BL4 Roof Information.pdf

PDF 357 KB Posted

Attached to
Full Maintenance Services for Houston, Beaumont, and Galveston, TX
Solicitation number
47PH0220R0017
Issued by

About this file

This document outlines full maintenance services requirements for several federal buildings in Texas. The General Services Administration Public Buildings Service seeks a contractor to provide operation and maintenance, custodial, and ground maintenance services. Required services include building maintenance and upkeep for nine federal facilities in Houston, Beaumont, and Galveston housing various agencies including the U.S. Customs House, Bob Casey Courthouse, Alliance Tower, La Branch Federal Building, Mickey Leland Federal Building and Parking Garage, Galveston U.S. Courthouse/U.S. Post Office, FBI Office Building, FBI Guard House, FBI Parking Garage, and Jack Brooks Federal Building. The anticipated period of performance is from May 2021 onwards. This procurement is reserved exclusively for Service-Disabled Veteran-Owned Small Businesses.

View the file

Other files

File Type Posted
Amendment 0004 47PH0220R0017 SF33.pdf PDF
Amendment 0004 Questions and Answers.pdf PDF
Amendment 0004 Figure B-3 Pricing of Services .xlsx XLSX spreadsheet
Amendment 0004 SF30.pdf PDF
Amendment 0003 Questions and Answers.pdf PDF
Amendment 0003 47PH0220R0017 SF33.pdf PDF
Amendment 0003 BL8 Leland Davits and Anchor Inspection Report.pdf PDF
Amendment 0003 BL7 Leland Design Guide.pdf PDF
Amendment 0003 Houston Galveston Beaumont OM_FM Spec Amend 0003 7 Jan 21.pdf PDF
47PH0220R0017 Amendment 0003.pdf PDF
Amendment 0003 BL5 Work Order History.xlsx XLSX spreadsheet
Amendment 0002 Houston Galveston Beaumont OM FM Spec 21 Dec 20.pdf PDF
Amendment 0002 BL5 Work Order History.xlsx XLSX spreadsheet
47PH0220R0017 Amendment 0002.pdf PDF
Amendment 0001 Attachment 4 Flag Policy.pdf PDF
Amendment 0001 Pre-Proposal Conference Houston Beaumont and Galveston.pptx PPTX presentation
Amendment 0001 Houston Galveston Beaumont OM_FM Spec 14 Dec 20 - Google Docs.pdf PDF
Amendment 0001 BL2 Inventory to Include Fire Alarm Devices.xlsx XLSX spreadsheet
47PH0220R0017 Amendment 0001 SF30.pdf PDF
Amendment 0001 Pre-Proposal Conference Questions and Answers.pdf PDF
Amendment 0001 Figure B-3 Pricing 5 YEAR- TOTAL_ESTIMATES.xlsx XLSX spreadsheet
BL2 Inventory to Include Fire Alarm Devices.pdf PDF
Exhibit M7 - Qualificaiton of Electrical Testing Technicians.pdf PDF
Exhibit M2 - Green Purchasing Report.pdf PDF
Figure L-3 Past Performance Questionnaire.pdf PDF
Exhibit C6 - Recycle Solid Water Trash Report.pdf PDF
Exhibit C2 Custodial Quality Assurance Surveillance Plan.pdf PDF
Exhibit C1 Building Information Sheet.pdf PDF
Attachment 1 Collective Bargaining Agreement for O_M personnel with Wage Determination.pdf PDF
Figure L-2 Management Plan Baseline.pdf PDF
Exhibit C8 - GSA Form 3638 Pest Control Work and Inspection Report.pdf PDF
Exhibit M4 - Bldg Op Plan Template.pdf PDF
Exhibit M10- PV Service Schedule V5.pdf PDF
Exhibit C4 - Building Exterior and Hardscape Plan.pdf PDF
Exhibit C7 - PBS Waste Audits.pdf PDF
47PH0220R0017 Solicitation and Specifications.pdf PDF
Exhibit M3 - Environmental Sustainable Products.pdf PDF
BL5 Work Order History.pdf PDF
Figure B-1 for Union and Non Union Contracts.xlsx XLSX spreadsheet
BL6 PM Report.pdf PDF
BL3 Location General Information .pdf PDF
Exhibit C3 - Surveilence Form 1181-A.pdf PDF
Exhibit M9 Preventative Maintenance 2018 GSA OM Guide.pdf PDF
Exhibit M1 Quality Assurance Surveillance Plan.pdf PDF
Figure B-3 Pricing 5 YEAR- TOTAL_ESTIMATES.xlsx XLSX spreadsheet
Figure L-1 Management Plan Worksheet.xlsx XLSX spreadsheet
BL1- Houston_Galveston Fire Extinguisher Report.pdf PDF
Exhibit M8 - Misc Best Practices Shave Energy.pdf PDF
Exhibit M5 - Smart Buildings.pdf PDF
Exhibit M6 Water Treatment.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BL4: Roof Information

● TX0019 - Jack Brooks Cths/PO o Main Building (Original Structure)

▪ Low-Slope

▪ Modified bitumen over tongue-and-groove deck over wood structure.

▪ Insulation friction fitted and tacked into place at underside of deck.

▪ Low-slope roof transitions to steep-slope roof.

▪ Steep-Slope

▪ Clay tile over felt underlayment.

▪ On the front elevation of the building, the clay tile roof transitions to two small, low-slope copper roofs that cover portions of the building that “bump out”.

