Exhibit C3- GSA Form 3638 Pest Control Work and Inspection Report.pdf

GSA Form PDF 24 KB Posted

Attached to
Amend 03 Custodial Services El Paso Texas Questions/Answers - Preproposal Power Point Presentation
Solicitation number
47PH0221Q0007
Issued by

View the file

Other versions and copies of GSA Form 3638

Who attaches GSA Form 3638

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIELD OFFICE

BUILDING DATE

INSTRUCTIONS: The Field Office, GSA Inspector, and Contractor should use Section A for reporting type of pest and location.

The GSA Inspector should use Section B for reporting presence or absence of pests and adequacy of service. The Contractor should use Section C for reporting material used for treatment.

SECTION A SECTION B SECTION C

TYPE OF PEST LOCATION

REPORTED BY INFESTATION SERVICE PESTICIDES, TRAPS, AND

OTHER MATERIAL USED PERSON TELEPHONE NO. ACTIVE NONE SAT. UNSAT.

REMARKS

SIGNATURE OF PEST CONTROLLER TIME IN DATE SIGNATURE OF GSA INSPECTOR TIME INSPECTION

COMPLETED

DATE

TIME OUT

GSA FORM 3638

EXHIBIT C3

PEST CONTROL WORK AND INSPECTION REPORT

File details come from the government source that posted it. Updated .