FEDERAL HIGHWAY ADMINISTRATION
PROJECT
AK DOT 135(5)
GLENN HIGHWAY REHABILITATION
WEST CHICKALOON GRADE SECTION:
MP 77.4 TO 78.2
GLENN HIGHWAY MAINLINE EARTHWORK
10083+60.00 TO 10126+63.50
ALASKA DEPARTMENT OF TRANSPORTATION
AND PUBLIC FACILITIES
MATANUSKA-SUSITNA BOROUGH, ALASKA
File: c:\myfiles\pw_production\d0269796\Mainline Final Earthwork.log 5/9/2016, 4:31:14 PM
Input File: pw:\Alaska\Glenn_Highway\AK_DOT_135(5)\Development\CADD\Design\Mainline Final Earthwork_input unedited.inp Output File: Mainline Final Earthwork.log
COMPUTING EARTHWORKS FOR BASELINE = GLENN
COMPUTING EARTHWORKS FOR JOB = 055
FORMING LIST OF XSCELLS
BEGINNING EARTHWORKS COMPUTATION
Page: 1
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)
10083+50.00 RDWYEXC
Excavation 10.78 9 9 1.00 9 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 9 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.62 1 0 0.00 9 1
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.67 1 0 0.00 9 1
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.92 4 0 0.00 9 4
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.52 4 0 0.00 9 4
10083+59.75 RDWYEXC
Excavation 38.75 9 9 1.00 18 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 18 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Page: 2
Fill 1.63 1 0 0.00 18 2
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.69 1 0 0.00 18 2
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.03 2 0 0.00 18 6
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 32.82 7 0 0.00 18 11
10083+60.00 RDWYEXC
Excavation 128.18 1 1 1.00 19 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.49 0 0 1.00 19 0
EXISTPAVEMENT
Excavation 11.95 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 19 0 Mass ordinate for EXISTPAVEMENT = 0
EXISTPAVEMENTLAYER2
Excavation 11.94 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 19 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.45 0 0 0.00 19 2
LAYER2
Excavation 0.00 0 0 0.00 0
Page: 3
Fill 5.53 0 0 0.00 19 2
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.76 0 0 0.00 19 6
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 126.88 1 0 0.00 19 12
10083+75.00 RDWYEXC
Excavation 128.08 71 71 1.00 90 Subsoil Exc 0.00 0 0 1.00 0 Fill 34.12 12 12 1.00 78 12
EXISTPAVEMENT
Excavation 11.95 7 7 1.00 7 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 78 0 Mass ordinate for EXISTPAVEMENT = 7
EXISTPAVEMENTLAYER2
Excavation 11.94 7 7 1.00 7 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 78 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 7
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.33 3 0 0.00 78 5
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.40 3 0 0.00 78 5
LAYER3
Page: 4
Subsoil Exc 0.00 0 0 0.00 0 Fill 22.78 13 0 0.00 78 19
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 128.77 71 0 0.00 78 83
10084+00.00 RDWYEXC
Excavation 129.84 120 120 1.00 210 Subsoil Exc 0.00 0 0 1.00 0 Fill 52.09 40 40 1.00 158 52
EXISTPAVEMENT
Excavation 11.95 11 11 1.00 18 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 158 0 Mass ordinate for EXISTPAVEMENT = 18
EXISTPAVEMENTLAYER2
Excavation 11.95 11 11 1.00 18 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 158 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 18
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.12 5 0 0.00 158 10
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.19 5 0 0.00 158 10
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.21 20 0 0.00 158 39
Page: 5
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 127.01 118 0 0.00 158 201
10084+10.00 RDWYEXC
Excavation 130.41 49 49 1.00 259 Subsoil Exc 0.00 0 0 1.00 0 Fill 61.03 21 21 1.00 186 73
EXISTPAVEMENT
Excavation 11.96 4 4 1.00 22 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 186 0 Mass ordinate for EXISTPAVEMENT = 22
EXISTPAVEMENTLAYER2
Excavation 11.97 4 4 1.00 22 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 186 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 22
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.04 2 0 0.00 186 12
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 2 0 0.00 186 12
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.56 8 0 0.00 186 47
LAYER5
Excavation 0.00 0 0 0.00 0
Page: 6
Fill 132.14 48 0 0.00 186 249
10084+25.00 RDWYEXC
Excavation 131.74 73 73 1.00 332 Subsoil Exc 0.00 0 0 1.00 0 Fill 56.13 33 33 1.00 226 106
EXISTPAVEMENT
Excavation 11.98 7 7 1.00 29 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 226 0 Mass ordinate for EXISTPAVEMENT = 29
EXISTPAVEMENTLAYER2
Excavation 11.98 7 7 1.00 29 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 226 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 29
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.04 3 0 0.00 226 15
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 3 0 0.00 226 15
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.57 11 0 0.00 226 58
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 132.96 74 0 0.00 226 323
10084+50.00 RDWYEXC
Page: 7
Excavation 134.16 123 123 1.00 455 Subsoil Exc 0.00 0 0 1.00 0 Fill 39.13 44 44 1.00 305 150
EXISTPAVEMENT
Excavation 12.01 11 11 1.00 40 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 305 0 Mass ordinate for EXISTPAVEMENT = 40
EXISTPAVEMENTLAYER2
Excavation 12.00 11 11 1.00 40 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 305 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 40
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.05 5 0 0.00 305 20
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 5 0 0.00 305 20
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.55 19 0 0.00 305 77
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 130.48 122 0 0.00 305 445
10084+65.09 RDWYEXC
Excavation 135.75 75 75 1.00 530 Subsoil Exc 0.00 0 0 1.00 0 Fill 31.42 20 20 1.00 360 170
Page: 8
EXISTPAVEMENT
Excavation 11.99 6 6 1.00 46 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 360 0 Mass ordinate for EXISTPAVEMENT = 46
EXISTPAVEMENTLAYER2
Excavation 11.99 7 7 1.00 47 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 360 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 47
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.06 3 0 0.00 360 23
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 3 0 0.00 360 23
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.54 11 0 0.00 360 88
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 135.36 74 0 0.00 360 519
10084+75.00 RDWYEXC
Excavation 137.93 50 50 1.00 580 Subsoil Exc 0.00 0 0 1.00 0 Fill 30.12 11 11 1.00 399 181
EXISTPAVEMENT
Excavation 11.98 4 4 1.00 50 Subsoil Exc 0.00 0 0 1.00 0
Page: 9
Fill 0.00 0 0 1.00 399 0 Mass ordinate for EXISTPAVEMENT = 50
EXISTPAVEMENTLAYER2
Excavation 11.98 4 4 1.00 51 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 399 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 51
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.13 2 0 0.00 399 25
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.19 2 0 0.00 399 25
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.79 8 0 0.00 399 96
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 136.92 50 0 0.00 399 569
10085+00.00 RDWYEXC
Excavation 140.89 129 129 1.00 709 Subsoil Exc 0.00 0 0 1.00 0 Fill 27.73 27 27 1.00 501 208
EXISTPAVEMENT
Excavation 11.94 11 11 1.00 61 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 501 0 Mass ordinate for EXISTPAVEMENT = 61
EXISTPAVEMENTLAYER2
Page: 10
Excavation 11.94 11 11 1.00 62 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 501 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 62
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.32 5 0 0.00 501 30
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.39 5 0 0.00 501 30
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.36 20 0 0.00 501 116
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 137.82 127 0 0.00 501 696
10085+25.00 RDWYEXC
Excavation 143.35 132 132 1.00 841 Subsoil Exc 0.00 0 0 1.00 0 Fill 27.16 25 25 1.00 608 233
EXISTPAVEMENT
Excavation 11.93 11 11 1.00 72 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 608 0 Mass ordinate for EXISTPAVEMENT = 72
EXISTPAVEMENTLAYER2
Excavation 11.94 11 11 1.00 73 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 608 0
Page: 11
Mass ordinate for EXISTPAVEMENTLAYER2 = 73
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.54 5 0 0.00 608 35
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.61 5 0 0.00 608 35
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.96 20 0 0.00 608 136
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 138.57 128 0 0.00 608 824
10085+50.00 RDWYEXC
Excavation 145.93 133 133 1.00 974 Subsoil Exc 0.00 0 0 1.00 0 Fill 25.63 24 24 1.00 717 257
EXISTPAVEMENT
Excavation 11.91 11 11 1.00 83 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 717 0 Mass ordinate for EXISTPAVEMENT = 83
EXISTPAVEMENTLAYER2
Excavation 11.92 11 11 1.00 84 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 717 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 84
LAYER1
Page: 12
Fill 5.74 5 0 0.00 717 40
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.73 5 0 0.00 717 40
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 22.54 21 0 0.00 717 157
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 139.71 129 0 0.00 717 953
10085+75.00 RDWYEXC
Excavation 144.33 134 134 1.00 1108 Subsoil Exc 0.00 0 0 1.00 0 Fill 24.45 23 23 1.00 828 280
EXISTPAVEMENT
Excavation 11.92 11 11 1.00 94 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 828 0 Mass ordinate for EXISTPAVEMENT = 94
EXISTPAVEMENTLAYER2
Excavation 11.92 11 11 1.00 95 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 828 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 95
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.95 5 0 0.00 828 45
LAYER2
Page: 13
Subsoil Exc 0.00 0 0 0.00 0 Fill 6.03 5 0 0.00 828 45
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 22.75 21 0 0.00 828 178
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 138.31 129 0 0.00 828 1082
10086+00.00 RDWYEXC
Excavation 138.99 131 131 1.00 1239 Subsoil Exc 0.00 0 0 1.00 0 Fill 36.70 28 28 1.00 931 308
EXISTPAVEMENT
Excavation 11.91 11 11 1.00 105 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 931 0 Mass ordinate for EXISTPAVEMENT = 105
EXISTPAVEMENTLAYER2
Excavation 11.92 11 11 1.00 106 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 931 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 106
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.16 6 0 0.00 931 51
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.31 6 0 0.00 931 51
Page: 14
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.20 21 0 0.00 931 199
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 140.38 129 0 0.00 931 1211
10086+15.09 RDWYEXC
Excavation 135.48 76 76 1.00 1315 Subsoil Exc 0.00 0 0 1.00 0 Fill 45.12 23 23 1.00 984 331
EXISTPAVEMENT
Excavation 11.94 7 7 1.00 112 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 984 0 Mass ordinate for EXISTPAVEMENT = 112
EXISTPAVEMENTLAYER2
Excavation 11.94 7 7 1.00 113 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 984 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 113
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.25 3 0 0.00 984 54
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.40 4 0 0.00 984 55
LAYER3
Excavation 0.00 0 0 0.00 0
Page: 15
Fill 23.50 13 0 0.00 984 212
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 140.32 78 0 0.00 984 1289
10086+25.00 RDWYEXC
Excavation 133.86 49 49 1.00 1364 Subsoil Exc 0.00 0 0 1.00 0 Fill 50.18 17 17 1.00 1016 348
EXISTPAVEMENT
Excavation 11.95 4 4 1.00 116 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1016 0 Mass ordinate for EXISTPAVEMENT = 116
EXISTPAVEMENTLAYER2
Excavation 11.94 4 4 1.00 117 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1016 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 117
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.29 2 0 0.00 1016 56
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.36 2 0 0.00 1016 57
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.44 9 0 0.00 1016 221
LAYER5
Page: 16
Fill 139.35 51 0 0.00 1016 1340
10086+50.00 RDWYEXC
Excavation 142.99 128 128 1.00 1492 Subsoil Exc 0.00 0 0 1.00 0 Fill 43.62 43 43 1.00 1101 391
EXISTPAVEMENT
Excavation 11.97 11 11 1.00 127 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1101 0 Mass ordinate for EXISTPAVEMENT = 127
EXISTPAVEMENTLAYER2
Excavation 11.96 11 11 1.00 128 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1101 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 128
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.28 6 0 0.00 1101 62
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.37 6 0 0.00 1101 63
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.34 22 0 0.00 1101 243
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 138.01 128 0 0.00 1101 1468
Page: 17
10086+75.00 RDWYEXC
Excavation 155.93 139 139 1.00 1631 Subsoil Exc 0.00 0 0 1.00 0 Fill 36.26 37 37 1.00 1203 428
EXISTPAVEMENT
Excavation 11.95 11 11 1.00 138 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1203 0 Mass ordinate for EXISTPAVEMENT = 138
EXISTPAVEMENTLAYER2
Excavation 11.97 11 11 1.00 139 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1203 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 139
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.29 6 0 0.00 1203 68
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.36 6 0 0.00 1203 69
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.30 22 0 0.00 1203 265
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 137.39 127 0 0.00 1203 1595
10087+00.00 RDWYEXC
Excavation 159.35 146 146 1.00 1777
Page: 18
Fill 33.39 32 32 1.00 1317 460
EXISTPAVEMENT
Excavation 11.97 11 11 1.00 149 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1317 0 Mass ordinate for EXISTPAVEMENT = 149
EXISTPAVEMENTLAYER2
Excavation 11.97 11 11 1.00 150 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1317 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 150
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.36 6 0 0.00 1317 74
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.52 6 0 0.00 1317 75
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.25 22 0 0.00 1317 287
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 138.88 128 0 0.00 1317 1723
10087+25.00 RDWYEXC
Excavation 164.15 150 150 1.00 1927 Subsoil Exc 0.00 0 0 1.00 0 Fill 29.15 29 29 1.00 1438 489
EXISTPAVEMENT
Excavation 12.01 11 11 1.00 160
Page: 19
Fill 0.00 0 0 1.00 1438 0 Mass ordinate for EXISTPAVEMENT = 160
EXISTPAVEMENTLAYER2
Excavation 12.01 11 11 1.00 161 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1438 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 161
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.26 6 0 0.00 1438 80
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.54 6 0 0.00 1438 81
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.21 22 0 0.00 1438 309
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 144.26 131 0 0.00 1438 1854
10087+50.00 RDWYEXC
Excavation 167.94 154 154 1.00 2081 Subsoil Exc 0.00 0 0 1.00 0 Fill 30.01 27 27 1.00 1565 516
EXISTPAVEMENT
Excavation 12.04 11 11 1.00 171 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1565 0 Mass ordinate for EXISTPAVEMENT = 171
Page: 20
Excavation 12.04 11 11 1.00 172 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1565 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 172
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.29 6 0 0.00 1565 86
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.50 6 0 0.00 1565 87
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.46 22 0 0.00 1565 331
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 141.87 132 0 0.00 1565 1986
10087+75.00 RDWYEXC
Excavation 168.56 156 156 1.00 2237 Subsoil Exc 0.00 0 0 1.00 0 Fill 29.08 27 27 1.00 1694 543
EXISTPAVEMENT
Excavation 11.90 11 11 1.00 182 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1694 0 Mass ordinate for EXISTPAVEMENT = 182
EXISTPAVEMENTLAYER2
Excavation 11.90 11 11 1.00 183
Page: 21
Fill 0.00 0 0 1.00 1694 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 183
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.29 6 0 0.00 1694 92
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.49 6 0 0.00 1694 93
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.47 22 0 0.00 1694 353
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 141.92 131 0 0.00 1694 2117
10088+00.00 RDWYEXC
Excavation 174.28 158 158 1.00 2395 Subsoil Exc 0.00 0 0 1.00 0 Fill 31.12 28 28 1.00 1824 571
EXISTPAVEMENT
Excavation 11.86 11 11 1.00 193 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1824 0 Mass ordinate for EXISTPAVEMENT = 193
EXISTPAVEMENTLAYER2
Excavation 11.86 11 11 1.00 194 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1824 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 194
LAYER1
Page: 22
Subsoil Exc 0.00 0 0 0.00 0 Fill 6.29 6 0 0.00 1824 98
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.49 6 0 0.00 1824 99
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.47 22 0 0.00 1824 375
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 157.39 139 0 0.00 1824 2256
10088+25.00 RDWYEXC
Excavation 180.52 164 164 1.00 2559 Subsoil Exc 0.00 0 0 1.00 0 Fill 34.08 30 30 1.00 1958 601
EXISTPAVEMENT
Excavation 11.92 11 11 1.00 204 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1958 0 Mass ordinate for EXISTPAVEMENT = 204
EXISTPAVEMENTLAYER2
Excavation 11.92 11 11 1.00 205 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1958 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 205
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.29 6 0 0.00 1958 104
Page: 23
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.49 6 0 0.00 1958 105
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.46 22 0 0.00 1958 397
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 164.23 149 0 0.00 1958 2405
10088+50.00 RDWYEXC
Excavation 179.48 167 167 1.00 2726 Subsoil Exc 0.00 0 0 1.00 0 Fill 42.25 35 35 1.00 2090 636
EXISTPAVEMENT
Excavation 11.99 11 11 1.00 215 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2090 0 Mass ordinate for EXISTPAVEMENT = 215
EXISTPAVEMENTLAYER2
Excavation 11.99 12 12 1.00 217 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2090 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 217
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.29 6 0 0.00 2090 110
LAYER2
Excavation 0.00 0 0 0.00 0
Page: 24
Fill 6.49 6 0 0.00 2090 111
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.47 22 0 0.00 2090 419
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 166.65 153 0 0.00 2090 2558
10088+75.00 RDWYEXC
Excavation 183.36 168 168 1.00 2894 Subsoil Exc 0.00 0 0 1.00 0 Fill 60.18 47 47 1.00 2211 683
EXISTPAVEMENT
Excavation 12.06 11 11 1.00 226 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2211 0 Mass ordinate for EXISTPAVEMENT = 226
EXISTPAVEMENTLAYER2
Excavation 12.05 11 11 1.00 228 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2211 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 228
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.29 6 0 0.00 2211 116
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.49 6 0 0.00 2211 117
LAYER3
Page: 25
Fill 23.47 22 0 0.00 2211 441
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 176.87 159 0 0.00 2211 2717
10089+00.00 RDWYEXC
Excavation 190.86 174 174 1.00 3068 Subsoil Exc 0.00 0 0 1.00 0 Fill 93.90 71 71 1.00 2314 754
EXISTPAVEMENT
Excavation 12.11 11 11 1.00 237 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2314 0 Mass ordinate for EXISTPAVEMENT = 237
EXISTPAVEMENTLAYER2
Excavation 12.11 11 11 1.00 239 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2314 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 239
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.29 6 0 0.00 2314 122
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.49 6 0 0.00 2314 123
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.47 22 0 0.00 2314 463
Page: 26
Subsoil Exc 0.00 0 0 0.00 0 Fill 187.52 169 0 0.00 2314 2886
10089+25.00 RDWYEXC
Excavation 200.52 181 181 1.00 3249 Subsoil Exc 0.00 0 0 1.00 0 Fill 68.11 75 75 1.00 2420 829
EXISTPAVEMENT
Excavation 12.06 11 11 1.00 248 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2420 0 Mass ordinate for EXISTPAVEMENT = 248
EXISTPAVEMENTLAYER2
Excavation 12.06 11 11 1.00 250 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2420 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 250
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.29 6 0 0.00 2420 128
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.49 6 0 0.00 2420 129
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.47 22 0 0.00 2420 485
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 141.99 153 0 0.00 2420 3039
Page: 27
10089+25.36 RDWYEXC
Excavation 200.63 3 3 1.00 3252 Subsoil Exc 0.00 0 0 1.00 0 Fill 66.90 1 1 1.00 2422 830
EXISTPAVEMENT
Excavation 12.06 0 0 1.00 248 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2422 0 Mass ordinate for EXISTPAVEMENT = 248
EXISTPAVEMENTLAYER2
Excavation 12.06 0 0 1.00 250 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2422 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 250
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.29 0 0 0.00 2422 128
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.49 0 0 0.00 2422 129
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.47 0 0 0.00 2422 485
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 141.99 2 0 0.00 2422 3041
10089+50.00 RDWYEXC
Excavation 283.48 221 221 1.00 3473
Page: 28
Fill 0.00 31 31 1.00 2612 861
EXISTPAVEMENT
Excavation 12.16 11 11 1.00 259 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2612 0 Mass ordinate for EXISTPAVEMENT = 259
EXISTPAVEMENTLAYER2
Excavation 12.16 11 11 1.00 261 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2612 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 261
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.35 6 0 0.00 2612 134
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.55 6 0 0.00 2612 135
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.63 21 0 0.00 2612 506
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 115.82 118 0 0.00 2612 3159
10089+75.00 RDWYEXC
Excavation 251.48 247 247 1.00 3720 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2859 861
Page: 29
Excavation 12.82 12 12 1.00 271 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2859 0 Mass ordinate for EXISTPAVEMENT = 271
EXISTPAVEMENTLAYER2
Excavation 12.82 12 12 1.00 273 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2859 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 273
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.41 6 0 0.00 2859 140
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.61 6 0 0.00 2859 141
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.80 22 0 0.00 2859 528
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 143.67 120 0 0.00 2859 3279
10090+00.00 RDWYEXC
Excavation 259.04 236 236 1.00 3956 Subsoil Exc 0.00 0 0 1.00 0 Fill 29.28 14 14 1.00 3081 875
EXISTPAVEMENT
Excavation 12.78 12 12 1.00 283 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3081 0
Page: 30
Mass ordinate for EXISTPAVEMENT = 283
EXISTPAVEMENTLAYER2
Excavation 12.78 12 12 1.00 285 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3081 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 285
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.46 6 0 0.00 3081 146
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.54 6 0 0.00 3081 147
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 42.87 31 0 0.00 3081 559
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 144.52 133 0 0.00 3081 3412
10090+01.48 RDWYEXC
Excavation 260.62 15 15 1.00 3971 Subsoil Exc 0.00 0 0 1.00 0 Fill 35.36 2 2 1.00 3094 877
EXISTPAVEMENT
Excavation 12.78 1 1 1.00 284 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3094 0 Mass ordinate for EXISTPAVEMENT = 284
EXISTPAVEMENTLAYER2
Excavation 12.78 1 1 1.00 286
Page: 31
Fill 0.00 0 0 1.00 3094 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 286
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.47 0 0 0.00 3094 146
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.55 0 0 0.00 3094 147
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 45.82 2 0 0.00 3094 561
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 152.08 8 0 0.00 3094 3420
10090+25.00 RDWYEXC
Excavation 264.38 228 228 1.00 4199 Subsoil Exc 0.00 0 0 1.00 0 Fill 25.72 27 27 1.00 3295 904
EXISTPAVEMENT
Excavation 12.82 11 11 1.00 295 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3295 0 Mass ordinate for EXISTPAVEMENT = 295
EXISTPAVEMENTLAYER2
Excavation 12.82 11 11 1.00 297 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3295 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 297
Page: 32
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.78 6 0 0.00 3295 152
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.99 6 0 0.00 3295 153
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 27.36 32 0 0.00 3295 593
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 157.04 135 0 0.00 3295 3555
10090+39.52 RDWYEXC
Excavation 261.22 141 141 1.00 4340 Subsoil Exc 0.00 0 0 1.00 0 Fill 44.29 19 19 1.00 3417 923
EXISTPAVEMENT
Excavation 12.74 7 7 1.00 302 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3417 0 Mass ordinate for EXISTPAVEMENT = 302
EXISTPAVEMENTLAYER2
Excavation 12.73 7 7 1.00 304 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3417 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 304
LAYER1
Excavation 0.00 0 0 0.00 0
Page: 33
Fill 6.97 4 0 0.00 3417 156
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.18 4 0 0.00 3417 157
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 27.91 15 0 0.00 3417 608
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 160.00 85 0 0.00 3417 3640
10090+39.77 RDWYEXC
Excavation 263.04 2 2 1.00 4342 Subsoil Exc 0.00 0 0 1.00 0 Fill 82.89 1 1 1.00 3418 924
EXISTPAVEMENT
Excavation 12.73 0 0 1.00 302 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3418 0 Mass ordinate for EXISTPAVEMENT = 302
EXISTPAVEMENTLAYER2
Excavation 12.73 0 0 1.00 304 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3418 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 304
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.34 0 0 0.00 3418 156
LAYER2
Page: 34
Fill 8.63 0 0 0.00 3418 157
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 26.93 0 0 0.00 3418 608
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 196.06 2 0 0.00 3418 3642
10090+50.00 RDWYEXC
Excavation 235.18 94 94 1.00 4436 Subsoil Exc 0.00 0 0 1.00 0 Fill 77.42 30 30 1.00 3482 954
EXISTPAVEMENT
Excavation 12.46 5 5 1.00 307 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3482 0 Mass ordinate for EXISTPAVEMENT = 307
EXISTPAVEMENTLAYER2
Excavation 12.46 5 5 1.00 309 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3482 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 309
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.69 3 0 0.00 3482 159
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.98 3 0 0.00 3482 160
Page: 35
Subsoil Exc 0.00 0 0 0.00 0 Fill 25.08 10 0 0.00 3482 618
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 172.75 70 0 0.00 3482 3712
10090+51.70 RDWYEXC
Excavation 232.80 15 15 1.00 4451 Subsoil Exc 0.00 0 0 1.00 0 Fill 75.97 5 5 1.00 3492 959
EXISTPAVEMENT
Excavation 12.42 1 1 1.00 308 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3492 0 Mass ordinate for EXISTPAVEMENT = 308
EXISTPAVEMENTLAYER2
Excavation 12.41 1 1 1.00 310 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3492 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 310
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.58 0 0 0.00 3492 159
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.88 0 0 0.00 3492 160
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 24.77 2 0 0.00 3492 620
Page: 36
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 171.12 11 0 0.00 3492 3723
10090+69.70 RDWYEXC
Excavation 208.42 147 147 1.00 4598 Subsoil Exc 0.00 0 0 1.00 0 Fill 50.62 42 42 1.00 3597 1001
EXISTPAVEMENT
Excavation 11.95 8 8 1.00 316 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3597 0 Mass ordinate for EXISTPAVEMENT = 316
EXISTPAVEMENTLAYER2
Excavation 11.95 8 8 1.00 318 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3597 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 318
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.55 5 0 0.00 3597 164
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.85 5 0 0.00 3597 165
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.83 16 0 0.00 3597 636
LAYER5
Excavation 0.00 0 0 0.00 0
Page: 37
Fill 155.87 109 0 0.00 3597 3832
10090+75.00 RDWYEXC
Excavation 206.41 40 40 1.00 4638 Subsoil Exc 0.00 0 0 1.00 0 Fill 46.21 10 10 1.00 3627 1011
EXISTPAVEMENT
Excavation 11.97 2 2 1.00 318 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3627 0 Mass ordinate for EXISTPAVEMENT = 318
EXISTPAVEMENTLAYER2
Excavation 11.98 2 2 1.00 320 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3627 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 320
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.62 1 0 0.00 3627 165
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.92 1 0 0.00 3627 166
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 22.00 4 0 0.00 3627 640
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 156.85 31 0 0.00 3627 3863
10091+00.00 RDWYEXC
Page: 38
Excavation 199.53 188 188 1.00 4826 Subsoil Exc 0.00 0 0 1.00 0 Fill 31.18 36 36 1.00 3779 1047
EXISTPAVEMENT
Excavation 11.98 11 11 1.00 329 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3779 0 Mass ordinate for EXISTPAVEMENT = 329
EXISTPAVEMENTLAYER2
Excavation 11.98 12 12 1.00 332 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3779 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 332
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.94 6 0 0.00 3779 171
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.08 6 0 0.00 3779 172
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 22.97 21 0 0.00 3779 661
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 160.16 147 0 0.00 3779 4010
10091+25.00 RDWYEXC
Excavation 170.41 172 172 1.00 4998 Subsoil Exc 0.00 0 0 1.00 0 Fill 28.79 28 28 1.00 3923 1075
Page: 39
Excavation 11.97 11 11 1.00 340 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3923 0 Mass ordinate for EXISTPAVEMENT = 340
EXISTPAVEMENTLAYER2
Excavation 11.97 11 11 1.00 343 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3923 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 343
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.24 7 0 0.00 3923 178
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.39 7 0 0.00 3923 179
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.84 22 0 0.00 3923 683
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 164.31 150 0 0.00 3923 4160
10091+50.00 RDWYEXC
Excavation 147.69 147 147 1.00 5145 Subsoil Exc 0.00 0 0 1.00 0 Fill 34.52 29 29 1.00 4041 1104
EXISTPAVEMENT
Excavation 11.96 11 11 1.00 351
Page: 40
Fill 0.00 0 0 1.00 4041 0 Mass ordinate for EXISTPAVEMENT = 351
EXISTPAVEMENTLAYER2
Excavation 11.97 12 12 1.00 355 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 4041 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 355
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.55 7 0 0.00 4041 185
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.74 7 0 0.00 4041 186
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 24.75 22 0 0.00 4041 705
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 169.91 155 0 0.00 4041 4315
10091+51.70 RDWYEXC
Excavation 146.11 9 9 1.00 5154 Subsoil Exc 0.00 0 0 1.00 0 Fill 35.16 2 2 1.00 4048 1106
EXISTPAVEMENT
Excavation 11.97 0 0 1.00 351 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 4048 0 Mass ordinate for EXISTPAVEMENT = 351
Page: 41
Excavation 11.97 0 0 1.00 355 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 4048 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 355
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.57 0 0 0.00 4048 185
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.77 0 0 0.00 4048 186
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 24.81 2 0 0.00 4048 707
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 170.29 11 0 0.00 4048 4326
10091+75.00 RDWYEXC
Excavation 99.34 106 106 1.00 5260 Subsoil Exc 0.00 0 0 1.00 0 Fill 92.97 55 55 1.00 4099 1161
EXISTPAVEMENT
Excavation 11.97 10 10 1.00 361 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 4099 0 Mass ordinate for EXISTPAVEMENT = 361
EXISTPAVEMENTLAYER2
Excavation 11.96 11 11 1.00 366 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 4099 0
Page: 42
Mass ordinate for EXISTPAVEMENTLAYER2 = 366
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.57 7 0 0.00 4099 192
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.72 7 0 0.00 4099 193
LAYER3
S