AKDOT135(5)_Earthwork_Geopak_Fill_and_Select_Borrow_Correction.pdf

PDF 59 KB Posted

Attached to
AK DOT 135(5), Glenn Highway Rehabilitation West Chickaloon Grade Section: MP 77. 4 to 78. 2
Solicitation number
DTFH7016B00007
Issued by

About this file

AKDOT135(5)_Earthwork_Geopak Fill and Select Borrow Correction

View the file

Other files

File Type Posted
BidSum_Chickaloon.pdf PDF
Q&A_5-3-17.pdf PDF
Q&A_5-2-17.pdf PDF
A002_Chickaloon.pdf PDF
AKDOT135(5)_Proposed_Surface_For_Information_Only.xml XML file
ak-13505_3-D_Break_Lines_For_Information_Only.dgn —
AKDOT135(5)_Approach_Road.xml XML file
A001_Chickaloon.pdf PDF
AKDOT135(5)_Mainline.xml XML file
AKDOT135(2)_Additional_Cut_in_Hillside_(Contract_Mod).pdf PDF
AKDOT135(5)_NCHBRD_XS_Final.pdf PDF
IFB_Chickaloon.pdf PDF
AKDOT135(2)_05-04-2016_Design_Contract_Modification_Sheets.pdf PDF
Geo_Rpt_17-15_Glenn_Highway_MP_77-79_Signed_Final_Report.pdf PDF
AKDOT135(2)_Contract_Modification_J-Sheets.pdf PDF
Observations_During_AKDOT135(2)_Project_on_Previous_Fuel_Spill_(For_Info_Only).pdf PDF
Glenn_Highway_Pavement_Evaluation_COMPLETE_REPORT.pdf PDF
AKDOT135(5)_Mainline_Final_Earthwork.pdf PDF
Redlines_AKDOT135(2)Plans_With_Updates1.pdf PDF
GR01-16_Glenn_Highway_West_Chickaloon_Grade.pdf PDF
AKDOT135(5)_NCHBRD_Final_Earthwork.pdf PDF
ADL_232406_DNR_Parcel_1.pdf PDF
Phase_II_ESA_-_Release_Investigation.pdf PDF
FINAL_GR07-14_Chickaloon_River_Bridge_Foundation_Report.pdf PDF
AKDOT135(5)_Mainline_XS_Final_With_Subsurface_Data_FOR_INFORMATION_ONLY_PHYSICAL_DATA.pdf PDF
(12170)_55967_Reconstruction_-_Kings_River_to_Chickaloon_River.pdf PDF
AKDOT135(2)_Final_Excavation_Near_Old_N._Abutment_(For_Info_Only,_does_not_affect_(5)).pdf PDF
AKDOT135(5)_Plans_Final.pdf PDF
AKDOT135(5)_Mainline_XS_Final.pdf PDF
Plan_Request_for__Chickaloon.pdf PDF
SWPPP_AK_DOT_135(5),_Glenn_Highway_West_Chickaloon_Grade.pdf PDF
FINAL_GR10-14_Glenn_Highway_Preliminary_Geotechnical_Recommendations_Report_2014_12_19.pdf PDF
AKDOT135(2)_CM_Approach_Cross_Section_Sheets.pdf PDF
AKDOT135(2)_AWARDEDPlans.pdf PDF
Glenn_Hwy_Initial_Memo_7-9-14.pdf PDF
AKDOT135(2)_CM_Mainline_Cross_Section_Sheets.pdf PDF
PROJECT_DESCRIPTION_Chickaloon_revised.pdf PDF
PROJECT_DESCRIPTION_Chickaloon.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D Sheet Station Cut (cu yd) D Sheet totals Fill (cu yd) D Sheet totals

Geopak EW Run Layer 5 (cu yd)

Layer 5 Corrected (sq ft)

Fill Corrected (sq ft) Layer 5 Corrected (cu yd) Fill Corrected (cu yd)

CORRECT

ED FILL

(cu yd)

