AKDOT135(2)_Contract_Modification_J-Sheets.pdf
PDF 3 MB Posted
- Attached to
- AK DOT 135(5), Glenn Highway Rehabilitation West Chickaloon Grade Section: MP 77. 4 to 78. 2
- Solicitation number
- DTFH7016B00007
About this file
AKDOT135(2)_Contract Modification J-Sheets
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
-M a y -2
:2
A M
H
T e a m F o ld e r s B
R
ID
G E
K
D O
T
(2
C h ic k a lo o n
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s C
M
1\ P
R O J E
C T
S .d g n
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
CL
Existing ground at C
CL
CL
ground line Proposed
21’ left of C
Existing ground ground line
Proposed
Q50 = 825.70
L Pier 2C L Pier 3C
ELEVATION
No Scale
Elev. 862.41
Sta. 404+06.51
Begin Bridge Elev. 870.82
Sta. 407+59.17
End BridgeC
N
352’-8"
101’-4" 150’-0" 101’-4"
Begin Bridge End Bridge
PLAN
DRAWING INDEX
TITLE
C
TYPICAL SECTION
Pier
Concrete
(Typ.)
405+00 406+00 407+00 408+00 404+00
GENERAL LAYOUT
A C
T U
A L F I L E R
A K
D O
T
G e n
L a y o u t.
D G
N
RG2998 - A
= 73.31’ L
= 36.76’ T
= 400.00’ R
= 10° 30’ 03" (RT)
= 402+99.63 PC Sta.
L Structure
(Typ.)
3’-0" Bench
1’-6"
45’-0"
Girders
Concrete
Prestressed
Existing ground
21’ right of C
406+00
407+00
408+00 405+00
Elev. 800.00
Datum 404+00
852.89
Low chord
Drilled Shaft Foundation
J1
CWN DW
= 403+72.94 PT Sta.
SHEET NO.
(Typ.)
Railing
Bridge
Steel
CL Pier 2 L Pier 3C
CL Brg. Abut. 1 CL Brg. Abut. 4 3’-3"
3’-3"
Edge of Wedge
E F F F F
E
3.1
8%
330’ VC
S ta
E le v .0
0.9576
760’ VC
S ta
E le v .3
0.9576% 6.
6.
B E
G I N B
R I D
G E
E N
D B
R I D
G E
352’-8"
E le v .4
E le v .0
1.5" Asphalt Overlay
Concrete Wedge with
SUPERELEVATION TRANSITION DATA
4%
0%
1%
1%
SUPERELEVATION
SUPERELEVATION TRANSITION DATA
TEMPORARY WEDGE AND ASPHALT FINAL CONCRETE DECK AND ASPHALT
top of asphalt overlay Elevations provided at
Varies
0% to 4%
Varies 1% to
7’-0"
2’-0" 12’-0" 12’-0"
4%
0%
-4%
SUPERELEVATION
2’-0" top of asphalt overlay Elevations provided at Initial Condition
Final Condition
Approx. OHW Approx. OHW
Deck
C.I.P. Concrete
CURVE DATA
CURVE DATA
& End Transition Rail
Begin Concrete Barrier End of Concrete Wedge
Transition Rail (Typ.)
Guardrail and
1’-6"
C h ic k a lo o n R iv e r
2:1
Top of Fill
Toe of Fill
Toe of Riprap
2:1
Toe of Fill Top of Fill
Top of Riprap
5/3/16 CN2
REVISION NO. 1 2
BORING LOGS
BORING LOG LOCATION MAP
THRIE BEAM CONCRETE TRANSITION
THRIE BEAM TRANSITION
BRIDGE RAILING
ABUTMENT 4 APPROACH SLAB
ABUTMENT 1 APPROACH SLAB
INTERMEDIATE DIAPHRAGMS
PIER DIAPHRAGMS
ABUTMENT 4 END DIAPHRAGM
ABUTMENT 1 END DIAPHRAGM
SPAN 2 GIRDERS
SPAN 1 & 3 GIRDERS
GIRDER DEFLECTION DIAGRAM - 2
GIRDER DEFLECTION DIAGRAM - 1
SLAB CONSTRUCTION
DECK
CONCRETE WEDGE ELEVATIONS
DECK ELEVATION
TYPICAL SECTION
FRAMING PLAN
PIER 3
PIER 2
PIER COLUMNS
PIER DRILLED SHAFTS
ABUTMENT 4 WINGWALLS
ABUTMENT 1 SW WINGWALL
ABUTMENT 1 SE WINGWALL
ABUTMENT 4
ABUTMENT 1
ABUTMENT DRILLED SHAFTS
RIPRAP PLAN
FOUNDATION PLAN
SITE PLAN
GENERAL LAYOUT
J35
J34
J33
J32
J31
J30
J29
J28
J27
J26
J25
J24
J23
J22
J21
J20
J19
J18
J17
J16
J15
J14
J13
J12
J11
J10
J9
J8
J7
J6
J5
J4
J3
J2
J1
C ROADWAY GRADE DATA FOR CM#1L C BRIDGE GRADE DATAL
3.5
2%
3.7
0%
E le v .4
6.
