FEDERAL HIGHWAY ADMINISTRATION
U. S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TYPE OF CONSTRUCTION:
DESIGN DESIGNATION:
SPECIFICATION:
PROJECT MANAGER
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PLANS PREPARED BY
PLANS FOR PROPOSED PROJECT
AK DOT 135(5)
ALASKA
MATANUSKA-SUSITNA BOROUGH
ALASKA DEPARTMENT OF TRANSPORTATION & PUBLIC FACILITIES
Glennallen
Palmer
Valdez
Portage
Whittier
ANCHORAGE
M O U N T A I N S T A L K E E T N A
Sutton
PRINCE WILLIAM SOUND
TRADING BAY
N
5002550
SCALE IN MILES
M O U N T A I N S
C H U G A C H
INDEX TO SHEETS
60 MPH
6.0%e (max)
V
ADT (2040)
ADT (2016)
LENGTH 0.82 MILES
PROJECT LOCATION
See Sheet A.3
GLENN
HWY.
Wiener Lake
Long Lake
APPROVED:
DATE
Project Location
Wasilla
PRESERVE
DENALI N.P
CEAN
OCITCRA
i r e B n g ea S
PACIFIC OCEAN
Gulf of A la k a s
Dillingham
Bethel ANCHORAGE
Homer
King Salmon
Kodiak
Valdez
Tok YUKON
WHITEHORSE
JUNEAU
Unalaska
Kotzebue
Nome
FAIRBANKS
Barrow
S
IB
E R
IA
C A
N A
D A
U N I T
E D S
T A
T E S
BC
PARK
NATIONAL
DENALI
NAT'L PARK
ST. ELIAS
WRANGELL-
NAT'L PARK
LAKE CLARK
N.P.
FJORDS
KENAI
NAT'L PARK
THE ARCTIC
GATES OF
N.P.
VALLEY
KOBUK
PRESERVE
KATMAI N.P.
NAT'L PARK
GLACIER BAY
ALASKA KEY MAP
k u
Y o n
R
UNI
TE
D
STATE
S
RUSS
IA
Chickaloon
Projects, FP-14 US Customary Units of Roads and Bridges on Federal Highway
Standard Specifications for Construction
R. JOHNSON
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
K
H A
R R I S
O N
Minor Bridge Work
Grading, Base, Paving, Safety Features, Rehabilitation:
WRANGELL -
ST. ELIAS
N.P.
K. PERMANENT TRAFFIC CONTROL PLAN
J. BRIDGE
I. TEMPORARY TRAFFIC CONTROL PLAN
H. SAFETY FEATURES
G. DRAINAGE
F. EROSION CONTROL
E. N. CHICKALOON BRANCH ROAD & PULLOUT
D. GLENN HIGHWAY PLAN-PROFILE
C. TYPICAL SECTIONS
B. SUMMARIES
A. GENERAL INFORMATION
K.2-9
K.1
J.1-4
I.2-8
I.1
H.1-8
G.2-8
G.1
F.4-8
F.2-3
F.1
E.3
E.2
E.1
D.8
D.7
D.3-6
D.2
D.1
C.6
C.5
C.2-4
C.1
B.1-3
A.3
A.2
A.1
DRAWINGS AND DETAILS
PERMANENT TRAFFIC CONTROL PLANS, STANDARD
QUANTITIES
TABULATION OF PERMANENT TRAFFIC CONTROL
CHICKALOON RIVER BRIDGE (545) SHEETS
DRAWINGS AND DETAILS
TEMPORARY TRAFFIC CONTROL STANDARD
QUANTITIES
TABULATION OF TEMPORARY TRAFFIC CONTROL
AND DETAILS
GUARDRAIL PLANS, STANDARD DRAWINGS
CULVERT PIPE STANDARD DRAWINGS
TABULATION OF DRAINAGE QUANTITIES
AND DETAILS
EROSION CONTROL STANDARD DRAWINGS
EROSION AND SEDIMENT CONTROL PLAN
TABULATION OF EROSION CONTROL QUANTITIES
PULLOUT PLAN
PLAN AND PROFILE
TABULATION OF APPROACH ROAD QUANTITIES
FUEL SPILL INFORMATION
SURVEY CONTROL SHEET
PLAN AND PROFILE
RIGHT-OF-WAY DISPLAY
TABULATION OF PLAN AND PROFILE QUANTITIES
N. CHICKALOON BRANCH ROAD
TYPICAL SECTION - COMPOUND CUT DETAIL
TYPICAL SECTIONS
TABULATION OF TYPICAL SECTION QUANTITIES
SUMMARY OF QUANTITIES
VICINITY MAP
PLAN SYMBOLS AND ABBREVIATIONS
TITLE SHEET
A.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d a k a a .d g n
AK AK DOT 135(5)
P
M
F e b r u a r y
H I N
S H
A W
C h e c k e d b y
D e s ig n e d b y
Western Federal Lands Highway Division
Chief of Engineering, CFHWY00272
MP 77.4 TO 78.2
WEST CHICKALOON GRADE SECTION:
GLENN HIGHWAY REHABILITATION
AND ABBREVIATIONS
PLAN SYMBOLS
A.2
STATE PROJECT
NUMBER
SHEET
U
S C m y fi le s p w p r o d u c ti o n d a k a b .d g n
AK DOT 135(5)
h e c k e d b y
D e s ig n e d b y
M
H I N
S H
A W
K
H A
R R I S
O N
M a r c h
BH
CP GPS
JH
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
RIP
G G
W W
DI
T T
NO SCALE
- no symbol -wall face
TP
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
NOTE:
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Compost Sock
Drill Lake
A K S U N A T A M
R E V I R
YAWHGIH NNELG
GLENN HIGHWAY
C H I C A L O O
R E
V I R
K
END PROJECT
N
SCALE IN MILES
1/4 1/40 1/21/8
C a r b o n C r e e k
Harrison Lake
Glennallen
110 miles
Su tt on m ile s
MP
MP
END PROJECT
T
N R
E
T
N R
E
T
N R
E
T
N R
E
VICINITY MAP
C oa l C re e k
BEGIN PROJECT
A.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k a c .d g n
AK DOT 135(5)
M a y
K
H A
R R I S
O
H I N
S H
C h e c k e d b y
D e s ig n e d b y
MP 77.4
10083+60.00
AK DOT 135(5)
MP 77.4 TO 78.2
WEST CHICKALOON GRADE SECTION:
GLENN HIGHWAY REHABILITATION
MP 78.2
10126+63.50
AK DOT 135(5)
MP 77.4 TO 78.2
WEST CHICKALOON GRADE SECTION:
GLENN HIGHWAY REHABILITATION
201+70.00
AK DOT 135(5)
MP 77.4 TO 78.2
WEST CHICKALOON GRADE SECTION:
GLENN HIGHWAY REHABILITATION
Sheet and Description
Section C Section D Section E Section F Section G Section I Section J Section K
Typical Section
Plan & Profile
Approach Roads
Erosion Control Drainage
Temporary Traffic Control
Bridge Permanent Traffic Control ALLOWANCE Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15703-1000 SOIL EROSION CONTROL, SOIL
STABILIZATION (ROLLED EROSION CONTROL
PRODUCT, TYPE 4) ACRE 6.1 3.9 10.0
A0140 15704-1000 SOIL EROSION CONTROL, PLASTIC LINING SQYD 2,500 250 2,750
A0160 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 6,830 670 7,500
A0180 15705-0300 SOIL EROSION CONTROL, SLOPE DRAINS LNFT 465 235 700
A0200 15705-1500 SOIL EROSION CONTROL, COMPOST SOCK LNFT 28,412 5,588 34,000
A0220 15706-0200 SOIL EROSION CONTROL, CHECK DAM EACH 30 5 35
A0240 15706-1600 SOIL EROSION CONTROL, STABILIZED
CONSTRUCTION EXIT EACH 4 2 6
A0260 15707-1000 SOIL EROSION CONTROL, TEMPORARY TURF
ESTABLISHMENT SLRY 84 20 104
A0280 15720-0000 STORM WATER POLLUTION PREVENTION PLAN LPSM ALL ALL
A0300 15801-0000 WATERING FOR DUST CONTROL MGAL 550 50 600
A0320 20101-0000 CLEARING AND GRUBBING ACRE 16.3 0.7 17.0
A0340 20301-2400 REMOVAL OF SIGN EACH 13 2 15
A0360 20302-1200 REMOVAL OF GUARDRAIL LNFT 1,306 94 1,400
A0380 20302-1300 REMOVAL OF GUARDRAIL, CONCRETE BARRIER LNFT 390 10 400
A0400 20401-0000 ROADWAY EXCAVATION CUYD 652,591 614 44,295 697,500
A0420 20411-0000 SELECT BORROW TON 30,065 1,435 31,500
A0440 20701-0900 SEPARATION-STABILIZATION GEOTEXTILE,
CLASS 2, TYPE D SQYD 739 81 820
A0460 25120-2000 RIPRAP DITCH, METHOD B LNFT 450 50 500
A0480 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 8,319 681 9,000
A0500 30302-1000 DITCH RECONDITIONING LNFT 300 300 As directed by the CO.
