CLOIS_DRAFT_Attachment_L-02_Sample_Mission.xlsx

XLSX spreadsheet 131 KB Posted

Attached to
Cape Launch Operations and Infrastructure Support (CLOIS) Federal contract opportunity
Solicitation number
FA2521-13-R-0019
Issued by
Department of the Air Force Space Command

About this file

CLOIS DRAFT Attachment L-02 Sample Mission

View the file

Other files for this federal contract opportunity

Other files attached to Cape Launch Operations and Infrastructure Support (CLOIS), newest first.
File Type Posted
CLOIS_QA_Working_Master_-_posted_10_Feb_15.xlsx XLSX spreadsheet
CLOIS_QA_Working_Master_-_Posted_30_Jan_15.xlsx XLSX spreadsheet
L-04_TEP_Task_Ordering_Wrksht_-26_Jan.xlsx XLSX spreadsheet
CLOIS_QA_posted_16_Jan_15.xlsx XLSX spreadsheet
CLOIS_QA_-_Updated_13_Jan_14.xlsx XLSX spreadsheet
L-02_Sample_Mission_-_13_Jan_update_V2.xlsx XLSX spreadsheet
Section_L_-_29_Dec_with_Missing_Page.pdf PDF
L-06a_Fac_60650_Act-Deact_Sample_Work_Plan.docx DOCX document
L-06b_Facility_60650_Floor_Plans.pdf PDF
Sect_L_Update_22_Dec.docx DOCX document
Sect_M_update_22_Dec.docx DOCX document
L-04_TEP_Task_Ordering_Wrksht_-18_Dec.xlsx XLSX spreadsheet
Sect_B_update_22_Dec.doc DOC document
CLOIS_Q A_18_DEC_FBO_post.xlsx XLSX spreadsheet
CLOIS_DRAFT_CDRL_PORTFOLIO.pdf PDF
CLOIS_TEP_and_Task_Ordering_Worksheet_-Revised_21_Nov_14.xlsx XLSX spreadsheet
CLOIS_Q A_as_of_25_Nov_14.xlsx XLSX spreadsheet
FA2521-13-R-0019_CLOIS_DRAFT_RFP_(25_Nov).doc DOC document
Section_M_Changes_Highlighted_25_Nov_14.docx DOCX document
Section_L_Changes_Highlighted_25_Nov_14.docx DOCX document
CLOIS_Industry_Day_-_Opening_Remarks.pdf PDF
Industry_Day_Tour_Script_-_final_11-17-14.pdf PDF
CLOIS_Q A__-_21_Nov_14.pdf PDF
CLOIS_Industry_Day_Briefing_Attendee_List.pdf PDF
Attachment_L-01_CLOIS_Q A_Form.xlsx XLSX spreadsheet
Attachment__L-04_TEP_Worksheet_28_Oct_14.xlsx XLSX spreadsheet
Draft_Section_M_-28_Oct_14.docx DOCX document
Draft_Section_L_-_28_Oct_14.docx DOCX document
Atch_11_CBA_Yang _TWA.pdf PDF
Atch_02_-_SCA_WD_2005-2118_Rev_17.pdf PDF
Atch_03_-_CBA_-_Indyne_and_IAM.pdf PDF
Atch_09_CBA_SLCS __TWA.pdf PDF
Atch_06_WD_CBA_Indyne _TWA.pdf PDF
Atch_12_WD_CBA_Yang _TWA.pdf PDF
Atch_10_WD_CBA_SCLS _TWA.pdf PDF
Atch_04 _WD_CBA_Indyne_and_IAM.pdf PDF
CLOIS_DRAFT_Attachment_L-03_Work_Classification_Worksheet.xlsx XLSX spreadsheet
CLOIS_DRAFT_Attachment_L-01_Question_and_Answer_Template.docx DOCX document
CLOIS_DRAFT_Section_M.pdf PDF
CLOIS_DRAFT_Attachment_L-05_Labor_Rates_Listing.xlsx XLSX spreadsheet
CLOIS_DRAFT_Section_L.pdf PDF
CLOIS_DRAFT_Attachment_L-04_TEP_Worksheet.xlsx XLSX spreadsheet
1-CLOIS_RFI_Questions_-_25_April_2014.pdf PDF
7-Appendix_D_-_COLS_Definitions_-_25_April_2014.pdf PDF
6-Appendix_C_-_Facility_Tier_Definitions_-_25_April_2014.pdf PDF
8-Appendix_E_-_Work_Classifications_-_25_April_2014.pdf PDF
5-Appendix_B_--__Communications_Systems_-_DRAFT_-_25_Apr_2014.pdf PDF
4-Appendix_A_-_Facilities_and_Systems_-_DRAFT-_25_April_2014.pdf PDF
3-RFI_Notional_CLIN_Structure_25_April_2015.pdf PDF
OMEU 1 .pdf PDF
Show all 50

Cape Launch Operations and Infrastructure Support (CLOIS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Area 59 Mission Support Tasks Area 59 Mission Support Task for a Typical SV Nominal Duration