S ta
.6
215.52’ VC
E le v .3
1.3213%
S ta
.0
100’ VC
407+57.84
407+59.17
405+82.84
404+57.84
404+07.84
404+06.51
STATION
407+57.84
407+59.17
405+82.84
404+07.84
404+06.51
STATION
CLUPDATED APPR. SLAB, GRADE & ROADWAY
352’-8"
B E
G I N B
R I D
G E
E le v .3
E le v .6
E N
D B
R I D
G E
(This project)
L Roadway
Bridge Profile Grade top of Asphalt Overlay
& Begin Transition Rail
End Concrete Barrier project)
Roadway (This CL
CL
= 6.0% e
= 467.29’ L
= 239.71’ T
= 850.00’ R
= 31° 29’ 54" (RT)
= 407+94.50 PC Sta.
CL
CL
CL Structure
CL
Roadway, unless stated otherwise.
in reference to Structure, not noted throughout the J-sheets are
2.) All Structure/Bridge/Glenn Highway
Roadway (This project).
1.) Curve Data and PT Station is for updated
Notes:
STATE PROJECT
SHEET
NO.
AK AK DOT 135(2)
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
JEG Phillip Boinske
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GLENN HIGHWAY
DRAWING NO.
CHICKALOON RIVER BRIDGE (545)
May 2016
-M a y -2
H
T e a m F o ld e r s B
R
ID
G E
T
(2
C h ic k a lo o n
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s C
M
1\ P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
NO.
U.S. DEPARTMENT OF TRANSPORTATION
35JEG Phillip Boinske
GLENN HIGHWAY
DRAWING NO.
CHICKALOON RIVER BRIDGE (545)
May 2016
MARK SIZE NO. LENGTH TYPE
A401
BENDING DIAGRAM
4 7’-5" BENT
L BearingC
Dwg.
See "END DIAPHRAGM"
Concrete Diaphragm
ELEVATION
Slab
Approach
4-A1102 e.f.
SECTION A-A
A
A
" = 1’-0"4 1Scale:
" = 1’-0"4 1Scale:
A501 5
A403 4 12’-8" BENT8
17’-7"
A501
A402 4 32 11’-4" BENT
-M a y -2
H
T e a m F o ld e r s B
R
ID
G E
T
(2
C h ic k a lo o n
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s C
M
1\ P
R O J E
C T
S .d
DATE BY REVISIONS NO. DATE BY REVISIONS
ABUTMENT 1
F
A401 A402
A402
A403
A501
Joint
Construction
A403 each step
8-A401, A402 or
3’-3" 3’-3"
Not to scale
6’-3"
A401
10’-2"
A402
A403
A601 6 36
11 8 VariesA1102
240 BENT
BENT
6As Shown
WINGWALL" Dwg.
See "ABUTMENT 1 SE
WINGWALL" Dwg.
See "ABUTMENT 1 SW
REINFORCING STEEL - ONE ABUTMENT
a - Lap splice length not included.
aA C
T U
A L F I L E R
A K
D O
T
A b u t-
.D
G N
APPROACH SLAB" Dwg.
See "ABUTMENT 1
Shaft
Drilled
RG2998 - F
E D C B A
"8 1" = 46’-18
55 Spa. @ 9’-2
Elev. 854.28 Elev. 853.93 Elev. 853.56 Elev. 853.20 Elev. 852.83
Elev. 849.18
Elev. 847.00
"2 m in m a x
CL Glenn Highway
CL Glenn Highway
CL Brg.
(Typ.)
Shaft
Drilled
PLAN
Dwg.
See Detail on "ABUTMENT 4"
Elastomeric Brg. Pad, "8 110’-9 "4
316’-10
"8 17’-8"2
11’-6
Elev. 852.46
J6
CWN CV
1’-6"
LC LC LC LC LC LC
A402 A402
6’-6"
11’-6"
54’-4" min.
