AKDOT135(5)_Mainline_Final_Earthwork.pdf

PDF 471 KB Posted

Attached to
AK DOT 135(5), Glenn Highway Rehabilitation West Chickaloon Grade Section: MP 77. 4 to 78. 2
Solicitation number
DTFH7016B00007
Issued by

About this file

AKDOT135(5)_Mainline Final Earthwork

View the file

Other files

File Type Posted
BidSum_Chickaloon.pdf PDF
Q&A_5-3-17.pdf PDF
Q&A_5-2-17.pdf PDF
A002_Chickaloon.pdf PDF
AKDOT135(5)_Proposed_Surface_For_Information_Only.xml XML file
ak-13505_3-D_Break_Lines_For_Information_Only.dgn —
AKDOT135(5)_Approach_Road.xml XML file
A001_Chickaloon.pdf PDF
AKDOT135(5)_Mainline.xml XML file
AKDOT135(2)_Additional_Cut_in_Hillside_(Contract_Mod).pdf PDF
AKDOT135(5)_NCHBRD_XS_Final.pdf PDF
IFB_Chickaloon.pdf PDF
AKDOT135(2)_05-04-2016_Design_Contract_Modification_Sheets.pdf PDF
Geo_Rpt_17-15_Glenn_Highway_MP_77-79_Signed_Final_Report.pdf PDF
AKDOT135(2)_Contract_Modification_J-Sheets.pdf PDF
Observations_During_AKDOT135(2)_Project_on_Previous_Fuel_Spill_(For_Info_Only).pdf PDF
Glenn_Highway_Pavement_Evaluation_COMPLETE_REPORT.pdf PDF
Redlines_AKDOT135(2)Plans_With_Updates1.pdf PDF
AKDOT135(5)_Earthwork_Geopak_Fill_and_Select_Borrow_Correction.pdf PDF
GR01-16_Glenn_Highway_West_Chickaloon_Grade.pdf PDF
AKDOT135(5)_NCHBRD_Final_Earthwork.pdf PDF
ADL_232406_DNR_Parcel_1.pdf PDF
Phase_II_ESA_-_Release_Investigation.pdf PDF
FINAL_GR07-14_Chickaloon_River_Bridge_Foundation_Report.pdf PDF
AKDOT135(5)_Mainline_XS_Final_With_Subsurface_Data_FOR_INFORMATION_ONLY_PHYSICAL_DATA.pdf PDF
(12170)_55967_Reconstruction_-_Kings_River_to_Chickaloon_River.pdf PDF
AKDOT135(2)_Final_Excavation_Near_Old_N._Abutment_(For_Info_Only,_does_not_affect_(5)).pdf PDF
AKDOT135(5)_Plans_Final.pdf PDF
AKDOT135(5)_Mainline_XS_Final.pdf PDF
Plan_Request_for__Chickaloon.pdf PDF
SWPPP_AK_DOT_135(5),_Glenn_Highway_West_Chickaloon_Grade.pdf PDF
FINAL_GR10-14_Glenn_Highway_Preliminary_Geotechnical_Recommendations_Report_2014_12_19.pdf PDF
AKDOT135(2)_CM_Approach_Cross_Section_Sheets.pdf PDF
AKDOT135(2)_AWARDEDPlans.pdf PDF
Glenn_Hwy_Initial_Memo_7-9-14.pdf PDF
AKDOT135(2)_CM_Mainline_Cross_Section_Sheets.pdf PDF
PROJECT_DESCRIPTION_Chickaloon_revised.pdf PDF
PROJECT_DESCRIPTION_Chickaloon.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEDERAL HIGHWAY ADMINISTRATION

PROJECT

AK DOT 135(5)

GLENN HIGHWAY REHABILITATION

WEST CHICKALOON GRADE SECTION:

MP 77.4 TO 78.2

GLENN HIGHWAY MAINLINE EARTHWORK

10083+60.00 TO 10126+63.50

ALASKA DEPARTMENT OF TRANSPORTATION

AND PUBLIC FACILITIES

MATANUSKA-SUSITNA BOROUGH, ALASKA

File: c:\myfiles\pw_production\d0269796\Mainline Final Earthwork.log 5/9/2016, 4:31:14 PM

Input File: pw:\Alaska\Glenn_Highway\AK_DOT_135(5)\Development\CADD\Design\Mainline Final Earthwork_input unedited.inp Output File: Mainline Final Earthwork.log

