SWPPP AK DOT 135(5), Glenn Highway West Chickaloon Grade
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Stormwater Pollution Prevention Plan
SWPPP
For:
AK Dot 135(5) Glenn Highway Rehabilitation
West Chickaloon Grade Section: MP 77.4 to 78.2
Federal Highway Administration, Western Federal Lands Highway Division Project Engineer: _____________________________
General Contractor: ____________________________
Table of Contents
. SWPPP/ESCP TABS
TAB 1: SWPPP/ESCP Narrative
TAB 2: NPDES Permit (Construction General Permit or Corresponding State Permit)
TAB 3: NOI, EPA/State Acknowledgement, Other Applicable EPA/State Correspondence
TAB 4: Delegation of Authority
TABS: Maps
TAB 6: Erosion/Sediment Control Plan Sheets (plan set and BMP typical details)
TAB 7: Permanent Stabilization and Revegetation Pian(plan sets and details)
TAB 8: SWPPP Amendment Log
TAB 9: Erosion/Sediment Control Inspection Reports and Requirements
TAB 10: Corrective Action Log
TAB 11: Water Quality Monitoring, Reporting Requirements, and Reports
TAB 12: Training Log
TAB 13: Waste and/or Borrow Site Information
TAB 14: Grading and Stabilization .Log
TAB 15: Hazardous Spill Plan
TAB 16: Other Applicable Permits(§ 404, § 401, Oregon Remove-Fill Permit)
TAB 17: NPDES Quality Assurance Checklist
TAB 18: NPDES Notice of Termination (NOT) r • .
h t r ' A
!'1
.t
. 1 i· l .
J l
1:
SWPPP (ESCP - Oregon) NARRATIVE t t-:'··l .. ...... ... ·:
I.'
•,, .1 l.~ ...
•• 1.
.c :i:·-., 'i ,:.r_
Tab 1
CONTRACTOR:
Complete SWPPP narrative in accordance with contract 107.0lA(b).
Revise SWPPP narrative as needed throughout construction in accordance with contract 107.0lA(f)
ALASKA, IDAHO AND WASHINGTON PROJECTS ONLY:
SWPPP narrative must be signed by General Contractor's responsible corporate officer as defined in CGP I.11.2.
File approved SWPPP narrative i1?- Tab 1.
For Construction Activities at:
Project Name:
Project Site Location:
City, County, State, Zip Code:
SWPPP Prepared for:
Organization Name:
Address:
Telephone Number:
SWPPP Prepared by:
Name, Title:
Name, Title:
Company/Organization:
Address:
Telephone Number:
Glenn Highway: West Chickaloon Grade, AK DOT 135(5)
Glenn Highway MP 77.4-78.1
Palmer/Wasilla and Glennallen, Matanuska-Susitna Borough, AK, 99645
FHWA, Western Federal Lands Highway Division
610 East Fifth Street
Vancouver, WA 98661-3801
360-619-7700
Christopher J. Kelly, Environmental Protection Specialist
FHWA, Western Federal Lands Highway Division
610 East Fifth Street
Vancouver, WA 98661-3801
360-619-7806
SWPPP Preparation Date: 03/13/2017
Estimated Construction Start Date: 06/06/2017 Estimated Construction Completion Date:
05/05/2020
Estimated Revegetation Start Date: 05/05/2019 Estimated Revegetation Completion Date:
10/15/2021
TAB 1:
TAB2:
TAB3:
TAB4:
TABS:
TAB6:
TAB7:
TAB8:
TAB9:
TAB 10:
TAB 11:
TAB 12:
TAB 13:
TAB 14:
TAB 15:
TAB 16:
TAB 17:
TAB 18:
SWPPP TABs (SWPPP Inclusions)
SWPPP/ESCP Narrative
NPDES Permit (Construction General Permit or Corresponding State Permit)
NOI, EPA/State Acknowledgement, Other Applicable EPA/State Correspondence
Delegation of Authority
Maps
Erosion/Sediment Control Plan Sheets (plan set and BMP typical details)
Revegetation Plan (if applicable)
SWPPP Amendment Log
Inspection Reports
Corrective Action Log
Water Quality Monitoring, Reporting Requirements, and Reports (if applicable)
Training/Certification Log
Government-Selected Waste, Borrow, Staging Sites
Grading and Stabilization Log
Hazardous Spill Plan or SPCC
Threatened and Endangered Species and Historic Preservation (Section 106) Documentation
NPDES Quality Assurance Checklist
NPDES Notice of Termination (NOT)
SWPPP/ESCP NARRATIVE
SECTION 1: RESPONSIBLE PARTIES/CONTACT INFORMATION .............................. l
1.1 Operator(s):
1.2 Construction Site SWPPP Contact(s):
1.3 SWPPP Prepared by:
1.4 NPDES Stormwater Permit
1.5 SWPPP Administrator
1.6 Permitting Authority for FHW A/WFLHD Projects
SECTION 2: PROJECT INFORMATION
2.1 Project Name and Location
2.2 Project Site Characteristics
SECTION 3: NATURE OF CONSTRUCTION ACTIVITY
3.1 General Description of Project and Scope ofWork: ......... : ....................•.............................. :
3.2 Sequence and Estimated Dates of Construction Activities ...•
3.3 Potential Sources of Pollutants
SECTION 4: SITE MAPS
SECTION 5: DISCHARGES
5.1 Allowable Non-Stormwater Discharges
5.2 Receiving Waters:
5.3 Water Quality Monitoring Requirements
SECTION 6: COMPLIANCE WITH OTHER APPLICABLE REQUIREMENTS
6.1 Endangered Species Protection
6.2 Historic Preservation
6.3 Safe Drinking Water Act Underground Injection Control Requirements
SECTION 7: EROSION AND SEDIMENT CONTROLS
7.1 Natural Buffers or Equivalent Sediment Controls
7 .2 Perimeter Controls ..............................................................•
7.3 Sediment Track-Out
7.4 Stockpiled Soil or Other Erodible Materials
7 .5 Minimize Dust .....................................................•
[i]
7 .6 Minimize Disturbance of Steep Slopes
7.7 Topsoil Conservation
7.8 Minimize Soil Compaction
7.9 Storm Drain Inlets and Culvert Inlets