54’-6" max.
54’-4" min.
56’-4" max.
A1101
Begin Bridge
5’-0" 5’-0" 5’-0"
5’-0" 5’-0" 5’-0"
Triple A501 hoops
2’-6" Bearing Pad
Elastomeric
"8 52’-4
"4
1’-6
72°
(Typ.)
Top of Cap
"8 75’-0
6’-0"
A601
7’-0"
1’-4"
DIAPHRAGMS" Dwg.
See "ABUTMENT 1 END full width under End Diaphragm
" Expanded Polyethylene 2
A601 on each face of bearing Pad
4" Expanded Polyethylene
(Top & Bottom)
18-A1101 along joint in Backwall
1’-0" wide Waterstop
Girder
C@ L of
"8 32’-3
4’-8" casing permanent
Top of
11 36 VariesA1101a
A1102
@ 1’-0"
A501
@ 6"
A501
@ 1’-0" A501 A501
A501 A501
@ 1’-0" A501
@ 1’-0" A501
@ 1’-0"
@ 6" @ 6" @ 6"
228 2’-0" min.
3’-8" max.
"8 59’-2
6’-2" "8 53’-0
"8 515’-4
"4 112’-3"8
515’-4
"16 1321’-5
" clr.2
" Clr.2
3/19/15 CN
"2 156’-2
UPDATED BAR LAYOUTS AND DIMENSIONS
"2 12’-61 shown in Section A-A.
within the joint area above the shafts as other vertical-to-longitudinal bar intersection the cap beam are to be located at every longitudinal reinforcement on each face of
Note: Horizontal A601 J-bars hooked around the
2REVISION NO. 1
AMENDMENT NO. 1 1
2 CN
UPDATED APPROACH SLAB4/4/16
NO.
DRAWING NO.
-M a y -2
H
T e a m F o ld e r s B
R
ID
G E
T
(2
C h ic k a lo o n
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s C
M
1\ P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
GLENN HIGHWAY
DRAWING NO.
CHICKALOON RIVER BRIDGE (545)
May 2016
-M a y -2
H
T e a m F o ld e r s B
R
ID
G E
T
(2
C h ic k a lo o n
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s C
M
1\ P
R O J E
C T
S .d
50’-0"
Diaphragm
L IntermediateC Diaphragm
L IntermediateC
" B
C
D
E
A s p a
10’-0" 10 Spa.@ 10’-0" = 100’-0" 26 Spa. @ 10’-0"= 260’-0"
150’-0"
8 Spa. @ 10’-0" = 80’-0"
"2 12’-10
7’-11 2"
Rail Post spacing (Typ.)
PLAN
A C
T U
A L F I L E R
A K
D O
T F P .D
G N
FRAMING PLAN
No Scale 15
J15
RG2998 - O
F
Diaphragm
L IntermediateC
75’-0"50’-0"
Rail Post spacing
CL Glenn Highway
CL Pier 2 CL Pier 3
CL Bearing
CL Bearing
Rail Post spacing
MARK SIZE NO. LENGTH TYPE
U401
BENDING DIAGRAM
4 BENTVaries
3’-8"
10" 10" m in a x m in x
U401
REINFORCING STEEL - HAUNCH REINFORCEMENT
See Note 2
18’-0"
See Note 2 See Note 2
42’-0" 19’-0"42’-0"
See Note 2 See Note 2
CWN RE
"2 112’-4
L Deck DrainC
10’-0" 10’-0"
L Deck DrainC
L Deck DrainC
CL Deck Drain
14’-0"
S p a
"2 13’-11
"2
6’-0
14’-0"
See Note 2
98’-1" 98’-1"
(See Note 3) Chain Link Fence
Drawing number F-01.01.
of the SW Wingwall according to Alaska DOT Standard
3. Provide a 5’-0" high chain link fence along the length area noted, along all beams.
2. Provide U401 @ 1’-0" spacing for haunch within the
1. Measure Rail Post spacing along the curb.
Notes:
"2
15’-4
2’-0""2
2’-4
T y p
L b e a r in g
C s p a n
S p a n
"2 142’-4
"2
2’-7
1 3/19/15 CN UPDATED RAIL POST SPACING
REVISION NO. 1 2
1AMENDMENT NO. 1
2 CN UPDATED APPROACH SLAB AND POST SPACING4/4/16
8’-0"
4’-0"
NO.
DRAWING NO.
