TRD_F2C Gun and Ammunition Test Facility TA C-74L

View the file

Other files for this federal contract opportunity

Other files attached to Eglin Operations & Maintenance Services (Formerly Eglin Test & Training Complex Technical Services (ETTC-TS) Program), newest first.
File Type Posted
E-OMS_Model_Contract_QandA.pdf PDF
FA2486-16-R-0002-0002_Signed.pdf PDF
RN_and_CE_MFR.pdf PDF
Section_J_Attachment_6_WD_05-2511_Rev_20_NRTF.pdf PDF
Section_J_Attachment_2_WD_05-2121_Rev_16_Walton_County _FL.pdf PDF
Section_J_Attachment_4_WD_05-2419_Rev_20_WPAFB.pdf PDF
Section_L.pdf PDF
Section_J_Attachment_1_B01_LOE_Labor_Category_Descriptions.pdf PDF
Section_L_Attachment_1_Government_Staffing_Estimate.xlsx XLSX spreadsheet
Section_J_Attachment_7_DD254.pdf PDF
Section_J_Attachment_9__E-OMS_PWS.pdf PDF
Section_J_Attachment_6_WD_05-2511_Rev_19_NRTF.pdf PDF
ADM_Synopsis.pdf PDF
Section_C_E-OMS_PWS_28_May_2015.pdf PDF
Section_J_Attachment_10_NRTF_Collective_Bargaining_Agreement.pdf PDF
Section_L_Final_28_May_2015.pdf PDF
Section_L_Attachment_9_TEP_3.20.15.xlsx XLSX spreadsheet
MGTF_LCDs_Consolidated_Final.pdf PDF
E-OMS_PWS_v5.5_Draft_RFP.pdf PDF
NRTF_Industry_Day_Questions_Answers.pdf PDF
E-OMS_Industry_Day_2_Questions_Answers.pdf PDF
NRTF_Industry_Day_Attending_Companies.pdf PDF
Delta_ASP_Synopsis.pdf PDF
FBO_Draft_RFP_Cover_Letter.pdf PDF
Section_J_Attachment_7_Task_Approval_Procedures.pdf PDF
Draft_Section_L.pdf PDF
Draft_RFP.pdf PDF
ASP_Synopsis.pdf PDF
E-OMS_OCI_Clause_Draft_for_FBO.pdf PDF
EOMS_RFI_3_Final.pdf PDF
E-OMS_Industry_Day_Range_Brief.pdf PDF
B4_TM_Tour_TAIP_-_updated.pdf PDF
C-80_Script_5-1-14_TAIP_-_updated.pdf PDF
SRI_Windshield_Tour_Script_(draft)_with_Threat_update_-_updated.pdf PDF
C-72W_Script_TAIP_-_updated.pdf PDF
HELLFIRE_Script_4-16-14_TAIP_-_updated.pdf PDF
KEMTF_Script_TAIP_-_updated.pdf PDF
E-OMS_Tour_Rules_of_Engagement_.pdf PDF
TRD_B11.pdf PDF
TRD_A4.pdf PDF
TRD_B9D.pdf PDF
TRD_B5.pdf PDF
TRD_B8.pdf PDF
TRD_C13.pdf PDF
TRD_B1.pdf PDF
TRD_C14.pdf PDF
TRD_B9B.pdf PDF
E-OMS_Draft_Industry_Day_Agenda.pdf PDF
EOMS_RFI_2_Posted.pdf PDF
E-OMS_and_NRTF_Consolidation_memo.pdf PDF
Show all 50

Eglin Operations & Maintenance Services (Formerly Eglin Test & Training Complex Technical Services (ETTC-TS) Program) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev E

FA9200-05-C-0001, P00057

Attachment 3 Page F2C-1

APPENDIX F2C

GUN AND AMMUNITION TEST FACILITY, TA C-74L

1.0 PURPOSE

2.0

. The purpose of TA C-74L is to test gun systems performance, ammunition performance, and ammunition life cycle, and to determine ballistic characteristics. The site is also used for remote control of sled missions conducted at TA C-74.

2.1. TA C-74L is used to test the terminal effects of gun systems and ammunition. The on-site data collection and reduction system is utilized to record critical performance parameters of small caliber (usually 40 mm or less) gun systems and ammunition. The firing bays are equipped for static firing of a wide variety of weapons ranging from small handguns to large automatic systems.

GENERAL.

2.2. TA C-74L is located approximately 24 miles northeast of Eglin main base, reached via SRs 20 and 285 and RR 213.

2.3. Principal features include a fixed mount and automatic weapon firing facility (building 9372). The facility includes an office, instrumentation room, maintenance area, ammunition handling and conditioning room, and two instrumented firing bays. The facility also has a target butt approximately 300 feet downrange. Although located adjacent to TA C-74, the facility has ample area to allow the testing of both high-explosive and high-explosive incendiary ammunition.

3.0

3.1. The Contractor shall operate and maintain the TA C-74L data equipment, including:

CAPABILITIES.