7.10 Constructed Stormwater Conveyance Channels and Culvert Outlets
7 .11 Sediment Basins
7.12 Chemical Treatment
7.13 Dewatering Practices
7.14 Erosion Control and Stabilization
7.15 Removal ofBMPs
7.16 Post Construction Measures
SECTION 8: OPERATIONAL CONTROLS/GOOD HOUSEKEEPING MEASURES ... 30
8.1 Hazardous Spill Plan
8.2 Spills/Releases in Excess of Reportable Quantities .......... ~
8.3 EquipmentNehicle Fueling and Maintenance Practices
8.4 EquipmentNehicle Washing
8.5 Material Handling and Waste Management
8.6 Designate Concrete Washout Areas
SECTION 9: INSPECTIONS
9.1 Inspection Frequency
9.2 Corrective Actions
SECTION 10: DELEGATIONS OF AUTHORITY
SE CTI 0 N 11: STAFF TRAINING
SECTION 12: CERTIFICATION AND NOTIFICATION
[ii]
1:
1.1 Operator(s):
Organization Name:
Address:
Telephone Number:
Contractor and PE
FHWA, Western Federal Lands Highway Division (WFLHD 610 East Fifth Street Vancouver, WA 98661-3801 360-619-7700
Note: Fill in all incomplete information following contract award date and prior to start of construction
(AK, ID, WA projects only) TBD General Contractor Name:
Address:
Telephone Number:
Contractor and PE Note: Fill in all incomplete infon11ation following contract award date and prior to start of construction
1.2 Construction Site SWPPP Contact(s):
FHW A Contact Name: TBD
Title: Project Engineer
Address:
Telephone Number:
General Contractor, TBD Company:
(complete for all States) Erosion Control Supervisor Name:
(complete for all States) Address:
Telephone Number:
1.3 SWPPP Prepared by:
Organization/Company:
Name, Position:
Role/Responsibility Telephone Number:
. Christopher J. Kelly, Environmental Protection Specialist SWPPP preparer 360-619-7806
Email: Christopher .kelly@dot.gov
Name, Position:
Role/Responsibility Telephone Number:
Email:
1.4 NPDES Stormwater Permit
The Applicable EPA/State NPDES Stormwater Permit is located in TAB 2. The Project NOI and EPA/State Acknowledgement with NPDES Tracking Number is located in TAB 3.
1.5 SWPPP Administrator
The General Contractor (section 1.2) is responsible for maintaining the project SWPPP of Record. The General Contractor will provide a qualified Erosion Control Supervisor, who is responsible for managing the installation, maintenance, inspection, and reporting for erosion and sediment control measures, shall maintain and update the project SWPPP of Record and prepare all documentation required by the project NPDES stonnwater permit and SWPPP.
The Erosion Control Supervisor (ECS) is identified in section 1.2 and his/her qualifications are documented in TAB 12.
The FHW A/WFLHD Project Engineer (PE) is the duly authorized representative of the FHW A for the purpose of overseeing compliance with the NPDES stormwater permit and SWPPP at the construction site. See Delegation of Authority TAB 4.
All SWPPP documentation, revisions/updates, and reports will be approved/signed by both the General Contractor's ECS and the FHW A PE.
1.6 Permitting Authority for FHW A/WFLHD Projects
Delivery Confirmation documentation of the NOI is located in TAB 3.
The applicable EPA/State NPDES permit is located in TAB 2
Idaho and Washington, Environmental Protection Agency EPA Region 10
Alaska Department of Environmental Conservation (ADEC)
Montana Department of Environmental Quality (MDEQ)
Oregon Department of Environmental Quality (ODEQ)
Wyoming Department of Environmental Quality (WDEQ)
State Permittin~ Authority Alaska • ADEC is permitting authority for most discharges within the state EXCEPT for:
• EPA is the permitting authority for the Denali National Park and Preserve and Metlakatla Indian Reservation.
Idaho • EPA is permitting authority for discharges within the state .
Montana • MDEQ is permitting authority for most discharges within the state EXCEPT for:
• EPA is the permitting authority for Indian Country lands within the state .
Oregon • ODEQ is permitting authority for most discharges within the state EXCEPT for:
• EPA is the permitting authority for Indian Country lands within the state .
Washington • WDE is permitting authority for most discharges within the state EXCEPT for:
• EPA is permitting authority for Federal Operators and Indian Country lands within the
[2] state Wyoming 0 WDEQ is permitting authority for most discharges within the state EXCEPT for:
0 EPA is the pennitting authority for Indian Country lands within the state
The NOI for Alaska projects (through the ADEC) can be filed electronically at Alaska Pollutant Discharge Elimination System Program website. The completed SWPPP will be submitted to either ADEC or the Municipality based on the project type and operator described in the ADEC CGP.
The NOi for projects in Idaho, Washington, Denali NP and Metlakatla Indian Reservation can be filed electronically at The EPA website.
The NOI for Montana can be filed through MDEQ following guidance at this website.
Oregon DEQ authorizes FHWA/WFLHD projects under the programmatic 1200-CA permit, (expired in 12/31/2005, administratively extended)
The NOi for Wyoming can be filed electronically at this website.
