YELL_spreadsheet.xlsx
XLSX spreadsheet 40 KB Posted
- Solicitation number
- DTFH70-15-R-00015
About this file
This spreadsheet is being provided for informational use only. We will not be updating this information for any amendments. This spreadsheet may not be used in place of the bid schedule issued in the RFP
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q A_4-11-2016.pdf | ||
| A002_Norris.pdf | ||
| Q A_4-8-2016.pdf | ||
| A001.pdf | ||
| K-Sheets.pdf | ||
| C-Sheets.pdf | ||
| Physical_Data_WY_PRA_YELL_10(19).pdf | ||
| G-Sheets.pdf | ||
| T-Sheets_-_Final.pdf | ||
| D-Sheets.pdf | ||
| P-sheets.pdf | ||
| X-Sheets_-_Final.pdf | ||
| S-Sheets_-_Final.pdf | ||
| H-Sheets.pdf | ||
| O-sheets.pdf | ||
| Plan_Request_for_WY_PRA_YELL_10(19).pdf | ||
| F-Sheets.pdf | ||
| RFP_Norris_reduced.pdf | ||
| V-Sheets_-_Final.pdf | ||
| W-Sheets_-_Final.pdf | ||
| M-Sheets.pdf | ||
| E-Sheets.pdf | ||
| L-sheets.pdf | ||
| U-Sheets_-_Final.pdf | ||
| B_-_SHEETS_-_Final.pdf | ||
| N-sheets.pdf | ||
| I-Sheets.pdf | ||
| J-Sheets.pdf | ||
| NorrisToGoldenGatePhase2-Plans-70_with_Canyon_Rim_sites.pdf | ||
| PROJECT_DESCRIPTION.pdf | ||
| Preliminary_Letter.pdf |
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule A
| This spreadsheet is being provided for informational use only. We will not be updating this information for any amendments. This spreadsheet may not be used in place of the bid schedule issued in the RFP. | ||||
| Pay Item | Description | Unit | Description2 | Quantity |
| 15101-0000 | MOBILIZATION | LPSM | 1 | |
| 15101-0000 | MOBILIZATION | LPSM | (IP) | 1 |
| 15101-0000 | MOBILIZATION | LPSM | (BUF) | 1 |
| 15201-0000 | CONSTRUCTION SURVEY AND STAKING | LPSM | 1 | |
| 15201-0000 | CONSTRUCTION SURVEY AND STAKING | LPSM | (IP) | 1 |
| 15201-0000 | CONSTRUCTION SURVEY AND STAKING | LPSM | (BUF) | 1 |
| 15301-0010 | CONTRACTOR QUALITY CONTROL AND ASSURANCE | LPSM | 1 | |
| 15301-0010 | CONTRACTOR QUALITY CONTROL AND ASSURANCE | LPSM | (IP) | 1 |
| 15301-0010 | CONTRACTOR QUALITY CONTROL AND ASSURANCE | LPSM | (BUF) | 1 |
| 15401-0000 | CONTRACTOR TESTING | LPSM | 1 | |
| 15401-0000 | CONTRACTOR TESTING | LPSM | (IP) | 1 |
| 15401-0000 | CONTRACTOR TESTING | LPSM | (BUF) | 1 |
| 15501-0000 | CONSTRUCTION SCHEDULE | LPSM | 1 | |
| 15501-0000 | CONSTRUCTION SCHEDULE | LPSM | (IP) | 1 |
| 15501-0000 | CONSTRUCTION SCHEDULE | LPSM | (BUF) | 1 |
| 15701-0000 | SOIL EROSION CONTROL | LPSM | (IP) | 1 |
| 15701-0000 | SOIL EROSION CONTROL | LPSM | (BUF) | 1 |
| 15704-1000 | SOIL EROSION CONTROL, PLASTIC LINING | SQYD | 160 | |
| 15704-1100 | SOIL EROSION CONTROL, BRUSH BLANKET | SQYD | 40523 | |
| 15705-0100 | SOIL EROSION CONTROL, SILT FENCE | LNFT | 11292 | |
| 15705-1000 | SOIL EROSION CONTROL, TEMPORARY 48-INCH CULVERT PIPE | LNFT | 60 | |
| 15705-1400 | SOIL EROSION CONTROL, FIBER ROLL | LNFT | 33713 | |
| 15705-1400 | SOIL EROSION CONTROL, FIBER ROLL | LNFT | (IP) | 560 |
| 15705-1400 | SOIL EROSION CONTROL, FIBER ROLL | LNFT | (BUF) | 1935 |
| 15706-0200 | SOIL EROSION CONTROL, CHECK DAM | EACH | 72 | |
| 15706-0300 | SOIL EROSION CONTROL, SANDBAG | EACH | 500 | |
