About this file

TRD_F5 Arena Test Complex TA C-80B/80C TS C-80W

View the file

Other files for this federal contract opportunity

Other files attached to Eglin Operations & Maintenance Services (Formerly Eglin Test & Training Complex Technical Services (ETTC-TS) Program), newest first.
File Type Posted
E-OMS_Model_Contract_QandA.pdf PDF
FA2486-16-R-0002-0002_Signed.pdf PDF
RN_and_CE_MFR.pdf PDF
Section_J_Attachment_6_WD_05-2511_Rev_20_NRTF.pdf PDF
Section_J_Attachment_2_WD_05-2121_Rev_16_Walton_County _FL.pdf PDF
Section_J_Attachment_4_WD_05-2419_Rev_20_WPAFB.pdf PDF
Section_L.pdf PDF
Section_J_Attachment_1_B01_LOE_Labor_Category_Descriptions.pdf PDF
Section_L_Attachment_1_Government_Staffing_Estimate.xlsx XLSX spreadsheet
Section_J_Attachment_7_DD254.pdf PDF
Section_J_Attachment_9__E-OMS_PWS.pdf PDF
Section_J_Attachment_6_WD_05-2511_Rev_19_NRTF.pdf PDF
ADM_Synopsis.pdf PDF
Section_C_E-OMS_PWS_28_May_2015.pdf PDF
Section_J_Attachment_10_NRTF_Collective_Bargaining_Agreement.pdf PDF
Section_L_Final_28_May_2015.pdf PDF
Section_L_Attachment_9_TEP_3.20.15.xlsx XLSX spreadsheet
MGTF_LCDs_Consolidated_Final.pdf PDF
E-OMS_PWS_v5.5_Draft_RFP.pdf PDF
NRTF_Industry_Day_Questions_Answers.pdf PDF
E-OMS_Industry_Day_2_Questions_Answers.pdf PDF
NRTF_Industry_Day_Attending_Companies.pdf PDF
Delta_ASP_Synopsis.pdf PDF
FBO_Draft_RFP_Cover_Letter.pdf PDF
Section_J_Attachment_7_Task_Approval_Procedures.pdf PDF
Draft_Section_L.pdf PDF
Draft_RFP.pdf PDF
ASP_Synopsis.pdf PDF
E-OMS_OCI_Clause_Draft_for_FBO.pdf PDF
EOMS_RFI_3_Final.pdf PDF
E-OMS_Industry_Day_Range_Brief.pdf PDF
B4_TM_Tour_TAIP_-_updated.pdf PDF
C-80_Script_5-1-14_TAIP_-_updated.pdf PDF
SRI_Windshield_Tour_Script_(draft)_with_Threat_update_-_updated.pdf PDF
C-72W_Script_TAIP_-_updated.pdf PDF
HELLFIRE_Script_4-16-14_TAIP_-_updated.pdf PDF
KEMTF_Script_TAIP_-_updated.pdf PDF
E-OMS_Tour_Rules_of_Engagement_.pdf PDF
TRD_B11.pdf PDF
TRD_A4.pdf PDF
TRD_B9D.pdf PDF
TRD_B5.pdf PDF
TRD_B8.pdf PDF
TRD_C13.pdf PDF
TRD_F2C.pdf PDF
TRD_B1.pdf PDF
TRD_C14.pdf PDF
E-OMS_Draft_Industry_Day_Agenda.pdf PDF
EOMS_RFI_2_Posted.pdf PDF
E-OMS_and_NRTF_Consolidation_memo.pdf PDF
Show all 50

Eglin Operations & Maintenance Services (Formerly Eglin Test & Training Complex Technical Services (ETTC-TS) Program) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev I

APPENDIX F5

ARENA TEST COMPLEX, TA C-80B/80C, TS C-80W

1.0 PURPOSE. The purpose of the arena test complex is to conduct static detonations of conventional munitions and collect data to characterize their effectiveness.

2.0 GENERAL.

2.1. The TA C-80 complex is primarily a static test facility for various ordnance items having high-explosive characteristics. It is located about 20 miles northeast of Eglin main base, reached via SRs 20 and 285 and RRs 200 and 201. It includes TS C-80W and TA C-80A, C- 80B and C-80C. TA C-80A is covered in appendix F6. The TA C-80 complex consists of three satellite test areas and a central support area at TS C-80W. Normally, missions can be safely conducted simultaneously at more than one satellite location without interference.

Instrumentation at TA C-80C and the Explosive Instrumentation Data System (EIDS) van are similarly configured. The EIDS van can be deployed anywhere a temporary instrumentation capability is required.

