CLOIS Q A - 21 Nov 14
View the file
Other files for this federal contract opportunity
Show all 50
Cape Launch Operations and Infrastructure Support (CLOIS) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Number Questions/Answers Answers RFP Section/
Exhibit/Attachment Paragraph Number
a) Will the USAF provide field content and format structure for the flat file requirement to the contractor community as a supplement to the RFP?
b) Regarding "directly connected systems", what access will the Government furnish the contractor for access to Government systems?
1a. No - this paragraph was adjusted in the revision to section L posted on 30 Oct 14; 1 b.
Input/User rights only
Section L Sec. L, Page 7, L-2.1.2.1
a) Task: SV pre-Arrival Task/SV Processing @ NPF/DPF – General Support Effort 60 days before arrival.
Attachment L-02 Tab: Area 59 Mission Support Task
3 1) 60 days before arrival at the NPF or the Launch Site?
Arrival at launch site (Skid Strip) and NPF occur on the same day.
Attachment L-02 Line 3
4 b) Task: Pre-Ship IRR 1 Day Attachment L-02 Line 15
5 1) What is being shipped and to where?
The Pre-Ship IRR is to ensure readiness for the SV to be shipped to the Cape from the SV factory location (typically California).
Attachment L-02
6 c) Task: Order NVR Plates (10) for MB, HB & A/L 1 day Attachment L-02 Line 18
7 1) Pre or post acquisition? Attachment L-02
8 2) What is the typical delivery period? Attachment L-02
Does the Contractor Responsibility Information replace the need for a fully developed Past Performance volume?
Past performance will not be evaluated as part of the best value tradeoff. Therefore there will not be a Past Performance Volume. Performance information requested in Section L 2.3.2.3 is for the Contractor's Responsibility determination only.
Section L and Section M
Sec. L, Page 16, L. 2.3.2.3 and Sec. M, Page 6 M -
The Cross Reference Matrix can be sizable – 10 pages and up, are the List of Figure and the Cross Reference Matrix included in the page count for Volume I?
Cross Reference Matrix and List of Figures will be excluded from the page count on the next Section L revision.
Section L Sec. L, Page 6, L 2.1
30 days before SV arrival they install new plates.
When the SV arrives they change out the plates again, then again every 28 days. Old plates go the AF Chem lab for analysis.
Takes from 2 - 15 days to get results.
a) It is not clear what the government considers an “outline”. Would the government give an example of what levels the outline should include in order to be at lease “adequate?”
b) Does the government want the narrative in the outline to demonstrate “adequacy” of the approach?
a) The offeror determines the level of outline necessary to demonstrate and adequate approach. B) Yes, the government would prefer that the narrative in the outline demonstrates "adequacy" of the approach.
Section L and M Sec. L, Page 8, L.
2.1.4. and Sec. M, Page 5, M 2.2.4
a) How does the government anticipate the SEMP, which PWS 1.7 requires to be fully developed, be handled in the EMP outline?
b) Does the government anticipate that the outline should include a fully developed SEMP as required by PWS 1.7?
c) When will CDRLs 0039 and 0049 referred to in PWS 1.7 be made available?
a)The government is leaving this up to the contractor to determine the most appropriate way to show their proposed methodology. b) The outline should adequately convey the contractor's proposed method and structure of executing PWS requirements. c) CDRLs will be made available with draft RFP release.
Section L, PWS
Sec. L, Page 8 L.2.1.4, PWS, Page 39, PWS 1.7 & 1.7.10
With regards to Appendix B, the far right column labeled notes provides directions on the condition of and how to address each facility. Where no notes exist, what is the expected or required support for the corresponding facility?
Where no notes exist, all systems identified in each of the facilities are to be fully maintained/supported as required and are utilized to support all daily operations.
Appendix B
“The Offeror shall identify the amount transferred to the TEP Worksheet on each cost detail worksheet.”
How does the Government prefer to have this represented?
The Government would like to be able to easily identify where the number on the TEP worksheet came from. The contractor may choose any method they desire to identify the cell on the cost detail backup which is the source of the TEP number.
Section L Sec. L, Page 13, L.2.2.1.7 e (last paragraph)
When referring to Cost Type CLINs, does the Government mean Cost Plus Fixed Fee CLINs?
Cost type CLINS include both the CPFF CLINs and the CR (no fee) CLINs
Section L Sec. L, Page 13, L.2.2.1.7 b
Will the Government be providing the mentioned Part I Section 5 in the completed Draft RFP?