COMPUTING EARTHWORKS FOR BASELINE = GLENN

COMPUTING EARTHWORKS FOR JOB = 055

FORMING LIST OF XSCELLS

BEGINNING EARTHWORKS COMPUTATION

Page: 1

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)

10083+50.00 RDWYEXC

Excavation 10.78 9 9 1.00 9 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 9 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.62 1 0 0.00 9 1

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.67 1 0 0.00 9 1

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.92 4 0 0.00 9 4

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.52 4 0 0.00 9 4

10083+59.75 RDWYEXC

Excavation 38.75 9 9 1.00 18 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 18 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Page: 2

Fill 1.63 1 0 0.00 18 2

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.69 1 0 0.00 18 2

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.03 2 0 0.00 18 6

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 32.82 7 0 0.00 18 11

10083+60.00 RDWYEXC

Excavation 128.18 1 1 1.00 19 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.49 0 0 1.00 19 0

EXISTPAVEMENT

Excavation 11.95 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 19 0 Mass ordinate for EXISTPAVEMENT = 0

EXISTPAVEMENTLAYER2

Excavation 11.94 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 19 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.45 0 0 0.00 19 2

LAYER2

Excavation 0.00 0 0 0.00 0

Page: 3

Fill 5.53 0 0 0.00 19 2

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.76 0 0 0.00 19 6

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 126.88 1 0 0.00 19 12

10083+75.00 RDWYEXC

Excavation 128.08 71 71 1.00 90 Subsoil Exc 0.00 0 0 1.00 0 Fill 34.12 12 12 1.00 78 12

EXISTPAVEMENT

Excavation 11.95 7 7 1.00 7 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 78 0 Mass ordinate for EXISTPAVEMENT = 7

EXISTPAVEMENTLAYER2

Excavation 11.94 7 7 1.00 7 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 78 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 7

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.33 3 0 0.00 78 5

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.40 3 0 0.00 78 5

LAYER3

Page: 4

Subsoil Exc 0.00 0 0 0.00 0 Fill 22.78 13 0 0.00 78 19

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 128.77 71 0 0.00 78 83

10084+00.00 RDWYEXC

Excavation 129.84 120 120 1.00 210 Subsoil Exc 0.00 0 0 1.00 0 Fill 52.09 40 40 1.00 158 52

EXISTPAVEMENT

Excavation 11.95 11 11 1.00 18 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 158 0 Mass ordinate for EXISTPAVEMENT = 18

EXISTPAVEMENTLAYER2

Excavation 11.95 11 11 1.00 18 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 158 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 18

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.12 5 0 0.00 158 10

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.19 5 0 0.00 158 10

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.21 20 0 0.00 158 39

Page: 5

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 127.01 118 0 0.00 158 201

10084+10.00 RDWYEXC

Excavation 130.41 49 49 1.00 259 Subsoil Exc 0.00 0 0 1.00 0 Fill 61.03 21 21 1.00 186 73

EXISTPAVEMENT

Excavation 11.96 4 4 1.00 22 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 186 0 Mass ordinate for EXISTPAVEMENT = 22

EXISTPAVEMENTLAYER2

Excavation 11.97 4 4 1.00 22 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 186 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 22

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.04 2 0 0.00 186 12

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 2 0 0.00 186 12

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.56 8 0 0.00 186 47

LAYER5

Excavation 0.00 0 0 0.00 0

Page: 6

Fill 132.14 48 0 0.00 186 249

10084+25.00 RDWYEXC

Excavation 131.74 73 73 1.00 332 Subsoil Exc 0.00 0 0 1.00 0 Fill 56.13 33 33 1.00 226 106

EXISTPAVEMENT

Excavation 11.98 7 7 1.00 29 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 226 0 Mass ordinate for EXISTPAVEMENT = 29

EXISTPAVEMENTLAYER2

Excavation 11.98 7 7 1.00 29 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 226 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 29

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.04 3 0 0.00 226 15

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 3 0 0.00 226 15

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.57 11 0 0.00 226 58

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 132.96 74 0 0.00 226 323

10084+50.00 RDWYEXC

Page: 7

Excavation 134.16 123 123 1.00 455 Subsoil Exc 0.00 0 0 1.00 0 Fill 39.13 44 44 1.00 305 150