-M a y -2
H
T e a m F o ld e r s B
R
ID
G E
T
(2
C h ic k a lo o n
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s C
M
1\ P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
GLENN HIGHWAY
DRAWING NO.
CHICKALOON RIVER BRIDGE (545)
May 2016
-M a y -2
H
T e a m F o ld e r s B
R
ID
G E
T
(2
C h ic k a lo o n
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s C
M
1\ P
R O J E
C T
S .d
As Shown
21’-0"1’-6" 21’-0" 1’-6"
TYPICAL SECTION
" = 1’-0"8 3Scale:
" = 1’-0"8 3Scale:
of curb
Bottom face
1’-0" after drain installation grate w/epoxy grout
Fill space btwn. curb and
DECK DRAIN PLAN
TYPICAL SECTION
CL Glenn Highway
TYPICAL SLAB SECTION
Varies
" = 1’-0"4 3Scale:
" = 1’-0"4 3Scale:
" = 1’-0"4 3Scale:
R503 @ 8" (Typ.)
2 C lr
C lr
R501 D503
D504
"2 under drain
Epoxy grout pad
" (Typ.)2 13"x
Grate bars
A C
T U
A L F I L E R
A K
D O
T
T y p S e c t.
D G
N
J16
D501 or D506 D502 or D507
RG2998 - P
2’-6"
1’-6" Varies 2’-0" 2’-0"2’-0" 12’-0" 12’-0" 2’-0" 1’-6"
" = 1’-0"8 3Scale:
TYPICAL WEDGE SECTION
CL Glenn Highway
7’-0"
CL Roadway not shown
" Asphalt overlay2
Varies
Varies (1" min. depth) wedge for concrete
1" minimun
CL Glenn Highway
" (Abutment 1) to 5 spa. @ 8’-0" = 40’-0" (Pier 2)8 1" = 46’-18
5Span 1 - Varies from 5 spa. @ 9’-2
Span 2 & 3 - 5 spa. @ 8’-0" = 40’-0" btwn. grate bars
Remove tube
DECK DRAIN ELEVATION
CWN RE
SECTION A-A
A
A
Typ.
110° tube w/epoxy grout grout voids around of epoxy grout and
" pad2 1Set drain on overlay
Asphalt 1
Typ.
1" Typ. all sides
"4 1 Backer rod all around for grout adhesion
" profile8 1TS to provide
" Weld beads around4 12 -concrete wedge
Concrete deck or top flange prestressed beam in deck and
6" x 6" Blockout
"2 1TS 5" x 5" x
"4 31’-1
Constuction joint
Note:
1. See "DECK" sheet for bending diagram of R501 and R502
R502
Construction joint
3" drip
1" V-grove all deck and curb reinforcing.
for overhang in span 1.
2. See dimension "J" on the "GIRDER DEFLECTION DIAGRAM" sheet
45’-0" Span 1 - Varies from 45’-0" to 56’-2"
Span 2 & 3 - 45’-0"
Span 1
2’-6"
- Varies
Span 2 & 3 -
1 3/19/15 CN
UPDATED CALLOUTS, SPACING, AND NOTES
Span 2 & 3 - 21’-0"
REVISION NO. 1 2
2 4/21/16 CN UPDATED SPAN 1 DIMENSIONS
Span 1 - Varies from 21’-0" to 27’-2" curb varies in Span 1 deck to outside face of Distance from edge of
1AMENDMENT NO. 1
NO.
DRAWING NO.
-M a y -2
H
T e a m F o ld e r s B
R
ID
G E
T
(2
C h ic k a lo o n
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s C
M
1\ P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
GLENN HIGHWAY
DRAWING NO.