A0520 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 5,097 303 5,400
A0540 41201-0000 TACK COAT TON 8 1 9
A0560 41301-0400 ASPHALT PAVEMENT MILLING, 1 1/2-INCH
DEPTH (BRIDGE DECK) SQYD 1,387 1,387
A0580 55901-0000 MEMBRANE WATERPROOFING SQYD 1,869 1,869
A0600 56001-0000 REMOVAL OF CONCRETE BY HYDRODEMOLITION SQYD 1,151 1,151
A0620 60201-0800 24-INCH PIPE CULVERT LNFT 112 12 124
A0640 60201-1000 36-INCH PIPE CULVERT LNFT 74 6 80
A0660 61701-1300 GUARDRAIL SYSTEM G4, TYPE 2, CLASS A
STEEL OR WOOD POSTS LNFT 1,838 113 1,950
-M ar -2
3:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
Es tim at e-
_F in al .x ls x]
S he et
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
B.1DOT 135(5)AK
SHEET
NUMBER
Typical Section
Plan & Profile
Approach Roads
Erosion Control Drainage
Temporary Traffic Control
Bridge Permanent Traffic Control ALLOWANCE Bid
Schedule
A0680 61702-0600 TERMINAL SECTION, TYPE FLARED EACH 1 1
A0700 61702-0800 TERMINAL SECTION TYPE TANGENT EACH 2 2
A0720 61707-0000 STRUCTURE TRANSITION RAILING LNFT 92 92
A0740 61708-1000 REMOVE AND RESET, GUARDRAIL LNFT 80 63 38 180
A0760 61709-4000 REMOVE AND RESET, TERMINAL SECTION EACH 1 1 2
A0780 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM
CAPACITY HOUR 80 80
A0800 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM
RATED CAPACITY HOUR 80 80
A0820 62201-1300 BULLDOZER, 160HP MINIMUM FLYWHEEL POWER HOUR 40 40
A0840 62201-2050 ROLLER HOUR 40 40
A0860 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 60 60
A0880 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD
MINIMUM CAPACITY WITH THUMB ATTACHMENT HOUR 80 80
A0900 62301-0000 GENERAL LABOR HOUR 100 100
A0920 62402-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH
DEPTH ACRE 8.0 1.0 9.0
A0940 62406-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH ACRE 6.9 2.1 9.0
A0960 62501-0000 TURF ESTABLISHMENT ACRE 14.9 1.6 16.5
A0980 62525-0000 WATER MGAL 3,000 3,000
A1000 63302-0000 SIGN SYSTEM SQFT 77 9 85
A1020 63309-0000 DELINEATOR EACH 6 6
A1040 63316-1000 REMOVE AND RESET SIGN EACH 15 4 19
A1060 63401-0000 PAVEMENT MARKINGS (MMA SOLID WHITE) LNFT 8,665 335 9,000
A1080 63401-0000 PAVEMENT MARKINGS (MMA SOLID YELLOW) LNFT 5,347 253 5,600
A1100 63401-0000 PAVEMENT MARKINGS (MMA SOLID BROKEN
YELLOW) LNFT 2,440 160 2,600
A1120 63401-0000 PAVEMENT MARKINGS (MMA STOP BAR) LNFT 180 60 240
A1140 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC
CONTROL SUPERVISOR LPSM ALL ALL
A1160 63502-1250 TEMPORARY TRAFFIC CONTROL, TUBULAR
MARKER, TYPE 42-INCH EACH 150 25 175
A1180 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 150 25 175
A1200 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING
LIGHT TYPE B EACH 9 3 12
A1220 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE
CHANGEABLE MESSAGE SIGN EACH 2 2
A1240 63502-2100 TEMPORARY TRAFFIC CONTROL, CRASH CUSHION EACH 4 2 6
A1260 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE
TYPE 3 LNFT 80 10 90
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
3- M ar -2
9:
A M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
Es tim at e-
_F in al .x ls x]
S he et
2)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.2DOT 135(5)AK
Typical Section
Plan & Profile
Approach Roads
Erosion Control Drainage
Temporary Traffic Control
Bridge Permanent Traffic Control ALLOWANCE Bid
Schedule
A1280 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE
BARRIER LNFT 3,500 500 4,000
A1300 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT
MARKINGS LNFT 15,206 2,794 18,000
A1320 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION
SIGN SQFT 260 80 340
A1340 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 2,700 600 3,300
A1360 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER FXHR 18,000 18,000
A1380 63701-0000 FIELD OFFICE EACH 1
A1400 63704-0000 VEHICLE EACH 3
A1420 64620-0400 REMOVE AND RESET MAILBOX EACH 3 3
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
3- M ar -2
9:
A M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
Es tim at e-
_F in al .x ls x]
S he et
3)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.3DOT 135(5)AK
FOOTNOTE:
QUANTITIES
TYPICAL SECTION
TABULATION OF
10108+25.
Includes quantities for N. Chickaloon Branch Road and pullout [1]
C.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k c a .d g n
AK DOT 135(5)
F e b r u a r y
H A
R R I S
H I N
S H
C h e c k e d b y
D e s ig n e d b y
NO SCALE
1:4 1:4
C le a r in g l im it
10'
Min.
C le a r in g l im it
10'
Min.
Lane Lane
7" compacted depth
Roadway Aggregate, Method 2, Select Borrow, 36" compacted depth
Profile grade
"[2]
Variable
[2]
Variable
Varies 11-12'
Shoulder
Varies 1-6'
LC
S lo p e s ta k e
ROUNDING DETAIL
FILL SLOPE
C le a r in g l im it
10' 10'
0.25DExisting ground
D
SAFETY EDGE DETAIL
Second lift of asphalt
First lift of asphalt
Tack coat (between pavement lifts)
1:4 d it c h d e p th
M in
FOOTNOTE:
Existing Roadway Saw cut pavement structure
Proposed pavement
See this sheet
Safety Edge Detail (typ.)
1:4
7" compacted depth
Roadway Aggregate, Method 2, 6'6'
Profile grade
[2]
Variable
[1] 2% Crown
Select Borrow, 36" compacted depth
C le a r in g l im it
Min.
10'
Turf esta blish ment limit s
1:4
Shoulder Lane
LC
Lane Shoulder
See this sheet
Safety Edge Detail (typ.)
Min.