SV Pre-Arrival Task/SV Processing @ NPF/DPF - General Support Effort60 days before Arrival
Clean DPF East Bay to 100K to support (NVR Plate Install)7 days
Install NVR Plates in DPF East Bay (28 days data EB)1 day
Pre-Cleaning NPF Processing Bays30 days before Arrival
Main Bay Cleaning 100K7 days
High Bay Cleaning 100K4 days
Air Lock Cleaning 100K5 days
SV ICE #1 & 22 days
Pre-Inspection of NPF for SV Arrival- 5 days before Arrival (Internal)1 day
Pre-Arrival Walkdown NPF Arrival- 3 days before Arrival (Customer)1 day
Cleaning DPF (WB, MB, & A/L) install NVR Plates1 day
Sample GN2 ports NPF-2 weeks before SV Arrival1 day
Pre-Ship IRR1 day
Attend SV Offload Briefing with all Stakeholders1 day
Move Air Pallets over to NPF1 day
Order NVR Plates (10) for MB, HB & A/L1 day
Contamination Control/Flow Manager inspect process bays1 day
Secure Deluge System (OS&Y Valve) @ NPF for SV Offload1 day
SV Arrival at NPF - General Support Effort35 day in NPF
Landoll Trailer with SV backed into Air Lock1 day
Offload SV in Air lock1 day
Install new NVR plates in High Bay & Air Lock1 day
Clean High bay and Air Lock back to 100KDaily
Support crane Ops in High Bay1 day
SV moved from High Bay to Main Bay2 days
SV Testing @ NPF in Main Bay (SV only effort)N/A
Offload (ULA) PLF Fairing in East Bay DPF4 days
Offload (ULA) AGE equipment into Air Lock2 days
Satellite techs open Air Lock & East Bay blast door1 day
Contamination Control tech support with Offloading PLFs1 day
Contamination Control support PLFs cleaning in EB1 day
Transport Torqus Ring and LV GSE Equipment to DPF Air Lock (45 days before launch)5 days
Satellite tech open Air Lock blast door1 day
Contamination Control tech cleaning1 day
Fuel Arrival Preps in (WB, WCR, WPA, Pressurization)8 days
Support Fuel Arrival in DPF WB2 days
GPSIIF Countdown Launch Procedure (CLP#1) @ NPF1 day
Sample Fuel in WB (DPF Bldg clear)1 day
Comm perform comm checks for DPF (Fuel Ops)1 day
Move SV from NPF to DPF (WB)1 day
Fuel SV in West Bay (Bldg Clear)1 day
Move SV from WB to A/L for Combined Ops1 day
Satellite tech open blast door between WB & A/L1 day
Mate PLA to SV4 days
Crane Ops -SV weigh, ordnace install, clamp band2 days
SV mate to PLA (crane Ops)1 day
Clamp Band Finaling (Crane Ops)1 day
Mate SV/PLA to (ULA) PAF (Combined Ops)3 days
Install PLF Fairing to SV in DPF A/L4 days
Install PLF Fairing (Half #1)- Crane Ops1 day
Install PLF Fairing (Half#2)- Crane ops1 day
Contamination Control Cleaning2 days
Fairing to PAF connector Install2 days
Preps for Transport to pad5 days
Transport to Pad1 day
Satellite techs Open Air Lock door1 day
Contamination Control tech for Cleaning1 day
SV transported from DPF to Complex-371 day
Countdown Launch Procedure (CLP#2) @ NPFN/A
On Pad Processing (Complex-37 SV Processing) -10 Day SV effortN/A
Monitoring SV from NPF Control RoomN/A
Intergrated Verification Test (IVT), battery charging, ISTN/A
LV Propellant loading, SV Battery Top offN/A
Ordnance Install & Stray Voltage check, Battery Top offN/A
Launch Day Activties - General Suport Effort-
Generator Support (Mech and Elect techs)1 day
Life Safety on site secure Fire Alarm & O2 Sys (2 shifts)1 day
HVAC on site in Area 59 monitor work station1 day

Sample Mission Support Task DRAFT Attachment L-02

PS - 7 Mission Support Tasks Pump Station 7 Mission Support Tasks Nominal Task Timeline

Support LV with 1 Engine/Pump at 175 PSI for approx. 2 hours for the LV - Water Deluge ROV Timing TestL-15 Day
Perform System Pre-Launch Validation - Test Deluge Pump/Engines/Safety Equipment for Operational Readiness RequirementsL-10 thru L-1 Day

Support LV-ASWS Manifold Fill and Water Deluge System Prime, 1 Engine/Pump with 150 PSIG for approx. 4 hours. LV will use ~100,000 gallons of water L-2 Day

Support LV-ACCMR Charge for approx. 3 hours, 1 Engine/Pump Online with 150 PSIG for approx 3 hours. LV will use ~20,000 gallons of water L-1 Day

Launch Support - Pump Station #7: (~T-3:40), 4 pumps minimum with 1 back up pump on the 30" line at 175 +10 -0 psig for ~6 hours. LV washdown crew will call pump station post launch to reduce to 1 pump and will call again to secure all pumps when complete. L-0 Day

Post Launch Wash-down Support - 1 pump online at 150 PSIG from 0800 - 2300, or until released by LV Contractor L+1 Day

Post Launch Wash-down Support - 1 pump online at 150 PSIG from 0600 - 1400, or until released by LV Contractor L+2 Day

DRAFT Attachment L-02

SV-LV Ordnance Mission Support

Ordnance Mission Support TasksQuantity and/or Effort
SV Ordnance Mission Support Tasks
Test SV ordnance (using MOTC)4 Bolt Cutters
Deliver SV ordnance to Area 594 Bolt Cutters
LV Ordnance Mission Support Tasks
Pull from storage booster ordnance for next flight300 LV Ordance Items (such as: Bolt Cutters, igniters, S&A devices, thrusters)
Test & prep booster ordnance, assign flight kits240 items
Deliver and Support Installation of 1st stage ordnance5 days
Deliver and Support Installation of final booster ordnance3 days - 8 hr shifts performed on second shift
Test booster FTS Safe & Arm on MOTC (T-4 day)4 items
Deliver and Support Installation of booster FTS Safe & Arm4 hours

Launch of Booster/SV

DRAFT Attachment L-02

Comm Mission Support Tasks

SV Comm Mission Support
EquipmentFacilities
NPF Ctrl Rm 1NPF Cntrl Rm 2DPF West Cntrl RmDPF East Cntrl RmSOSFNPF & DPF Facilities (non-specific locations)General Mission Support Effort Description
Orion COEI26441-Circuits remain connected, daily verification checks, process and work approx. 50 comm type changes/issues per SV flow (110 days)

Provide network programming of all nets on Peas and Orion switches for all NEMO supported operations using Console Level Voice Matrix (CLVM)

Orion Touch Screen4100--
Orion SDEI02004-
Orion OEEI0200--
Pesa P32D Video Selector12006-
Pelco Camera Controller0111--
Video Monitor (48")2200--
Video Monitor (9"")0488--
Video Monitor (55")00004-
Video Monitor (32")00004-
Phones (Desktop/Single Line)3400--
Phones (Desktop STE)1000--
Phones (Wall mount/Single Line)2422--
Phones (Horiz Comm Panel/SL)0044--
Phones (Spkr Phones)----45-
Phones (P-Sets)----3-
Projectors00002-
XTRON Controller----1-
LAN Drops----5530
PA/AW System----11
Timing Displays----313

DRAFT Attachment L-02

NEMO Mission Support NEMO Mission Support

OPERATIONDELIVERABLE / SUPPORTQuantityEffort Details
SV COMPATABILITY TESTF-1 NETWORK VALIDATION CHECKSFacilities where console support occurs for a typical operation are the TSF, DOC, ASOC, MOC, DPF, NPF. Provide network connectivity, support and comm checks on approx. 106 consoles, totaling 2,704 nets, during all operations.