CHICKALOON RIVER BRIDGE (545)
May 2016
-M a y -2
H
T e a m F o ld e r s B
R
ID
G E
T
(2
C h ic k a lo o n
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s C
M
1\ P
R O J E
C T
S .d
L Pier 3C
No Scale
405+00 406+00
404+00
DECK ELEVATION
J17
RG2998 - Q
N
L Pier 2C
860.09
861.32
860.32 860.56 860.80 861.05 861.30 861.56 861.82 862.08 862.35 862.62
861.48 861.64 861.81 861.99 862.17 862.36 862.56 862.76861.18
862.11 862.22 862.34 862.46 862.59 862.72 862.86 863.01862.02 863.17
863.02
863.31
863.60
863.44
863.66
863.87
863.88
864.02
864.17
864.33
864.40
864.48
864.80
864.80
864.80
865.29
865.22
865.14
865.79
865.65
865.50
866.31
866.09
865.88
866.84
866.55
866.27
867.39
867.03
866.67
862.98
863.34
867.39 867.77
867.36
866.95
868.15
867.70
867.24
868.54
868.04
867.53
868.94
868.39
867.84
869.35
868.75
868.15
869.76
869.11
868.46
870.18
869.48
868.78
870.60
869.86
869.12
871.04
870.25
869.45
871.47
870.63
869.79
867.03
866.67
L Pier 3C
10 spa. @ 15’-0" = 150’-0"
407+00
A C
T U
A L F I L E R
A K
D O
T d e c k E le v .D
G N
CL Glenn Highway
PLAN
PLAN
CWN DW
10 spa. @ 10’-0" = 100’-0"
861.77 861.88
861.04860.91
L Glenn HighwayC
Sta. 404+07.84
Begin bridge deck
10’-0"10’-0"
10 spa. @ 10’-0" = 100’-0"
Sta. 407+57.84
End Bridge Deck
871.87 872.45
871.44
870.19
871.03
870.44
10’-0" 10’-0"
3. Grade data from final condition.
2. Spacing is along centerline of Glenn Highway.
" concrete deck.2
11. Elevations are to top of 8
Notes:
1 3/19/15 CN UPDATED ELEVATIONS
CN2
AMENDMENT NO. 1
REVISION NO. 1
UPDATED APPROACH SLABS AND ELEVATIONS
859.50
871.95
870.11
861.96861.90
859.81
859.77
1’-4"2
4/4/16
NO.
DRAWING NO.
-M a y -2
H
T e a m F o ld e r s B
R
ID
G E
T
(2
C h ic k a lo o n
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s C
M
1\ P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
GLENN HIGHWAY
DRAWING NO.
CHICKALOON RIVER BRIDGE (545)
May 2016
-M a y -2
H
T e a m F o ld e r s B
R
ID
G E
T
(2
C h ic k a lo o n
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s C
M
1\ P
R O J E
C T
S .d
L Pier 3C
No Scale
405+00 406+00
404+00
J18
RG2998 - R
N
L Pier 2C
862.44 862.58 862.71 862.84 862.97 863.11 863.25 863.40 863.56862.31
862.23 862.37 862.50 862.63 862.76 862.91 863.07 863.24862.10 863.41 863.88 864.19 864.52 864.87 865.24 865.53 865.84 866.17 866.51 866.88863.59
867.54
867.13
867.86
867.40
868.17
867.66
868.50
867.94
868.84
868.24
867.24
866.88
L Pier 3C
10 spa. @ 15’-0" = 150’-0"
5 spa. @ 10’-0" = 50’-0"
407+00
CONCRETE WEDGE ELEVATIONS
862.42 862.55 862.69 862.82 862.95 863.08 863.21 863.34 863.48 863.63 863.78 864.04 864.30 864.60 864.91 865.24 865.64 866.06 866.50 866.95 867.42
863.99 864.27 864.58 864.90 865.24 865.61 865.99 866.39 866.80 867.24863.72
867.42 867.75 868.09 868.43 868.78 869.15 869.39
869.09
868.42
"4 36’-6
Sta. 407+14.40
End Concrete
A C
T U
A L F I L E R
A K
D O
T
W e d g e E le v .D
G N
CL Glenn Highway
PLAN
PLAN
CL Glenn Highway
CWN DW
Edge of Wedge (See "TYPICAL SECTION" Dwg.)
Sta. 404+07.84
Begin bridge deck
10 spa. @ 10’-0" = 100’-0"
861.93 861.73
862.18862.04
862.35
862.15
Edge of Wedge
10’-0"10’-0"
3. Grade data from initial condition.
2. Spacing is along centerline of Glenn Highway.
1. Elevations are to top of lightweight concrete wedge.
CN2
REVISION NO. 1 2
UPDATED APPRROACH SLAB AND ELEVATIONS5/3/16
862.28
NO.
DRAWING NO.
-M a y -2
H
T e a m F o ld e r s B
R
ID
G E
T
(2
C h ic k a lo o n
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s C
M
1\ P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
GLENN HIGHWAY
DRAWING NO.
MARK SIZE NO. LENGTH TYPE
M501
BENDING DIAGRAM
5 BENT
M501
2’-8"
REINFORCING STEEL - TWO DIAPHRAGMS
" = 1’-0"8 3Scale:
SECTION A-A
TYPICAL SECTION LOOKING BACK AT ABUTMENT 1
" = 1’-0"8 3Scale:
C
6 - Paired M501
Equally spaced
(Typ. Interior Bays)
A
A
J25
L Girder
As Shown a a - Epoxy coat all End Diaphragm reinforcing steel.