3.1.1. One CCTV system, including:

1. Videocassette recorder.

2. Cameras with integrated positioning systems.

3. Position controller.

4. Monitors.

5. Signal modulators.

3.1.2. One ballistic pressure transducer calibration system, including

1. High-pressure hydraulic ram.

2. Digital voltmeters.

3. Charge amplifiers.

4. Associated cabling.

5. Calibration standards.

6. Operational transducers.

3.1.3. One X-Y scoring system, including:

1. Target area transducer frames.

2. Acoustic coupler system with coupler/amplifiers and a power supply packaged in a weather-resistant housing.

Attachment 3 Page F2C-2

3.1.4. Voltage mode amplifiers.

3.1.5. Dual mode amplifiers.

3.1.6. One remote-controlled roll paper framing target.

3.1.7. Ballistic velocity screens and associated Strobotac tester.

3.1.8. Assorted instrumentation transducers, including flow, pressure, temperature, and position indicators, and blast gauges and magnetic sensors.

3.1.9. Ten-channel digital temperature indicator.

3.2. The Contractor shall operate and maintain TA C-74L temperature conditioning chambers for ammunition up to 40mm.

3.3. The Contractor shall operate and maintain TA C-74L specialized test support equipment, including:

1. Various gun mount systems from 50 caliber to 40mm.

2. Laser bore sight system.

3. One high-pressure hydraulic system with associated controls and instrumentation.

3.4. The Contractor shall operate and maintain TA C-74L general test support equipment, including:

3.4.1. One programmable sequencer system, including:

1. Computer-controlled sequencer/controllers.

2. Input modules.

3. Output modules.

3.4.2. One interconnection patch panel and associated patch boards.

3.4.3. A communications and control system, including:

1. Amplifiers.

2. Control panels.

3. Mounting racks.

4. FM transceiver.

3.4.4. One four-bay console, including:

1. Associated mission control panels.

2. Firing control panels.

3. Safety interlocks.

4. Lights and controls.

3.4.5. DC power supplies.

3.5. The Contractor shall conduct tests at TA C-74L IAW tasks and test directives.

3.6. The Contractor shall operate and maintain remote control equipment for TA C-74 sled tests.

3.7. Provide minor target fabrication and modification and make repairs to existing targets.

Attachment 3 Page F2C-3

3.8. Simultaneous operation requirements for gun facilities are included in Appendix F2A and PWS paragraph 1.7.

APPENDIX F2C
1.0 UPURPOSEU. The purpose of TA C-74L is to test gun systems performance, ammunition performance, and ammunition life cycle, and to determine ballistic characteristics. The site is also used for remote control of sled missions conducted at TA C-74.
2.0 UGENERAL.
2.1. TA C-74L is used to test the terminal effects of gun systems and ammunition. The on-site data collection and reduction system is utilized to record critical performance parameters of small caliber (usually 40 mm or less) gun systems and ammunition.
2.2. TA C-74L is located approximately 24 miles northeast of Eglin main base, reached via SRs 20 and 285 and RR 213.
2.3. Principal features include a fixed mount and automatic weapon firing facility (building 9372). The facility includes an office, instrumentation room, maintenance area, ammunition handling and conditioning room, and two instrumented firing bays. The
3.0 UCAPABILITIES.
3.1. The Contractor shall operate and maintain the TA C-74L data equipment, including:
3.1.1. One CCTV system, including:
1. Videocassette recorder.
2. Cameras with integrated positioning systems.
3. Position controller.
4. Monitors.
5. Signal modulators.
3.1.2. One ballistic pressure transducer calibration system, including
1. High-pressure hydraulic ram.
2. Digital voltmeters.
3. Charge amplifiers.
4. Associated cabling.
5. Calibration standards.
6. Operational transducers.
3.1.3. One X-Y scoring system, including:
1. Target area transducer frames.
2. Acoustic coupler system with coupler/amplifiers and a power supply packaged in a weather-resistant housing.
3.1.4. Voltage mode amplifiers.
3.1.5. Dual mode amplifiers.
3.1.6. One remote-controlled roll paper framing target.
3.1.7. Ballistic velocity screens and associated Strobotac tester.
3.1.8. Assorted instrumentation transducers, including flow, pressure, temperature, and position indicators, and blast gauges and magnetic sensors.
3.1.9. Ten-channel digital temperature indicator.
3.2. The Contractor shall operate and maintain TA C-74L temperature conditioning chambers for ammunition up to 40mm.
3.3. The Contractor shall operate and maintain TA C-74L specialized test support equipment, including:
1. Various gun mount systems from 50 caliber to 40mm.
2. Laser bore sight system.
3. One high-pressure hydraulic system with associated controls and instrumentation.
3.4. The Contractor shall operate and maintain TA C-74L general test support equipment, including:
3.4.1. One programmable sequencer system, including:
1. Computer-controlled sequencer/controllers.
2. Input modules.
3. Output modules.
3.4.2. One interconnection patch panel and associated patch boards.
3.4.3. A communications and control system, including:
1. Amplifiers.
2. Control panels.
3. Mounting racks.
4. FM transceiver.
3.4.4. One four-bay console, including:
1. Associated mission control panels.
2. Firing control panels.
3. Safety interlocks.
4. Lights and controls.

3.4.5. DC power supplies.

3.5. The Contractor shall conduct tests at TA C-74L IAW tasks and test directives.
3.6. The Contractor shall operate and maintain remote control equipment for TA C-74 sled tests.
3.7. Provide minor target fabrication and modification and make repairs to existing targets.
3.8. Simultaneous operation requirements for gun facilities are included in Appendix F2A and PWS paragraph 1.7.