[3]
Section 2: Project Information
2.1 Project Name and Location
This basic site information is used to file for National Pollutant Discharge Elimination System (NPDES) permit coverage. Permit coverage is obtained by filing the Notice oflntent (NOI) after the SWPPP is complete.
Project Name:
Project Site Location:
City, County, State, Zip Code:
Glenn Highway: Chickaloon Grade, AK DOT 135(5)
Glenn Highway MP 77.4-78.1
Palmer/Wasilla and Glennallen, AK, 99645
Latitude/Longitude (Using!.!.!!!: of three possible formats) 1
Latitude: Longitude:
I. __ 0 __ ' __ " N (degrees, minutes, seconds) I. __ 0
__ ' __ " W (degrees, minutes, seconds)
2. __ 0 __ • __ ' N (degrees, minutes, decimal) 2. __ 0
__ • __ ' W (degrees, minutes, decimal)
3. 61.780556 ° N (decimal) 3. -148. 468056 ° W (decimal)
The method used for determining latitude/longitude was: USGS Topographic map
Township: T20N
Range: R5E
Section: S36
Is the project located in Indian country? No
If yes, the name of Reservation is:
Name of Reservation:
Are you applying for permit coverage as a "federal operator?" Yes
The project Does Not discharge stormwater into a Municipal Separate Storm Sewer System?
1 Detailed information on determining the site's latitude and longitude can be found at:
www.epa.gov/npdes/stormwater/latlong
[4]
2.2 Project Site Characteristics
The undeveloped site and features of the land that are incorporated into the final soil Erosion and Sediment Control plan sheets (TAB 6) , as well as natural resources that should be protected are described below:
Vegetation, trees, and sensitive areas, such as stream buffers, wetlands, highly erodible soils, and steep slopes at the site include:
Types: Cottongrass tussocks, frost scars, peat rings, and tussock-birch-heath polygons. Western hemlocks, Mountain hemlock, Black spruce, and Red alder.
Riverine and freshwater forested/shrub wetlands.
Also, see TAB 6
Stormwater cun-ently drains from the site in the following manner, North to South
Also, see TAB 6
The location of discharge points or areas
Roadside ditches
Also see TAB 6
The location of all waters, including wetlands, are shown on the site map located in
TABs 5 and 6.
Critical slopes and slope lengths include:
Locations: None
Soil type(s) of highly erodible soils and the soils' infiltration capacity are identified as,2
"""'""'""'"c'"'' silt loam. 4 3 ~::ip:ing
Cf)'!Xls. low elevation. 2'7 ardl 3lHo
K~oenl soils. 0 to 2 .43 ;rer~t slopes
2 Access the Natural Resources Conservation Service Web Soil Survey.
[5]
Any past soil contamination at the site is identified as, None
[6]
The following natural features, including trees, streams, wetlands, slopes and other features to be protected includes:
Also see TAB 6
Protected Natural Features:
Cottongrass tussocks, frost scars, peat rings, and tussock-birch-heath polygons.
Western hemlocks, Mountain hemlock, Black spruce, and Red alder. Riverine and freshwater forested/shrub wetlands.
Measures to protect these features:
Minimization and/or avoidance of construction disturbances, buffer zones, silt fences, temporary stabilization methods, rehabilitation of disturbed areas.
Mean Annual Precipitation at the Project Site: 11.87 inches
The frequency, intensity, and duration of rainfall for the project site, which are the principal factors influencing erosion from a construction site, are described as, The 2-year, 24-hour storm event:3
1.27 Inches per day
The 10-year, 24-hour storm event:
1.86 Inches per day
The 25-year, 24-hour storm event:
2.22 Inches per day
Alaska Projects Only, Approximate Growing Season at the Project Site: June 1 - September 15
3 Precipitation frequency for Western States
[7]
Section 3: Nature of Construction Activity
3.1 General Description of Project and Scope of Work:
(i.e. highway construction, roadway realignment, highway and bridge reconstruction, etc.) is described below:
Highway construction
The type or function of the project is: Road Construction
Contractor and PE
Note: Fill in all incomplete information following contract award date and prior to start of construction
Construction Support Activities: If applicable, describe any construction support activities such as dedicated concrete or asphalt batch plants, dedicated aggregate sites, equipment staging yards, material storage areas, borrow, or disposal sites (government-selected sites):
TBD by contractor
NOTE: All Contractor-selected sources and support sites are the sole responsibility of the General Contractor. The SWPPP and NPDES permitting for Contractor-selected sites and sources are separate from this documentation (SCR 107.0lA(h)).
Support activities are located on the general vicinity map and/or site map in T s T 6.
Size of the Construction Project:
(Including all Government-selected support sites such as staging, borrow, waste, access roads, etc.)
Estimated Area
Total project area (within ROW or Construction limits):
Construction site area to be disturbed:
Percent Impervious Area BEFORE Construction: 5.75 %
Runoff Coefficient BEFORE Construction: 0.25
Percent Impervious Are AFTER Construction:
Runoff Coefficient AFTER Construction:
[8]
8.33 %
0.26
. Units
42.4 Acres
16.9 Acres
3.
S eq ue nc e an d E st im at ed
D at es o f C on st ru ct io n A ct iv it ie s
C on tr ac to r an d
P E
N ot e:
F ill i n al l in co m pl et e in fo rm at io n fo ll ow in g co nt ra ct a w ar d da te a nd p ri or to s ta rt o f c on st ru ct io n
T he in te nd ed c on st ru ct io n.
se qu en ci ng a nd
. t im in g of m aJ <i r c6
1f tq ~i i6 n" i~ ti fl ti es is d et ai le d he re , i nc lu di ng th e ph as ed g ra di ng a nd st ab il iz at io n ac ti vi ti es u se d to m in im iz e ov er al l a m ou nt o f d is tu rb ed s oi l.