RG2998 - YCWN RE
CL Glenn Highway
M501 1 - Paired
(Typ. Interior bays)
M802
M504
M605 spaced equally 7 - M604
M802
(Typ. Interior Bays) M602 n.f.
M608 M606
M502
4-M802
M502 5a
M503 5a
M504 5a
M601 6a
M602 6a
M603 6a
M604 6a
M605 6a
M606 6a
M607 6a
M608 6a
M701 7a
M801 8a
M802 8a BENT
BENT
BENT
BENT
BENT
BENT
BENT
BENT
BENT
BENT
M502
M503
2’-8"
"2 12’-1
(Typ.)
M503 - Paired
M504 M604
M605
"2 12’-1
M606 M607
M608 M701 M802
4’-4"
"2
4’-4"
4’-4" "
1’-8"
2’-2"
2’-8"
1’-8"
3’-10"
2’-8"
1’-6"
" 1
’-0
R
2’-6"
2’-11"
8"
(Typ. Interior Bays) M603 n.f.
4-M504
8 - M802, 8 - M504 or M804 f.f.
or M803, M801 n.f., or M609 f.f.
M601 n.f., M804 8 a
6a
10M609
8 3’-6"
19’-10"
18’-9"
14’-4"
52’-6"
8’-4"
5’-8"
7’-7"
5’-4"
"2 15’-4
6’-5"
55’-8"
2 52’-6"
49 6’-9"
4 55’-8"
M803 8 2 53’-7" a
M601 or M801
M609 M609 or M804
M803
M804
"2 11’-9
"2 11’-4
52’-10"
ABUTMENT 1 END DIAPHRAGM
A C
T U
A L F I L E R
A K
D O
T
A b u t
E n d
D ia p h .D
G N
22’-4" 33’-8"
" = 1’-0"8 3Scale:
PLAN
L Glenn HighwayCL Glenn Highway
CL Girder CL Girder CL Girder CL Girder CL Girder
CL Brg.CL Brg.
M604, or M605
"2 15’-9
2’-1"
8’-2"
CC
(Typ.)
(2 e.f.)
per hole
4-F701
15’-4" 21’-6"
" Clr.2 shown for clarity
Other reinforcing not
Joint
Construction
M603
M801
M602
M601 n.f., M609 f.f
M803
M609
M804
M609
M504
M801
M602 n.f., M609 f.f
M601
M804
M803
M802
M501
Bearing Pad
Elastomeric diaphragm full width under End
" Expanded Polyethylene2 on each face of bearing pad
4" Expanded Polyethylene
22’-6"
M608 M607 or
M501 1-Paired
M502
M501 2-Paired
M502
M502
15’-4"
6’-6"
8"
M607
M701
3/19/15 CN
conduit
& utility
56’-0"56’-2"1
UPDATED CALLOUTS, NOTE, AND BAR TABLE
AMENDMENT NO. 1
REVISION NO. 1 2
CN2 4/4/16
" = 1’-0"8 3Scale:
SECTION A-A
(Section without approach slab) shown for clarity
Other reinforcing not
M603
M801
M602
M601 n.f., M609 f.f
M803
M609
M804
M609
M504
M801
M602 n.f., M609 f.f
M804
Bearing Pad
Elastomeric diaphragm full width under End
" Expanded Polyethylene2 on each face of bearing pad
4" Expanded Polyethylene
Joint
Construction
M601
M803
M501 conduit
& utility
M802
M802
UPDATED SECTION A-A (WITHOUT APPR. SLAB)
Cut M802 flush with construction joint approved epoxy.
2. Coat the cut ends of the M802 bars with an under the approach slab.
1. Extend utility conduit to end of sleeper slab, NO.
DRAWING NO.
MARK SIZE NO. LENGTH TYPE
M501
BENDING DIAGRAM
5 BENT
M501
2’-8"
REINFORCING STEEL - TWO DIAPHRAGMS
" = 1’-0"8 3Scale:
SECTION A-A
TYPICAL SECTION LOOKING BACK AT ABUTMENT 1
" = 1’-0"8 3Scale:
C
6 - Paired M501
Equally spaced
(Typ. Interior Bays)
A
A
J25
L Girder
As Shown a a - Epoxy coat all End Diaphragm reinforcing steel.