3 1008305.07 0 0 0

1008350.00 8.97 0 0

1008359.75 8.94 0 0

1008360.00 0.77 0.04 0.04

1008375.00 71.18 12.11 12.11

1008400.00 119.41 39.91 39.91

1008410.00 48.19 20.95 20.95

1008425.00 72.82 32.54 32.54

1008450.00 123.1 44.1 44.1

1008465.09 75.42 19.71 19.71

1008475.00 50.23 11.29 11.29

1008500.00 129.08 26.78 26.78

1008525.00 131.59 25.41 25.41

1008550.00 133.93 24.44 24.44

1008575.00 134.38 23.19 23.19

1008600.00 131.17 28.31 28.31

1008615.09 76.7 22.86 22.86

1008625.00 49.43 17.49 17.49

1008650.00 128.17 43.43 43.43

1008675.00 138.39 36.98 36.98

1008700.00 145.96 32.25 32.25

1008725.00 149.77 28.95 28.95

1008750.00 153.75 27.39 27.39

1008775.00 155.79 27.36 27.36

1008800.00 158.72 27.87 27.87

1008825.00 164.26 30.19 30.19

1008850.00 166.67 35.34 35.34

1008875.00 167.98 47.42 47.42

1008900.00 173.25 71.33 71.33

1008925.00 181.19 75 75

1008925.36 2.67 0.9 0.9

1008950.00 220.9 30.53 30.53

1008975.00 247.67 0 0

1009000.00 236.35 3957 13.56 878 13.56

4 1009001.48 14.24 1.77 1.77

1009025.00 228.67 26.6 26.6

1009039.52 141.33 18.82 18.82

1009039.77 2.43 0.59 0.59

1009050.00 94.39 30.37 30.37

1009051.70 14.73 4.83 4.83

1009069.70 147.07 42.2 42.2

1009075.00 40.71 9.5 9.5

1009100.00 187.94 35.83 35.83

1009125.00 171.27 27.76 27.76

1009150.00 147.27 29.31 29.31

1009151.70 9.25 2.19 2.19

1009175.00 105.91 55.29 55.29

1009200.00 85.83 108.85 108.85

From Geopak Earthwork Run Manually corrected due to Geopak Earthwork Error totals

Geopak EW Run Layer 5 (cu yd)

Layer 5 Corrected (sq ft)

Fill Corrected (sq ft) Layer 5 Corrected (cu yd) Fill Corrected (cu yd)

CORRECT

ED FILL

(cu yd)