▪ Bump Out

▪ Copper roofing system slopes to gutters and downspouts that are routed thru the interior.

o Third Level Roof (over elevator penthouse)

▪ Modified bitumen roofing system.

o Two-Story Addition (‘U’-Shaped)

▪ Added in 1965.

▪ Main Roof

▪ Modified bitumen roofing system over deck (deck material unknown).

Assuming same as original structure.

▪ Overflow scuppers installed through the parapet wall on east elevation.

▪ Two expansions joints running east to west covered with stainless steel covers.

▪ Lower Roof

▪ Same as main roof.

▪ Expansion joint runs north to south along the back elevation of the original structure.

▪ Canopy Roof

▪ Probably was installed as loading dock cover but is now enclosed and used as office space.

▪ Ballasted, built-up roofing system.

● TX0081- Galveston Cths/PO

▪ Main Roof

▪ Clay tile roof over concrete deck into a copper gutter system.

▪ Copper gutter system has been repaired with gutter liners and a coating system.

▪ Low-slope roof is coated with an unknown coating system.

▪ Miscellaneous Roofs

▪ SBS modified bitumen roofing system (2-ply) over 1/2” cover board over multiple layers of polyiso insulation and tapered insulation over concrete roof deck.

▪ Sopraflam 180 (Base-Ply)

▪ Sopralene 180 FR GR (Cap Sheet)

▪ Roofing system drains to roof drains.

● TX0101- Houston US Customs House o Original Building

▪ Main Roof

▪ Standing seam metal roofing system over concrete roof deck.

▪ Drains to a trough-style gutter system coated with modified bitumen membrane.

▪ Mechanical Penthouses

▪ Standing seam metal roofing system over concrete roof deck.

▪ Elevator Penthouse

▪ Modified bitumen roofing system with a white acrylic coating over concrete roof deck.

o Towers

▪ Modified bitumen roofing system with a white acrylic coating over concrete roof deck.

▪ Water discharged thru internal roof drains.

▪ Mansard roof were added in 1963 and cover the original façade at the fourth floor level. Mansard roofs exist on three elevations and drain to copper-lined gutter troughs. The drainage trough is portion of the original drainage system constructed in 1935 which included an integrated stone gutter at the exterior apron, below the balustrades. The orginial stone getter has been capped with metal coping.

o Third Level Roofs

▪ Added in 1932 renovation project.

▪ Located behind the original structure.

▪ Modified bitumen roofing system with a white acrylic coating over concrete roof deck (assuming).

o First Level Roofs

▪ Added in 1932 renovation project.

▪ Modified bitumen roofing system with a white acrylic coating over concrete roof deck (assuming).

o Canopy and Freight Elevator Roofs

▪ Canopy covers the loading dock on the southeast side of the building.

▪ Both roofs have a modified bitumen roofing system with a white acrylic coating over concrete roof deck.

▪ Internal roof drains discharge water from the canopy.

o Walkway

▪ Modified bitumen roofing system with a white acrylic coating over concrete roof deck.

▪ Rainwater discharged via thru-wall scuppers and metal conductor head/downspout system.

● TX0211- Bob Casey Cths o Design documents indicated a modified bitumen cap sheet over 4-ply membrane roofing system over 3/4" perlite over tapered polyiso insulation over concrete roof deck. **Present of cap sheet over 4-ply membrane roofing system has not been verified.** o Design documents also indicate a batten-lok standing seam metal roofing system over flexible retarder over concrete roof deck is present.

o Firestone roofing system installed in 2003 & 2011.

o Rainwater discharge via internal roof drains.

o Thru-wall overflow scuppers are present along the shellstone panels.

o Parapet wall consists of double-wide, unsupported brick, enclosed with metal

R-panels on the backside and shellstone on the exterior side with metal coping.

o Lightning protection is installed.

● TX0297- Alliance Tower FB o SBS modified bitumen roofing system (2-ply) over 1/2” cover board over 1-

1/2” polyiso insulation and tapered insulation over concrete roof deck.

o Johns Manville roofing system installed in 2010.

▪ Membrane Spec. and Type: 2FID-CR-HW.

▪ Insulation Type: NRG3, DuraBoard.

o Rainwater discharged via internal roof drains.

● TX0298 - GT Leland FB o Main Structure

▪ Single-ply roofing system over polyiso insulation and tapered insulation over concrete roof deck.

▪ Rainwater discharged via internal roof drains.

▪ Secondary overflow roof drains are present.

o Rotunda and Pedestrian Connector

▪ Design documents indicate a structural standing seam metal roofing system over purlins and a single-ply roofing system.

▪ Currently, a green roofing system installed.

● TX0435 - FBI Building o Roof Type A, B & C: TPO roofing system over cover board over polyiso insulation over concrete roof deck.

o Roof Type D: TPO roofing system over cover board over polyiso insulation over fire barrier over metal roof deck.

● TX0436 - FBI Guard House o Standing seam metal roofing system over fabric underlayment over exterior grade plywood over polyiso insulation over gypsum thermal barrier over metal roof deck.

o Continuous gutter lined with an elastomeric membrane gutter liner.

● TX0701 - LaBranch FB o GAFGLAS built-up roofing system over cover board over polyiso insulation and tapered insulation over lightweight concrete roof deck.

o GAF roofing system installed in 2011.

▪ Membrane Spec. and Type: I02TGPFREC.

o Rainwater discharged via internal roof drains.

File details come from the government source that posted it. Updated .