RG2998 - YCWN RE
CL Glenn Highway
M501 1 - Paired
(Typ. Interior bays)
M802
M504
M605 spaced equally 7 - M604
M802
(Typ. Interior Bays) M602 n.f.
M608 M606
M502
4-M802
M502 5a
M503 5a
M504 5a
M601 6a
M602 6a
M603 6a
M604 6a
M605 6a
M606 6a
M607 6a
M608 6a
M701 7a
M801 8a
M802 8a BENT
BENT
BENT
BENT
BENT
BENT
BENT
BENT
BENT
BENT
M502
M503
2’-8"
"2 12’-1
(Typ.)
M503 - Paired
M504 M604
M605
"2 12’-1
M606 M607
M608 M701 M802
4’-4"
"2
4’-4"
4’-4" "
1’-8"
2’-2"
2’-8"
1’-8"
3’-10"
2’-8"
1’-6"
" 1
’-0
R
2’-6"
2’-11"
8"
(Typ. Interior Bays) M603 n.f.
4-M504
8 - M802, 8 - M504 or M804 f.f.
or M803, M801 n.f., or M609 f.f.
M601 n.f., M804 8 a
6a
10M609
8 3’-6"
19’-10"
18’-9"
14’-4"
52’-6"
8’-4"
5’-8"
7’-7"
5’-4"
"2 15’-4
6’-5"
55’-8"
2 52’-6"
49 6’-9"
4 55’-8"
M803 8 2 53’-7" a
M601 or M801
M609 M609 or M804
M803
M804
"2 11’-9
"2 11’-4
52’-10"
ABUTMENT 1 END DIAPHRAGM
A C
T U
A L F I L E R
A K
D O
T
A b u t
E n d
D ia p h .D
G N
22’-4" 33’-8"
" = 1’-0"8 3Scale:
PLAN
L Glenn HighwayCL Glenn Highway
CL Girder CL Girder CL Girder CL Girder CL Girder
CL Brg.CL Brg.
M604, or M605
"2 15’-9
2’-1"
8’-2"
CC
(Typ.)
(2 e.f.)
per hole
4-F701
15’-4" 21’-6"
" Clr.2 shown for clarity
Other reinforcing not
CL Brg.
Joint
Construction
M603
M801
M602
M601 n.f., M609 f.f
M803
M609
M804
M609
M504
M801
M602 n.f., M609 f.f
M601
M804
M803
M802
M501
Bearing Pad
Elastomeric diaphragm full width under End
" Expanded Polyethylene2 on each face of bearing pad
4" Expanded Polyethylene
22’-6"
M608 M607 or
M501 1-Paired
M502
M501 2-Paired
M502
M502
15’-4"
6’-6"
8"
M607
M701
C
3/19/15 CN
conduit
& utility
56’-0"56’-2"1
UPDATED CALLOUTS, NOTE, AND BAR TABLE
AMENDMENT NO. 1
REVISION NO. 1 2
CN2 4/4/16
" = 1’-0"8 3Scale:
SECTION A-A
(Section without approach slab) shown for clarity
Other reinforcing not
M603
M801
M602
M601 n.f., M609 f.f
M803
M609
M804
M609
M504
M801
M602 n.f., M609 f.f
M804
Bearing Pad
Elastomeric diaphragm full width under End
" Expanded Polyethylene2 on each face of bearing pad
4" Expanded Polyethylene
C1
Joint
Construction
M601
M803
M501
CL Brg.
conduit
& utility
M802
M802
UPDATED SECTION A-A (WITHOUT APPR. SLAB)
Cut M802 flush with construction joint approved epoxy.
2. Coat the cut ends of the M802 bars with an under the approach slab.
1. Extend utility conduit to end of sleeper slab, Notes:
-M a y -2
H
T e a m F o ld e r s B
R
ID
G E
T
(2
C h ic k a lo o n
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s C
M
1\ P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
GLENN HIGHWAY
DRAWING NO.
-M a y -2
H
T e a m F o ld e r s B
R
ID
G E
T
(2
C h ic k a lo o n
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s C
M
1\ P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
GLENN HIGHWAY
DRAWING NO.
2" 2" 4" 4"
Wingwall
SECTION B-B
c lr c lr for details)
END DIAPHRAGM" Dwg.
Dowel (See "ABUTMENT 1
ABUTMENT 1 APPROACH SLAB
A C
T U
A L F I L E R
A K
D O
T
A p p r S la b .D
G N
J29
No Scale
B601 (Top & Bottom)
(Typ.)