EXISTPAVEMENT

Excavation 12.01 11 11 1.00 40 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 305 0 Mass ordinate for EXISTPAVEMENT = 40

EXISTPAVEMENTLAYER2

Excavation 12.00 11 11 1.00 40 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 305 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 40

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.05 5 0 0.00 305 20

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 5 0 0.00 305 20

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.55 19 0 0.00 305 77

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 130.48 122 0 0.00 305 445

10084+65.09 RDWYEXC

Excavation 135.75 75 75 1.00 530 Subsoil Exc 0.00 0 0 1.00 0 Fill 31.42 20 20 1.00 360 170

Page: 8

EXISTPAVEMENT

Excavation 11.99 6 6 1.00 46 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 360 0 Mass ordinate for EXISTPAVEMENT = 46

EXISTPAVEMENTLAYER2

Excavation 11.99 7 7 1.00 47 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 360 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 47

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.06 3 0 0.00 360 23

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 3 0 0.00 360 23

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.54 11 0 0.00 360 88

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 135.36 74 0 0.00 360 519

10084+75.00 RDWYEXC

Excavation 137.93 50 50 1.00 580 Subsoil Exc 0.00 0 0 1.00 0 Fill 30.12 11 11 1.00 399 181

EXISTPAVEMENT

Excavation 11.98 4 4 1.00 50 Subsoil Exc 0.00 0 0 1.00 0

Page: 9

Fill 0.00 0 0 1.00 399 0 Mass ordinate for EXISTPAVEMENT = 50

EXISTPAVEMENTLAYER2

Excavation 11.98 4 4 1.00 51 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 399 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 51

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.13 2 0 0.00 399 25

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.19 2 0 0.00 399 25

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.79 8 0 0.00 399 96

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 136.92 50 0 0.00 399 569

10085+00.00 RDWYEXC

Excavation 140.89 129 129 1.00 709 Subsoil Exc 0.00 0 0 1.00 0 Fill 27.73 27 27 1.00 501 208

EXISTPAVEMENT

Excavation 11.94 11 11 1.00 61 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 501 0 Mass ordinate for EXISTPAVEMENT = 61

EXISTPAVEMENTLAYER2

Page: 10

Excavation 11.94 11 11 1.00 62 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 501 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 62

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.32 5 0 0.00 501 30

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.39 5 0 0.00 501 30

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.36 20 0 0.00 501 116

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 137.82 127 0 0.00 501 696

10085+25.00 RDWYEXC

Excavation 143.35 132 132 1.00 841 Subsoil Exc 0.00 0 0 1.00 0 Fill 27.16 25 25 1.00 608 233

EXISTPAVEMENT

Excavation 11.93 11 11 1.00 72 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 608 0 Mass ordinate for EXISTPAVEMENT = 72

EXISTPAVEMENTLAYER2

Excavation 11.94 11 11 1.00 73 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 608 0

Page: 11

Mass ordinate for EXISTPAVEMENTLAYER2 = 73

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.54 5 0 0.00 608 35

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.61 5 0 0.00 608 35

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.96 20 0 0.00 608 136

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 138.57 128 0 0.00 608 824

10085+50.00 RDWYEXC

Excavation 145.93 133 133 1.00 974 Subsoil Exc 0.00 0 0 1.00 0 Fill 25.63 24 24 1.00 717 257

EXISTPAVEMENT

Excavation 11.91 11 11 1.00 83 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 717 0 Mass ordinate for EXISTPAVEMENT = 83

EXISTPAVEMENTLAYER2

Excavation 11.92 11 11 1.00 84 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 717 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 84

LAYER1

Page: 12

Fill 5.74 5 0 0.00 717 40

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.73 5 0 0.00 717 40

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 22.54 21 0 0.00 717 157

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 139.71 129 0 0.00 717 953

10085+75.00 RDWYEXC

Excavation 144.33 134 134 1.00 1108 Subsoil Exc 0.00 0 0 1.00 0 Fill 24.45 23 23 1.00 828 280

EXISTPAVEMENT

Excavation 11.92 11 11 1.00 94 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 828 0 Mass ordinate for EXISTPAVEMENT = 94

EXISTPAVEMENTLAYER2

Excavation 11.92 11 11 1.00 95 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 828 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 95