CLP= Countdown Launch Procedure

SV COMPATABILITY TESTF-0 TECH SUPPORT
SV COMPATABILITY TESTF-0 TECH SUPPORT
SV COMPATABILITY TESTF-0 TECH SUPPORT
INTEGRATED CREW EXERCISE #1F-1 NETWORK VALIDATION CHECKS
INTEGRATED CREW EXERCISE #1F-0 NETWORK VALIDATION CHECKS & CONSOLE SUPPORT
INTEGRATED CREW EXERCISE #2F-1 NETWORK VALIDATION CHECKS
INTEGRATED CREW EXERCISE #2F-0 NETWORK VALIDATION CHECKS & CONSOLE SUPPORT
CLP REHEARSAL #1F-0 NETWORK VALIDATION CHECKS
CLP REHEARSAL #1F-0 TECH SUPPORT
FUEL SAMPLINGF-0 TECH SUPPORT
CLP REHEARSAL #1F-0 TECH SUPPORT
FUELING OPERATIONF-1 NETWORK VALIDATION CHECKS
FUELING OPERATIONF-0 TECH SUPPORT
CLP REHEARSAL #2F-0 NETWORK VALIDATION CHECKS
CLP REHEARSAL #2F-0 TECH SUPPORT
MISSION DRESS REHEARSALF-1 NETWORK VALIDATION CHECKS
MISSION DRESS REHEARSALF-0 NETWORK VALIDATION CHECKS & CONSOLE SUPPORT
LAUNCHF-1 NETWORK VALIDATION CHECKS
LAUNCH ROLL TO PADF-0 NETWORK VALIDATION CHECKS & CONSOLE SUPPORT
LAUNCHF-0 NETWORK VALIDATION CHECKS & CONSOLE SUPPORT
NEMO Mission Script Support
OPERATIONDELIVERABLE
INTEGRATED CREW EXERCISE #1DRAFT MISSION SCRIPT1Effort includes developing the Integration Mission Script (IMS) and integrating inputs/changes with the LV, SV and Government. IMS includes L-minus time/T-minus time tag sequence of major milestones and activities in the countdown procedures. The purpose is to highlight those activities that cross organizational boundaries -SV/LV/Range/Contractor/Government. It also integrates the Government polling activity with the basic LV and SV countdown activities.
INTEGRATED CREW EXERCISE #1FINAL MISSION SCRIPT1
INTEGRATED CREW EXERCISE #2DRAFT MISSION SCRIPT1
INTEGRATED CREW EXERCISE #2FINAL MISSION SCRIPT1
MISSION DRESS REHEARSAL/LAUNCHDRAFT MISSION SCRIPT1
MISSION DRESS REHEARSAL/LAUNCHFINAL MISSION SCRIPT1

NEMO Seating Plan Support

INTEGRATED CREW EXERCISE #1 DRAFT CLVM & SEATING PLAN 1 each Develop a Console Level Voice Matrix (CLVM) and provide to 45 LCSS, 5 SLS, CSR, LV and SV customers.

Develop seating plans for consoles located in the following typical launch/SV supported facilities: NPF, DPF, MOC, DOC, and TSF.

INTEGRATED CREW EXERCISE #1FINAL CLVM & SEATING PLAN1 each
INTEGRATED CREW EXERCISE #2DRAFT CLVM & SEATING PLAN1 each
INTEGRATED CREW EXERCISE #2FINAL CLVM & SEATING PLAN1 each
MISSION DRESS REHEARSAL/LAUNCHDRAFT CLVM & SEATING PLAN1 each
MISSION DRESS REHEARSAL/LAUNCHFINAL CLVM & SEATING PLAN1 each

NEMO Launch Console Handbook Support

INTEGRATED CREW EXERCISE #1 DRAFT LAUNCH CONSOLE HANDBOOK 1 Develop, build and deliver Launch Console Handbooks that include as a minimum the below sections:

1. Countdown

2. Integrated Mission Script

3. Personnel

4. Constraints

5. Mission Overview

6. Supplemental Information

After operation is completed, pickup and breakdown the Launch Console Handbooks.

INTEGRATED CREW EXERCISE #1DRAFT SC LAUNCH CONSOLE HANDBOOK1
INTEGRATED CREW EXERCISE #1FINAL LAUNCH CONSOLE HANDBOOK23
INTEGRATED CREW EXERCISE #1FINAL SC LAUNCH CONSOLE HANDBOOK33
INTEGRATED CREW EXERCISE #2DRAFT LAUNCH CONSOLE HANDBOOK1
INTEGRATED CREW EXERCISE #2DRAFT SC LAUNCH CONSOLE HANDBOOK1
INTEGRATED CREW EXERCISE #2FINAL LAUNCH CONSOLE HANDBOOK23
INTEGRATED CREW EXERCISE #2FINAL SC LAUNCH CONSOLE HANDBOOK33
MISSION DRESS REHEARSAL / LAUNCHDRAFT LAUNCH CONSOLE HANDBOOK1
MISSION DRESS REHEARSAL / LAUNCHDRAFT SC LAUNCH CONSOLE HANDBOOK1
MISSION DRESS REHEARSAL / LAUNCHFINAL LAUNCH CONSOLE HANDBOOK42
MISSION DRESS REHEARSAL / LAUNCHFINAL SC LAUNCH CONSOLE HANDBOOK35

NEMO Eastern Vehicle Checkout Facility (EVCF) Support Activities

SV Compatibility TestingTiming and Comm Support1Provide timing distribution and two Orion voice unit connectivity and support for each activity.
CLP #1Timing and Comm Support1
CLP #2Timing and Comm Support1
INTEGRATED CREW EXERCISE #1Timing and Comm Support1
INTEGRATED CREW EXERCISE #2Timing and Comm Support1
F-1 Data FlowTiming and Comm Support1
Day-of-Launch (DoL)Timing and Comm Support1

