Exhibit C8 - GSA Form 3638 Pest Control Work and Inspection Report.pdf

GSA Form PDF 29 KB Posted

Attached to
Full Maintenance Services for Houston, Beaumont, and Galveston, TX
Solicitation number
47PH0220R0017
Issued by

About this file

This solicitation notice seeks full maintenance, operations and maintenance, and grounds maintenance services for federal facilities in Houston, Beaumont, and Galveston, Texas. The contractor shall provide all management, supervision, labor, materials, supplies, repair parts, tools, equipment and subcontractors necessary to provide the required services at seven buildings in Houston totaling over 1.7 million rentable square feet, one building in Galveston of 92,805 rentable square feet, one building in Beaumont of 119,336 rentable square feet, and three additional properties in Houston. The solicitation number is 47PH0220R0011 and is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses with a NAICS code of 561210 and size standard of $41.5 million. The anticipated start date for the contract is May 1, 2021.

View the file

Other versions and copies of GSA Form 3638

Who attaches GSA Form 3638

Other files

File Type Posted
Amendment 0004 47PH0220R0017 SF33.pdf PDF
Amendment 0004 Questions and Answers.pdf PDF
Amendment 0004 Figure B-3 Pricing of Services .xlsx XLSX spreadsheet
Amendment 0004 SF30.pdf PDF
Amendment 0003 Questions and Answers.pdf PDF
Amendment 0003 47PH0220R0017 SF33.pdf PDF
Amendment 0003 BL8 Leland Davits and Anchor Inspection Report.pdf PDF
Amendment 0003 BL7 Leland Design Guide.pdf PDF
Amendment 0003 Houston Galveston Beaumont OM_FM Spec Amend 0003 7 Jan 21.pdf PDF
47PH0220R0017 Amendment 0003.pdf PDF
Amendment 0003 BL5 Work Order History.xlsx XLSX spreadsheet
Amendment 0002 Houston Galveston Beaumont OM FM Spec 21 Dec 20.pdf PDF
Amendment 0002 BL5 Work Order History.xlsx XLSX spreadsheet
47PH0220R0017 Amendment 0002.pdf PDF
Amendment 0001 Attachment 4 Flag Policy.pdf PDF
Amendment 0001 Pre-Proposal Conference Houston Beaumont and Galveston.pptx PPTX presentation
Amendment 0001 Houston Galveston Beaumont OM_FM Spec 14 Dec 20 - Google Docs.pdf PDF
Amendment 0001 BL2 Inventory to Include Fire Alarm Devices.xlsx XLSX spreadsheet
47PH0220R0017 Amendment 0001 SF30.pdf PDF
Amendment 0001 Pre-Proposal Conference Questions and Answers.pdf PDF
Amendment 0001 Figure B-3 Pricing 5 YEAR- TOTAL_ESTIMATES.xlsx XLSX spreadsheet
BL2 Inventory to Include Fire Alarm Devices.pdf PDF
Exhibit M7 - Qualificaiton of Electrical Testing Technicians.pdf PDF
Exhibit M2 - Green Purchasing Report.pdf PDF
Figure L-3 Past Performance Questionnaire.pdf PDF
Exhibit C6 - Recycle Solid Water Trash Report.pdf PDF
Exhibit C2 Custodial Quality Assurance Surveillance Plan.pdf PDF
Exhibit C1 Building Information Sheet.pdf PDF
Attachment 1 Collective Bargaining Agreement for O_M personnel with Wage Determination.pdf PDF
Figure L-2 Management Plan Baseline.pdf PDF
Exhibit M4 - Bldg Op Plan Template.pdf PDF
Exhibit M10- PV Service Schedule V5.pdf PDF
Exhibit C4 - Building Exterior and Hardscape Plan.pdf PDF
Exhibit C7 - PBS Waste Audits.pdf PDF
47PH0220R0017 Solicitation and Specifications.pdf PDF
Exhibit M3 - Environmental Sustainable Products.pdf PDF
BL5 Work Order History.pdf PDF
Figure B-1 for Union and Non Union Contracts.xlsx XLSX spreadsheet
BL6 PM Report.pdf PDF
BL3 Location General Information .pdf PDF
Exhibit C3 - Surveilence Form 1181-A.pdf PDF
Exhibit M9 Preventative Maintenance 2018 GSA OM Guide.pdf PDF
Exhibit M1 Quality Assurance Surveillance Plan.pdf PDF
Figure B-3 Pricing 5 YEAR- TOTAL_ESTIMATES.xlsx XLSX spreadsheet
Figure L-1 Management Plan Worksheet.xlsx XLSX spreadsheet
BL1- Houston_Galveston Fire Extinguisher Report.pdf PDF
Exhibit M8 - Misc Best Practices Shave Energy.pdf PDF
Exhibit M5 - Smart Buildings.pdf PDF
BL4 Roof Information.pdf PDF
Exhibit M6 Water Treatment.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT C8

FIELD OFFICE

PEST CONTROL WORK AND INSPECTION REPORT

BUILDING DATE

INSTRUCTIONS: The Field Office, GSA Inspector, and Contractor should use Section A for reporting type of pest and location.

The GSA Inspector should use Section B for reporting presence or absence of pests and adequacy of service. The Contractor should use Section C for reporting material used for treatment.

SECTION A SECTION B SECTION C

TYPE OF PEST LOCATION

REPORTED BY INFESTATION SERVICE PESTICIDES, TRAPS, AND

OTHER MATERIAL USED PERSON TELEPHONE NO. ACTIVE NONE SAT. UNSAT.

REMARKS

SIGNATURE OF PEST CONTROLLER TIME IN DATE SIGNATURE OF GSA INSPECTOR TIME INSPECTION

COMPLETED

DATE

TIME OUT

GSA FORM 3638

File details come from the government source that posted it. Updated .