A001_Chickaloon.pdf
PDF 977 KB Posted
- Attached to
- AK DOT 135(5), Glenn Highway Rehabilitation West Chickaloon Grade Section: MP 77. 4 to 78. 2
- Solicitation number
- DTFH7016B00007
About this file
Amendment A001
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A001 04/21/2017 N/A See Block 14
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
DTFH7016B00007
9B. DATED (SEE ITEM 11)
04/12/2017
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
AK DOT 135(5), Glenn Highway Rehabilitation West Chickaloon Grade Section: MP 77.4 to 78.2
See page 2
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A001, dated 04/21/2017 Project No.: AK DOT 135(5) Solicitation No. DTFH7016B00007 Project Name: Glenn Highway Rehabilitation Page 2 West Chickaloon Grade Section: MP 77.4 to 78.2
REVISIONS ARE AS FOLLOWS:
CONTRACT CLAUSES
Page C-91. Revises, FAR Clauses 52.236-4, Physical Data (Apr 1984).
SPECIAL CONTRACT REQUIREMENTS
Page E-21 Subsection 109.06A, Revises Web Link Page G-4 Subsection 713.17 Compost Socks, Deletes SCR.
PLANS
Plan sheet #A.1 Revises approval block (signature)
ENCLOSURES
Pages:
C-91 E-21 G-4
Plan Sheets:
A.1
C-91
Contract Clauses Project: AK DOT 135(5) Glenn Highway Rehabilitation West Chickaloon Grade Section: MP 77.4 to 78.2
(b) The Government assumes no responsibility for any conclusions or interpretations made by the Contractor based on the information made available by the Government. Nor does the Government assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of this contract, unless that understanding or representation is expressly stated in this contract.
52.236-4 Physical Data (Apr 1984) Data and information furnished or referred to below is for the Contractor’s information. The
Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by: N/A..
(b) Weather conditions: N/A.
(c) Transportation facilities: N/A.
(d) Geotechnical data, design data, and environmental information consisting of the following, will be posted with the solicitation.
(1) (12170) 55967 Reconstruction - Kings River to Chickaloon River
(2) ADL 232406 DNR Parcel 1
(3) AKDOT135(2) 05-04-2016 Design Contract Modification Sheets
(4) AKDOT135(2)_Additional Cut in Hillside (Contract Mod)
(5) AKDOT135(2)_Contract Modification J-Sheets
(6) AKDOT135(2)_Final Excavation Near Old N. Abutment (For Info Only)
(7) FINAL GR07-14_Chickaloon River Bridge Foundation Report
(8) FINAL GR10-14_Glenn Highway Preliminary Geotechnical Recommendations Report_2014 12 19
(9) Geo Rpt 17-15 Glenn Highway MP 77-79 Signed Final Report
(10) Glenn Highway Pavement Evaluation COMPLETE REPORT
(11) Glenn Hwy Initial Memo 7-9-14
(12) GR01-16 Glenn Highway West Chickaloon Grade
(13) Observations During AKDOT135(2) Project on Previous Fuel Spill (For Info Only)
(14) Phase II ESA - Release Investigation
(15) Redlines AKDOT135(2)Plans With Updates
(16) AKDOT135(2)_AWARDEDPlans
(17) Government’s initial Stormwater Pollution Prevention Plan (Government’s initial SWPPP) or Erosion and Sediment Control Plan (ESCP)
(18) Earthwork data listing end areas, adjusted volumes, and mass ordinates.
(19) Plotted cross-sections of earthwork.
(20) ak-13505_3-D_Break_Lines_For_Information_Only.dgn
(21) AKDOT135(5)_Approach_Road.xml
(22) AKDOT135(5)_Mainline.xml
(23) AKDOT135(5)_Proposed_Surface_For_Information_Only.xml
52.236-5 Material and Workmanship (Apr 1984)
(a) All equipment, material, and articles incorporated into the work covered by this contract shall be new and of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract. References in the specifications to equipment, material, articles, or patented processes by trade name, make, or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The Contractor may, at its option, use any equipment, material, article, Revised by Amendment A001
E-21 DIVISION 100
Special Contract Requirements Project: AK DOT 135(5) GLENN HIGHWAY REHABILITATION WEST CHICKALOON
GRADE SECTION: MP 77.4 TO 78.2
Table 109-1 Pricing Adjustment Pay Items
Line Item Number
Pay Item Number
Pay Item Description Product
A0400 20401-0000 Roadway Excavation Fuel
Monthly adjustments will be accrued with the payment or rebate to be made in the final voucher.