DRAFT Attachment L-02

CLVM Example

ConsolePosition User / Call SignKey Name41 CH01 / COUNTDOWN 141 CH02 / COUNTDOWN 241 CH03 / MANAGEMENT41 CH04 / ENGINEERING41 CH05 / RANGE41 CH06 / ANOMALY 141 CH07 / ANOMALY 241 CH08 / WX CONF41 CH09 / SPACECRAFT 141 CH10 / SPACECRAFT 241 CH11 / AF INT41 CH12 / FLIGHT CONTROL41 CH13 / ATLAS LOAD41 CH14 / CENTAUR LOAD41 CH15 / ATLAS MECH41 CH16 / CENTAUR MECH41 CH17 / COMM41 CH18 / QUALITY41 CH19 / AIRBOURNE ELEC41 CH20 / FLIGHT TERM SYS41 CH21 / GC341 CH22 / FACILITIES41 CH23 / INSTRUMENTATION41 CH24 / TDRSSa af anom 1a af anom 2a af corda af engra af mgmta af rd-180 anoma lr mgmtb netbeach cordcc lclem neter tlmfco lclflt cordgps intercom 1gps intercom 2inst 1inst 2inststatmco netmd net amiss audnet stat
ASOC 049ASOC 025ASOC 050ASOC 026ASOC 051ASOC 027ASOC 052ASOC 028ASOC 053ASOC 029ASOC 054ASOC 030ASOC 055ASOC 031ASOC 056ASOC 032ASOC 057ASOC 033ASOC 058ASOC 034ASOC 059ASOC 035ASOC 060ASOC 036ASOC 146ASOC 147ASOC 148ASOC 149ASOC 150ASOC 188ASOC 173ASOC 061ASOC 048ASOC 076ASOC 068ASOC 151ASOC 047ASOC 077
60705.0
ST-31Comm Mgr 10512345
ST-34Comm Mgr 11912345
ST-41Comm Mgr 12012345
AE/MDC
MUOS OBSVR12345678910111213141516171819
MUOS OBSVR12345678910111213141516171819
MUOS OBSVR12345678910111213141516171819
MUOS OBSVR12345678910111213141516171819
ASOC/ESA
324AFA123456789101112131415161718192021222324
325AGO CE1234567891011121314151617181920212223
326AGO PD12345678910111213141516171819202122
ASOC/MDC
125LV-1123456789101112131415161718192021222324
126MD12345678910111213141516181719
12712345678910111213141516181719
131MUOS OBSVR12345678910111213141516171819
132MUOS OBSVR12345678910111213141516171819
133AGO GM1234567891011121314151617181920212223
134DAFLD12345678910111213141516
135AFLD / AFLDA12345678910111213141516
136SVPD12345678910111213141617
137GP-212345678910111213141516
138GP-112345678910111213141516
139AERO 1123456789101112131516
ASOC/MSR #3
3-1SVA12345678910111213141617
3-2BOEING RSVD12345678910111213141617
3-3GPS RSVD12345678910111213141517
3-4AERO 2123456789101112131516
3-5AERO RSVD123456789101112131516
3-6GP-512345678910111213141517
ASOC/MSR #4
4-1SPO ATLAS123456789101112131415161718192021222324
4-2AGO ATLAS123456789101112131415161718192021222324
4-4AP-11234567891011121314151617181920212223
4-5AGO 1801234567891011121314151617181920212223
4-6SPO 180123456789101112131415161718192021222324
4-8AFP-11234567891011121314151617181920212223
ASOC/SOC
221LVTA12345678910111213151617
ASOC/EXEC CONF ROOM
COMM 2-3LR COORD12345678910111213141516171819
COMM 2-4LR SIM12345678910111213141516171819
COMM 2-6LR COORD-112345678910111213141516171819
BLDG 1645
STA 4685 SLS123
STA 10745 SLS123
MOC/MCR #2
B-1LCG COMM12345678910111213141516171819202122232425262728293031323334353637383940
B-34GPS SV12345678910111213141516181920
B-35GPS SV12345678910111213141516181920
B-36GPS SV12345678910111213141516181920
B-37GPS SV12345678910111213141516181920
MOC/MDC
B-3945 LCSS RSVD1234567891011121314151617192021
B-40ASD1234567891011121314151617192021
B-41AFSD1234567891011121314151617192021
B-42GPS RSVD123456789101112131415161718202122
B-43GP-3123456789101112131415161718202122
B-44GP-4123456789101112131415161718202122
B-45AERO 312345678910111213151617
B-46GPS RSVD12345678910111213141516181920
B-47BOEING RSVD12345678910111213141516181920
B-48SVVP12345678910111213141516181920
MOC/CAB
C-9LCG / APD13141516171819202122363738393526254827284032
NPF/CTRL RM 1
S103QA12345678910111213141516
S104GSAT12345678910111213141516
S105GPS RE12345678910111213141516
S106SVCE1234567891011121314151617
S107SVCE1234567891011121314151617
S108AERO 51234567891011121314151617
NPF/CTRL RM 2
S109STE1/2123456789101112131415
S110RSVD123456789101112131415
S111AFQS123456789101112131415
S112FPM123456789101112131415161718192021
S113AERO 4123456789101112131415
S114SV RAT123456789101112131415
S115TD1234567891011121314151617
S116SD123456789101112131415
S117TE212345678910111213
SOSF
S30245 LCSS12345678910
S303Ops Mgr123456789
S304Site Mgr123456789
S30845 LCSS12345678910
TSF/LV LSC
2102A1Trng Observer123456781112131415161718192021222324252627282933353631
2102A2AM-1 / AFM-11234567811121314151617181920212223242526283631
2102A3AGO Cent / SPO Cent123456781112131415161718192021222324252628343631
2102A4AP-2 / AFP-21234567811121314151617181920212223242526283631
2102A5AM-2 / AFM-21234567811121314151617181920212223242526283631
2102A6AM-3 / AFM-31234567811121314151617181920212223242526283631
2102B1AGO Elec / SPO Elec123456781112131415161718192021222324252628343631
2102B2AFE-31234567811121314151617181920212223242526283631
2102B3AE-1 / AFE-11234567811121314151617181920212223242526283631
2102B4AE-2 / AFE-21234567811121314151617181920212223242526283631
2102B5AG-1 / AFG-11234567811121314151617181920212223242526283631
2102B6AGO GC3 / SPO GC3123456781112131415161718192021222324252628343631
2102C1AERO MIM / LRGI12345678910111213141516171819202122232425262728293433353631
2102C2GMM / GMIM12345678910111213141516171819202122232425262728293433353631
2102C3SPO CE12345678111213141516171819202122232425262728293433353631
2102C4DCC12345678111213141516171819202122232425262728293433353631
2102C5MSL / MSL-1123456781112131415161718192021222324252627282941333840353631
2102C6LSC SPT / LSC SPT-1123456781112131415161718192021222324252627282941333840353631
2102D1FML / FML-112345678111213141516171819202122232425262728293340353631
2102D2FMLA / FMLA-11234567811121314151617181920212223242526272829343340353631
2102D3AFLC / AFLC-11234567811121314151617181920212223242526272829343340353631
2102D4CEA / FTL1234567811121314151617181920212223242526272829343340353631
2102D5TDA / CE12345678111213141516171819202122232425262728293340353631
2102D6LCG / LCGTD12345678910111213141516171819202122232425262728293340353631
TSF/TSR
2106C1COMM CORD313233343536373839404142434445464748495051525354555657585963857576776274618073
2106C2COMM CORD313233343536373839404142434445464748495051525354555657585963857576776274618073
2106C3NEMO313233343536373839404142434445464748495051525354555657585963857576776274618073
2106C4NEMO313233343536373839404142434445464748495051525354555657585963857576776274618073
TSF/TECH COMM
2300 LDS910
2300 VOICETSF COMM3132333435363738394041424344454647484950515253545556575859636475656662616970