P ha se
C on st ru ct io n se gu en ce d es cr in ti on
D ur at io n of se gu en ce
B
M P s as so ci at ed w it h th is s eg ue nc e:
S ta bi li za ti on m ea su re s:
M ob il iz at io n to e nt er te xt
So il er os io n
S tr aw , m ul ch b la nk et s
S l te m po ra ry ha se
C on st ru ct io n se gu en ce d es cr in ti on
D ur at io n of se gu en ce
B
M Ps a ss oc ia te d w it h th is s eg ue bi li za ti on m ea su
R oa d co ns tr uc ti on lo e nt er t ex t.
l
S tr aw m ul ch b la nk et s te m po ra ry ha se
C on st ru ct io n se gu en ce d es cr in ti on
D ur at io n of se gu en ce
B
M P s as so ci at ed w it h th is s eg ue bi li za ti on m ea su
[9 c::
0 ·.g N ..... - 0 a Q)
Q g c <.I
"O <.I r:r.i l8l l8l [8J [8J
D D [8J
D D [8J
D D D D [8J
3.3 Potential Sources of Pollutants
The follow table identifies all potential sources (checked activities in column 1) of sediment and other sources of pollution, which may reasonably be expected to affect the quality of stormwater discharges from the construction site.
Potential Construction Site Pollutants
"' Construction Activity "' "' ..... "' "' "' ... .. = = "' c ~ "O "" ·;:
5 "' .c .~ ~ ·;: ~ ~ "' ... :a = <.I
= "'.Q "' ""' "' 0 ... ""' ..
r:r.i ;z ~ 0. r...o Q.
Clearing, excavating, and grading x x Fill of roadway embankment, backfill at structures x x Vehicle/equipment fueling and maintenance x x Vehicle/equipment use and storage x Sanitary/septic waste x x Dewatering operations x x Drilling and blasting operations x x x Concrete washout and waste x x Structure construction/painting/cleaning x x x Demolition and debris disposal x x x Solid waste (trash and debris) x Hazardous waste or contaminated spills x Paving operations x x Landscaping operations x x x Mining, rock extraction, crushing x x x
Contractor and PE
Note: Fill in all incomplete information following contract award date and prior to start of construction
Construction and waste material expected to be stored on-site includes:
Material Storage Location
TBD by contractor
[ll]
"' l!l :; =
> "' = "' -= ~ "' = 0 Q.
x x x x x x x x
Section 4: Site Maps
Vicinity maps are located in TAB 5. Site maps and erosion and sediment control plan maps are located in TAB 6.
[12]
Industrial stormwater discharges associated with industrial activity other than construction at the site (including dedicated asphalt plants and dedicated concrete plants that are covered by this permit) include:
NOTE: An Industrial Activity Multi-Sector General Permit may be required for some activities.
I.NIA
2.
3.
Stormwater Discharge Location
5.1 Allowable Non-Stormwater Discharges
Multi-Sector General Permit Number (if applicable)
Non-stormwater discharges used at the construction sited are identified below, along with control measures used to eliminate or reduce the discharges and BMPs used to prevent stormwater contamination.
Applicable to this Project
(check all that apply)
[gj
• [gj
• D
• D
• [gj
• D
• D
• D
• D
• [gj
• D
• D
Potential Non-Stormwater Discharges
Waters used to wash vehicles where detergents are not used
• Water used to control dust
• Potable water including uncontaminated water line flushings
• Construction dewatering (uncontaminated)
• Ground water or spring water (uncontaminated)
• Routine external building wash down that does not use detergents
• Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred (unless all spilled material has been removed) and where detergents are not used
• Foundation or footing drains where flows are not contaminated with process materials such as solvents
• Landscape irrigation
• Discharges from emergency fire-fighting activities
• Fire hydrant flushings
• Uncontaminated air conditioning or compressor condensate
[13]
Control Measures
NOTE: The likely locations of these discharges are identified on the site map TAB 5 and/or
TAB6
5.2 Receiving Waters:
Are there any surface waters located within 50 feet of the construction disturbance? No
Name(s) of the first surface water that receives stormwater directly from your site and/or from the MS4 l .Matanuska River
2.
4.
Impaired Waters/TDMLs:
Answer the following for each surface water listed in Table 1:
Is this surface What pollutant(s) is HasaTMDL Pollutant(s) for which water listed as causing the been there is a TDML
. "impaired?" impairment? completed?
1. YesD No~ YesD No~
2. YesD NoD YesD NoD
YesD NoD YesD NoD .) .
: 4. YesD NoD YesD NoD
Source used to determine whether or not your project discharges into an impaired water:
Click here to enter text.
Tier 2, 2.5 or 3 Waters
Answer the following for each surface water listed in Table 1:
Is this surface If yes, specify which Tier.
water designated as Tier 1,2 or 3?
i 1. YesD No~ Choose an item.
2. YesD NoD Choose an item.
3. YesD NoD Choose an item.
4. YesD NoD Choose an item.
If applicable, documentation of consultation with State or Federal TMDL authorities on consistency of SWPPP conditions with the approved TMDL is found in TAB 11. The control
[14] measures required to ensure that discharge of pollutants from the site are consistent with the assumptions and requirements of the EPA-established or approved TMDL, including any specific waste-load allocations are included in that documentation.
5.3 Water Quality Monitoring Requirements
Provisions in Permit Conditions of the applicable NPDES stom1water permit, as well as the associated §401 certification or other special conditions, define additional monitoring and repmiing requirements. Details about water quality monitoring and reporting requirements applicable to this project are included in TAB 11.