A partial price adjustment payment may be made once every 12 months or when the unpaid accrued increase exceeds $10,000 when requested in writing. The Government will withhold a rebate when the deductive accrual exceeds $10,000.
The maximum allowable monthly and final adjustment for payment to the Contractor or rebate to the Government is limited to 50% of the Base Price Index.
(a) Fuel Price Adjustment. The Government will determine price indexes for fuel using price data obtained from the Oil Price Information Service (OPIS) which publishes a daily report (Monday through Friday) on gasoline and distillate reseller prices. Gross No. 2 Distillate rack average price data for Ultra Low Sulfur No. 2 Diesel fuel reported for ANCHORAGE AND PADD 5 will be averaged and used to establish a Base Price Index (BPI) and a Monthly Performance Price Index (MPPI). These indexes are defined as follows:
(1) Base Price Index. The Base Price Index (BPI) is a price index determined by the arithmetic average as specified above, reported in the OPIS publications for the four weeks immediately preceding the bid opening.
BPI (LOW SULFUR, NO. 2 DIESEL FUEL) = $ [PRICE TO BE INSERTED AT AWARD] per U.S. gallon
(2) Monthly Performance Price Index. The Monthly Performance Price Index (MPPI) is the arithmetic average of the weekly price data from OPIS publications issued before the last Wednesday of the month in which the work was performed.
The BPI and MPPI will be posted at:
http://www.wfl.fhwa.dot.gov/construction/escalation https://flh.fhwa.dot.gov/business/construction/escalation/wfl/chickaloon.htm
Price adjustments to fuel will be calculated by the Government using a ratio of the MPPI/BPI to determine price adjustments as follows:
No price adjustment – When the ratio MPPI/BPI falls within the range of 0.90 to 1.10, no price adjustment will be made for fuel used in construction work performed during the relevant month.
Government rebate – When the ratio MPPI/BPI is calculated to be less than 0.90, the Government is due a rebate as follows:
Revised by Amendment A001 james.mikell Cross-Out
G-4 DIVISION 700
Special Contract Requirements Project: AK DOT 135(5) GLENN HIGHWAY REHABILITATION WEST CHICKALOON
GRADE SECTION: MP 77.4 TO 78.2
Section 713. — ROADSIDE IMPROVEMENT MATERIAL
08/01/14–FP14
713.03 Fertilizer. Add the following:
(a) Fertilizer for turf establishment. Furnish fertilizer with the following minimum percentages of available nutrients:
20N:20P:10K
Each ingredient is acceptable up to 5 percent over the minimum requirements.
Potassium need not be present but will be allowed.
Formulate the 20:20:10 fertilizer from urea-formaldehyde compounds. The maximum activity index is 50.
713.04 Seed. Add the following:
Furnish a mixture consisting of the following kinds of seed with the corresponding percentages by weight of “live seed”:
Tufted Hairgrass (Nortran) 40% Red Fescue (Arctared) 30% Alpine Bluegrass (Gruening) 25% Annual Ryegrass (Lolium) 5%
Determine the amount of “live seed” in a container by the following formula:
Net weight of seed in container multiplied by the purity percentage multiplied by the germination percentage. (If seed is 85 percent pure and tests 90 percent germination, then a 100 pound (45.4 kilogram) container would contain 76.5 pounds (34.7 kilograms) of “live seed”.)
713.12(d) Compost socks. Delete the text of this Subsection and substitute the following:
Compost socks are to be obtained from the US Composting Council list of certified vendors. A list of the certified vendors can be found at the following link:
http://compostingcouncil.org/participants/
713.17 Compost socks. Delete the text of this Subsection and substitute the following:
Revised by Amendment A001
| SF30amd_WORD |
| Amd_Page_2_Master |
| E-21 |
| G-4_A001 |
| a.1 |
File details come from the government source that posted it. Updated .