Inf&Fac Ops

ITEMTIMEELEMENTSUPPORT TASK
F-100800ECCAFSProvide or service Port-O-Lets as indicated at the following sites no later than F-3 Day. Support Contractor/Contractor Cape Support Office notifies AFLIO @ 476-4046 when complete.
Water & Waste
Support ContractorLEOC fallback area (2 units)S-1 North
UCS-23 / 19110deliver by F-5
POC:ITL Causeway (near old guard shack)
Cape Support OfficeITL Causeway (4 units)*
853-5211AF viewing area (4 units)*CCAFS South Gate
AF viewing area (4 units)*NASA Causeway
F-100800ECCAFS Power ProductionContact 1) 45 SFS and verify the requirement to provide light carts at posted roadblocks; 2) Emergency Management for light cart at fallback area if required; and 3) NASA for light cart at Building AE. Have in place no later than F-1 day. Support Contractor Cape Support notifies AF Launch Integration Office (AFLIO) @ 476-4046 when complete.
Support Contractor
POC:
Cape Support Office
853-5211
F-100800ECCAFS Power ProductionPrepare to deliver and set up searchlights at Complex 41 and light banks at specific locations as described in Cape Support Request. Coordinate with 45 LRS Fuels (494-1365) to ensure searchlight fueling to support max run time of ~ 24 hours. Support Contractor/ Contractor Cape Support notify AF Launch Integration Office at 476-4046 when ready to support.
Support ContractorNOTE – no fueling operations within 500 ft. of the VIF and SLC 41 fan intakes from 48 hours prior to SC mate until after launch unless coordinated with ULA ECS Engineering (476-5097 / 98)
POC:
Cape Support Office
853-5211
F-100800ECCAFS Power ProductionCheckout 36kw generator at Communications Shop (Bldg. 36665), prior to F-1 day. Start generator on Launch Day prior to pick-up of the Range Count. Respond to problems within 1 hour of notification.
Support Contractor
Support Contractor/Contractor Cape Support Office notifies AFLIO upon completion.
POC:
Cape Support Office
853-5211

F-10 0800 E Support Contractor PAO Schedule PAO support requirements with Support Contractor/Contractor Cape Support Office as needed. For launches during hours of darkness, ensure lighting units are in place and ready to operate at LEOC fallback area and AF viewing areas* before F-1 day. Support Contractor/Contractor Cape Support Office notify AF Launch Integration Office (AFLIO) @ 476-4046 that all support is scheduled.

POC:*NOTE: Work to be billed to 45 SW Institutional JON.
Cape Support Office
853-5211
F-50800ECCAFS Power ProductionPerform critical checks at the following facilities with completion no later than F-1 day. Verify PMIs are current, no open tasks are in work, and identify any non-standard configuration. Support Contractor / Contractor Cape Support notify AF Launch Integration Office (AFLIO) @ 476-4046 when complete.
Support Contractor
FACILITYNUMBER
POC:XY Building1641
Cape Support OfficePower Dispatch Office (R&D)1708
853-5211Generator Building54708
UHF Timing Tower54715
Building AE60680
MOC Generator Plant181730
NOTE: 1) On DOL, two (2) Generator Mechanics on standby at MOC Generator Plant L-90 minutes through T + 120 minutes or release by CSR personnel.

DATE: _____/_____/_____ TIME_________ NAME:________________________________

F-50800ECCAFS HVACPerform critical checks at facilities listed below with completion no later than F-1 day. Verify PMIs are current, no open tasks are in work, and identify any non-standard configuration. Support Contractor / Contractor Cape Support notify AF Launch Integration Office (AFLIO) @ 476-4046 when complete.
Support Contractor
NOTES: 1. For GPS IIF-7, HVAC on-site support required at Building AE from 1830 until 0200 hours (L +1) day unless otherwise released by Building AE personnel.
POC:2. Plus count support required for MOC, Building AE, and XY Bldg. until ~ T + 3h or until release by CSR personnel. Standby support at shop is sufficient.
Cape Support Office3. HVAC/EMCS controls for CCAFS facilities maintained by 45 CES at 494-4477. Contractor HVAC trouble team can respond for HVAC issues.
853-5211FACILITY
Receivers
XY Building
Chiller Plant Building
Power Dispatch Office (R&D)
Weather Station
Communications Shop (N. Tip Shack)
UHF Timing Facility
Building AE
Command and Control
Emergency Power Bldg.
Electrical Power Station
Morrell Operations Center
Satellite Comm Grnd Trml
Satellite Comm Grnd Trml
BIDDS Telephone Bldg.
RADAR SITES
Radar 1.16
1.21 (Sea Surveillance Radar S.)
CABLE TERMINAL BUILDINGS
South Terminal Bldg.
East Terminal Bldg.
North Terminal Bldg.
Southwest Terminal Bldg.
Northwest Terminal Bldg.
F-50800ECCAFSPerform critical checks at facilities listed below with completion no later than F-1 day. Verify PMIs are current, no open tasks are in work, and identify any non-standard configuration. Support Contractor / Contractor Cape Support notify AF Launch Integration Office (AFLIO) @ 476-4046 when complete.
Interior Electric (L/V)
Support ContractorNOTES : 1. For GPS IIF-7, LV on-site support required at Building AE from 1830 on launch day until 0200 hours (L + 1) unless otherwise released by Building AE personnel.
2. Plus count support required for MOC, Building AE and XY Bldg. until ~ T + 3h or until release by CSR personnel. Standby support at shop is sufficient.
POC:FACILITYNUMBER
Cape Support Office
853-5211Receivers1102
XY Building1641
Chiller Plant Building1646
TV Operations1663
Power Dispatch Office (R&D)1708
Weather Station20185
North Warning Device36606
Communications Shop36665
Skid Strip Tower50210
UHF Timing Tower54714
UHF Timing Facility54715
Building AE60680
South Warning Device63200
Command and Control81550
Emergency Power Bldg.81551
Electrical Power Station81565
Morrell Operations Center81900
Satellite Comm Grnd Trml81905
Satellite Comm Grnd Trml81906
BIDDS Telephone Bldg.90400
CAMERA SITES
UCS-2319110
RADAR SITES
Radar 1.1650166
SSR South 1.21 (Sea Surveillance Radar S.)46712
CABLE TERMINAL BLDGS.
S. Cable Terminal Bldg.1307
E. Cable Terminal Bldg.1532
N. Cable Terminal Bldg.1664
NW Cable Terminal Bldg.70499
SW Cable Terminal Bldg.78150
F-50800ECCAFSPerform critical checks at facilities listed below no later than F-1 day. Verify PMIs are current, no open tasks are in work, and identify any non-standard configuration. Support Contractor / Contractor Cape Support notify AF Launch Integration Office (AFLIO) @ 476-4046 when complete.
Exterior Electric (HV) Support Contractor
POC:FACILITYNUMBER
Cape Support Office
853-5211SUBSTATIONS
CCAFS Substation Yard49775
North Substation60302
Titan Substation63805
Command Control Substation81567
South Substation85300
SWITCH STATIONS
Switch Station #781727
Switch Station #3738221