Samples and measurements taken for the purpose of monitoring will be representative of the monitored activity. Records of all monitoring information will be retained in TAB 11, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation.
Records of monitoring information will include:
1. The date, exact place, and time of sampling or measurements;
2. The individual(s) who performed the sampling or measurements;
3. The date(s) analyses were performed
4. The individual(s) who performed the analyses;
5. The analytical techniques or methods used; and
6. The results of such analyses.
[IS]
Section 6: Compliance with Other Applicable Requirements
6.1 Endangered Species Protection
Under which criterion is project eligible for Endangered Species coverage under the NPDES permit (EPA)?
~A OB De On OE
Criterion A.
Criterion B.
Criterion C
Criterion D.
No federally-listed threatened or endangered species or their designated critical habitat(s) are likely to occur in your site's "action area" as defined in Appendix A of EPA permit.
The construction site's discharges and discharge-related activities were already addressed in another operator's valid certification of eligibility for your action area under eligibility Criterion A, C, D, E, or F and there is no reason to believe that federally-listed species or federally-designated critical habitat not considered in the prior certification may be present or located in the "action area". To certify your eligibility under this Criterion, there must be no lapse ofNPDES permit coverage in the other operator's certification.
By certifying eligibility under this Criterion, you agree to comply with any effluent limitations or conditions upon which the other operator's certification was based. You must include in your NOI the tracking number from the other operator's notification of authorization under this permit. If your certification is based on another operator's certification under Criterion C, you must provide EPA with the relevant supporting information required of existing dischargers in Criterion C in the EPA NOI form.
Federally-listed threatened or endangered species or their designated critical habitat(s) are likely to occur in or near your site's "action area," and your site's discharges and discharge-related activities are not likely to adversely affect listed threatened or endangered species or critical habitat. This determination may include consideration of any stormwater controls and/or management practices you will adopt to ensure that your discharges and discharge-related activities are not likely to adversely affect listed species and critical habitat. To make this certification, you must include the following in your NOI: 1) any federally listed species and/or designated habitat located in your "action area"; and 2) the distance between your site and the listed species or designated critical habitat (in miles). You must also include a copy of your site map with the
NOL
Coordination between you and the Services has been concluded. The coordination must have addressed the effects of your site's discharges and discharge-related activities on federally-listed threatened or endangered species and federally-designated critical habitat, and must have resulted in a written concurrence from the relevant Service(s) that your site's discharges and discharge-related activities are not likely to adversely affect listed species or critical habitat. You must include copies of the
[16]
Criterion E.
Criterion F.
correspondence between yourself and the Services in your SWPPP and
NOL
Consultation between a Federal Agency and the U.S. Fish and Wildlife Service and/or the National Marine Fisheries Service under section 7 of the ESA has been concluded. The consultation must have addressed the effects of the construction site's discharges and discharge-related activities on federally-listed threatened or endangered species and federally designated critical habitat. The result of this consultation must be either:
1. a biological opinion that concludes that the action in question (taking into account the effects of your site's discharges and discharge-related activities) is not likely to jeopardize the continued existence of listed species, nor the destruction or adverse modification of critical habitat; or
IL written concurrence from the applicable Service(s) with a finding that the site's discharges and discharge-related activities are not likely to adversely affect federally-listed species or federally-designated habitat.
You must include copies of the correspondence between yourself and the Services in your SWPPP and NOL
Your construction activities are authorized through the issuance of a permit under section 10 of the ESA, and this authorization addresses the effects of the site's discharges and discharge-related activities on federally listed species and federally-designated critical habitat. You must include copies of the correspondence between yourself and the Services in your SWPPP and NOL
Support Documentation for Endangered Species criterion eligibility is filed in TAB 16.
6.2 Historic Preservation
1. Will the project involve installation of any of the following storm water controls that entail subsurface earth disturbance? No
D Dike
D Berm
D Catch Basin
D Pond
D Ditch, trench, swale, perimeter drain, etc.
D Culvert
D Other ground-disturbing stormwater control Click here to enter text.
If the project involves no installation of earth-disturbing stormwater controls, then no further historic preservation screening is necessary (for NPDES permitting purposes).
2. If answer to step 1 is Yes, have professional surveys or evaluations determined that historic properties do not exist (or have prior disturbances at the site precluded the existence of historic properties)? Yes
Provide documentation for the basis of this determination. Survey
[17]
3. If answer to step 2 is No, have professional surveys or evaluations determined that installation of stormwater controls will have no effect on historic properties? an
Provide documentation for the basis of this determination. Click here to enter text.
4. Has the State Historic Preservation Officer (SHPO), Tribal Historic Preservation Office (THPO) or other tribal representative concurred with the determinations of effects on historic properties? Yes
Provide the nature of their response. no effect
6.3 Safe Drinking Water Act Underground Injection Control Requirements
Will the project plan install any of the following controls? 'No
Check all that apply:
D Infiltration trenches (if stormwater is directed to any bored, drilled, driven shaft or dug hole that is deeper than is widest surface dimension, or has a subsurface fluid distribution system)
D Commercially manufactured pre-cast or pre-built proprietary subsurface detention vaults, chambers, or other devices designed to capture and infiltrate stormwater flow.
D Drywells, seepage pits, or improved sinkholes (if stormwater is directed to any bored, drilled, driven shaft or dug hole that is deeper than its widest surface dimension, or has a subsurface fluid distribution system)
If yes, provide documentation of communications with the EPA or applicable State agency.
Click here to enter text.
[18]
7:
Note: Contractor and PE - if any additional control methods are put in place, or there are modifications to existing control methods, make notes in this section accordingly
Control measures at the construction site are selected, installed, implemented, and maintained to minimize pollutants in the discharge as necessary to meet applicable water quality standards.