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.95 5 0 0.00 828 45

LAYER2

Page: 13

Subsoil Exc 0.00 0 0 0.00 0 Fill 6.03 5 0 0.00 828 45

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 22.75 21 0 0.00 828 178

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 138.31 129 0 0.00 828 1082

10086+00.00 RDWYEXC

Excavation 138.99 131 131 1.00 1239 Subsoil Exc 0.00 0 0 1.00 0 Fill 36.70 28 28 1.00 931 308

EXISTPAVEMENT

Excavation 11.91 11 11 1.00 105 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 931 0 Mass ordinate for EXISTPAVEMENT = 105

EXISTPAVEMENTLAYER2

Excavation 11.92 11 11 1.00 106 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 931 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 106

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.16 6 0 0.00 931 51

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.31 6 0 0.00 931 51

Page: 14

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.20 21 0 0.00 931 199

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 140.38 129 0 0.00 931 1211

10086+15.09 RDWYEXC

Excavation 135.48 76 76 1.00 1315 Subsoil Exc 0.00 0 0 1.00 0 Fill 45.12 23 23 1.00 984 331

EXISTPAVEMENT

Excavation 11.94 7 7 1.00 112 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 984 0 Mass ordinate for EXISTPAVEMENT = 112

EXISTPAVEMENTLAYER2

Excavation 11.94 7 7 1.00 113 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 984 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 113

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.25 3 0 0.00 984 54

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.40 4 0 0.00 984 55

LAYER3

Excavation 0.00 0 0 0.00 0

Page: 15

Fill 23.50 13 0 0.00 984 212

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 140.32 78 0 0.00 984 1289

10086+25.00 RDWYEXC

Excavation 133.86 49 49 1.00 1364 Subsoil Exc 0.00 0 0 1.00 0 Fill 50.18 17 17 1.00 1016 348

EXISTPAVEMENT

Excavation 11.95 4 4 1.00 116 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1016 0 Mass ordinate for EXISTPAVEMENT = 116

EXISTPAVEMENTLAYER2

Excavation 11.94 4 4 1.00 117 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1016 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 117

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.29 2 0 0.00 1016 56

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.36 2 0 0.00 1016 57

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.44 9 0 0.00 1016 221

LAYER5

Page: 16

Fill 139.35 51 0 0.00 1016 1340

10086+50.00 RDWYEXC

Excavation 142.99 128 128 1.00 1492 Subsoil Exc 0.00 0 0 1.00 0 Fill 43.62 43 43 1.00 1101 391

EXISTPAVEMENT

Excavation 11.97 11 11 1.00 127 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1101 0 Mass ordinate for EXISTPAVEMENT = 127

EXISTPAVEMENTLAYER2

Excavation 11.96 11 11 1.00 128 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1101 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 128

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.28 6 0 0.00 1101 62

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.37 6 0 0.00 1101 63

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.34 22 0 0.00 1101 243

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 138.01 128 0 0.00 1101 1468

Page: 17

10086+75.00 RDWYEXC

Excavation 155.93 139 139 1.00 1631 Subsoil Exc 0.00 0 0 1.00 0 Fill 36.26 37 37 1.00 1203 428

EXISTPAVEMENT

Excavation 11.95 11 11 1.00 138 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1203 0 Mass ordinate for EXISTPAVEMENT = 138

EXISTPAVEMENTLAYER2

Excavation 11.97 11 11 1.00 139 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1203 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 139

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.29 6 0 0.00 1203 68

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.36 6 0 0.00 1203 69

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.30 22 0 0.00 1203 265

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 137.39 127 0 0.00 1203 1595

10087+00.00 RDWYEXC

Excavation 159.35 146 146 1.00 1777

Page: 18

Fill 33.39 32 32 1.00 1317 460

EXISTPAVEMENT

Excavation 11.97 11 11 1.00 149 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1317 0 Mass ordinate for EXISTPAVEMENT = 149

EXISTPAVEMENTLAYER2

Excavation 11.97 11 11 1.00 150 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1317 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 150

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.36 6 0 0.00 1317 74

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.52 6 0 0.00 1317 75

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.25 22 0 0.00 1317 287

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 138.88 128 0 0.00 1317 1723

10087+25.00 RDWYEXC

Excavation 164.15 150 150 1.00 1927 Subsoil Exc 0.00 0 0 1.00 0 Fill 29.15 29 29 1.00 1438 489

