About this file

TRD_B9B Test Area C-52 Complex

View the file

Other files for this federal contract opportunity

Other files attached to Eglin Operations & Maintenance Services (Formerly Eglin Test & Training Complex Technical Services (ETTC-TS) Program), newest first.
File Type Posted
Section_J_Attachment_3_WD_05-3033_Rev_16_Okaloosa_County _FL.pdf PDF
Section_J_Attachment_10_E-OMS_WPAFB_GFP.xlsx XLSX spreadsheet
Section_M.pdf PDF
Section_L_Attachment_1_Government_Staffing_Estimate.xlsx XLSX spreadsheet
Section_L_Attachment_8_TEP_6_Jul.xlsx XLSX spreadsheet
Section_L_Attachment_7_Sample_E-OMS_Cost_Element_Summary.xlsx XLSX spreadsheet
Combined_Industry_DRAFT_RFP_CRM.xlsx XLSX spreadsheet
Comment_Resolution_Matrix.xlsx XLSX spreadsheet
2015_E-OMS_CDRLs_10_Jun_2015.pdf PDF
E-OMS_AFP_10_June_2015.pdf PDF
NRTF_Mission_Info.pdf PDF
E-OMS_Mission_Vision_HLO's.pdf PDF
Draft_Contract.pdf PDF
Section_J_Attachment_3_WD_05-3033_Rev_15_Okaloosa_County _FL.pdf PDF
Section_J_Attachment_7_DD254_Contract_Security_Classification_Specification.pdf PDF
Section_L_Attachment_8_Sample_E-OMS_Cost_Element_Summary.xlsx XLSX spreadsheet
Section_L_Attachment_1_Government_Staffing_Estimate.xlsx XLSX spreadsheet
Section_L_Attachment_9_TEP_3.20.15.xlsx XLSX spreadsheet
Section_L_Attachment_1_Government_Staffing_Estimate_3.20.15.xlsx XLSX spreadsheet
Draft_Section_L_3.20.15.pdf PDF
E-OMS_Draft_Comments_MFR.pdf PDF
E-OMS_Draft_RFP_Questions_Answers.pdf PDF
NRTF_Industry_Day_Tour_Scripts.pdf PDF
Resources.pdf PDF
Regulations_List.pdf PDF
Section_L_Attachment_8_Sample_E-OMS_Cost_Element_Summary.xlsx XLSX spreadsheet
Section_J_Attachment_9_Key_Personnel_Labor_Category_Descriptions.pdf PDF
FBO_Schedule_Update__2.pdf PDF
OM_DTF_Description_17_Apr_14_TAIP_-_updated.pdf PDF
TRD_C10.pdf PDF
TRD_B2B.pdf PDF
TRD_D1.pdf PDF
TRD_F4.pdf PDF
TRD_D4.pdf PDF
TRD_C2.pdf PDF
TRD_B9A.pdf PDF
TRD_C9.pdf PDF
TRD_F2D.pdf PDF
TRD_A3.pdf PDF
TRD_F2A.pdf PDF
TRD_A2.pdf PDF
TRD_B2A.pdf PDF
TRD_B13.pdf PDF
TRD_D2.pdf PDF
TRD_C1.pdf PDF
TRD_A1.pdf PDF
E-OMS_Industry_Day_Announcement.pdf PDF
TAB_62_-_Attachment_02_-_PWS__Rev_I__10_Jan_2014.pdf PDF
Attachment_3_Rev_I.pdf PDF
Name_Change_FBO_MFR.pdf PDF
Show all 50

Eglin Operations & Maintenance Services (Formerly Eglin Test & Training Complex Technical Services (ETTC-TS) Program) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev I

APPENDIX B9B

TEST AREA C-52 COMPLEX

1.0 PURPOSE. The purpose of the TA C-52 Complex is to test seekers and munitions, and to conduct training.

2.0 GENERAL.

2.1. TA C-52 is a multipurpose test complex located approximately 17 miles northeast of Eglin main base, reached via SRs 20 and 285 and RR 200. The complex consists of four active test areas (TA C-52A, TA C-52C, TA C-52N, and TA C-52W). TA C-52A is primarily a seeker test and evaluation facility. TA C-52C is a multipurpose test and training range. TA C-52N is a gunnery and bombing range. TA C-52W is an explosive detonation facility.

2.1.1. TA C-52A is intended for captive (non-release) testing of laser, infrared, and millimeter wave seekers for guided weapons. TA C-52A facilities enable operation of seekers and other electro-optical equipment from an elevated platform (300-foot tower).

The tower and associated target turntables were designed to be used together or in conjunction with airborne designators and seekers (Appendix D3). TA C-52A also supports the Electro-Optical Evaluation Complex (EOEC) (Reference Appendix C-6).

Also, this area has commercial power and clay mounds for supporting tests.

2.2. TA C-52C is intended for evaluating the performance of small air-to-ground munitions, ground testing of guns and ammunition at the Long Range Ballistics Test Site (LRBTS), and performing ground functional testing of munitions. TA C-52C serves as the central control site (8730) for overall control of the C-52 complex. Ranges include a grenade launcher range, mortar range, qualification training range and 25 meter flat range that are covered in TRD B13.

2.2.1. TA C-52N is the primary test area for air-to-ground testing of large high explosive munitions and for tactical training exercises. TA C-52N is the only Eglin test area designated for large-scale drops of fully live high-explosive ordnance. Saturation bombing and gunnery missions are conducted on this range also. Navy EOD has a facility for training on static explosive detonations.

2.2.2. TA C-52W supports training on static explosive detonations.

2.3. TA C-52A, TA C-52C, TA C-52N, and TA C-52W may be used simultaneously for up to three separate missions. Independent and simultaneous use of each test area depends on required cinetheodolite coverage and safety requirements.

3.0 CAPABILITIES.

3.1. The Contractor shall operate and maintain TA C-52A systems and equipment, including:

FA9200-05-C-0001, P00121

Attachment 3

Page B9B-1

1. The Seeker Test and Evaluation Facility. (Appendix D3)

2. Contraves cinetheodolite tracking camera stations. (Appendix C8)

3.2. The Contractor shall operate and maintain TA C-52C systems and equipment, including:

3.2.1. A control building (8730) for central mission control of aircraft and instrumentation on any portion or all of the C-52 complex.

3.2.2. A cleared drop zone 2 1/4 miles by 1 1/2 miles for air-to-ground ordnance.

3.2.3. An inactive aircraft runway (Auxiliary Field 8) suitable for a target or test pad.

3.2.4. Contraves cinetheodolite camera tracking stations. (Appendix C8)

3.2.5. A 1500-foot by 4000-foot clay grid target for submunitions testing.

3.2.6. A 120-foot by 40-foot shed and fenced compound for storage of target vehicles (i.e. tanks, trucks, etc.).

3.2.7. The range and cinetheodolite control station, TS C-l02, including:

1. Range net radio.

2. Communications rack with amplifier and dual-console keying circuit.

3. A five-bay control console with various panels for communication control and cinetheodolite pulse control. (Appendix C8)

3.2.8. Mobile communications van(s).

3.3. The Contractor shall operate and maintain TA C-52N systems and equipment, including:

1. Contraves cinetheodolite tracking camera stations. (Appendix C8)

2. A cleared drop zone 2 1/4 miles by 2 1/4 miles for air-to-ground bombing and gunnery.

3. A 5000-foot clay landing strip.

3.4. The Contractor shall provide mission support common to the TA C-52 Complex, IAW test and task directives, including:

3.4.1. Pre-mission preparation, including:

1. Fabrication, installation, and maintenance of temporary, fixed, and test targets (TT). These targets may include cloth gunnery/impact-point markings, drum arenas, wood/metal structures, and other expendable target structures.

2. Range surveillance and control, including closing range gates, installing portable barriers or manning control points during missions, and opening gates/barriers on primary roads when no missions are in progress.

3.4.2. Mission execution IAW Test Directives, including:

FA9200-05-C-0001, P00121

Page B9B-2

1. Providing fixed and mobile range instrumentation/communication systems.

2. Assessing and recording target damage, assisting project personnel, and annotating mission data.

3. Providing communications including air-to-ground and ground-to-ground communications, aircraft vectoring, and aircraft drop point determination.

4. Operating instrumentation installed on the test area and specialized instrumentation as required for mission support. This support includes pre-mission and post-mission setup/teardown and instrumentation calibration/checkout, and operation in accordance with existing range operating procedures.

3.4.3. Post mission support, typically including:

1. Munitions impact scoring (third-order survey).

2. Range control until cleared by EOD.

3. Equipment tear-down.

4. Removal of range debris.

3.5. The contractor shall maintain and operate the vehicles identified in Table B9B-1 in accordance with requirements established in TRD A3. Co-utilization of vehicles from and to other Contractor operated and maintained facilities is an acceptable means for satisfying vehicle shortages due to surge support requirements. Suitable substitute for vehicle type is acceptable.

TABLE B9B-1

Mgt Code Nomenclature Qty Auth

B228 4X4 SUV COMPACT 4

FA9200-05-C-0001, P00121

Page B9B-3

APPENDIX B9B
TEST AREA C-52 COMPLEX
1.0 PURPOSE. The purpose of the TA C-52 Complex is to test seekers and munitions, and to conduct training.
2.0 GENERAL.
2.1. TA C-52 is a multipurpose test complex located approximately 17 miles northeast of Eglin main base, reached via SRs 20 and 285 and RR 200. The complex consists of four active test areas (TA C-52A, TA C-52C, TA C-52N, and TA C-52W). TA C-52A is ...
2.1.1. TA C-52A is intended for captive (non-release) testing of laser, infrared, and millimeter wave seekers for guided weapons. TA C-52A facilities enable operation of seekers and other electro-optical equipment from an elevated platform (300-foot ...
2.2. TA C-52C is intended for evaluating the performance of small air-to-ground munitions, ground testing of guns and ammunition at the Long Range Ballistics Test Site (LRBTS), and performing ground functional testing of munitions. TA C-52C serves as...
2.2.1. TA C-52N is the primary test area for air-to-ground testing of large high explosive munitions and for tactical training exercises. TA C-52N is the only Eglin test area designated for large-scale drops of fully live high-explosive ordnance. Sa...
2.2.2. TA C-52W supports training on static explosive detonations.

2.3. TA C-52A, TA C-52C, TA C-52N, and TA C-52W may be used simultaneously for up to three separate missions. Independent and simultaneous use of each test area depends on required cinetheodolite coverage and safety requirements.

3.0 CAPABILITIES.
3.1. The Contractor shall operate and maintain TA C-52A systems and equipment, including:
1. The Seeker Test and Evaluation Facility. (Appendix D3)
2. Contraves cinetheodolite tracking camera stations. (Appendix C8)
3.2. The Contractor shall operate and maintain TA C-52C systems and equipment, including:
3.2.1. A control building (8730) for central mission control of aircraft and instrumentation on any portion or all of the C-52 complex.
3.2.2. A cleared drop zone 2 1/4 miles by 1 1/2 miles for air-to-ground ordnance.
3.2.3. An inactive aircraft runway (Auxiliary Field 8) suitable for a target or test pad.
3.2.4. Contraves cinetheodolite camera tracking stations. (Appendix C8)
3.2.5. A 1500-foot by 4000-foot clay grid target for submunitions testing.
3.2.6. A 120-foot by 40-foot shed and fenced compound for storage of target vehicles (i.e. tanks, trucks, etc.).
3.2.7. The range and cinetheodolite control station, TS C-l02, including:
1. Range net radio.
2. Communications rack with amplifier and dual-console keying circuit.
3. A five-bay control console with various panels for communication control and cinetheodolite pulse control. (Appendix C8)

3.2.8. Mobile communications van(s).

3.3. The Contractor shall operate and maintain TA C-52N systems and equipment, including:
1. Contraves cinetheodolite tracking camera stations. (Appendix C8)
2. A cleared drop zone 2 1/4 miles by 2 1/4 miles for air-to-ground bombing and gunnery.
3. A 5000-foot clay landing strip.
3.4. The Contractor shall provide mission support common to the TA C-52 Complex, IAW test and task directives, including:
3.4.1. Pre-mission preparation, including:
1. Fabrication, installation, and maintenance of temporary, fixed, and test targets (TT). These targets may include cloth gunnery/impact-point markings, drum arenas, wood/metal structures, and other expendable target structures.
2. Range surveillance and control, including closing range gates, installing portable barriers or manning control points during missions, and opening gates/barriers on primary roads when no missions are in progress.
3.4.2. Mission execution IAW Test Directives, including:
1. Providing fixed and mobile range instrumentation/communication systems.
2. Assessing and recording target damage, assisting project personnel, and annotating mission data.
3. Providing communications including air-to-ground and ground-to-ground communications, aircraft vectoring, and aircraft drop point determination.
4. Operating instrumentation installed on the test area and specialized instrumentation as required for mission support. This support includes pre-mission and post-mission setup/teardown and instrumentation calibration/checkout, and operation in acco...
3.4.3. Post mission support, typically including:
1. Munitions impact scoring (third-order survey).
2. Range control until cleared by EOD.
3. Equipment tear-down.
4. Removal of range debris.

3.5. The contractor shall maintain and operate the vehicles identified in Table B9B-1 in accordance with requirements established in TRD A3. Co-utilization of vehicles from and to other Contractor operated and maintained facilities is an acceptable me...

File details come from the government source that posted it. Updated .