The objectives of this SWPPP include:
• Stabilize the site as soon as possible (targeting the preparation and implementation of erosion and sediment controls to get the site to final grade, and either permanently or temporarily stabilize all bare soil areas as soon as possible).
• Perimeter controls will be installed before ground disturbing activities are initiated.
• Perimeter protection will remain in place until final stabilization has been achieved.
• Slopes and channels will be protected by conveying concentrated stormwater runoff around the top of slopes and stabilize slopes as soon as possible. A void disturbing natural channels and the vegetation along natural channels as much as possible.
• Divert stormwater coming on to the site by conveying it safely around, through, or under the work area. (Divert the clean water, trap the dirty water.)
• Protect receiving waters and other environmentally sensitive waters or areas adjacent to the site.
• Follow pollution prevention measures by providing proper containers for waste and garbage at the site. Store hazardous materials and chemicals so that they are not exposed to stormwater.
• Minimize the area and duration of exposed soils. Clear only land that will be under construction in the near future.
7.1 Natural Buffers or Equivalent Sediment Controls (Required for EPA CGP states only - ID, WA)
This section only applies if a surface water is located within 50 feet of the project's earth disturbing activities.
Are there any surface waters within 50 feet of the project's eaiih disturbances? No
If No, then no further documentation is required for the SWPPP.
NOTE: Reference EPA CGP appendix G for buffer guidance.
If Yes, check which natural buffer compliance alternative is used at the project site:
~ The project will provide and maintain a 50-foot wide undisturbed natural buffer.
The location and width of natural buffers are shown on the Erosion and Sediment Control Plan sheets in TAB 6.
[19]
D The project will provide and maintain an undisturbed natural buffer that is less than 50 feet in width and is supplemented by additional erosion and sediment controls, which in combination achieves the sediment load reduction equivalent to a 50-foot undisturbed natural buff er.
The location of natural buffers are shown on the Erosion and Sediment Control Plan sheets in TAB 6.
Insert the width of the natural buffer to be retained Click here to enter text.
Insert description of additional erosion and sediment controls to be used in combination with the natural buffer: Click here to enter text.
Document the method used to determine that the above combination of natural buffer and sediment and erosion controls equal the estimated sediment removal capacity of a 50-foot undisturbed natural buffer: Click here to enter text.
D It is infeasible to provide and maintain an undisturbed natural buffer of any size, therefore, the project will implement erosion and sediment controls that achieve the sediment load reduction equivalent to a 50-foot undisturbed natural buffer.
Insert rationale for concluding that providing and maintaining a natural buffer of any size is infeasible: Click here to enter text.
Insert description of erosion and sediment controls to be used to achieve the sediment load reduction equivalent to a 50-foot undisturbed natural buffer: Click here to enter text.
D The project qualifies for one of the exceptions in EPA CGP Part 2.1.2.1.e
D For a "linear project", site constraints (e.g. limited right of way) make it infeasible for the project to meet any of the CGP part 2.1.2.1.a compliance alternatives.
D Other exception (state type): Click here to enter text.
Document why it is infeasible to meet one of the buffer compliance alternatives: Click here to enter text.
Insert description of erosion and sediment controls to be used to achieve the sediment load reduction equivalent to a 50-foot undisturbed natural buffer: Click here to enter text.
[20]
7.2 Perimeter Controls
All Perimeter Sediment Controls will be installed prior to ground disturbing activities taking place. There will be no clearing or grubbing outside the physical clearance limits.
Locations and design specifications ofBMPs are shown on the erosion and sediment control plan sheets in TAB 6.
The following perimeter controls will be implemented:
Control measure: Silt Fence placed around disturbed areas SCR 157 and F sheets
Implementation: 9/2016 and as project advances prior to ground disturbing activities
Maintenance requirements: Periodic inspections in accordance with CGP to ensure there is no overtopping, rilling, or other erosive conditions
Control measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
Add other measures as needed.
7 .3 Sediment Track-Out
The following methods will be implemented to minimize off-site vehicle tracking of sediment onto paved surfaces. If sediment escapes the construction site, off-site accumulations of sediment will be removed at a frequency sufficient to minimize off-site impacts.
Locations and design specifications of BMPs are shown on the erosion and sediment control plan sheets in TAB 6.
D Not applicable to this project. Reason: Click here to enter text.
If applicable:
Control measure: Washing without detergents or solvents within perimeter
Implementation: If used, during active construction as necessary
Maintenance requirements: Care must be taken that runoff is directed within construction perimeter to be managed by established control methods already in place. Any uncontrollable runoff must be remedied and additional BMPs put in place.
Control measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
[21]
Add other measures as needed.
7.4 Stockpiled Soil or Other Erodible Materials
Stockpile management includes measures to minimize surface erosion and sediment transport from soil stockpiles or other erodible materials.
Locate erodible stockpiles away from drainages including storm sewer inlets and culvert inlets.
Locations of stockpiles are shown on the erosion and sediment control plan sheets in TAB 6.
D Not applicable to this project. Reason: Click here to enter text.
If applicable:
Control measure: Silt Fence placed around disturbed areas SCR 157 and F sheets
Implementation: During active construction, if used
Maintenance requirements: Periodic inspections in accordance with CGP to ensure there is no overtopping, rilling, or other erosive conditions
Control measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
Add other measures as needed.
7 .5 Minimize Dust
Dust control includes practices used to reduce or prevent the surface and air transport of dust during construction
D Not applicable to this project. Reason: Click here to enter text.
If applicable:
Control measure: Application of water for dust control
Implementation: During active construction as needed
Maintenance requirements: Water used for dust control requires constant attention. In periods of hot or dry weather, several applications a day may be required.