From Geopak Earthwork Run Manually corrected due to Geopak Earthwork Error

1009225.00 73.92 153.36 153.36

1009250.00 63.42 194.3 194.3

1009275.00 54.48 225.51 225.51

1009300.00 46.08 258.68 258.68

1009325.00 37.01 281.96 281.96

1009350.00 26.86 283.65 283.65

1009375.00 17.71 293.7 293.7

1009400.00 11.05 322.55 322.55

1009425.00 5.72 353.01 353.01

1009450.00 1.81 378.95 378.95

1009475.00 0.22 417.08 417.08

1009490.00 0.05 252.62 252.62

1009500.00 0.03 183.71 183.71

1009525.00 0 597.04 192.15 725.67 597.04

1009550.00 0 652.41 169 173.22 678.05 169.15 649.87 649.87

1009575.00 0 314.3 485 173.22 707.65 160.39 641.53 641.53

1009600.00 0 347.58 485 173.22 751.07 160.39 675.33 675.33

1009625.00 0 738.33 160 173.22 839.72 160.39 736.48 736.48

1009650.00 0 390.75 589 173.22 920.53 160.39 814.93 814.93

1009675.00 0 461.79 589 173.22 999.15 160.39 888.74 888.74

1009700.00 0 461.79 669 173.22 1102.1 160.39 972.80 972.80

1009725.00 0 562.19 669 173.22 1213.82 160.39 1072.19 1072.19

1009750.00 0 562.19 743 173.22 1257.65 160.39 1144.20 1144.20

1009775.00 0 587.31 743 173.22 1268.6 160.39 1169.56 1169.56

1009800.00 0 1191.43 160 173.22 1305.06 160.39 1191.51 1191.51

1009825.00 0 1138.35 160 173.22 1154.01 160.39 1138.46 1138.46

1009850.00 0 963.29 963.29

1009875.00 0 815.91 815.91

1009900.00 0 733.17 733.17

1009925.00 0 694.98 694.98

1009950.00 0 667.59 667.59

1009975.00 0 618.29 618.29

1010000.00 0 604.04 604.04

1010025.00 0 618.93 618.93

1010050.00 0 629.32 173.22 690.11 629.32

1010075.00 263.64 623.15 160 173.22 665.43 160.39 627.56 627.56

1010100.00 1225.44 308.07 424 173.22 568.23 160.39 571.14 571.14

1010125.00 2677.5 262.41 424 173.22 565.49 160.39 524.87 524.87

1010139.00 2153.93 278.07 90 173.22 512.33 89.82 279.43 279.43

1010150.00 2016.41 186.9 72 178.72 411.77 71.69 188.24 188.24

1010175.00 5394.26 190.63 347 191.22 380.58 171.27 366.83 366.83

1010190.00 3667.96 103.2 214 198.72 371.49 108.32 208.91 208.91

1010199.75 2528.96 133.08 72 198.72 365.34 71.76 133.04 133.04

1010200.00 66.31 3.35 Total = 7424 2927 3.35 totals

Geopak EW Run Layer 5 (cu yd)

Layer 5 Corrected (sq ft)

Fill Corrected (sq ft) Layer 5 Corrected (cu yd) Fill Corrected (cu yd)

CORRECT

ED FILL

(cu yd)

From Geopak Earthwork Run Manually corrected due to Geopak Earthwork Error

1010225.00 6975.77 326.42

Difference to be subtracted from grand total of Layer 5 = 4497 cu yd 326.42

1010250.00 7609.4 343.5 Difference checks out = 4502 343.50

1010275.00 8244.3 363.27 363.27

1010300.00 9141.94 352.75 352.75

1010325.00 10330.64 331.45 331.45

1010350.00 11637.84 306.29 306.29

1010375.00 13027.17 294.96 294.96

1010376.88 1037.6 22.4 22.40

1010400.00 13405.99 281.52 281.52

1010425.00 15405.4 318.14 318.14

1010450.00 15727.44 336.06 336.06

1010475.00 15695.72 358.72 358.72

5 1010500.00 15296.62 165,260 382.06 28,952 382.06

1010525.00 14886.22 399.48 399.48

1010526.96 1159.13 31.75 31.75

1010540.00 7693.71 210.61 210.61

1010550.00 5862.69 161.65 161.65

1010575.00 14656.95 404.77 404.77

1010600.00 14658.31 405.14 405.14

1010610.00 5822.51 162.33 162.33

1010625.00 8687.04 243.96 243.96

1010650.00 14224.49 404.02 404.02

1010675.00 13746.74 431.32 431.32

1010700.00 13586.42 482.44 482.44

1010725.00 13895.46 523.87 523.87

1010750.00 14499.81 535.18 535.18

1010775.00 15304.82 536.5 536.50

1010800.00 16031.49 521.34 521.34

1010825.00 16847.4 474.91 474.91

1010850.00 17779.62 416.96 416.96

1010875.00 18333.66 356.62 356.62

1010900.00 18638.02 323.34 323.34

1010925.00 18757.46 317.79 317.79

1010950.00 18423.69 312.22 312.22

1010975.00 18050.1 304.75 304.75

1011000.00 17475.08 311.71 311.71

1011025.00 16875.19 309.81 309.81

1011050.00 16794.39 291.51 291.51

1011075.00 16617.62 263.92 263.92

1011100.00 16036.13 232.62 232.62 totals

Geopak EW Run Layer 5 (cu yd)