B601
19 Spa. @ 12" = 19’-0"
JJO RE
N
MARK SIZE NO. LENGTH TYPE
B501
BENDING DIAGRAM
B502
B601
B602 6
Varies
B801 8 58
19’-8"
BENT8’-4"
19’-8"
7’-0"
B603 6 1 8’-8"
B802 8 1 8’-8"
B601
28’-1" max.
27’-2" min.
B604 6 1
BENT
REINFORCING STEEL - ONE SLAB AND ONE SLEEPER SLAB
SECTION A-A
RG2998 - AC
" 2
(Typ.)
joint material
" Preformed expansion2
3/19/15 CN
27’-11"
UPDATE CALLOUTS, NOTE, ELEV., BAR TABLE
PLAN
CN REMOVED SLEEPER SLAB, UPDATED APPR. SLAB2
L Glenn HighwayC
Wingwall Curb line
B B
A
A
B802
B603 or
6"
B801 @ 6" (Bottom)
B602 @ 12" (Top)
Curb line
56’-2"
15’-8"
50’-1"
1 2
"2 122’-5 28’-8"
AMENDMENT NO. 1
REVISION NO. 1 2
"2 15’-0
1’-6"
"2
C C
DD
SECTION C-C
Dwg. for reinforcement details
See "BRIDGE RAILING" and "DECK"
SECTION D-D
"2
B505
B505 B506
B507
Approach Slab
Approach Slab
B804
B604 or
B805
B604 or B603 or
B602 @ 12"
B804
B803 or or B802 or
B801 @ 6"
B508 Top & Bottom
B804 8 1 15’-8"
B805 8 1 7’-10"
1’-2"
5"5"
B506
5"
B507
1’-10"
B508
B508
B507
B506
B505 5
5 2
4’-10"
1’-10"
3’-8"
19’-8"
BENT
BENT
BENT
4/4/16
51’-10" a - Epoxy coat all Approach Slab reinforcing steel.
a a a a a a a a a a a a
20’-0"
1" "2
1’-5"1"
NO.
DRAWING NO.
CHICKALOON RIVER BRIDGE (545)
May 2016
-M a y -2
H
T e a m F o ld e r s B
R
ID
G E
T
(2
C h ic k a lo o n
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s C
M
1\ P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
GLENN HIGHWAY
DRAWING NO.
-M a y -2
H
T e a m F o ld e r s B
R
ID
G E
T
(2
C h ic k a lo o n
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s C
M
1\ P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
GLENN HIGHWAY
DRAWING NO.
(Top & Bottom)
Wingwall
A
B B
PLAN
ABUTMENT 4 APPROACH SLAB
A C
T U
A L F I L E R
A K
D O
T
A b u t_
A p p r S la b .D
G N
No Scale
45’-0"
B605 @ 12"
B803 @ 6"
(Bottom)
B606 @ 12"
(Top)
JJO RE
A
N
Wingwall
SECTION B-B
MARK SIZE NO. LENGTH TYPE
B503
BENDING DIAGRAM
B504
B605
B606 6
44’-8"
B803 8 91
19’-8"
BENT8’-4"
7’-0"
B607 6 12
BENT
20’-0"
2" 2" 4" 4" c lr c lr for details)
END DIAPHRAGM" Dwg.
Dowel (See "ABUTMENT 4
B605 (Top & Bottom)
(Typ.)
B605
19 Spa. @ 12" = 19’-0"
B606 @ 12" B803 @ 6"
44’-8"
19’-8"
SECTION A-A
J30
(Typ.)
Curb line
(Typ.)
Wingwall
RG2998 - AD
" 2
(Typ.)
joint material
" Preformed expansion2 in "SECTION A-A"
Elevations shown
Dwg. for reinforcement details
See "BRIDGE RAILING" and "DECK"
CL Glenn Highway
CN UPDATED CALLOUTS, NOTE, ELEV.
CN2
1 3/19/15
REMOVED SLEEPER SLAB
AMENDMENT NO. 1
REVISION NO. 1
REINFORCING STEEL - ONE SLAB AND ONE SLEEPER SLAB2
4/4/16 a - Epoxy coat all Approach Slab reinforcing steel.
a
NO.
DRAWING NO.
CHICKALOON RIVER BRIDGE (545)
May 2016
-M a y -2
H
T e a m F o ld e r s B
R
ID
G E
T
(2
C h ic k a lo o n
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s C
M
1\ P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
GLENN HIGHWAY
DRAWING NO.
File details come from the government source that posted it. Updated .