EXISTPAVEMENT

Excavation 12.01 11 11 1.00 160

Page: 19

Fill 0.00 0 0 1.00 1438 0 Mass ordinate for EXISTPAVEMENT = 160

EXISTPAVEMENTLAYER2

Excavation 12.01 11 11 1.00 161 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1438 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 161

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.26 6 0 0.00 1438 80

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.54 6 0 0.00 1438 81

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.21 22 0 0.00 1438 309

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 144.26 131 0 0.00 1438 1854

10087+50.00 RDWYEXC

Excavation 167.94 154 154 1.00 2081 Subsoil Exc 0.00 0 0 1.00 0 Fill 30.01 27 27 1.00 1565 516

EXISTPAVEMENT

Excavation 12.04 11 11 1.00 171 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1565 0 Mass ordinate for EXISTPAVEMENT = 171

Page: 20

Excavation 12.04 11 11 1.00 172 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1565 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 172

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.29 6 0 0.00 1565 86

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.50 6 0 0.00 1565 87

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.46 22 0 0.00 1565 331

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 141.87 132 0 0.00 1565 1986

10087+75.00 RDWYEXC

Excavation 168.56 156 156 1.00 2237 Subsoil Exc 0.00 0 0 1.00 0 Fill 29.08 27 27 1.00 1694 543

EXISTPAVEMENT

Excavation 11.90 11 11 1.00 182 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1694 0 Mass ordinate for EXISTPAVEMENT = 182

EXISTPAVEMENTLAYER2

Excavation 11.90 11 11 1.00 183

Page: 21

Fill 0.00 0 0 1.00 1694 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 183

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.29 6 0 0.00 1694 92

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.49 6 0 0.00 1694 93

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.47 22 0 0.00 1694 353

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 141.92 131 0 0.00 1694 2117

10088+00.00 RDWYEXC

Excavation 174.28 158 158 1.00 2395 Subsoil Exc 0.00 0 0 1.00 0 Fill 31.12 28 28 1.00 1824 571

EXISTPAVEMENT

Excavation 11.86 11 11 1.00 193 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1824 0 Mass ordinate for EXISTPAVEMENT = 193

EXISTPAVEMENTLAYER2

Excavation 11.86 11 11 1.00 194 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1824 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 194

LAYER1

Page: 22

Subsoil Exc 0.00 0 0 0.00 0 Fill 6.29 6 0 0.00 1824 98

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.49 6 0 0.00 1824 99

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.47 22 0 0.00 1824 375

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 157.39 139 0 0.00 1824 2256

10088+25.00 RDWYEXC

Excavation 180.52 164 164 1.00 2559 Subsoil Exc 0.00 0 0 1.00 0 Fill 34.08 30 30 1.00 1958 601

EXISTPAVEMENT

Excavation 11.92 11 11 1.00 204 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1958 0 Mass ordinate for EXISTPAVEMENT = 204

EXISTPAVEMENTLAYER2

Excavation 11.92 11 11 1.00 205 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 1958 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 205

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.29 6 0 0.00 1958 104

Page: 23

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.49 6 0 0.00 1958 105

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.46 22 0 0.00 1958 397

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 164.23 149 0 0.00 1958 2405

10088+50.00 RDWYEXC

Excavation 179.48 167 167 1.00 2726 Subsoil Exc 0.00 0 0 1.00 0 Fill 42.25 35 35 1.00 2090 636

EXISTPAVEMENT

Excavation 11.99 11 11 1.00 215 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2090 0 Mass ordinate for EXISTPAVEMENT = 215

EXISTPAVEMENTLAYER2

Excavation 11.99 12 12 1.00 217 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2090 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 217

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.29 6 0 0.00 2090 110

LAYER2

Excavation 0.00 0 0 0.00 0

Page: 24

Fill 6.49 6 0 0.00 2090 111

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.47 22 0 0.00 2090 419

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 166.65 153 0 0.00 2090 2558

10088+75.00 RDWYEXC

Excavation 183.36 168 168 1.00 2894 Subsoil Exc 0.00 0 0 1.00 0 Fill 60.18 47 47 1.00 2211 683

EXISTPAVEMENT

Excavation 12.06 11 11 1.00 226 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2211 0 Mass ordinate for EXISTPAVEMENT = 226