2.2. Electronic instrumentation is installed at TA C-80C and in the EIDS van to acquire and record fragment velocity, fragment dispersion, and pressure profile data. Fragments are recovered and weighed at TS C-80W to produce mass distribution data. Fragment sensor fabrication equipment and transducer calibration equipment are located at TS C-80W.

Normally, fragment data is obtained from event sensors placed on fiberboard bundles from which fragments are recovered. When total fragment recovery is required, the test item is detonated in an air cylinder under water in one of the steel tanks at TA C-80A (presently in Category “E” Reduced Maintenance).

2.3. Each test area includes a cleared space approximately 800 feet by 2000 feet, a control building, a vehicle shelter, an underground bunker, and a clay test pad (arena).

2.4. TA C-80B supports tests of ordnance from 0 to 500 pounds net explosive weight (NEW) on an arena 400 feet in diameter and 750 feet downrange from the control building (9469). TA C-80B also has one 40-foot by 60-foot storage building (9465), located 500 feet east of the control building. TA C-80C supports tests of ordnance from 0 to 3000 pounds NEW on an arena 500 feet in diameter and 1600 feet downrange from the control building (9474).

2.5. TS C-80W supports TAs C-80A, C-80B, C-80C, and the portable EIDS van. This van can be deployed within the complex or at other Eglin or off-station test ranges. TS C-80W has four buildings and a 325-foot by 95-foot secure vehicle storage compound. Two 40-foot by 60-foot buildings (9468 and 9480) provide storage for mission support materials. One 15-foot by 20-foot building (9569) houses equipment to fabricate fragment sensor screens and to clean recovered fragments. A 120-foot by 40-foot building (9461) houses a pressure transducer calibration facility, a fragment weighing system, and the TA C-80 complex administrative, engineering, and mission support communications activities.

3.0 CAPABILITIES.

3.1. The Contractor shall operate and maintain the Arena Test Complex, including:

FA9200-05-C-0001, P00121

Attachment 3

Page F5-1

3.1.1. TA C-80B instrumentation, including:

1. FS-10 firing system

2. Electric Field Mill (lightning warning) system

3.1.2. TA C-80C instrumentation, including:

1. Vulnerability and Lethality Test System (VALTS) Fragment Velocity Systems

2. 32-channel digitizing data acquisition system

3. High-speed digitizers, 36-channel amplifier system, and miscellaneous transducers and cables

4. Temperature data acquisition system

5. Programmable sequencer/controller unit

6. Site control console

7. CCTV systems

8. Triphaser Slow Cook System

9. Digital Weather System

10. Electric Field Mill System.

3.1.3. EIDS van instrumentation, including:

1. VALTS Fragment Velocity Systems

2. 32-channel digitizing data acquisition system

3. Pressure data system including a data acquisition control unit, a data recorder, a multi-channel amplifier system, and miscellaneous transducers and cables

4. Radio remote controller for data instrumentation equipment

5. Timing receiver

6. Radio-remote firing system.

3.1.4. TS C-80W equipment and instrumentation, including:

1. Dry-blast cabinet, including a cabinet, a gun, a gun mount, and an abrasive reclaim system used for fragment cleaning

2. Flame-spray system, including flame spray guns, a spraying rack, an aluminum wire feeder reel and stand, oxygen and acetylene cylinders, gauges, regulators, and heads

3. Diesel-operated air compressor

4. Electrically operated air compressor

5. Fragment weighing system.

3.1.5. The Transducer Evaluation Facility (TEF) at TS C-80W, including:

1. Desktop computer

2. Printers

3. Pneumatic pressure calibration system

4. 10,000 g drop ball accelerometer calibrator

5. Miscellaneous pneumatic, electric, shock, and thermal calibration sources, standards, and PME components.

3.1.6. Reserved

3.1.7. Various mobile and fixed radios, including:

1. FM transceiver base stations

2. Hand-held radios.

FA9200-05-C-0001, P00121

Page F5-2

3.2. The Contractor shall conduct Arena Test Complex missions IAW tasks and test directives.

3.3. The Contractor shall simultaneously support testing on all four sites (TA C-80B/C/W and the TA C80A total-fragment-recovery system), and support data acquisition with the EIDS Van, when required as part of the seven simultaneous operations as specified in PWS paragraph 1.7.

This does not include simultaneously conducting two 16 foot arena tests.

3.4 Reserved

3.5 The contractor shall maintain and operate the vehicles identified in Table F5-1 in accordance with requirements established in TRD A3. Co-utilization of vehicles from and to other Contractor operated and maintained facilities is an acceptable means for satisfying vehicle shortages due to surge support requirements. Suitable substitute for vehicle type is acceptable.