Patrol Overhead Lines

F-50800ECCAFS Compressed AirPerform critical checks at the following facilities complete by F-1 day. Verify PMIs are current; no open tasks are in work and identify any non-standard configuration. Support Contractor / Contractor Cape Support notify AF Launch Integration Office (AFLIO) @ 476-4046 when complete.
Facility Systems
Support Contractor
FACILITYNUMBER
POC:
Cape Support OfficeSouth Cable Terminal Building1307
853-5211XY Building1641
North Cable Terminal Bldg.1664
SW Cable Terminal Bldg.78150
F-50800ECCAFSPerform system checks at the following facilities by F-1 day. Verify PMIs are current; no open tasks are in work and identify any non-standard configuration. Support Contractor / Contractor Cape Support notify AF Launch Integration Office (AFLIO) @ 476-4046 when complete.
Support Contractor
FACILITYNUMBER
POC:
Cape Support OfficeXY Bldg.1641
853-5211Building AE60680
Command and Control81550
Morrell Operations Center81900
F-50800EFlorida Annexes HVAC, LV,Perform critical checks at the following facilities by F-1 day. Verify PMIs are current; no open tasks are in work and identify any non-standard configuration. Support Contractor / Contractor Cape Support notify AF Launch Integration Office (AFLIO) @ 476-4046 when complete.
Support Contractor
NOTE – generators to be on line at L-480 minutes on day of launch.
POC :
Cape Support OfficeFACILITYNUMBER
853-5211
JDMTA
Instrumentation Building28001
Powerhouse Building28002
Bore Sight Building28010
TLM Antenna Mount #5 (TAA-50-5)28012
TLM Antenna Mount #3 (TAA-50-3)28014
Command Radome #228015
Command Radome #128016
TLM Antenna Mount # 228018
TLM Antenna Mount #128019
Stuart Microwave Relay Site28101
Fort Pierce Microwave Relay Site28201
Wabasso Microwave Relay Site28301
F-50800EFlorida Annexes Gen PowerPerform critical checks at the following facility by F-1 day. Verify PMIs are current; no open tasks are in work and identify any non-standard configuration. Support Contractor / Contractor Cape Support notify AF Launch Integration Office (AFLIO) @ 476-4046 when complete.
Support Contractor
POC:JDMTA
Cape Support OfficePowerhouse Building (include generators)28002
853-5211
F-50800EFlorida Annexes ESS-F/APerform critical checks at the following facilities by F-1 day. Verify PMIs are current; no open tasks are in work and identify any non-standard configuration. Support Contractor / Contractor Cape Support notify AF Launch Integration Office (AFLIO) @ 476-4046 when complete.
Support Contractor
POC:JDMTA
Cape Support OfficeInstrumentation Building28001
853-5211Bore Site Building28010
F-5CCAFS Cape Support OfficeCAPE SUPPORT OFFICE WILL BROADCAST MESSAGE 1, SCHEDULED LAUNCH ANNOUNCEMENT, VIA THE CAPE AURAL WARNING SYSTEM STARTING AT L-48 HOURS AND REPEATING EVERY 4 HOURS. On launch day, Cape Support will broadcast at L-242 minutes and L-182 minutes.
Support Contractor
ANNOUNCEMENT: “A Launch from Complex 41 is scheduled for (date). We will use the Cape Aural Warning System to advise you of required actions. Launch Toxic Shelters may be required for your protection. Approved Launch Toxic Shelters are identified with a brown sign at the main facility entrance. Your cooperation is essential to avoid personal risk or injury. “ (REPEAT)
POC: 853-5211
Roll Out1000CCAFS Power ProductionDeliver and set up (6) self-powered light banks as follows:
Support Contractor
- One (1) on Transporter Road at security checkpoint on the west side at the “Y”;
POC:- Three (3) at the ITL Warehouse north parking lot; and
Cape Support Office- Two (2) at ASOC west side of east parking lot entrance and east side of west parking lot entrances.
853-5211
NOTE: light banks will be activated before dark on 31 Jul and will be deactivated at sunrise on DOL.

Notify AF Launch Integration Office (AFLIO) @ 476-4046 when complete.