EXISTPAVEMENTLAYER2

Excavation 12.05 11 11 1.00 228 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2211 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 228

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.29 6 0 0.00 2211 116

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.49 6 0 0.00 2211 117

LAYER3

Page: 25

Fill 23.47 22 0 0.00 2211 441

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 176.87 159 0 0.00 2211 2717

10089+00.00 RDWYEXC

Excavation 190.86 174 174 1.00 3068 Subsoil Exc 0.00 0 0 1.00 0 Fill 93.90 71 71 1.00 2314 754

EXISTPAVEMENT

Excavation 12.11 11 11 1.00 237 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2314 0 Mass ordinate for EXISTPAVEMENT = 237

EXISTPAVEMENTLAYER2

Excavation 12.11 11 11 1.00 239 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2314 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 239

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.29 6 0 0.00 2314 122

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.49 6 0 0.00 2314 123

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.47 22 0 0.00 2314 463

Page: 26

Subsoil Exc 0.00 0 0 0.00 0 Fill 187.52 169 0 0.00 2314 2886

10089+25.00 RDWYEXC

Excavation 200.52 181 181 1.00 3249 Subsoil Exc 0.00 0 0 1.00 0 Fill 68.11 75 75 1.00 2420 829

EXISTPAVEMENT

Excavation 12.06 11 11 1.00 248 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2420 0 Mass ordinate for EXISTPAVEMENT = 248

EXISTPAVEMENTLAYER2

Excavation 12.06 11 11 1.00 250 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2420 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 250

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.29 6 0 0.00 2420 128

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.49 6 0 0.00 2420 129

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.47 22 0 0.00 2420 485

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 141.99 153 0 0.00 2420 3039

Page: 27

10089+25.36 RDWYEXC

Excavation 200.63 3 3 1.00 3252 Subsoil Exc 0.00 0 0 1.00 0 Fill 66.90 1 1 1.00 2422 830

EXISTPAVEMENT

Excavation 12.06 0 0 1.00 248 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2422 0 Mass ordinate for EXISTPAVEMENT = 248

EXISTPAVEMENTLAYER2

Excavation 12.06 0 0 1.00 250 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2422 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 250

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.29 0 0 0.00 2422 128

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.49 0 0 0.00 2422 129

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.47 0 0 0.00 2422 485

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 141.99 2 0 0.00 2422 3041

10089+50.00 RDWYEXC

Excavation 283.48 221 221 1.00 3473

Page: 28

Fill 0.00 31 31 1.00 2612 861

EXISTPAVEMENT

Excavation 12.16 11 11 1.00 259 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2612 0 Mass ordinate for EXISTPAVEMENT = 259

EXISTPAVEMENTLAYER2

Excavation 12.16 11 11 1.00 261 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2612 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 261

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.35 6 0 0.00 2612 134

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.55 6 0 0.00 2612 135

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.63 21 0 0.00 2612 506

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 115.82 118 0 0.00 2612 3159

10089+75.00 RDWYEXC

Excavation 251.48 247 247 1.00 3720 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2859 861

Page: 29

Excavation 12.82 12 12 1.00 271 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2859 0 Mass ordinate for EXISTPAVEMENT = 271

EXISTPAVEMENTLAYER2

Excavation 12.82 12 12 1.00 273 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 2859 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 273

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.41 6 0 0.00 2859 140

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.61 6 0 0.00 2859 141

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.80 22 0 0.00 2859 528

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 143.67 120 0 0.00 2859 3279

10090+00.00 RDWYEXC

Excavation 259.04 236 236 1.00 3956 Subsoil Exc 0.00 0 0 1.00 0 Fill 29.28 14 14 1.00 3081 875

EXISTPAVEMENT

Excavation 12.78 12 12 1.00 283 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3081 0

Page: 30

Mass ordinate for EXISTPAVEMENT = 283

EXISTPAVEMENTLAYER2

Excavation 12.78 12 12 1.00 285 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3081 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 285

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.46 6 0 0.00 3081 146

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.54 6 0 0.00 3081 147

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 42.87 31 0 0.00 3081 559

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 144.52 133 0 0.00 3081 3412

10090+01.48 RDWYEXC

Excavation 260.62 15 15 1.00 3971 Subsoil Exc 0.00 0 0 1.00 0 Fill 35.36 2 2 1.00 3094 877