TABLE F5-1

Mgt Code Nomenclature Qty Auth

B168 TRK PNL 4X2 6999G / UNDE 1

B180 TRUCK, MULTISTOP, 1 TON, 4X2 1

B185 TRUCK, CARRYALL, 4X2 1

B211 TRK 1/2T4X4 4600-5799GVW 1

B222 TRK 3/4T CREW CAB 4X4 PU 4

B265 TRK S/P 4X2 10000 GVW 1

B368 TRK TRAC 6X4 44.5K-46K GV 1

B409 TRAILER, FLATBED, 20 TON, 40 FT 1

D526 CRANE 30TON 1

D560 TRACTOR, FARM, SZ 5 1

D633 LODR SCP PT 4CY 1

D652 GRADER, SIZE 5 1

D741 TRAILER, DITCH WITCH 1

D772 Wheeled Ditching Machine 1

E949 TRK FL 6K(COMMERCIAL) 1

L398 STLR V A-C 7-10T 1

FA9200-05-C-0001, P00121

Page F5-3

APPENDIX F5
1.0 PURPOSE. The purpose of the arena test complex is to conduct static detonations of conventional munitions and collect data to characterize their effectiveness.
2.0 GENERAL.
2.1. The TA C-80 complex is primarily a static test facility for various ordnance items having high-explosive characteristics. It is located about 20 miles northeast of Eglin main base, reached via SRs 20 and 285 and RRs 200 and 201. It includes TS ...
2.2. Electronic instrumentation is installed at TA C-80C and in the EIDS van to acquire and record fragment velocity, fragment dispersion, and pressure profile data. Fragments are recovered and weighed at TS C-80W to produce mass distribution data. ...
2.3. Each test area includes a cleared space approximately 800 feet by 2000 feet, a control building, a vehicle shelter, an underground bunker, and a clay test pad (arena).
2.4. TA C-80B supports tests of ordnance from 0 to 500 pounds net explosive weight (NEW) on an arena 400 feet in diameter and 750 feet downrange from the control building (9469). TA C-80B also has one 40-foot by 60-foot storage building (9465), locat...
2.5. TS C-80W supports TAs C-80A, C-80B, C-80C, and the portable EIDS van. This van can be deployed within the complex or at other Eglin or off-station test ranges. TS C-80W has four buildings and a 325-foot by 95-foot secure vehicle storage compoun...
3.0 CAPABILITIES.
3.1. The Contractor shall operate and maintain the Arena Test Complex, including:
3.1.1. TA C-80B instrumentation, including:
1. FS-10 firing system
2. Electric Field Mill (lightning warning) system
3.1.2. TA C-80C instrumentation, including:
1. Vulnerability and Lethality Test System (VALTS) Fragment Velocity Systems
2. 32-channel digitizing data acquisition system
3. High-speed digitizers, 36-channel amplifier system, and miscellaneous transducers and cables
4. Temperature data acquisition system
5. Programmable sequencer/controller unit
6. Site control console
7. CCTV systems
8. Triphaser Slow Cook System
9. Digital Weather System
10. Electric Field Mill System.
3.1.3. EIDS van instrumentation, including:
1. VALTS Fragment Velocity Systems
2. 32-channel digitizing data acquisition system
3. Pressure data system including a data acquisition control unit, a data recorder, a multi-channel amplifier system, and miscellaneous transducers and cables
4. Radio remote controller for data instrumentation equipment
5. Timing receiver
6. Radio-remote firing system.
3.1.4. TS C-80W equipment and instrumentation, including:
1. Dry-blast cabinet, including a cabinet, a gun, a gun mount, and an abrasive reclaim system used for fragment cleaning
2. Flame-spray system, including flame spray guns, a spraying rack, an aluminum wire feeder reel and stand, oxygen and acetylene cylinders, gauges, regulators, and heads
3. Diesel-operated air compressor
4. Electrically operated air compressor
5. Fragment weighing system.
3.1.5. The Transducer Evaluation Facility (TEF) at TS C-80W, including:
1. Desktop computer
2. Printers
3. Pneumatic pressure calibration system
4. 10,000 g drop ball accelerometer calibrator
5. Miscellaneous pneumatic, electric, shock, and thermal calibration sources, standards, and PME components.
3.1.6. Reserved
3.1.7. Various mobile and fixed radios, including:
1. FM transceiver base stations
2. Hand-held radios.
3.2. The Contractor shall conduct Arena Test Complex missions IAW tasks and test directives.
3.3. The Contractor shall simultaneously support testing on all four sites (TA C-80B/C/W and the TA C80A total-fragment-recovery system), and support data acquisition with the EIDS Van, when required as part of the seven simultaneous operations as spe...

3.4 Reserved