Control measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
[22]
7.6 Minimize Disturbance of Steep Slopes
Describe how disturbance of steep slopes will be minimized. Describe controls (e.g. erosion control blankets, tackifiers) that will be implemented to minimize sediment discharges from slope disturbances.
If applicable, describe how stormwater run-on and run-off will be managed. Flows may be diverted from exposed soils by retaining/detaining flows or otherwise minimizing runoff and the discharge of pollutants from exposed areas of the site. Placement of structural practices in floodplains will be avoided to the degree technologically and economically practicable and achievable.
D Not applicable to this project. Reason: Click here to enter text.
If applicable:
Control measure: Silt Fence placed around disturbed areas SCR 157 and F sheets
Implementation: During active construction, if used
Maintenance requirements: Periodic inspections in accordance with CGP to ensure there is no overtopping, rilling, or other erosive conditions
Control measure: Blanket
Implementation: During active construction, if used
Maintenance requirements: Inspection will ensure good contact with the ground is achieved and maintained. Damaged areas will be repaired and properly secured.
Control measure: Straw Mulch
Implementation: During active construction, if used
Maintenance requirements: Maintain thickness of cover. Any area showing signs of erosion shall be remulched and/or protected by a blanket or net.
[23]
7.7 Topsoil Conservation
Describe how topsoil will be preserved, if feasible. If conservation of topsoil is infeasible, explain why, and describe alternate methods to be used to insure optimum vegetation survival and growth.
Erosion and sediment control measures for topsoil stockpiles (and other erodible materials) are shown in section 4.4.
Note: Contractor and PE complete this section as appropriate.
D Conservation of topsoil is Infeasible:
Reason: Click here to enter text.
Alternate method: Click here to enter text.
D Conservation of topsoil is Feasible:
Conservation measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
Conservation measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
Add other measures as needed.
7.8 Minimize Soil Compaction
Minimize soil compaction in areas where final vegetative stabilization will occur and where infiltration practices will be installed.
D Not applicable to this project. Reason: Click here to enter text.
If applicable:
Control measure: Distribute layer of soft vegetative top soil after compaction complete
Implementation: After soil compaction is complete and prior to revegetation efforts
Maintenance requirements: Maximize depth whenever possible and seed as soon as practicable.
If seeding cannot occur in a timely manner, other BMPs (nets, blankets, etc.) will be placed to mitigate erosion.
Control measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
[24]
7.9 Storm Drain Inlets and Culvert Inlets
Applicable for stormwater drain inlets which are connected to separate storm sewer systems (usually in urban locations) AND for culvert inlets that discharge stormwater from the project into surface waters.
Locations and design specifications of BMPs are shown on the erosion and sediment control plan sheets in TAB 6.
~ Not applicable to this project. Reason: Restoration Project
If applicable:
The following BMPs are applicable to:
D Ston11 Drain Inlets
D Culvert Inlets
Control measure: All existing culverts must be protected in place to maintain full functionality of existing drainage patterns. Storm water runoff from construction site must be passed through sediment control BMPs as indicated on erosion control plans, standard details, and compliant with NPDES-CGP permit.
Implementation: Install perimeter silt fence to intercept construction stormwater before discharging to receiving waterbody.
Maintenance requirements: Clean, or remove and replace, the protection measures as sediment accumulates, the filter fabric becomes clogged, and/or performance is compromised. Where there is evidence of sediment accumulation adjacent to the protection measure, Contractor must remove the deposited sediment by the end of the same work day in which it is found or by the end of the following work day if removal by the same work day is not feasible
Control measure: Drainage structures in areas where no work occurs will remain and will be protected. To prevent discharge of turbid water downstream, all existing catch basins located within the disturbance area will be protected with storm drain inlet protection. Proposed inlets will also be protected with catch basin inserts, and where feasible, their outlets will be temporarily plugged until the site is stabilized. The Contractor shall remove inlet protection at the end of the project without releasing captured sediment into the storm system.
Implementation: The inlet structures should be protected during construction to not allow sediment plug.
Maintenance requirements: Clean, or remove and replace, the protection measures as sediment accumulates, the filter becomes clogged, and/or performance is compromised. Where there is evidence of sediment accumulation adjacent to the inlet protection measure, remove the deposited sediment by the end of the same work day in which it is found or by the end of the following work day if removal by the same work day is not feasible.
[25]
7.10 Constructed Stormwater Conveyance Channels and Culvert Outlets
Describe velocity dissipation and/or erosion control devices to be installed at stormwater conveyance channels (such as roadside ditches) and culvert outlets. Includes permanent and temporary devices (specify).
Velocity dissipation devices will be placed at discharge locations and along the length of any outfall channel to provide a non-erosive flow velocity from the structure to a water course so that the natural physical and biological characteristics and functions are maintained and protected (e.g., no significant changes in the hydrological regime of the receiving water).
Locations and design specifications of BMPs are shown on the erosion and sediment control plan sheets in TAB 6.
ISi Not applicable to this project.
If applicable:
Control measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
Control measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
Add other measures as needed.
7.11 Sediment Basins
If applicable, provide site design specifications and other details for design of sediment basins and ponds. This may also include sediment infiltration swales.
Locations and design specifications of BMPs are shown on the erosion and sediment control plan sheets in TAB 6.
At a minimum, sediment ponds must provide storage for either the calculated volume of runoff from the 2-year, 24-hour storm event or 3,600 cubic feet per acre drained. Sediment ponds must also use outlet structures that withdraw water from the surface, unless infeasible.
ISi Not applicable to this project.
If applicable, type of sediment retention/infiltration used: Click here to enter text.
Design description: Click here to enter text.
7.12 Chemical Treatment
If chemical sediment control (such as polymers) will be used, provide design specifications and other details considered when choosing treatment type and locations.