EXISTPAVEMENT

Excavation 12.78 1 1 1.00 284 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3094 0 Mass ordinate for EXISTPAVEMENT = 284

EXISTPAVEMENTLAYER2

Excavation 12.78 1 1 1.00 286

Page: 31

Fill 0.00 0 0 1.00 3094 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 286

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.47 0 0 0.00 3094 146

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.55 0 0 0.00 3094 147

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 45.82 2 0 0.00 3094 561

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 152.08 8 0 0.00 3094 3420

10090+25.00 RDWYEXC

Excavation 264.38 228 228 1.00 4199 Subsoil Exc 0.00 0 0 1.00 0 Fill 25.72 27 27 1.00 3295 904

EXISTPAVEMENT

Excavation 12.82 11 11 1.00 295 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3295 0 Mass ordinate for EXISTPAVEMENT = 295

EXISTPAVEMENTLAYER2

Excavation 12.82 11 11 1.00 297 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3295 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 297

Page: 32

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.78 6 0 0.00 3295 152

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.99 6 0 0.00 3295 153

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 27.36 32 0 0.00 3295 593

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 157.04 135 0 0.00 3295 3555

10090+39.52 RDWYEXC

Excavation 261.22 141 141 1.00 4340 Subsoil Exc 0.00 0 0 1.00 0 Fill 44.29 19 19 1.00 3417 923

EXISTPAVEMENT

Excavation 12.74 7 7 1.00 302 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3417 0 Mass ordinate for EXISTPAVEMENT = 302

EXISTPAVEMENTLAYER2

Excavation 12.73 7 7 1.00 304 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3417 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 304

LAYER1

Excavation 0.00 0 0 0.00 0

Page: 33

Fill 6.97 4 0 0.00 3417 156

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.18 4 0 0.00 3417 157

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 27.91 15 0 0.00 3417 608

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 160.00 85 0 0.00 3417 3640

10090+39.77 RDWYEXC

Excavation 263.04 2 2 1.00 4342 Subsoil Exc 0.00 0 0 1.00 0 Fill 82.89 1 1 1.00 3418 924

EXISTPAVEMENT

Excavation 12.73 0 0 1.00 302 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3418 0 Mass ordinate for EXISTPAVEMENT = 302

EXISTPAVEMENTLAYER2

Excavation 12.73 0 0 1.00 304 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3418 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 304

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.34 0 0 0.00 3418 156

LAYER2

Page: 34

Fill 8.63 0 0 0.00 3418 157

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 26.93 0 0 0.00 3418 608

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 196.06 2 0 0.00 3418 3642

10090+50.00 RDWYEXC

Excavation 235.18 94 94 1.00 4436 Subsoil Exc 0.00 0 0 1.00 0 Fill 77.42 30 30 1.00 3482 954

EXISTPAVEMENT

Excavation 12.46 5 5 1.00 307 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3482 0 Mass ordinate for EXISTPAVEMENT = 307

EXISTPAVEMENTLAYER2

Excavation 12.46 5 5 1.00 309 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3482 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 309

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.69 3 0 0.00 3482 159

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.98 3 0 0.00 3482 160

Page: 35

Subsoil Exc 0.00 0 0 0.00 0 Fill 25.08 10 0 0.00 3482 618

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 172.75 70 0 0.00 3482 3712

10090+51.70 RDWYEXC

Excavation 232.80 15 15 1.00 4451 Subsoil Exc 0.00 0 0 1.00 0 Fill 75.97 5 5 1.00 3492 959

EXISTPAVEMENT

Excavation 12.42 1 1 1.00 308 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3492 0 Mass ordinate for EXISTPAVEMENT = 308

EXISTPAVEMENTLAYER2

Excavation 12.41 1 1 1.00 310 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3492 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 310

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.58 0 0 0.00 3492 159

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.88 0 0 0.00 3492 160

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 24.77 2 0 0.00 3492 620

Page: 36

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 171.12 11 0 0.00 3492 3723

10090+69.70 RDWYEXC

Excavation 208.42 147 147 1.00 4598 Subsoil Exc 0.00 0 0 1.00 0 Fill 50.62 42 42 1.00 3597 1001

EXISTPAVEMENT

Excavation 11.95 8 8 1.00 316 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3597 0 Mass ordinate for EXISTPAVEMENT = 316