Roll OutPrior toCCAFS Power ProductionCoordinate with ULA Launch Conductor (853-5961) to place and activate nine (9) 10 kW searchlight units (including generators) on SLC 41 at locations defined per drawing 41-0110011, Sheet T-004 provided earlier. Activate searchlights in the afternoon prior to leaving for the day and bore sight as follows:
Roll OutLeaving for the daySupport Contractor
1) Lighting to provide 360 degree evenly dispersed coverage of the launch vehicle and Mobile Launch Platform (MLP) from the base of the MLP to the top of the payload fairing (overall height of 200’).
POC:
Cape Support Office2) Lighting to be placed between 350’ and 550’ from the launch vehicle.
853-5211
Ensure generators are fueled and lights configured for continuous use from evening of Roll Day until after launch. Maximum run time between fueling will be ~ 24 hours. Support Contractor Cape Support notifies AF Launch Integration Office (AFLIO) @ 476-4046 when complete.
F-1800CCAFSVerify launch complex is on preferred feeder through launch. Verify derrick digger and high rangers are operational and ready. Support Contractor / Contractor Cape Support notify AF Launch Integration Office (AFLIO) @ 476-4046 when complete.
Exterior Electric Support Contractor
POC:
Cape Support Office
853-5211

F-1 1200 ALL AREAS Report completion of all critical checks / preventive maintenance inspections, disposition any open tasks that are in work and identify any non-standard configuration or anomalies to AF Launch Integration Office (AFLIO) @ 476-4046.

F-11523 EL - 480Florida Annexes (L/V., GEN., HVAC)Trouble teams on duty at JDMTA. Ensure generators are on-line and verifications completed. Support Contractor/Contractor Cape Support notify AF Launch Integration Office (AFLIO) @ Console B15 (853-8081); LAN Line 853-8396 when on site.
1923 ZT - 430Support Contractor
POC:
Cape Support Office
853-5211
Day of1723 EL - 360CCAFS Power ProductionGenerator Rover Team on standby at shop through launch until released. Support Contractor/Contractor Cape Support notify AF Launch Integration Office (AFLIO) @ Console B15 (853-8081); LAN Line 853-8396 when on site.
Day of2123 ZT - 310Support Contractor
POC:
Cape Support Office
853-5211
Day of1723 EL - 360CCAFS Logistics ServicesLogistic Coordinator on site at Building 1621 through launch until released. Support Contractor/Contractor Cape Support notify AF Launch Integration Office (AFLIO) @ Console B15 (853-8081); LAN Line 853-8396 when on site.
2123 ZT - 310Support Contractor
POC:
Cape Support Office
853-5211
TIME: __________ NAME: ___________________________________
Day of1723 EL - 360CCAFS HVACHVAC trouble team to standby at A/C shop and second HVAC trouble team to standby at the MOC through launch until released. Shop team will rove XY Bldg as needed.
2123 ZT - 310Support Contractor
Support Contractor/Contractor Cape Support notify AF Launch Integration Office (AFLIO) @ Console B15 (853-8081); LAN Line 853-8396 when on site.
POC:
Cape Support Office
853-5211
TIME: ________ NAME: __________________________________(MOC)

TIME: ________ NAME: __________________________________(SHOP)

Day of1723 EL - 360CCAFSFire Alarm Tech on standby at Hangar D shop through launch until released. Support Contractor/Contractor Cape Support notify AF Launch Integration Office (AFLIO) @ Console B15 (853-8081); LAN Line 853-8396 when on site.
2123 ZT - 310Fire Alarm/ESS (Siemens)
POC:
Cape Support Office
853-5211

TIME: __________ NAME: ___________________________________

Day of1723 EL - 360CCAFSLow voltage rover teams on standby at MOC and at the shop through launch. Support Contractor/Contractor Cape Support notify AF Launch Integration Office (AFLIO) @ Console B15 (853-8081); LAN Line 853-8396 when ready to support.
2123 ZT - 310Rover Team (LV)
Support Contractor
POC:
Cape Support Office
853-5211
Day of1723 EL - 360CCAFSHigh Voltage trouble team on standby at shop through launch until released. Support Contractor/Contractor Cape Support notify AF Launch Integration Office (AFLIO) @ Console B15 (853-8081); LAN Line 853-8396 when on site.
2123 ZT - 310Exterior Electric Support Contractor
POC:
Cape Support Office
853-5211

TIME: __________ NAME: ___________________________________

Day of1723 EL - 360CCAFSPower Dispatcher at Hangar R&D on standby through launch until released. Support Contractor/Contractor Cape Support notify AF Launch Integration Office (AFLIO) @ Console B15 (853-8081); LAN Line 853-8396 when on site.
2123 ZT - 310Power Dispatcher Support Contractor
POC:
Cape Support Office
853-5211
Day of1815 ECCAFS Power ProductionReactivate searchlights at SLC 41. Contact the ULA Launch Conductor for re-entry to SLC 41 post launch. Slips or scrubs will be handled on a case-by-case basis. Support Contractor/Contractor Cape Support notify AF Launch Integration Office (AFLIO) @ Console B15 (853-8081); LAN Line 853-8396 when on site.
2215 ZSupport Contractor
POC:
Cape Support Office
853-5211
241830 ECCAFS HVACProvide on-site at Building AE until 0200 hours or release by AE personnel on DOL. Support Contractor/Contractor Cape Support notify AF Launch Integration Office (AFLIO) @ Console B15 (853-8081); LAN Line 853-8396 when on site.
2230 ZSupport Contractor
Cape Support Office
853-5211
Day of1830 ECCAFSProvide on-site support at Building AE until 0200 hours or release by AE personnel on DOL. Support Contractor/Contractor Cape Support notify AF Launch Integration Office (AFLIO) @ Console B15 (853-8081); LAN Line 853-8396 when on site.
2230 ZInterior Electric (LV)
Support Contractor
Cape Support Office
853-5211
Day of1921 EL - 242CCAFS Cape Support OfficeBroadcast the following announcement via the Cape Aural Warning System:
2321 ZT - 192Support Contractor
" A launch from Complex 41 is scheduled for _______________. We will use the Cape Aural Warning System to advise you of required actions. Launch Toxic Shelters may be required for your protection. Approved Launch Toxic Shelters are identified with a brown sign at the main facility entrance. Your cooperation is essential to avoid personal risk or injury."
POC:
Cape Support OfficeNOTE: Before each broadcast, contact the ISRO to avoid conflicting with countdown announcements.
853-5211
Day of1930 ECCAFS Power ProductionActivate light banks at the “Y” on Transporter Road, ITL Warehouse parking lot and ASOC entrances prior to dusk. Support Contractor/Contractor Cape Support notify AF Launch Integration Office (AFLIO) @ Console B15 (853-8081); LAN Line 853-8396 when complete.
2330 ZSupport Contractor (Contractor)
POC:
Cape Support Office
853-5211
Day of2021 EL - 182CCAFS Cape Support OfficeBroadcast the following announcement via the Cape Aural Warning System:
0021 ZT - 132Support Contractor (Contractor)
POC:
Cape Support Office
853-5211
" A launch from Complex 41 is scheduled for today, ___________. We will use the Cape Aural Warning System to advise you of required actions. Launch Toxic Shelters may be required for your protection. Approved Launch Toxic Shelters are identified with a brown sign at the main facility entrance. Your cooperation is essential to avoid personal risk or injury."