The reference to "Part I Section 5" will be removed from the next Draft Section L. The cost volume should also contain the mentioned subcontractor accounting system information if the sub will perform under a cost type contract.
Section L Sec. L, Page 10, L.2.2.1.3.
In Section L, page 13, L.2.2.1.7 b, the Government refers to Part II Supporting Cost Documentation, is this documentation the Excel worksheets that detail the Cost Proposal?
The reference to "Part II" was removed in the 28 Oct 14 version of Draft Section L (posted to FBO on 30 Oct 14)
Section L Sec. L, Page 13, L.2.2.1.7 b
a) In Attachment_L-04_TEP_Worsheet, the form requires the Offeror to enter a total cost to provide labor for facilities maintenance/repair at sites with a given number of square feet of area. In the form it says ‘12’ under ‘annual factor’. Is this meant to be the number of months in the year?
b) If so, to the right where it says ‘FYXX TO Price list’ are offerors to provide the effective unit cost of labor per square foot per month or per year?
Yes, the intent is to order by the square foot per month. This allows invoicing on a monthly basis.
The TEP attachment will be corrected to reflect this.
Attachment L-04 TEP Worksheet
The Govt. refers to "MPC for Cost Type CLINs" for all 6 years, plus "50% of the FY21 CLIN value for purposes of evaluating the cost of an extension. Since FY21 is Option 5 of the contract, does the Govt. mean the (6) month period beginning Oct.1, 2021 through Mar. 31,2022 which is equivalent to 50% of FY22 for the extension period?
Offerors will not propose costs for the period beginning Oct.1, 2021 through Mar. 31,2022.
This is the period the Govt would use if the clause at FAR 52.217-8, Option to Extend Services is utilized. In order for the Government to utilize this clause, the cost of the potential six month period must be evaluated at the time of award. Our method of evaluating this period is to use 6 months of the final year (FY21) to determine the amount.
Section M Sec. M, Page 5, M.2.2.4
PWS Paragraph 1.1.3.1.1 requires the Contractor to “Ensure the system is fully integrated with the Air Force’s automated work management system (currently Maximo)…” It is assumed that the LOSC and IOMS disparate Maximo instances will be superseded by a CLOIS variant.
See below PWS PWS, Page 5, PWS 1.1.3.1.1
a) Will the implementation and setup of Maximo for the CLOIS contract be the responsibility of the successful bidder or will a third party provide this service to Government?
Maximo is the current government computer maintenance management system (CMMS).
Maximo administration is handled by another government contract. The CLOIS contractor will need to work with the government and the Maximo contractor to setup the system for any new business rules.
PWS
PWS, Page 5, PWS 1.1.3.1.1
b) Will the successful contractor be a client of the CLOIS Maximo system?
Yes. The CLOIS contractor will be granted user licenses for data input, queries, and reports.
PWS
PWS, Page 5, PWS 1.1.3.1.1
c) Please describe the Government's plan for who and how the Maximo system will be implemented and supported?
Maximo administration is handled by another government contract. The CLOIS contractor will be responsible Maximo data inputs, queries, and reports. The Maximo contractor and the CLOIS contractor will work together.
PWS
PWS, Page 5, PWS 1.1.3.1.1
d) If a third party is to provide support for Maximo, how will reports and interfaces be developed and maintained?
Maximo administration is handled by another government contract. The CLOIS contractor will be responsible Maximo data inputs, queries, and reports. The Maximo contractor and the CLOIS contractor will work together.
PWS
PWS, Page 5, PWS 1.1.3.1.1
e) Are there specific constructs that the USAF would like to retain and will these be identified in the RFP
Pending PWS PWS, Page 5, PWS 1.1.3.1.1
f) Is the structure and configuration of the CMMS and Financial System Completely at the discretion of the contractor based on new JONs, WBS elements and CLINs?
No. The government has oversight of Maximo (CMMS) and JOCAS (Finance). The contractor may propose an separate enterprise system for their internal management. The government must approve any integration between government and contractor systems.
PWS
PWS, Page 5, PWS 1.1.3.1.1
g) If, however, the current instances of Maximo are to be retained by the Government and used by the in-coming contractor, how will the multiple instances, LOSC and IOMS, of Maximo be reconciled?
The CLOIS contractor will be granted user licenses for data input, queries, and reports.