Layer 5 Corrected (sq ft)

Fill Corrected (sq ft) Layer 5 Corrected (cu yd) Fill Corrected (cu yd)

CORRECT

ED FILL

(cu yd)

From Geopak Earthwork Run Manually corrected due to Geopak Earthwork Error

1011120.00 12257.88 175.8 175.80

1011125.00 2975.87 44.41 44.41

1011140.00 8675.35 150.79 150.79

1011150.00 5560.12 109.26 109.26

1011175.00 13195.48 272.36 272.36

1011200.00 11769.23 276 276.00

1011225.00 9880.79 307.83 307.83

1011250.00 8000.57 312.13 312.13

1011270.87 4870.47 204.73 204.73

1011275.00 720.93 34.62 34.62

1011300.00 3401.75 186.16 186.16

1011315.00 1340.56 89.61 89.61

1011325.00 612.88 51.25 51.25

1011350.00 974.02 129.19 129.19

1011375.00 634.67 141.52 141.52

1011400.00 454.12 144.96 144.96

1011401.31 16.15 7.11 7.11

1011412.67 135.07 59.12 59.12

1011420.82 89.12 45.79 45.79

1011425.00 41.03 24.72 24.72

1011431.14 36.47 37.44 37.44

1011439.00 20.05 24.27 24.27

1011445.80 16.45 0 0.00

Bridge 1011449.82 7.79 471,031 0 12,200 0.00 Bridge 1011802.50 0.01 0 0.00

1011816.32 1.59 0 0.00

1011821.16 0.28 0 0.00

1011825.00 0.24 4.83 4.83

1011840.00 27.99 18.98 18.98

1011846.94 33.35 0.08 0.08

1011850.00 18.42 0.03 0.03

1011875.00 151.45 0.15 0.15

1011900.00 135.35 0.54 0.54

1011925.00 121.37 14.3 14.30

1011950.00 135.2 27.53 27.53

1011964.23 83.4 16.98 16.98

1011975.00 62.81 19.16 19.16

1012000.00 171.3 943 83.13 186 83.13

7 1012013.18 106.67 67.82 67.82

1012025.00 100.38 60.67 60.67

1012027.26 19.71 9.62 9.62

1012043.19 149.62 55.7 55.70

1012050.00 68.09 19.57 19.57

1012075.00 256.88 74.42 74.42

1012100.00 269.08 75.94 75.94

1012125.00 278.66 72.21 72.21 totals

Geopak EW Run Layer 5 (cu yd)

Layer 5 Corrected (sq ft)

Fill Corrected (sq ft) Layer 5 Corrected (cu yd) Fill Corrected (cu yd)

CORRECT

ED FILL

(cu yd)

From Geopak Earthwork Run Manually corrected due to Geopak Earthwork Error

1012150.00 287.12 66.25 66.25

1012175.00 292.38 64.39 64.39

1012200.00 290.76 73 73.00

1012225.00 275.28 135.25 135.25

1012250.00 253.11 247.29 247.29

1012275.00 235.46 254.88 254.88

1012300.00 218.76 145.24 145.24

1012325.00 216.27 235 235.00

1012350.00 220.13 399.07 399.07

1012375.00 211.04 408.19 408.19

1012400.00 200.34 434.33 434.33

1012425.00 191.3 507.77 507.77

1012450.00 187.02 611.44 611.44

1012475.00 181.49 729.97 729.97

1012500.00 173.73 822.24 822.24

1012525.00 171.45 794.78 794.78

1012550.03 171.69 740.25 740.25

1012566.70 116.69 476.56 476.56

1012575.00 58.96 219.25 219.25

1012600.00 174.12 577.3 577.30

1012605.59 38.09 111.97 111.97

1012625.00 127.86 337.37 337.37

1012650.00 156.21 309.17 309.17

1012663.50 81.27 63.49 63.49

1012665.00 4.45 5,784 0 9,200 0.00

0.00 Totals 646,974.24 646,974.24 46913.7 51415.39 51415.39