EXISTPAVEMENTLAYER2

Excavation 11.95 8 8 1.00 318 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3597 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 318

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.55 5 0 0.00 3597 164

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.85 5 0 0.00 3597 165

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.83 16 0 0.00 3597 636

LAYER5

Excavation 0.00 0 0 0.00 0

Page: 37

Fill 155.87 109 0 0.00 3597 3832

10090+75.00 RDWYEXC

Excavation 206.41 40 40 1.00 4638 Subsoil Exc 0.00 0 0 1.00 0 Fill 46.21 10 10 1.00 3627 1011

EXISTPAVEMENT

Excavation 11.97 2 2 1.00 318 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3627 0 Mass ordinate for EXISTPAVEMENT = 318

EXISTPAVEMENTLAYER2

Excavation 11.98 2 2 1.00 320 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3627 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 320

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.62 1 0 0.00 3627 165

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.92 1 0 0.00 3627 166

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 22.00 4 0 0.00 3627 640

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 156.85 31 0 0.00 3627 3863

10091+00.00 RDWYEXC

Page: 38

Excavation 199.53 188 188 1.00 4826 Subsoil Exc 0.00 0 0 1.00 0 Fill 31.18 36 36 1.00 3779 1047

EXISTPAVEMENT

Excavation 11.98 11 11 1.00 329 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3779 0 Mass ordinate for EXISTPAVEMENT = 329

EXISTPAVEMENTLAYER2

Excavation 11.98 12 12 1.00 332 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3779 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 332

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.94 6 0 0.00 3779 171

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.08 6 0 0.00 3779 172

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 22.97 21 0 0.00 3779 661

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 160.16 147 0 0.00 3779 4010

10091+25.00 RDWYEXC

Excavation 170.41 172 172 1.00 4998 Subsoil Exc 0.00 0 0 1.00 0 Fill 28.79 28 28 1.00 3923 1075

Page: 39

Excavation 11.97 11 11 1.00 340 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3923 0 Mass ordinate for EXISTPAVEMENT = 340

EXISTPAVEMENTLAYER2

Excavation 11.97 11 11 1.00 343 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3923 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 343

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.24 7 0 0.00 3923 178

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.39 7 0 0.00 3923 179

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.84 22 0 0.00 3923 683

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 164.31 150 0 0.00 3923 4160

10091+50.00 RDWYEXC

Excavation 147.69 147 147 1.00 5145 Subsoil Exc 0.00 0 0 1.00 0 Fill 34.52 29 29 1.00 4041 1104

EXISTPAVEMENT

Excavation 11.96 11 11 1.00 351

Page: 40

Fill 0.00 0 0 1.00 4041 0 Mass ordinate for EXISTPAVEMENT = 351

EXISTPAVEMENTLAYER2

Excavation 11.97 12 12 1.00 355 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 4041 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 355

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.55 7 0 0.00 4041 185

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.74 7 0 0.00 4041 186

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 24.75 22 0 0.00 4041 705

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 169.91 155 0 0.00 4041 4315

10091+51.70 RDWYEXC

Excavation 146.11 9 9 1.00 5154 Subsoil Exc 0.00 0 0 1.00 0 Fill 35.16 2 2 1.00 4048 1106

EXISTPAVEMENT

Excavation 11.97 0 0 1.00 351 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 4048 0 Mass ordinate for EXISTPAVEMENT = 351

Page: 41

Excavation 11.97 0 0 1.00 355 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 4048 0 Mass ordinate for EXISTPAVEMENTLAYER2 = 355

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.57 0 0 0.00 4048 185

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.77 0 0 0.00 4048 186

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 24.81 2 0 0.00 4048 707

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 170.29 11 0 0.00 4048 4326

10091+75.00 RDWYEXC

Excavation 99.34 106 106 1.00 5260 Subsoil Exc 0.00 0 0 1.00 0 Fill 92.97 55 55 1.00 4099 1161

EXISTPAVEMENT

Excavation 11.97 10 10 1.00 361 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 4099 0 Mass ordinate for EXISTPAVEMENT = 361

EXISTPAVEMENTLAYER2

Excavation 11.96 11 11 1.00 366 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 4099 0

Page: 42

Mass ordinate for EXISTPAVEMENTLAYER2 = 366

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.57 7 0 0.00 4099 192

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.72 7 0 0.00 4099 193

LAYER3

S