The IOMS Maximo instance will become the primary CLOIS database, and the LOSC information integrated separately.
PWS
PWS, Page 5, PWS 1.1.3.1.1
Regarding migration of data, what is to be provided to construct the CLOIS implementation of the work and financial management systems?
a) Job Plans (PWS1.7.3.4);
b) Safety Plans;
c) Inventory and Warehouses;
d) Work categories mappable to CLOIS CLINs (Appendix E)
e) Assets, manual reload or migration from existing data
(PWS 1.7.8.8)
f) Employees and Certifications;
a) The contractor will be provided existing Job Plans, which must be removed and modified per PWS 1.7.3.4. b) No, the contractor must develop their own safety plans. c) Yes, the contractor will be provided inventories as shown the various PWS Appendices.
d) Yes e) Existing assets will be loaded into government systems. The contractor must provide updates, changes, alterations, additions, and deletions, as required through the life of the contract.
f) No, the contractor must input their own employee and certification records.
PWS
PWS, Page 30, PWS 1.7.3.4
Appendix E PWS, Page 33, PWS 1.7.8.8.
16. Regarding the Data Warehouse:
a) Has the LOSC data warehouse proved beneficial to the USAF or is it only a convenience to the contractor?
b) Is there going to be a requirement to preserve this facility?
c) Will CLOIS retain the existing Data Warehouse?
d) Does the USAF have access to Maximo directly or only to the data warehouse?
a) (The Gov assumes the question is referring to the technical library.) While the Government does not access the information regularly (the contractor does), maintenance of the information within the data warehouse is highly important to maintain.
b) Yes. The data warehouse is analogous to the Engineering Documentation Center (EDC) requirement on CLOIS.
c) Yes. All non-proprietary data should transition to the CLOIS contractor. d) Under LOSC, the government does not have access to Maximo. Under IOMS it does. Under CLOIS the government will maintain Maximo.
General Question
Will Area 59 be closing on 1 Oct 2015.
Not as of now. The original plan was to begin shut down of Area 59 during FY16. This timeline is pending GPS SV processing schedules and beyond that, everything is pending. There is scope on CLOIS to either begin divestiture activities in FY16 or continue at full operation.
General Question
Are there planned divestiture of responsibilities (in addition to Area 59) for facilities? Or changes in responsibilities through the course of this contract that will impact scope and thus workload estimation and cost? Will these divestitures/changes be shared in advance with the bidding community?
At this time there are no other major planned divestiture of responsibilities at CCAFS (other than Area 59 and SV processing support). Should that changes, the government will notify the bidding community as soon as possible.
General Question
32 Will there be a consolidated WBS or set of WBSs published to the bidding community on which to base estimation of costs? No. That is up to the contractor.
General Question
33 Can you speak to how the government will evaluate past performance and how you expect the bidder to address their PP? See response to question 9 above.
General Question
Will Systems Engineering as applied here be only facilities/physical plan planning and execution, or will it also include communications/network engineering monitoring, upgrades, integration and CM/DM?
Systems Engineering as applied to CLOIS will only be applied to facilities, physical planning, configuration management and execution. It will not include communications and network engineering.
General Question
What will the Government Program Management Structure look like? What will be the roles and positions within 45 SW, 45 MSG, 45 LCG, 45 OG?
Presently, the government PMO will reside in CCAFS Civil Engineering. The 2 primary functional directors will reside in 45 CES and 45 LCSS.
General Question
What Attachments to the technical, contracts and cost volumes will be required? (CWBS and Dictionary? IMS & IMP? OCI plan?
Risk Management Plan? SE&I plan?) All attachment required will be defined in Section L.
General Question
37 Will there be a requirement for a general contractor's license?
There is no requirement at this time for a general contractors license. General Question
38 Will the Government post current associate contractor agreements to the bidder's library?
No, these are agreements between the contractor's and unique to the various contracts currently in place.
General Question
39 Is there a "2 man rule" for all work?
Only to the extent required by collective bargaining agreements and safety standards. General Question
Will the Government post a 45 SW org chart to the bidder's library?
This information is available on the 45 SW public website. General Question
What is the status of Maximo? Will there be 2 versions?
Both current contractors are using Maximo version 7.
The government intends to consolidate data within the two versions prior CLOIS full performance.
General Question
42 It is not clear within Section L if the responsibility determination (past performance) is for the prime or the entire team.
The responsibility determination is for the prime only. This will be clarified in section L. Section L