CLOIS_DRAFT_Attachment_L-03_Work_Classification_Worksheet.xlsx

XLSX spreadsheet 10 KB Posted

Attached to
Cape Launch Operations and Infrastructure Support (CLOIS)
Solicitation number
FA2521-13-R-0019
Issued by

About this file

CLOIS DRAFT Attachment L-03 Work Classification Worksheet

View the file

Other files

File Type Posted
CLOIS_QA_Working_Master_-_posted_10_Feb_15.xlsx XLSX spreadsheet
CLOIS_QA_Working_Master_-_Posted_06_Feb_15.xlsx XLSX spreadsheet
L-04_TEP_Task_Ordering_Wrksht_-26_Jan.xlsx XLSX spreadsheet
CLOIS_QA_Working_Master_-_Posted_30_Jan_15.xlsx XLSX spreadsheet
CLOIS_QA_posted_16_Jan_15.xlsx XLSX spreadsheet
L-04_TEP_Task_Ordering_Wrksht_-Updated_13_Jan_14.xlsx XLSX spreadsheet
L-02_Sample_Mission_-_13_Jan_update_V2.xlsx XLSX spreadsheet
CLOIS_QA_-_Updated_13_Jan_14.xlsx XLSX spreadsheet
Section_L_-_29_Dec_with_Missing_Page.pdf PDF
L-06b_Facility_60650_Floor_Plans.pdf PDF
L-06a_Fac_60650_Act-Deact_Sample_Work_Plan.docx DOCX document
Sect_L_Update_22_Dec.docx DOCX document
Sect_M_update_22_Dec.docx DOCX document
L-04_TEP_Task_Ordering_Wrksht_-18_Dec.xlsx XLSX spreadsheet
Sect_B_update_22_Dec.doc DOC document
CLOIS_Q A_18_DEC_FBO_post.xlsx XLSX spreadsheet
CLOIS_Q A_as_of_25_Nov_14.xlsx XLSX spreadsheet
CLOIS_DRAFT_CDRL_PORTFOLIO.pdf PDF
FA2521-13-R-0019_CLOIS_DRAFT_RFP_(25_Nov).doc DOC document
Section_M_Changes_Highlighted_25_Nov_14.docx DOCX document
Section_L_Changes_Highlighted_25_Nov_14.docx DOCX document
CLOIS_TEP_and_Task_Ordering_Worksheet_-Revised_21_Nov_14.xlsx XLSX spreadsheet
CLOIS_Industry_Day_-_Opening_Remarks.pdf PDF
Industry_Day_Tour_Script_-_final_11-17-14.pdf PDF
CLOIS_Industry_Day_17_Nov_14_SLIDES_FINAL.pdf PDF
CLOIS_Q A__-_21_Nov_14.pdf PDF
CLOIS_Industry_Day_Briefing_Attendee_List.pdf PDF
Attachment_L-01_CLOIS_Q A_Form.xlsx XLSX spreadsheet
Attachment__L-04_TEP_Worksheet_28_Oct_14.xlsx XLSX spreadsheet
Draft_Section_M_-28_Oct_14.docx DOCX document
Draft_Section_L_-_28_Oct_14.docx DOCX document
Atch_02_-_SCA_WD_2005-2118_Rev_17.pdf PDF
Atch_12_WD_CBA_Yang _TWA.pdf PDF
Atch_03_-_CBA_-_Indyne_and_IAM.pdf PDF
Atch_10_WD_CBA_SCLS _TWA.pdf PDF
Atch_04 _WD_CBA_Indyne_and_IAM.pdf PDF
Atch_08_WD_CBA_Yang _SPFPA.pdf PDF
Atch_07_CBA_Yang _SPFPA.pdf PDF
Atch_05__CBA__Indyne _TWA.pdf PDF
Atch_11_CBA_Yang _TWA.pdf PDF
Atch_06_WD_CBA_Indyne _TWA.pdf PDF
Atch_09_CBA_SLCS __TWA.pdf PDF
CLOIS_DRAFT_Attachment_L-01_Question_and_Answer_Template.docx DOCX document
CLOIS_DRAFT_Attachment_L-02_Sample_Mission.xlsx XLSX spreadsheet
CLOIS_DRAFT_Section_L.pdf PDF
CLOIS_DRAFT_Section_M.pdf PDF
CLOIS_DRAFT_Attachment_L-04_TEP_Worksheet.xlsx XLSX spreadsheet
CLOIS_DRAFT_Attachment_L-05_Labor_Rates_Listing.xlsx XLSX spreadsheet
7-Appendix_D_-_COLS_Definitions_-_25_April_2014.pdf PDF
6-Appendix_C_-_Facility_Tier_Definitions_-_25_April_2014.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

1.4.2 Provide classification of the work task identified below as either
corrective maintenance (fixed-price under O&M CLIN), repair (fixed-price under O&M CLIN),
planned worked (cost reimbursement under the planned work CLIN), or projects (fixed-price under the project CLIN):
Part "X" in appropriate box
Corrective maintenance (fixed-price under O&M CLIN)Repair (fixed-price under O&M CLIN)Planned worked (cost reimbursement under the planned work CLIN)Projects (fixed-price under the project CLIN)Work Task
a. Unclog toilet
b. Replace 20-ton chiller
c. Install permanent 100KW generator
d. Paint office 10 sf x 10 sf
e. Replace 30 amp breaker
f. Install 600 amp distribution panel
g. Repair 8-inch diameter pothole in road
h. Repair 18-inch roof flashing from water leak
i. Replace 12-inch backflow preventer
j. Repair 6-foot section of chain link fence (not including posts)
k. Replace 3 each guy wires on 60-foot communication tower
l. Install 5 interior, office door locks and rekey
m. Replace office space thermostat
n. Repair surface rust on 80 foot roof ladder with fall cage
o. Replace lamps in traffic sign light
p. Replace belt on air handling unit

Work Classification Worksheet DRAFT Attachment L-03

File details come from the government source that posted it. Updated .