C le a r in g l im it
Turf establishment limits
Turf establishment limits
12'12' sti mil tne mhsi lbat se fruT
[2]
Variable
(between pavement lifts)
Tack coat depth, placed in two equal lifts
Type I, 5" compacted
Asphalt Concrete Pavement, d e p th d it c h
(between pavement lifts)
Tack coat depth, placed in two equal lifts
Type I, 5" compacted
Asphalt Concrete Pavement, 10'
[2]
Variable
GUARDRAIL DETAIL
Varies g r a v e l s h o u ld e r d g e o f
Second lift of asphalt
First lift of asphalt
Method 2, 12" compacted depth
Roadway Aggregate, 3.5'
[2]
Variable
ROUNDING DETAIL
CUT SLOPE
C le a r in g l im it
Slope stake
.25D [2]
Variable
10' 10'
D
GLENN HIGHWAY
TYPICAL SECTION
10083+60.00 to 10091+51.70
10091+51.70 to 10100+50.00
Shoulder
Shoulder
Varies 1-6' linear transition to 10084+12.53.
Verify existing cross-slope at 10083+60.00 and provide a smooth
10083+60.00 to -2.0% at 10084+12.53.
Right edge of pavement varies from existing cross-slope at [3]
Contractor Staking Report.
Construct slopes as shown on the cross sections and in the[2] the plan and profile curve data. See Sheet C.3 for transition points.
Superelevate roadway on curves at the rate 'e' as indicated on[1]
C o n tr o l T y p
P e r im e te r E r o s io n
PAVEMENT TRANSITION
BEGINNING
Roadway Aggregate to cover safety edge
Pull Roadway Aggregate
TYPICAL SECTION A
TYPICAL SECTION B
[3] [1] 2% Crown
Varies 11-12'
C.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k c b .d g n
AK DOT 135(5)
M a y
H A
R R I S
H I N
S H
C h e c k e d b y
D e s ig n e d b
H I N
S H
A W
K
H A
R R I S
O N
LC
1:4 1:4
Lane ShoulderLane[7]Shoulder
C le a r in g l im it
10'
Min.
Profile grade
V a ria b le
Turf e stablis hment lim its
Rockfall Ditch
[2]
Variable
[1] 2% Crown
LC
Lane Lane Shoulder[7]Shoulder
[2]
Variable
[1]Profile grade
[3
[2
V a ria b le
[4][2] Varies
FOOTNOTE:
Turf e stablis hment lim its in te r s e c ti o n r a d iu s v a r ie s a r o u d it c h d e p th
[2]1:50
Turf establishment limits
Turf establishm ent lim its
10100+50.00 to 10113+47.86
10113+47.86 to 10114+31.14
See Sheet C.2
Safety Edge Detail (typ.)
GLENN HIGHWAY
TYPICAL SECTION
[6]Select Borrow, 36" compacted depth
Tack coat (between pavement lifts)
[6]Select Borrow, 36" compacted depth
Tack coat (between pavement lifts) as approved by the CO. See Cross Sections.
project, the proposed 36" of Select Borrow may be eliminated, Where adequate Select Borrow exists from the AK DOT 135(2)
Existing Roadway Aggregate
Concrete Pavement
Existing Asphalt
[5]24'-33' 6' Varies 12-15' 6'[5]24' - 33'
Roadway Aggregate, Method 2, 7" compacted depth
Asphalt Concrete Pavement, Type I, 5" compacted depth, placed in two equal lifts
Varies 15'
Roadway Aggregate, Method 2, 7" compacted depth
Asphalt Concrete Pavement, Type I, 5" compacted depth, placed in two equal lifts
Existing Roadway
Varies
C le a r in g l im it
10'
Min.
Branch Road profile.
Provide a smooth transition to match N. Chickaloon[4]
See Sheet C.5 for compound cut Typical Section.[3] and in the Contractor Staking Report.
Construct slopes as shown on the cross sections [2] this sheet for transition points.
indicated on the plan and profile curve data. See table on
Superelevate roadway on curves at the rate 'e' as[1]
12'- 13.66'
13.66' - 15'
Establishment
Turf
TYPICAL SECTION C
TYPICAL SECTION D
[2]Varies
1:4
See Sheet C.2
Safety Edge Detail (typ.)
6' - 12.25'
C.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k c c .d g n
AK DOT 135(5)
M a y
C h e c k e d b y
D e s ig n e d b y linear transition to 10084+12.53.
Verify existing cross-slope at 10083+60.00 and provide a smooth
10083+60.00 to -2.0% at 10084+12.53.
Right edge of pavement varies from existing cross-slope at [8] and in the Contractor Staking Report. See Sheet E.2.
Construct edge of shoulder as shown on the cross sections [7] excavation. See SCR 204.06.
Select Borrow may be reduced to 6" in areas of bedrock [6]
33' from 10110+50.00 to 10113+47.86
30' from 10106+50.00 to 10110+50.00;
24' from 10100+50.00 to 10106+50.00;[5]
GLENN HIGHWAY
TYPICAL SECTION
C.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k c d .d g n
AK DOT 135 (5)
M a y
H A
R R I S
H I N
S H
C h e c k e d b y
D e s ig n e d b y subsidiary to paving items.
Milling of existing pavement in the detailed station range is[3]
Contractor Staking Report.
Construct slopes as shown on the cross sections and in the[2] transition points.
the plan and profile curve data. See table on Sheet C.3 for
Superelevate roadway on curves at the rate 'e' as indicated on[1]
LC
[1]Profile grade
New asphalt surface asphalt surface
Bottom of existing roadway aggregate
Bottom of existing
[3]10118+21.16 to 10119+00.00
MILLING DETAIL
placed in equal lifts
5" compacted depth, Asphalt Concrete Pavement, Type I, minimum 5" new asphalt sufficient depth to allow
Mill depth varies, mill
Mill pavement
Tack coat
Vertical saw cut
LC
Varies
Existing Roadway
15'
Lane Lane
6'
Shoulder
Varies
[1]Profile grade
15'
Shoulder
Existing approach slab
Existing asphalt overlay
Tack coat (between pavement lifts)
4" compacted depth, placed in equal lifts
Asphalt Concrete Pavement, Type I, Existing concrete wedge along south approach slab and bridge to be removed, See Sheet J.2
Final asphalt overlay on approach slabs and bridge
TYPICAL SECTION E
10114+31.14 to 10114+49.82
10118+02.50 to 10118+21.16
LaneLane
LC
[1]Profile grade
Tack coat (between pavement lifts)
Select Borrow, 36" compacted depth
Turf esta blish ment limit s
Min.
C le a r in g l im it
Existing Asphalt Concrete
Existing Roadway Aggregate
Existing Select Borrow
See Sheet C.2
Safety Edge Detail (typ.)
[2]
Varia ble
[2]
Varia ble
1:4
Method 2, 7" compacted depth
Roadway Aggregate, 10'
Varies 15-15.5'
TYPICAL SECTION F
10118+21.16 to 10119+00.00
15' 6'
Shoulder
6'
Shoulder
5" compacted depth, placed in equal lifts
Asphalt Concrete Pavement, Type I, See Sheet C.2
Safety Edge Detail (typ.)
placed in equal lifts, see detail
Type I, 5" compacted depth, Asphalt Concrete Pavement, 1:4
7" compacted depth Roadway Aggregate, Method 2, Tack coat (between pavement lifts)
Turf establishment
5" compacted depth, placed in two equal lifts Asphalt Concrete Pavement, Type I, [2]
Variable
Select Borrow, 36" compacted depth
Varies 11-15'
C le a r in g l im it
Min.
[2]
Variable
10'
Turf esta blish ment limit s
1:4
Shoulder Lane
LC
Lane Shoulder
See Safety Edge Detail (typ.)
10'
Min.
C le a r in g l im it
D it c h D e p th
M in
[1]Profile grade
TYPICAL SECTION G
10119+00.00 to 10126+63.50
Varies 11-15.5' Varies 1-6'Varies 1-6'
1:4
Filter Rock
Class 2, Type D
Separation-Stabilization Geotextile, Varies Varies
Top of Select Borrow
RIPRAP DITCH, METHOD B DETAIL
10122+50.00 to 10126+63.50 (LT)
V ariable
1'-6"
15' typ.
H I N
S H
A W
K
H A
R R I S
O N
1:4
LC
Silt
Sands & Gravels
[1]
1:1.5
[1]
1:2
Anticipated Hinge Point
Original Ground
1:4
LC
Silt
Sands & Gravels
Bedrock
[1]
1:2
[1]
1:1.5
[1
:1
Original Ground
Anticipated Hinge Point
Anticipated Hinge Point
:1
:1
FOOTNOTE:
GLENN HIGHWAY
COMPOUND CUT DETAIL
TYPICAL SECTION
NOTE:
10105+40.00 to 10114+00.00
10100+50.00 to 10105+40.00
Rockfall ditch
24' - 33'
Shoulder
6'
Lane
12'-15'
Rockfall ditch
12' - 33'
Shoulder
6'
Lane
12'-15'
Stage 1 Excavation
Stage 2 Excavation
Stage 3 Excavation
LEGEND:
Temporary Slope #1
Temporary Slope #2 :1
Temporary Slope #1
Anticipated initial slope staking
(Contractor determined)[2]
Anticipated initial slope staking
(Contractor determined)[2] establishing the initial and final slope staking limits.
A minimum of two slope staking events will be required for[2] compound cut will be verified by the Contractor per SCR 204.06(a).
Contractor Staking Report. The top of the rock portion of the
Construct slopes as shown on the cross sections and in the[1]
C.5
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k c e .d g n
AK DOT 135(5)
M a y
C h e c k e d b y
D e s ig n e d b y
TYPICAL SECTION H
TYPICAL SECTION I
Submit a plan showing slopes to be approved by the CO.
for winter shutdown periods at a minimum of 30 days in advance.
2. The CO must approve temporary slopes planned to be left in place these stations.
1. See Sheets C.2-3 for additional Typical Section details at
LaneLane
H I N
S H
A W
Turf establishment limits
BRANCH ROAD
N. CHICKALOON
TYPICAL SECTION
K
H A
R R I S
O N
C.6
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k c f.
d g n
AK DOT 135(5)
M a r c h
C h e c k e d b y
D e s ig n e d b y
1:4 1:4
12'
Tack coat (between pavement lifts)
LC
12'
Profile grade
2' Shoulder2' Shoulder
C le a r in g l im it
10'
Min.
C le a r in g l im it
10'
Min.
[2]
Variable
[1] 2% Crown
4" compacted depth, placed in two equal lifts
Asphalt Concrete Pavement, Type I, sti mil tne mhsi lbat se fr uT
FOOTNOTE:
See Sheet C.2
Safety Edge Detail (typ.)
NO SCALE
8" compacted depth
Roadway Aggregate, Method 2, Select Borrow, 12" compacted depth
D it c h D e th
V r ia b le
[2]
Variable
200+70.00 to 202+00.00 in the Contractor Staking Report.
Construct slopes and ditches as shown on the cross sections and[2]
Construct cross-slopes as shown on the cross sections.[1]
Existing Roadway Saw cut pavement structure
Proposed pavement
PAVEMENT TRANSITION
ENDING
TYPICAL SECTION J
NOTE:
GLENN HIGHWAY
PLAN & PROFILE QUANTITIES
TABULATION OF
D.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k fa .d g n
AK DOT 135(5)
F e b r u a r y
H A
R R I S
H I N
S H
C h e c k e d b y
D e s ig n e d b y
Includes furnishing new supports and hardware.[9] earthwork runs.
modification of the AK DOT 135(2) project, not reflected in
Includes a deduction of 1,760 cubic yards removed during a[8]
Includes additional quantities not reflected in earthwork runs.[7] areas where topsoil is obtained, not reflected in earthwork runs.
Includes additional quantities to replace volumes in embankment[6] is approximately 6" asphalt over 6" roadway aggregate.
AK DOT 135(2) project, where the existing pavement section asphalt over 4.8" base material except for the limits of the
Existing Glenn Highway is composed of approximately 7.2" [5]
Includes quantities for N. Chickaloon Branch Road.[4]
Includes quantities for pullout 10108+25.[3] reflected in earthwork runs.
and embankment areas. Includes additional quantities not
Based on conserved topsoil depth of 4-inches in excavation[2]
Includes conserved topsoil.[1]
1. See Sheet E.1 for additional Approach Road quantities.
820820
0 96
STATE OF ALASKA DNR
SEC. 36
GOVT. LOT 1
DEED 2009-020300-0
PARCEL 1
SEC. 36
GOVT. LOT 3
STATE OF ALASKA DNR
SEC. 36
GOVT. LOT 2
STATE OF ALASKA DNR
SEC. 36
GOVT. LOT 1
Slope stake limits (cut)
Slope stake limits (fill)
Slope stake limits (fill)
DENNIS FALLDORF
SE 1/4 SEC. 25
VICTORIA G. CARPENTER
DEED 2009-020300-0
PARCEL 2
SEC. 36
GOVT. LOT 3
Scale: 1" = 200'
N
Line to be constructed
Glenn Highway
DISPLAY
RIGHT-OF-WAY
[1]Limits
25' Clearing
969.59' LT.
10104+25.67, EASEMENT
CONSTRUCTION
END
Construction Easement = Property Line
15.46 acres = 673,385.29 sq ft
Construction Easement =
Construction Easement = Property Line
96.32' LT.
10100+09.71, EASEMENT
CONSTRUCTION
BEGIN
D.2
STATE PROJECT
NUMBER
SHEET
a k d m y fi le s p w p r o d u c ti o n d a k fb .d g n
AK DOT 135(5)
J a n u a r y
H A
R R I S
H I N
S H
C h e c k e d b y
D e s ig n e d b y
LEGEND:
Approximate clearing limits beyond slope stake limits
FOOTNOTE:
Clear to limits shown in the contractor staking report.[1]
NOTE:
coordinate system. See Physical Data for additional ROW exhibits.
ADL 232406. The ROW lines were inserted using a common
DOT, Plat No. 2015-16 Palmer Recording District and
The ROW lines shown are from record mapping provided by
P C
.0
P T
.7
.3
+0.9177%
N
ACCOUNT: 20N05E36A002
VICTORIA G. CARPENTERSTATE OF ALASKA DNR
D
L= 336.61'
T= 169.74'
R= 1,060.00' e = 6.0%
Guardrail RT
Existing ground
Profile grade
Slope stake limits (cut)
Slope stake limits (fill)
.0
.0
Transition
T
T Terminal section type tangent
STATE OF ALASKA DNR
SEC. 36
GOVT. LOT 2
DEED 2009-020300-0
PARCEL 1
SEC. 36
GOVT. LOT 3
M
H I N
S H
A W
(55 mph)
.0
.0
TP
BH
Curve Data
Shoulder Width = 1'
Lane Width = 11'
Match Existing
Shoulder Width = 3'
Lane Width = 12' LT & RT
(transition)
Slope stake limits CP
13187
13188
CP
CUYD
EXC.
CUYD
EMB.
10090+0010087+5010085+0010082+50
780 780
790 790
800 800
810 810
820 820
830 830
840 840
850 850
860 860
D.3
STATE PROJECT
NUMBER
SHEET
a k d m y fi le s p w p r o d u c ti o n d a k fc .d g n
AK DOT 135(5)
a r c h
H A
R R I S
C h e c k e d b y
D e s ig n e d b
El= 819.30'
E = 166,786.551
N = 221,181.868
BEGIN PROJECT
beyond slope stake limits
Approximate clearing limits
Approximate location of test borings
Approximate location of test pits
Existing edge of pavement
Proposed edge of shoulder
Line to be constructed
LEGEND:
3,957
10083+05
Begin Construction
Install 36" culvert
10089+50
Install 24" culvert
10090+00 LT
pave through returns entrance left, 20' radii, Construct residential
10090+00
10083+60.00
0 9
BH SC15-01
P T
.7
P C
.9
.5
+2.0827%300' VC
K = 258
.0
+2.0827%
+0.9576%
300' VC
K = 267
SSD = 1109'
.0
.0
+0.38%
N
CP
13189
CP
13190
CP
13191
Line to be constructed
Profile grade
.4
F
F
Existing ground
.7
.7
Transition 1
.8
Lane LT
Transition - Widen
Slope stake limits (fill)
Slope stake limits (cut)
Slope stake limits (fill)
DEED 2009-020300-0
PARCEL 2
SEC. 36
GOVT. LOT 3
DEED 2009-020300-0
PARCEL 1
SEC. 36
GOVT. LOT 3
STATE OF ALASKA DNR
SEC. 36
GOVT. LOT 1
Terminal section type flared
.5
Slope stake limits (cut)
.0
.0
T
T Terminal section type tangent
Guardrail RT
165,260
28,952
843.39'
10102+50 LT
Special ditch LT
Remove guardrail pave through returns entrance left, 20' radii, Construct residential
10094+85 do not disturb
Existing structure, do not disturb
Existing structure, CUYD
EXC.
CUYD
EMB.
10105+00
800 800
810 810
820 820
830 830
840 840
850 850
860 860
870 870
880 880
10090+00 10092+50 10095+00 10097+50 10100+00 10102+50
Shoulder Width = 6' LT & RT
Lane Width = 12' LT & RT
D.4
STATE PROJECT
NUMBER
SHEET
a k d m y fi le s p w p r o d u c ti o n d a k fd .d g n
AK DOT 135(5)
F e b r u a r y
H A
R R I S
H I N
S H
C h e c k e d b y
D e s ig n e d b y
Install 24" culvert
10094+85 LT
BH SC15-02
BH SC15-03vwp
SG14-23
CRB14
-01
-02
-03
-04
-05
-06
P C
.9
P T
.4
P C
.3
P C
C
.2
.3
+0.9576%
760' VC
K = 139
.9
N
.0
D
R= 1,060.00'
T= 509.24'
L= 949.46'
Existing ground
Profile grade
Line to be constructed e = 6.0%
W = 3.0'
(55 mph)
Slope stake limits (cut)
Slope stake limits (fill)
.9
.0
STATE OF ALASKA DNR
SEC. 36
GOVT. LOT 1
STATE OF ALASKA DNR
SEC. 36
GOVT. LOT 1
M
H I N
S H
A W
Top of bridge deck
.0
Guardrail RT
.0
Guardrail RT follows edge of pullout
.6
.0
B
Guardrail RT
Lane RT
Transition - Widen
.8
.0
See E.2 for Guardrail Details LT
B
B
.6
.2
T
T to remain
Note: Guardrail RT d a o R h c n a r
B n o ol a k ci h
C .
N
See Sheets J.1-J.4
Chickaloon Bridge
See Sheet. E.3
10108+25
Pullout
Existing Pullout
469,271 943
844.91'
10106+50 LT
Special ditch LT
+0.38%
Remove guardrail, concrete barrier approach road, see cross sections
Matchline for mainline and
Remove and reset transition rail transition rail
Remove and reset
Remove and reset guardrail
Remove and reset terminal section
Structure transition railing, reset from existing
Terminal section type tangent, reset from existing
[1]Guardrail LT
.0
Lane RT
Transition - Widen asphalt overlay
Concrete deck plus
Top of wearing surface =
12,200
D
R= 1,060.00'
T= 105.82'
L= 210.93' e = 6.0%
W = 3.5' to remain
Existing guardrail
Slope stake limits (transition)
(guardrail)
R = 150'
(guardrail)
R = 150'
Shoulder Width = 6' LT & RT
Lane Width = 15' LT & 12' RT
Shoulder Width = 6' LT & RT
Lane Width = 15' LT & 15' RT
Curve Data
Curve Data
CP
15118
+6.4
CUYD
EXC.
CUYD
EMB.
10120+0010117+5010115+0010112+5010110+0010107+5010105+00
820 820
830 830
840 840
850 850
860 860
870 870
880 880
890 890
900 900
D.5
STATE PROJECT
NUMBER
SHEET
a k d m y fi le s p w p r o d u c ti o n d a k fe .d g n
AK DOT 135(5)
a r c h
K
H A
R R I S
C h e c k e d b y
D e s ig n e d b y
Partial quantity reset from existing[1]
0 8
960 980
SG1
4-
TP1
5-
TP15
-02
TP15-03
P C
C
.2
P T
.7
+6.4
.6
+7.5
4%
200' VC
K = 175
.9
.0
CP
13195
CP
13196
L
IN
E E
A S E
M E N T
S E C T
IO
L
IN
E E
A S E
M E N T
S E C T
LIN
E
A S E
M E N T
' S
E C T
E
A S E
M E N T
' S
E C T
Line to be constructed
Profile grade
EL = 926.98'
E = 169,772.265
N = 223,978.075
M
H I N
S H
A W
Future alignment
LIN
E E
A S E
M E N T
' S
E C T
E
A S E
M E N T
' S
E C T
PORTION OF GOVT. LOT 5, SEC. 30
PEARL CORPORATION
HILLMAN ESTATE &
SE 1/4 SEC. 25
DENNIS FALLDORF
Future ProfileExisting ground
CUYD
EXC.
CUYD
EMB.
10127+5010125+0010122+5010120+00
.0
.5
.1
T
Slope stake limits (fill)
N
GOVT. LOT 4, SEC. 31
STATE OF ALASKA DNR
Slope stake limits (cut) limits (transition)
Slope stake
D
R= 750.00'
T= 281.98'
L= 539.44' e = 6.0%
W = 3.5'
.0
.0
Lane LT
Transition - Narrow
.0
Narrow Lane RT
Transition -
Shoulder Width = 1' LT & RT
Lane Width = 11' LT & RT
Match Existing
.7
R
T L a n e
.7
(all)
Transition
5,784
9,200
Curve Data
Shoulder Width = 6' LT & RT
Lane Width = 15' LT & 15.5' RT
Shoulder Width = 6' LT & RT
Lane Width = 12' LT & 15.5' RT
CP
15117
CP
15116
D.6
STATE PROJECT
NUMBER
SHEET
a k d m y fi le s p w p r o d u c ti o n d a k ff .d g n
AK DOT 135(5)
a r c h
K
H A
R R I S
C h e c k e d b y
D e s ig n e d b y
See Sheet C.4
Construct Riprap Ditch, Method B
10122+50 to 10126+63.50
END PROJECT
10126+63.50
GPK FILE DATED Sepember 2013, 15000 series added 9/2015
PROJECT COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION
13187 220881.895 166456.994 817.612 61°46'46.846416" N 148°28'11.915610" W 877.183 0.99993847 5/8"IR W/FHWA ALUM CAP
13188 221324.181 166950.124 820.308 61°46'51.085449" N 148°28'01.449528" W 879.923 0.99993863 5/8"IR W/FHWA ALUM CAP
13189 221651.886 167339.571 826.368 61°46'54.220555" N 148°27'53.194026" W 886.016 0.99993858 5/8"IR W/FHWA ALUM CAP
13190 221865.638 167885.612 830.759 61°46'56.197421" N 148°27'41.739143" W 890.447 0.9999387 5/8"IR W/FHWA ALUM CAP
13191 222195.403 168488.792 839.092 61°46'59.302593" N 148°27'29.038939" W 898.828 0.99993866 5/8"IR W/FHWA ALUM CAP
13195 223808.562 169477.071 902.139 61°47'14.949461" N 148°27'07.697757" W 961.984 0.99993625 5/8"IR W/FHWA ALUM CAP
13196 224066.942 169905.216 938.517 61°47'17.392224" N 148°26'58.668807" W 998.396 0.99993478 5/8"IR W/FHWA ALUM CAP
13197 224280.737 170420.223 983.747 61°47'19.375547" N 148°26'47.855735" W 1043.6647 0.99993293 5/8"IR W/FHWA ALUM CAP
13198 224302.526 170719.671 1007.285 61°47'19.519536" N 148°26'41.619352" W 1067.2216 0.99993199 5/8"IR W/FHWA ALUM CAP
13199 224162.083 171004.992 1032.638 61°47'18.069965" N 148°26'35.757432" W 1092.5877 0.99993096 5/8"IR W/FHWA ALUM CAP
13200 224151.241 171513.522 1077.309 61°47'17.843268" N 148°26'25.190595" W 1137.2921 0.99992914 5/8"IR W/FHWA ALUM CAP
13201 224354.941 172178.803 1130.053 61°47'19.690928" N 148°26'11.257751" W 1190.0827 0.99992703 5/8"IR W/FHWA ALUM CAP
13202 224585.927 172546.035 1160.290 61°47'21.877454" N 148°26'03.507311" W 1220.3493 0.99992581 5/8"IR W/FHWA ALUM CAP
13203 224964.482 173021.554 1184.715 61°47'25.490630" N 148°25'53.431164" W 1244.8146 0.99992494 2"DIA ALUM CAP GH 78.6
13204 225363.466 173484.448 1196.545 61°47'29.307676" N 148°25'43.606590" W 1256.684 0.99992466 5/8"IR W/FHWA ALUM CAP
13205 225493.842 174072.609 1229.108 61°47'30.450844" N 148°25'31.312026" W 1289.2883 0.99992347 5/8"IR W/FHWA ALUM CAP
13206 225351.982 174581.718 1210.451 61°47'28.933056" N 148°25'20.798235" W 1270.6359 0.99992467 5/8"IR W/FHWA ALUM CAP
13207 225338.014 174950.231 1197.118 61°47'28.707484" N 148°25'13.143319" W 1257.3213 0.99992554 5/8"IR W/FHWA ALUM CAP
13208 225492.680 175434.804 1184.382 61°47'30.113798" N 148°25'02.989987" W 1244.6106 0.99992644 5/8"IR W/FHWA ALUM CAP
15101 225465.388 173708.779 1207.710 61°47'30.25747" N 148°25'38.89107" W 1267.8725 0.999923838 5/8"IR W/FHWA ALUM CAP
15102 225599.849 173654.060 1205.828 61°47'31.59397" N 148°25'39.96117" W 1265.9936 0.999923894 5/8"IR W/FHWA ALUM CAP
15103 225652.951 173461.581 1211.660 61°47'32.16244" N 148°25'43.93655" W 1271.8173 0.999923497 5/8"IR W/FHWA ALUM CAP
15104 225605.754 173131.052 1185.915 61°47'31.77648" N 148°25'50.83272" W 1246.0543 0.999924525 5/8"IR W/FHWA ALUM CAP
15105 225556.036 172884.277 1180.044 61°47'31.34573" N 148°25'55.98866" W 1240.169 0.999924654 5/8"IR W/FHWA ALUM CAP
15106 225507.154 172628.396 1177.281 61°47'30.92531" N 148°26'01.33347" W 1237.3895 0.999924629 5/8"IR W/FHWA ALUM CAP
15107 225464.498 172419.602 1177.468 61°47'30.55497" N 148°26'05.69612" W 1237.563 0.999924492 5/8"IR W/FHWA ALUM CAP
15108 225416.203 172214.712 1166.784 61°47'30.12815" N 148°26'09.98035" W 1226.8659 0.999924877 5/8"IR W/FHWA ALUM CAP
15109 225377.126 172054.186 1169.158 61°47'29.78152" N 148°26'13.33754" W 1229.2176 0.999924666 5/8"IR W/FHWA ALUM CAP
15110 225290.511 171690.183 1152.243 61°47'29.01508" N 148°26'20.94913" W 1212.2781 0.999925252 5/8"IR W/FHWA ALUM CAP
15111 225062.539 171552.214 1124.405 61°47'26.80381" N 148°26'23.93154" W 1184.4233 0.9999265 5/8"IR W/FHWA ALUM CAP
15112 224787.309 171404.117 1117.808 61°47'24.12976" N 148°26'27.14792" W 1177.8073 0.999926725 5/8"IR W/FHWA ALUM CAP
15113 224642.881 171139.431 1091.951 61°47'22.77066" N 148°26'32.72296" W 1151.9245 0.9999278 5/8"IR W/FHWA ALUM CAP
15114 224530.524 170914.134 1071.131 61°47'21.71786" N 148°26'37.46295" W 1131.0868 0.999928659 5/8"IR W/FHWA ALUM CAP Note:
15115 224475.728 170593.242 1057.201 61°47'21.25409" N 148°26'44.16172" W 1117.1351 0.999929129 5/8"IR W/FHWA ALUM CAP
15116 224387.317 170375.715 1037.943 61°47'20.43506" N 148°26'48.72813" W 1097.861 0.999929918 5/8"IR W/FHWA ALUM CAP
15117 224142.508 170240.284 964.451 61°47'18.05730" N 148°26'51.66532" W 1024.3533 0.999933351 5/8"IR W/FHWA ALUM CAP
15118 222398.799 168977.579 843.757 61°47'01.19037" N 148°27'18.77834" W 903.5284 0.999938359 5/8"IR W/FHWA ALUM CAP
PROJECT :GLENN HIGHWAY
DATE OF FIELD WORK :Summer 2013 DATE OF FINAL ADJUSTMENT : september 2013
PROJECT UNITS : US SURVEY FOOT
COORDINATE SYSTEM :SPCS SCALED TO GROUND
VERTICAL DATUM :Differential levels holding beginning elevation at CP 13101
To convert the local coordinates to NAD83(CORS) State Plane U.S. Survey Foot coordinates, translate using +2,624,893.36529 N, +1,738,991.40294 E, and scale using 0.9999202167
STATE PROJECT
DOT 135(5) D.7AK
C
M yF ile s\
Pr oj ec ts
\A la sk a\
G le nn _H ig hw ay \C on tr ol \C on tr ol _S he et s\
PW
\p w
2\ [G le nn
_H ig hw ay
_C on
-F eb -2
2:
P M
W
FL
H D
_S ur ve y
D av ie s
D es ig ne d by
C he ck ed b y:
NUMBER
SURVEY CONTROL
Existing guardrail to be removed NOTE:
N
Existing Glenn Highway
Slope stake limits (fill)
Line to be constructed
Existing edge of shoulder
Existing edge of traveled way
Existing pullout
D.8
STATE PROJECT
NUMBER
H A
R R I S
H I N
S H
C h e c k e d b y
D e s ig n e d b y
Scale: 1" = 50'
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k fg .d g n
FOR INFORMATION ONLY
APPROXIMATE LIMITS
FUEL SPILL
AK DOT 135(2) Project tie-in
99.52' RT
10108+95.16
111.59' RT
10108+93.95
Existing centerline
92.52' RT
10108+95.88 61.94' RT
10114+56.79
43.01' RT
10114+66.98
S e p te m b e r to be removed. Do not obtain topsoil within the fuel spill limits.
only in areas within the slope stake limits outside of the pavement only the existing pavement and aggregate base. Place fill material
3. Within the fuel spill limits, from 10108+90 to 10114+70, excavate requirements, however, cleanup may not be complete in this area.
shown. Excavation from this project was subject to similar ADEC
2. The AK DOT 135(2) project limits overlap the fuel spill area as disposal requirements.
1. See Sections 107 and 204 for field screening, testing, handling and this location.
Clear and construct embankment as directed in within project slope stake or typical clearing limits.
Area outside of original Glenn Highway pavement in this location.
construct embankment as directed
Clear, excavate pavement and original Glenn Highway pavement.
Approximate fuel spill limits within
Total range of potentially hazardous material to be handled = 0-400 cubic yards
Excavation of existing aggregate base = 139 cubic yards
Excavation of existing pavement = 139 cubic yards of SB lanes)2 110108+95.17 to 10112+78.14 (existing NB lanes and
Not reflected in Geopak earthwork runs:
Potential earthwork subject to ADEC testing requirements (For Information Only) -
LEGEND:
ROAD
N. CHICKALOON BRANCH
APPROACH ROAD QUANTITIES
TABULATION OF
E.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k e a .d g n
AK DOT 135(5)
F e b r u a r y
H A
R R I S
H I N
S H
C h e c k e d b y
D e s ig n e d b
120' VC
K = 41
SSD = 426'
.1
.0
.9
-3.5450%
-0.6000%
.6
B
B
G le n n H ig h w a y
P T
.2
P C
.6
D
R= 80.00'
T= 24.50'
L= 47.55'
Scale: 1" = 50'
STATE OF ALASKA DNR
SEC. 36
GOVT. LOT 1
STATE OF ALASKA DNR
SEC. 36
GOVT. LOT 1
N. Chickaloon Branch Road
Structure rail transition
End radius
14.00' LT
201+06.81
R = 150'
Proposed edge of shoulder
Begin radius
21.00' LT
10112+71.76
Begin radius
32.01' RT
200+53.20
Slope stake limits (fill)
Proposed Glenn Highway
See Mainline cross sections
Proposed intersection grade, CUYD
EXC.
CUYD
EMB.
845 845
850 850
855 855
860 860
865 865
870 870
875 875
880 880
885 885 B L
Guardrail, RT
B
L
201+00200+00 202+00 approach road, see cross sections
Matchline for mainline and
Remove and reset terminal section
Remove and reset guardrail
Slope stake limits (cut)
Recondition as directed by the CO
Existing riprap ditch
Terminal section type LST, reset from existing
[1]G4
[1] Reset from existing follows edge of guardrail, see Sheet H.1
Proposed edge of shoulder
Typical 2' shoulder width 200+89.00
.5
M a in li n e
.3
.3
.9
Curve Data
BEGIN CONSTRUCTION
END CONSTRUCTION
E.2
STATE PROJECT
NUMBER
SHEET
a k d m y fi le s p w p r o d u c ti o n d a k e b .d g n
AK DOT 135(5)
F e b r u a r y
H A
R R I S
H I N
S H
C h e c k e d b y
D e s ig n e d b y
Existing ground
Elev. = 856.98' E = 169,030.512 N = 223,071.756
Elev. = 859.53' E = 169,115.177 N = 222,973.105
Profile grade
200+70.00
N. CHICKALOON BRANCH ROAD
202+00.00
Edge of paved shoulder
Line to be constructed
SECTION A-A
L C
N
P C
.9
1:50.0 1:2
12" compacted depth
Roadway Aggregate, Method 2
6" compacted depth
Select Borrow
4.0% reduce abrupt breakovers
Round pullout edge to
Method 2, 7" compacted depth
Roadway Aggregate, 5" compacted depth, placed in two equal lifts
Asphalt Concrete Pavement, Type I, Scale: 1" = 50'
NOTE:
1. See Sheets C.1 and D.1 for Pullout Quantities.
A yawhgiH nnelG desoporP
10108+25
PULLOUT PLAN
yawhgiH nnelG gnitsixE
E.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k e c .d g n
AK DOT 135(5)
M a y
H A
R R I S
H I N
S H
C h e c k e d b y
D e s ig n e d b y
Elevation = 854.75'
18.00' RT
10106+50.00
Elevation = 856.35'
38.00' RT
10109+00.00
Elevation = 854.91'
38.00' RT
10107+50.00
Elevation = 858.10'
18.00' RT
10110+00.00
1:5 taper
1:5 tap er
QUANTITIES
EROSION CONTROL
TABULATION OF
F.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k fa .d g n
AK DOT 135(5)
a r c h
H A
R R I S
H I N
S H
C h e c k e d b y
D e s ig n e d b
0 8
800800
5 1
N
LEGEND:
Surface flow direction
NOTE:
Silt Fence
Line to be constructed
Line to be constructed
Matanuska River
Matanuska River
Disturbed Area
Scale: 1" = 100'
N
Scale: 1" = 100'
Edge of Shoulder
Edge of Shoulder
Compost Sock
Slope stake limits (fill)
Slope stake limits (transition) Slope stake limits (cut)
Slope stake limits (fill)
Slope stake limits (cut)
Slope stake limits (transition)
PLAN
SEDIMENT CONTROL
FINAL EROSION AND
M
H I N
S H
A W
Silt Fence
Check Dam
Install Compost Socks
Install Compost Socks
Install Compost Socks
Install Check Dams
Slope Drain
Install Slope Drain
[1]Install Compost Socks as directed by the CO to drain towards slope drain.
Compost Socks installed along cut slopes to be sloped 1-2%[1]
F.2
STATE PROJECT
NUMBER
SHEET
a k d m y fi le s p w p r o d u c ti o n d a k fb .d g n
AK DOT 135(5)
M a y
K
H A
R R I S
C h e c k e d b y
D e s ig n e d b y and are for conceptual purposes only.
4. Contours shown are approximate proposed finished grades
3. See Sheet F.6 for Compost Sock Detail.
3. See Sheet F.5 for Silt Fence Detail.
2. See Sheet F.4 for Check Dam Detail.
field as approved by the CO.
1. Final location of erosion control devices to be determined in the
BEGIN PROJECT
10083+60
880 880
980 990
P T
.7
Line to be constructed
N
Scale: 1" = 100' Slope stake limits (fill)
Slope stake limits (fill)
PLAN
SEDIMENT CONTROL
FINAL EROSION AND
Slope stake limits (transition)
M
H I N
S H
A W
Slope stake limits (cut)
LEGEND:
Surface flow direction
NOTE:
Silt Fence
Disturbed Area
Compost Sock
Silt Fence
Check Dam
Install Compost Socks
Install Compost Socks
Install Check Dams
Install Check Dams
[1]Install Compost Socks as directed by the CO to drain towards slope drain.
Compost Socks installed along cut slopes to be sloped 1-2%[1]
F.3
STATE PROJECT
NUMBER
SHEET
a k d m y fi le s p w p r o d u c ti o n d a k fc .d g n
AK DOT 135(5)
M a y
K
H A
R R I S
C h e c k e d b y
D e s ig n e d b y
Slope stake limits (fill) Install Compost Socks
N around bridge berm Install Silt Fence around bridge berm Install Silt Fence
Slope stake limits (cut) and are for conceptual purposes only.
4. Contours shown are approximate proposed finished grades
3. See Sheet F.6 for Compost Sock Detail.
3. See Sheet F.5 for Silt Fence Detail.
2. See Sheet F.4 for Check Dam Detail.
field as approved by the CO.
1. Final location of erosion control devices to be determined in the
END PROJECT
10126+63.50
(S)
CHECK DAM SPACING
DITCHV DITCH
TRAPEZOIDAL DITCH
PROFILE VIEWCROSS SECTION
CROSS SECTION
CHECK DAM
SPACING
2%
3%
4%
5%
6%
* Do not use Check Dams below
2% or above 6% ditch grades.
DITCH
GRADE
(G)
1V:1.2H (typ.)
Ponded water
:2 ty p.
DITCH GRADE (G)
Filter Rock
Filter Rock
Filter Rock
CHECK DAM
S (ft)
STATE PROJECT
NUMBER
SHEET
F.4 DOT 135(5) AK
M a r c h
U m y fi le s p w p r o d u c ti o n d a k fd .d g
SILT FENCE
F.5
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d a k fe .d g n
AK DOT 135(5)
a r c h
H A
R R I S
H I N
S H
C h e c k e d b y
D e s ig n e d b y
Forced S
END POSTS DETAIL
PLAN
PLAN
END DETAIL
ELEVATION
Fi ll sl op e
Fasten fabric to posts.
around each post one full turn.
Fold geotextile fabric
PLAN
T o e o f s lo e
Note 3See
Staple or tie
POSTS AT JOINTS
Geotextile fabric
Posts Detail
See End
End posts
Section A fabric
Geotextile
Section B
Geotextile fabric
Steel or wood post
Top of posts tied together.
Posts driven tightly together.
Steel or wood posts
See End Posts Detail
End posts
Staple or tiePOST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
4.
3.
2.
1.
Fi ll slo pe
Flow
T o e o f s lo p e
Flow
Flow
PLAN
ELEVATION
Varies fo r s p a c in g
S e e n o te
Limits of clearing
Support mesh
Backfilled and compacted soil
Steel or wood post
(undisturbed)
Existing ground
Geotextile
6 ft. (max.) spacing without fence support.
10 ft. (max.) spacing with fence support.
m in m in
6" min. trench min.
4"
See Note 3
NOTE:
m in running around the ends.
Curve ends of silt fence upgrade to prevent water from as possible.
Install silt fence to follow the ground contours as closely does not slide down, supporting posts.
All types must ensure silt fence remains attached to, and manufacturer's recommendations for installation procedures.
as long as specified dimensions are satisfied. Follow
Alternate preassembled silt fence options will be allowed
F.6
STATE PROJECT
NUMBER
H A
R R I S
H I N
S H
C h e c k e d b y
D e s ig n e d b y
COMPOST SOCK
NOTE:
1.
2.
3.
4.
5.
6.
7.
4H : 1V
3H : 1V
2H : 1V
1H : 1V 10' - 0"
20' - 0"
30' - 0"
40' - 0"
MAXIMUM SPACINGSLOPE
PLAN VIEW
COMPOST SOCK DETAIL
D e fa u lt m y fi le s p w p r o d u c ti o n d a k ff .d g n control product, see note 3
Biodegradable rolled erosion
See detail
Compost sock (typ.)
Protected area
Disturbed area
(typ.)
Spacing varies table sock spacing
See compost
See note 3
Rolled erosion control product
2" x 2" x 24" untreated wooden
Compost sock
8"
M in im u m
M in
M a x wooden stake (typ.)
2" x 2" x 24" untreated
SECTION A
A
A
Le ng th v ar ie s off securely (typ.)
Excess sock material drawn in and tied
(typ.)
Stagger overlaps m ax
O .C
S pa ci n g around sock (typ.)
24" to 48" to prevent flow
Angle terminal end uphill o ve rl ap ty p.
2" m in
NO SCALE
Flow
Flow COMPOST SOCK SPACING TABLE
8" DIAMETER
Refer to SCR Section 157.15 for removal.
Perform maintenance in accordance with SCR Section 157.15.
of the Compost Sock.
of the effective height 2 1when accumulation has reached
Remove sediment from the up slope side of the Compost Sock
Install Compost Sock perpendicular to flow along contours.
Sock on top of blanket.
If Rolled Erosion Control Product is specified, place Compost when vegetation covers the surface.
Compost to be dispersed on site as determined by the CO, tie together.
Compost Sock ends 12" behind one another and securley
Securely knot each end of Compost Sock. Overlap adjacent
M a r c h
Place on 1-2% slope towards slope drain
Contour line
Lap in direction of flow manufacturer's recommendation tie-down method per
Allowable alternative
Diameter Minimum
Existing paved road
DOT 135(5) AK F.7
CONSTRUCTION EXIT
STABILIZED
ingress / egress area 20' typ.
Provide full width of
Geotextile filter, Class 2, Type C (Woven) subsidiary to Soil Erosion Control, Stabilized Construction Exit
All work and materials associated with this installation are
Adjust length to fit field conditions as approved by CO.
onto paved roadway.
Remove build-up of sediment as necessary to reduce tracking using exit.
Construct radius to allow turning movement of typical truck drainage ditches.
Provide temporary drainage where entrance crosses existing
Construct drainage ditches along entrance as directed by the CO.
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d a k fg .d p r il
H A
R R I S
H I N
S H
C h e c k e d b y
D e s ig n e d b y
50' typ.
See Note 2
25' radius typ.
6" min.
STABILIZED CONSTRUCTION EXIT NOTE:
5.
4.
3.
2.
1.
as approved by the CO
Clean, crushed aggregate 3" to 6" in diameter
WATERWAY
RIPRAP LINED
m in m in
SLOPE DRAINS
NO SCALE
CUT SLOPE
SECTION B-B
SECTION A-A
PLAN
Cut slope
Compost sock
Roadway
FLOW
Original ground
Slope rounding
Toe of slope
FLOWFLOW
or Roadway Embankment
Top of Cut
Compost sock
Waterway
Cut slope
FLOW
9" min.
A
A
B B
6.
5.
4.
3.
2.
1.
Separation-Stabilization Geotextile, Class 2, Type D
Separation-Stabilization Geotextile, Class 2, Type D
F.8
STATE PROJECT
NUMBER
SHEET
U m y fi le s p w p r o d u c ti o n d a k fh .d g n
AK DOT 135(5)
F e b r u a r y
H A
R R I S
H I N
S H
C h e c k e d b y
D e s ig n e d b y
Filter rock protected slope may be end dumped
Temporary filter rock temporary filter rock stabilized area or on
Discharge in drainage ditch, or as directed
10' ± dia.
min.
6"
8' min.
fill surface intermediate
Subgrade or
Control, Slope Drains
Filter Rock and geotextile fabric are subsidiary to Soil Erosion
Use Filter Rock. See Subsection 705.08.
subsidiary to Slope Drains.
after berm construction. Any required seed and mulch is
Seed and mulch any cut slope earth berms used immediately from disturbed areas.
Use toe-of-fill slope berms to divert offsite runoff away runoff velocity when existing grades are steep.
designated by the CO. Use check dams to reduce the slopes as shown on the Erosion Control Plans or as
Construct temporary berms at the top of all erodible cut
Use slope drains until the slopes are permanently stabilized.
by the CO. Place all slope drains at the end of each work shift.
on the Erosion and Sediment Control Plans or as designated and additionally as required by the CO. Use spacings as shown winter shutdown periods, final erosion and sediment control and filter rock) as the cut or embankment is constructed for
Use temporary slope drains (compost sock berms, drains,
10.4 x 16 60201 -0800
60201 -1000
63309 -0000
Station
ES
TI
M
A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
D
EL
IN
EA
TO
R
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD LNFT LNFT EACH Lt Rt 10089+50 2 41 74 2 1, 2, 3
10090+00 LT 2 17 36 2 22 A, AS, C, GS 1, 2, 3
10094+85 LT 3 35 76 2…