Observations_During_AKDOT135(2)_Project_on_Previous_Fuel_Spill_(For_Info_Only).pdf
PDF 695 KB Posted
- Attached to
- AK DOT 135(5), Glenn Highway Rehabilitation West Chickaloon Grade Section: MP 77. 4 to 78. 2
- Solicitation number
- DTFH7016B00007
About this file
Observations During AKDOT135(2) Project on Previous Fuel Spill (For Info Only)
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
880 88
960 9
N
D
L= 128.98'
T= 65.27'
R= 340.00'
L= 76.42'
T= 38.37'
R= 340.00'
D
CP
13192
CP
13193
CP
13194
Profile grade
Existing ground
Line to be constructed
BEGIN PROJECT
396+00.00
CHICKALOON BRIDGE
GLENN HIGHWAY
El=844.07
E=168818.35
N=222343.13
C h ic k a lo o n R iv e r
R o a d
D
R= 600.00'
T= 243.80'
L= 463.14'
Guardrail, LT
Guardrail, RT
Existing 1.3%
Future alignment
C
T
E
C
E
T Terminal section type tangent
Terminal section type CRT
Tie into existing guardrail
B Structure transition railing
B
B
B
D
R= 1,060.00'
T= 187.35'
L= 370.87'
P C
.3
P T
.8
P C
.9
P T
.5
P C
C
.5
PO
T
6+ .0
0 PC
6+
.4
See Sheet E.2 for Guardrail Details this side
8,649
NOTE:
have been inserted directly into the plans using a common coordinate system.
1. The ROW lines shown have been developed for this project by ADOT&PF and
404+07.74 407+57.74
S e e S h e e t E .2
Pullout 408+50
See Sheet E.4
Trail B
See Sheet E.3
Trail A
See Sheet E.3 e= 0.05
(See Sheet J.1)
Top of bridge deck
R = 29' e= 0.04 e= 0.04 e= 0.05
Existing Roadway Saw cut pavement pavement structure
See sheet C.2 for
PAVEMENT TRANSITION
BEGINNING AND ENDING
(No Scale)
396+00 to 404+04
Remove guardrail
CUYD
EXC.
CUYD
EMB.
410+00407+50405+00402+50400+00397+50395+00
840 840
845 845
850 850
855 855
860 860
865 865
870 870
875 875
D.2
STATE PROJECT
NUMBER
SHEET
AK
DOT 135(2)
A
M
F e b r u a r y
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d a k fb .d g n
D
S L
A N I N
A
W
W it u c k i
C h e c k e d b y
D e s ig n e d b y
Pullout 397+00
See Sheet E.4
1,098
6,165
R = 150'
R = 8.5'
(guardrail)
See Sheets J.1 - J.35
Construct Chickaloon Bridge
Remove delineators, Remove guardrail
403+85 to 404+20
Remove delineators, Remove guardrail
406+71 to 408+04
Remove delineators, Remove guardrail
406+85 to 408+33
Remove delineators
402+10 to 404+04
.0
+1.3000
.4
.1
260' VC
+3.1
350' VC
.4
+1.3213 % 8
.1
605' VC
6.
sean.jackson Pencil sean.jackson Callout Approximate truck location (See Phase II Report, Photo 6, PDF page 24) sean.jackson Pencil sean.jackson Callout Approximate excavation location sean.jackson Text Box Diesel odors found between STA 398+00 to existing bridge in the full width of the right (NB) lane and about 1/2 the width of the left (SB) lane (From CL to about the middle of the lane).
Odors most prominent in NB lane from 400+00 to the existing bridge.
File details come from the government source that posted it. Updated .