[26]
IZJ Not applicable to this project.
If applicable:
NOTE: If use of cationic treatment chemicals is planned, separate prior approval is required from EPA.
Locations of chemical treatment sites are shown on the erosion and sediment control plan sheets in TAB 6.
Describe/name treatment chemicals that will be used and why these chemicals are suited to site soil characteristics and other construction site conditions: Click here to enter text.
Describe treatment system specifications and dosage of chemicals to be used: Click here to enter text.
Describe storage of chemicals and other material safety data: Click here to enter text.
Special controls to be used for Cationic treatment chemicals: Click here to enter text.
Describe training that personnel handling/applying treatment chemicals have/will receive: Click here to enter text.
7.13 Dewatering Practices
Discharge of ground water or accumulated stormwater that is removed from excavations, trenches, foundations, etc. into surface waters is prohibited unless such waters are first effectively managed by appropriate sediment controls. Uncontaminated non-turbid dewatering water can be discharge without being routed to a control.
IZJ Not applicable to this project
If applicable:
Specific dewatering practice: Click here to enter text.
Implementation: Click here to enter text.
Maintenance: Click here to enter text.
Add other measures as needed.
7.14 Erosion Control and Stabilization
Commence temporary soil stabilization measures immediately if no further disturbance of an area of the site or stockpile is expected within the next 14 days. Complete temporary soil stabilization measures to disturbed sites or stockpiles within 14 days of last disturbance. Provide for temporary stabilization of all exposed soil prior to winter construction shut down,_
Specify whether stabilization measure is temporary or permanent.
IZJ Temporary Measures:
[27]
Control measure: Straw Mulch
Implementation: During active construction, if used, and within 14 days of last disturbance.
Maintenance requirements: Maintain thickness of cover. Any area showing signs of erosion shall be remulched and/or protected by a blanket or net.
Practice/Control measure: Tackifier
Implementation: During active construction, if used, and within 14 days of last disturbance.
Maintenance: Maintain thickness of cover. Any areas showing signs of rilling or other erosive circumstances will be retreated and/or protected by a blanket or net
[28]
~ Permanent Measures:
Practice/Control measure: Revegetation with state approved seed mix
Implementation: In accordance with schedule
Maintenance: Periodic inspections will be done to review for and confirm final stabilization
Practice/Control measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance: Click here to enter text.
Add other measures as needed.
7.15 Removal of BMPs
Remove erosion and sediment control BMPs that are no longer needed and leave in good working order those BMPs that will remain at the construction site after close-out.
BMPs are no longer needed when the site that the BMP is protecting has reached final stabilization as defined in the applicable NPDES Stormwater Permit.
Final stabilization means:
• All ground disturbing activities at the site have been completed, AND
• Vegetation has been established that provides a uniform perennial vegetative cover with a density of 70% of the natural vegetative cover prior to construction.
• In arid (0-10" annual precipitation) or semiarid (10-20" annual precipitation) areas, final stabilization is considered to be achieved when the area is seeded or planted and vegetation is expected to provide 70% cover within 3 years; AND, erosion controls are in place that provide soil protection for at least 3 years without active maintenance.
Document arid/semi-arid conditions in SWPPP
• Effective non-vegetative stabilization is in-place such as rip rap, gabions, geotextiles, rock, aggregate etc.
7.16 Post Construction Measures
Responsibility for NPDES permit compliance after construction close-out will be the responsibility of:
~ FHWNWFLHD
D Land Management/Owner Agency Specify Agency: Choose an item.
D County/State DOT
Applicable permit termination/transfer information is located in TAB 18.
[29]
Section 8: Operational Controls/Good Housekeeping Measures
8.1 Hazardous Spill Plan
Spills and potential stormwater contamination will be controlled to reduce the chance of spills, stop the source of spills, contain and clean up spills, and dispose of materials contaminated by spills.
Spill prevention and response actions are outlined in the Hazardous Spill Plan or Spill Prevention, Control, and Counte1measure Plan (SPCC) whichever is applicable, T 15.
Construction sites may be subject to 40 CFR Part 112 regulations that require the preparation and implementation of a Spill Prevention, Control and Countermeasure Plan if the facility is a non transp011ation-related facility that: has a total storage capacity greater than 1,320 gallons or a completely buried storage capacity greater than 42,000 gallons and could reasonably be expected to discharge oil in quantities that may be harmful to navigable waters of the United States and adjoining shorelines. See EPA website: http://www.epa.gov/OEM/content/spcc/index.htm
Implementation: Prior to construction activities and throughout construction.
8.2 Spills/Releases in Excess of Reportable Quantities
This permit does not provide authorization to discharge hazardous substances or oil resulting from an on-site spill. This permit does not provide relief from the federal reporting requirements of 40 CFR Part 110, 40 CFR Pait 117 and 40 CFR Part 302 relating to spills or other releases of oils or hazardous substances.
For a release containing a hazardous substance or oil in an amount equal to or in excess of a reportable quantity established under either 40 CFR Part 110, 40 CFR Part 117 or 40 CFR Part 302, occurs during a 24-hour period:
• Notice will be provided to the National Response Center (800-424-8802) in accordance with the requirements of 40 CFR Part 110, 40 CFR Part 117 and 40 CFR Part 302 as soon as site staff have knowledge of the discharge; and written notice will be provided within 7 calendar days of knowledge of the release, provide a description of the release, the circumstances leading to the release, and the date of a release.
• Measures to prevent the reoccurrence of such releases will be implemented.
8.3 EquipmentNehicle Fueling and Maintenance Practices
On-site fueling areas will have a spill kit present, visible, and maintained. Employees and subcontractors will receive training regarding equipment/vehicle fueling and…