NOTE: Before each broadcast, contact the ISRO to avoid conflicting with countdown announcements.

TIME: __________ NAME: ___________________________________

Day of2153 EL - 90CCAFS Power Production(2) Generator mechanics on site at the MOC Generator Plant in support of MOC and Receivers Bldg through launch until T + 120 minutes or release by CSR personnel.
0153 ZT - 70Support Contractor (Contractor)
Support Contractor/Contractor Cape Support notify AF Launch Integration Office (AFLIO) @ Console B15 (853-8081); LAN Line 853-8396 when on site.
POC:
Cape Support Office
853-5211
Day of2243 EL - 40ALL AREASReport mission capability status (FMC/PMC/NMC) to AF Launch Integration Office (AFLIO) @ Console B15 (853-8081); LAN Line 853-8396.
0243 ZT - 20ORGANIZATION STATUS POC
Day of2259 EL - 24START OF PLANNED 20 MINUTE BUILT-IN HOLD.
0259 ZT - 4ALL AREAS
2319 EL - 4
Day of0319 ZT- 4ALL AREASEND OF PLANNED 20 MINUTE BUILT-IN HOLD. RESUME COUNT.
Support Contractor
Contractor____________________________/_______________

NOTES:

1) HVAC and LV on-site support for Hangar AE from 1830 until 0200 hours unless otherwise released by AE personnel.
2) Plus count support for MOC, XY Bldg. and Hangar AE required through ~ T + 3h or end of plus count. CSR Network Ops (853-9555) will notify Cape Support Office that plus count is terminated.
L+1800L + 1 DayCCAFS Power ProductionRemove all generators, light banks and searchlights used in support of launch. Contact ULA Atlas Launch Conductor
Support Contractor (Contractor)(853-5961) for pad re-entry. Slips or scrubs will be handled on a case by case basis.
POC:Support Contractor / Contractor Cape Support notify AF Launch Integration Office (AFLIO) @ 476-4046 when complete.
Cape Support Office
853-5211
DATE: ____/____/____ TIME: _____ NAME: ________________________
Remove all port-o-lets used in support of this mission. Support Contractor / Contractor Cape Support Office notify AF Launch Integration Office (AFLIO) @ 476-4046 when complete.
L+1800L + 1 DayCCAFS
Water & Waste
Support Contractor (Contractor)
POC:
Cape Support Office
853-5211
CCAFS Cape Support OfficeMESSAGE 2, Launch Toxic Shelter Identification Announcement. If directed by 45 SW/SE, this announcement is made to affected aural warning zones via the CAWS at L-122 minutes, L-97 minutes and L-72 minutes. (REPEAT)
Support Contractor (Contractor)
NOTE: Before each broadcast, contact the ISRO to avoid conflicting with countdown announcements.
POC: 853-5211
CCAFS Cape Support OfficeMESSAGE 3, Risk Mitigation Announcement. If directed by 45 SW/SE, this announcement (3A (Toxic Dispersion), 3B (Distant Focusing Overpressure [DFO], or both) is made to affected aural warning zones via the CAWS at L-57 minutes, L-32 minutes and L-17 minutes. (REPEAT)
Support Contractor (Contractor)
NOTE: Before each broadcast, contact the ISRO to avoid conflicting with countdown announcements.
POC: 853-5211
CCAFS Cape Support OfficeMESSAGE 4, Accident Announcement. If directed by 45 SW/SE following a catastrophic launch abort in the launch area, broadcast this announcement across all aural warning zones via the CAWS:
Support Contractor (Contractor)4A – toxic dispersion, DFO and debris risk are not a concern.
4B – toxic dispersion risk is a concern.
POC: 853-52114C – when debris risk is a concern (within the FCA/FHA).
4d – when toxic dispersion and debris risk (within the FCA/FHA) are concerns.
(REPEAT)

NOTE – 45 SW/SE will provide specific, detailed messages by L-10 minutes.

4CCAFS Cape Support OfficeMESSAGE 5, Toxic Plume Announcement. If directed by 45 SW/SE when specific areas of CCAFS are affected by the exhaust plume, broadcast this announcement to affected aural warning zones via the CAWS. Repeat 10 minutes before the toxic plume arrives; 5 minutes before the toxic plume arrives; and as the toxic plume arrived. (REPEAT)
Support Contractor (Contractor)

POC: 853-5211

5CCAFS Cape Support OfficeMESSAGE 6, All Clear Announcement (For Personnel Outside Identified Affected Areas). If directed by 45 SW/SE, broadcast this announcement across all aural warning zones via the CAWS. (REPEAT)
Support Contractor (Contractor)
NOTE: upon agreement between 45 SW/SE, the Launch EOC Director, and 45 AMDS/SGGB, personnel outside of the affected area may be able to resume normal activities prior to the “All Clear” for the entire Cape.
POC: 853-5211
6CCAFS Cape Support OfficeMESSAGE 7, All Clear Announcement. If directed by 45 SW/SE, broadcast this announcement across all aural warning zones via the CAWS. (REPEAT)
Support Contractor (Contractor)
NOTE: upon agreement between 45 SW/SE, the Launch EOC Director, and 45 AMDS/SGGB, personnel may resume normal activities.
POC: 853-5211
7CCAFS Cape Support OfficeCape Support personnel may be directed to operate the radios monitoring the situation and assisting with any actions required by the Launch EOC Team.
Support Contractor (Contractor)

POC: 853-5211

DATE: ____/____/____ TIME: _____ NAME: ________________________

8CCAFS Cape Support OfficeRecall additional Support Contractor Cape Support personnel as needed.
Support Contractor (Contractor)

POC: 853-5211

DATE: ____/____/____ TIME: _____ NAME: ________________________

9CCAFS Cape Support OfficeRelay all pertinent information to PAFB Command Post (494-7001).
Support Contractor (Contractor)

POC: 853-5211

Sheet1

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .