section 1.9.1 and 1.9.2 of the PWS.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
12
Months
OPTION
NOTU Specific Support

FFP

Contractor to provide NOTU unique port/wharf and crane service as specified in section 1.10 of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each
OPTION
NASA Specific Support

CPFF

Contractor to provide NASA unique service as specified in section 1.11 of the PWS.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each
OPTION
RESERVED

FFP

Reserved for future use.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each
OPTION
Phase–out FY21

FFP

The contractor shall provide phase-out service as specified in section 2.9 of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each
OPTION
Activation, Deactivation, Closeout

FFP

Contractor to provide facility activation, deactivation, closeout and/or turnover of facilities identified by the Government. Work to be accomplished as specified in section 1.7.11 of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
Contract Data Requirements List (CDRL)

Contractor to provide CDRLs as identified in the different sections listed in the Performance Work Statement. Cost identified in individual section CLINs.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
6
Months
OPTION
6 Mon Ext-Prog Mgt, Ground, GFP, Log

FFP

The contractor to perform program management, general requirements, government furnished property administration and logistics in accordance with Sections 1.1, 2.0, 3.0, and 4.0 (excluding 2.9 and 2.10) of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
6
Months
OPTION
6 Month Ext-Cape Duty Office/Work Mgmt

FFP

Cape Duty Office/Work Management. The contractor to perform all work identified in Section 1.2 (excluding 1.2.5) in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each
OPTION
6 Month Extension-Emer Mgmt and Resp

COST

Emergency management and reponse. Contractor to provide emergency management and response operations as identified in section 1.2.5 of the PWS.

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
6
Months
OPTION
6 Month Extension-Engineering Services

FFP

Engineering Services. Contractor to provide engineering services in accordance with Section 1.7 of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
3,456,900
Square Foot
OPTION
6 Mon Ext-Tier 1 Facilities Maint/Rep Wo

FFP

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 1.

Max Quantity = Projected Square footage (228,075) plus a buffer of 60,00 square footage for flexibility. Multiplied by 6 for a total of 3,456,900 square foot.

Unit Price = price per square foot per month for Tier 1 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,716,516
Square Foot
OPTION
6 Mon Ext-Tier 2 Facilities Maint/Rep Wo

FFP

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 2.

Max Quantity = Projected square footage (103,043) plus a buffer of 40,000 square footage for flexibility. Multiplied by 6 for a total of 1,716,516 square foot

Unit Price = price per square foot per month for Tier 2 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
15,887,148
Square Foot
OPTION
6 Mon Ext-Tier 3 Facilities Maint/Rep Wo

FFP

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 3.

Max Quantity = Projected square footage (1,178,929) plus a buffer of 145,000 square footage for flexibility. Multiplied by 6 for a total of 15,887,148 square foot.

Unit Price = price per square foot per month for Tier 3 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,199,580
Square Foot
OPTION
6 Mon Ext-Tier 4 Facilities Maint/Rep Wo

FFP

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 4.

Max Quantity = Projected square footage (64,965) plus a buffer of 35,000 square footage for flexibility. Multiplied by 6 for a total of 1,199,580 square foot.

Unit Price = price per square foot per month for Tier 4 facilities.

MAX

TEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
2,665,776
Square Foot
OPTION
6 Mon Ext-Tier 5 Facilities Maint/Rep Wo

FFP

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 5.

Max Quantity = Projected square footage (172,148) plus a buffer of 50,000 square footage for flexibility. Multiplied by 6 for a total of 2,665,776 square foot.

Unit Price = price per square foot per month for Tier 5 facilities.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each
OPTION
6 Month Extension-Tier 0 Facilities

COST

Contractor to perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C, and D for Tier 0 for emergency response when requested by the government.

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
6
Each Per Month
OPTION
6 Month Extension-Towers

FFP

Contractor to perform work for the maintenance and repair of towers as identified in Section 1.4.12 of the PWS and identified in Appendix G.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
6
Months
OPTION
6 Month Extension-Storm Water

FFP

The contractor to perform all work identified for storm water maintenance and repair as identified in Section 1.14.13 of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
6
Months
OPTION
6 Month Extension-Base Op and Infra

FFP

Base Operations and Infrastructure. The contractor to perform all work base operations and infrastructure as specified in section 1.4 (excluding paragraphs 1.4.12 and 1.4.13) of the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each
OPTION
6 Month Extension - Materials

COST

Any materials required for work as specified in all areas of the PWS.

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each
OPTION
6 Month Extension-Base Services

CPFF

The contractor to provide all base services as identified in Section 1.5 of the PWS.

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Each
OPTION
6 Month Extension-Planned Work

CPFF

The contractor to provide any work identified in section 1.3 of the PWS for work identified with written authorization, beyond repair level of effort, and requires detailed planning or…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .