Standard Form 1413 - Statement and Acknowledgment

This is a Standard Form 1413 (Rev. 10/2023), a federal contracting form prescribed by GSA/FAR (48 CFR 53.222(e)) used to document subcontract awards under prime contracts and acknowledge labor standards requirements.

The form documents a subcontract awarded under Prime Contract Number 89243024CSC000002 by Fermi Forward Discovery Group LLC (prime contractor located at Kirk Road and Pine Street, Batavia, IL 60510) on 4/29/2026. The subcontract work involves power feed to Angstrom E-beam ECR vacuum deposition apparatus for the ICB-A Angstrom E-beam ECR vacuum deposition project. The form was signed by Dasia Guthrie, Subcontract Administrator. The prime contract contains the Contract Work Hours and Safety Standards Act - Overtime Compensation clause. Part II confirms that the subcontractor acknowledges inclusion of standard labor-related clauses including payroll and basic records requirements, withholding of funds, disputes concerning labor standards, construction wage rate requirements, apprentices and trainees, Copeland Act compliance, subcontracts (labor standards), contract termination-debarment, and certification of eligibility. The form includes sections for identifying intermediate subcontractors and requires subcontractor signature acknowledgment by the designated representative.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement And Acknowledgment OMB Control Number: 9000-0066 Expiration Date: 5/31/2027

Part I - Statement Of Prime Contractor

1. Prime Contract Number 2. Date Subcontract

Awarded

3. Subcontract Number

Authorized For Local Reproduction Previous Edition Is Not Usable

STANDARD FORM 1413 (REV. 10/2023)

Prescribed by GSA/FAR (48 CFR) 53.222(e)

4. Prime Contractor 5. Subcontractor

a. Name a. Name

b. Street Address b. Street Address

c. City d. State e. ZIP Code c. City d. State e. ZIP Code

6. The prime contract does, does not contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation."

7. The prime contractor states that under the contract shown in Item 1, a subcontract was awarded on the date shown in Item 2 to the subcontractor identified in Item 5 by the following firm:

a. Name Of Awarding Firm

b. Description Of Work By Subcontractor

8. Project 9. Location

10a. Name Of Person Signing 11. By (Signature) 12. Date Signed

10b. Title Of Person Signing

Part II - Acknowledgment Of Subcontractor

13. The subcontractor acknowledges that the following clauses of the contract shown in Item 1 are included in this subcontract:

Contract Work Hours and Safety Standards Act - Overtime Compensation (If included in prime contract see Block 6) Payrolls and Basic Records Withholding of Funds Disputes Concerning Labor Standards Compliance with Construction Wage Rate Requirements and Related Regulations

Construction Wage Rate Requirements Apprentices and Trainees Compliance with Copeland Act Requirements Subcontracts (Labor Standards) Contract Termination - Debarment Certification of Eligibility

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. §

3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number.

The OMB control number for this collection is 9000-0066. We estimate that it will take .05 hours to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S. General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800

F Street, NW, Washington, DC 20405.

15b. Title Of Person Signing

15a. Name Of Person Signing 16. By (Signature) 17. Date Signed

14. Name(s) Of Any Intermediate Subcontractors, If Any

A C

DB

STANDARD FORM 1413 (REV. 10/2023) BACK

1.6 Presentation Agent PDFlib 3.02 (C++/Win32) D:20050617125503-04'00' D:20080212101247-05'00' Presentation Agent Standard Form 1413 - Statement and Acknowledgment Statement And Acknowledgment OMB Control Number: 9000-0066 Expiration Date: 5/31/2027 Part I - Statement Of Prime Contractor

1. Prime Contract Number

2. Date Subcontract Awarded

3. Subcontract Number Authorized For Local Reproduction Previous Edition Is Not Usable

STANDARD FORM 1413 (REV. 10/2023)

Prescribed by GSA/FAR (48 CFR) 53.222(e)

4. Prime Contractor

5. Subcontractor

a. Name

a. Name

b. Street Address

b. Street Address

c. City

d. State

e. ZIP Code

c. City

d. State

e. ZIP Code

6. The prime contract does, does not contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation."

7. The prime contractor states that under the contract shown in Item 1, a subcontract was awarded on the date shown in Item 2 to the subcontractor identified in Item 5 by the following firm:

a. Name Of Awarding Firm

b. Description Of Work By Subcontractor

8. Project

9. Location 10a. Name Of Person Signing

11. By (Signature)

12. Date Signed 10b. Title Of Person Signing Part II - Acknowledgment Of Subcontractor

13. The subcontractor acknowledges that the following clauses of the contract shown in Item 1 are included in this subcontract:

Contract Work Hours and Safety Standards Act - Overtime Compensation (If included in prime contract see Block 6) Payrolls and Basic Records Withholding of Funds Disputes Concerning Labor Standards Compliance with Construction Wage Rate Requirements and Related Regulations Construction Wage Rate Requirements Apprentices and Trainees Compliance with Copeland Act Requirements Subcontracts (Labor Standards) Contract Termination - Debarment Certification of Eligibility Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0066. We estimate that it will take .05 hours to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S. General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

15b. Title Of Person Signing 15a. Name Of Person Signing

16. By (Signature)

17. Date Signed

14. Name(s) Of Any Intermediate Subcontractors, If Any A C D B

STANDARD FORM 1413 (REV. 10/2023) BACK

1. Enter the Prime Contract Number. : 89243024CSC000002
4a. Enter the Prime Contractor's Name. : Fermi Forward Discovery Group LLC
4b. Enter the Prime Contractor's Street Address. : Kirk Road and Pine Street
4c. Enter the Prime Contractor's City.: Batavia
7a. Enter the Name of the Awarding Firm.:
10a. Enter the Name of the Person signing this form as the Prime Contractor. : Dasia Guthrie
10b. Enter the Title of the Person signing this form as the Prime Contractor. : Subcontract Administrator
8. Enter the Project name.: ICB-A Angstrom E-beam ECR vacuum deposition
9. Enter the Location. :
7b. Enter a Description of Work completed by the Subcontractor. : Power feed to Angstrom E-beam ECR vacuum deposition apparatus
5c. Enter the Subcontractor's City.:
4e. Enter the Prime Contractor's Zone Improvement Plan (ZIP) Code. : 60510
5e. Enter the Subcontractor's Zone Improvement Plan (ZIP) Code. :
4d. Enter the Prime Contractor's State.: IL
5d. Enter the Subcontractor's State.:
3. Enter the Subcontract Number. :
5a. Enter the Subcontractor's Name.:
5b. Enter the Subcontractor's Street Address.:
2. Enter the Date the Subcontract was Awarded (enter 2 digit month, 2 digit day and 4 digit year).:
12. If you are the Prime Contractor, enter the Date you signed this form (enter 2 digit month, 2 digit day and 4 digit year).: 2026-04-29
6. Click here to select, "the prime contract does contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation.": 1
6. Click here to select, "the prime contract does NOT contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation.": 0
16. Sign here if you are the Subcontractor.:
15b. Enter the Title of the Person Signing this form as the Subcontractor. :
15a. Enter the Name of the Person Signing this form as the Subcontractor. :
17. If you are the Subcontractor, enter the Date you signed this form (enter 2 digit month, 2 digit day and 4 digit year).:
14a. Enter the First Name of an Intermediate Subcontractor, If Any. :
14c. Enter the Third Name of an Intermediate Subcontractor, If Any.:
14d. Enter the Fourth Name of an Intermediate Subcontractor, If Any.:
14b. Enter the Second Name of an Intermediate Subcontractor, If Any.:

File details come from the government source that posted it. Updated .