| 15706-1000 | SOIL EROSION CONTROL, INLET PROTECTION | EACH | 13 | |
| 15802-0000 | WATERING FOR DUST CONTROL | LPSM | 1 | |
| 20101-0000 | CLEARING AND GRUBBING | ACRE | 35 | |
| 20103-0000 | CLEARING AND GRUBBING | SQYD | (IP) | 530 |
| 20103-0000 | CLEARING AND GRUBBING | SQYD | (BUF) | 1458 |
| 20301-0080 | REMOVAL OF BENCH | EACH | (IP) | 6 |
| 20301-0200 | REMOVAL OF BOULDER | EACH | , STOCKPILE | 111 |
| 20301-1100 | REMOVAL OF GATE | EACH | , double swing | 2 |
| 20301-1200 | REMOVAL OF HEADWALL | EACH | 45 | |
| 20301-1400 | REMOVAL OF INLET | EACH | 1 | |
| 20301-1900 | REMOVAL OF PIPE CULVERT | EACH | 31 | |
| 20301-2300 | REMOVAL OF SIGN/MARKER | EACH | 25 | |
| 20301-2300 | REMOVAL OF SIGN/MARKER | EACH | (IP) | 4 |
| 20301-2300 | REMOVAL OF SIGN/MARKER | EACH | (BUF) | 4 |
| 20301-2700 | REMOVAL OF STRUCTURE | EACH | , DRY STACK WALL | 2 |
| 20301-3000 | REMOVAL OF TRASH RECEPTACLE | EACH | (BUF) | 4 |
| 20302-0700 | REMOVAL OF FENCE | LNFT | (BUF) | 130 |
| 20302-1000 | REMOVAL OF FENCE, RAIL | LNFT | (IP) | 55 |
| 20302-2500 | REMOVAL OF HANDRAIL | LNFT | (IP) | 275 |
| 20302-2500 | REMOVAL OF HANDRAIL | LNFT | (BUF) | 170 |
| 20303-0000 | REMOVAL OF STRUCTURES AND OBSTRUCTIONS | SQYD | , CONC. STAIRS (IP) | 105 |
| 20303-0000 | REMOVAL OF STRUCTURES AND OBSTRUCTIONS | SQYD | , TIMBER STEPS (IP) | 12 |
| 20303-0300 | REMOVAL OF CONCRETE | SQYD | (IP) | 25 |
| 20303-1600 | REMOVAL OF PAVEMENT, ASPHALT | SQYD | (BUF) | 1290 |
| 20303-3000 | REMOVAL OF SIDEWALK, ASPHALT | SQYD | (IP) | 10 |
| 20303-3000 | REMOVAL OF SIDEWALK, ASPHALT | SQYD | (BUF) | 938 |
| 20303-3200 | REMOVAL OF SIDEWALK, CONCRETE | SQYD | (BUF) | 66 |
| 20303-3500 | REMOVAL OF STONE MASONRY | SQYD | 11 | |
| 20401-0000 | ROADWAY EXCAVATION | CUYD | 162100 | |
| 20401-0000 | ROADWAY EXCAVATION | CUYD | (IP) | 340 |
| 20401-0000 | ROADWAY EXCAVATION | CUYD | (BUF) | 60 |
| 20402-0000 | SUBEXCAVATION | CUYD | 8800 | |
| 20402-0000 | SUBEXCAVATION | CUYD | (IP) | 350 |
| 20403-0000 | UNCLASSIFIED BORROW | CUYD | 5295 | |
| 20411-0000 | SELECT BORROW | TON | 23000 | |
| 20411-0000 | SELECT BORROW | TON | (IP) | 500 |
| 20411-0000 | SELECT BORROW | TON | (BUF) | 2200 |
| 20421-0000 | ROCK EXCAVATION | CUYD | (BUF) | 11 |
| 20465-0000 | CONSERVE AND PLACE BOULDER | EACH | 129 | |
| 20466-0000 | CONSERVE AND STOCKPILE TOPSOIL | CUYD | (IP) | 3 |
| 20701-0100 | SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE A | SQYD | , WOVEN | 2500 |
| 20701-0200 | SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE B | SQYD | 250 | |
| 20701-0300 | SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C | SQYD | 9000 | |
| 20701-0300 | SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C | SQYD | (Special Rock Embankment) | 2500 |
| 20701-0300 | SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C | SQYD | , WOVEN | 1777 |
| 20703-0000 | GEOGRID | SQYD | (Biaxial) | 8600 |
| 20703-2000 | GEOGRID, STABILIZATION | SQYD | 3776 | |
| 20704-0000 | GEOMEMBRANE | SQYD | 2200 | |
| 20704-0000 | GEOMEMBRANE | SQYD | (IP) | 110 |
| 20705-1000 | INSULATION BOARD, POLYSTYRENE FOAM | SQYD | 2200 | |
| 20815-0000 | COFFERDAMS | LPSM | (Glen Creek Box Culvert) | 1 |
| 21101-1000 | ROADWAY OBLITERATION, METHOD 1 | SQYD | 4400 | |
| 21101-1000 | ROADWAY OBLITERATION, METHOD 1 | SQYD | (IP) | 100 |
| 25101-0100 | PLACED RIPRAP, METHOD A, CLASS 1 | CUYD | 100 | |
| 25101-0200 | PLACED RIPRAP, METHOD A, CLASS 2 | CUYD | (IP) | 27 |
| 25101-0200 | PLACED RIPRAP, METHOD A, CLASS 2 | CUYD | (BUF) | 30 |
| 25101-0300 | PLACED RIPRAP, METHOD A, CLASS 3 | CUYD | 500 | |
| 25101-0300 | PLACED RIPRAP, METHOD A, CLASS 3 | CUYD | (IP) | 5 |
| 25120-0100 | RIPRAP DITCH, METHOD A, CLASS 1 | LNFT | 1900 | |
| 25125-0000 | BOULDER | EACH | (IP) | 140 |
| 25125-0000 | BOULDER | EACH | (BUF) | 55 |
| 25201-1000 | SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED | CUYD | (Class 2) | 350 |
| 25201-1000 | SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED | CUYD | (Class 3) | 730 |
| 25201-1000 | SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED | CUYD | (Class 5) | 350 |
| 25210-0000 | ROCKERY | SQFT | 3900 | |
| 25210-0000 | ROCKERY | SQFT | , SEAT WALL | 18 |
| 25210-0000 | ROCKERY | SQFT | , TYPE 1 (IP) | 1600 |
| 25210-0000 | ROCKERY | SQFT | , TYPE 2 (IP) | 220 |
| 25210-0000 | ROCKERY | SQFT | , TYPE 2 (BUF) | 600 |
| 25210-0000 | ROCKERY | SQFT | , TYPE 2A (BUF) | 600 |
| 25501-0000 | MECHANICALLY STABILIZED EARTH WALL | SQFT | 14000 | |
| 25501-0000 | MECHANICALLY STABILIZED EARTH WALL | SQFT | (IP) | 400 |
| 25701-0400 | CONTRACTOR FURNISHED REINFORCED CONCRETE RETAINING WALL DESIGN | LPSM | 1 | |
| 25801-0000 | REINFORCED CONCRETE RETAINING WALL | SQFT | (precast wing wall) | 151 |
| 27301-0000 | POLYURETHANE RESIN INJECTION | LB | (BUF) | 7600 |
| 27501-1000 | GEOFOAM, LIGHTWEIGHT FILL MATERIAL | CUYD | (IP) | 65 |
| 30202-1000 | ROADWAY AGGREGATE, METHOD 1 | TON | 70 | |
| 30202-2000 | ROADWAY AGGREGATE, METHOD 2 | TON | 1730 | |
| 30202-2000 | ROADWAY AGGREGATE, METHOD 2 | TON | (BUF) | 445 |
| 30801-0000 | RECYCLED AGGREGATE BASE | SQYD | 57100 | |
| 40101-5600 | ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL | TON | , TYPE III | 20500 |
| 40105-3000 | ANTISTRIP ADDITIVE, TYPE 3 | TON | 201 | |
| 40301-0100 | ASPHALT CONCRETE PAVEMENT, TYPE 1 | TON | (BUF) | 350 |
| 40601-0000 | FOG SEAL | TON | 27 | |
| 40605-0000 | BLOTTER | TON | 502 | |
| 40801-0000 | COLD RECYCLED ASPHALT BASE COURSE | TON | 23400 | |
| 41201-0000 | TACK COAT | TON | 35 | |
| 55201-0200 | STRUCTURAL CONCRETE, CLASS A (AE) | CUYD | (IP) | 38 |
| 55201-0200 | STRUCTURAL CONCRETE, CLASS A (AE) | CUYD | (BUF) | 8 |
| 55210-0000 | PRECAST STRUCTURAL CONCRETE | CUYD | (precast concrete footing) | 8 |
| 55401-1000 | REINFORCING STEEL | LB | (IP) | 11500 |
| 55401-3000 | REINFORCING STEEL, STAINLESS STEEL | LB | (BUF) | 2412 |
| 55501-0000 | STRUCTURAL STEEL | LPSM | BOARDWALK (IP) | 1 |
| 56701-0000 | MICROPILE | LNFT | , BOARDWALK (IP) | 640 |
| 56701-0000 | MICROPILE | LNFT | (IP) | 160 |
| 56701-0000 | MICROPILE | LNFT | (BUF) | 64 |
| 57501-0000 | MINOR BRIDGE WORK | LPSM | (BUF) | 1 |
| 60201-0400 | 12-INCH PIPE CULVERT | LNFT | (BUF) | 8 |
| 60201-0600 | 18-INCH PIPE CULVERT | LNFT | (IP) | 76 |
| 60201-0600 | 18-INCH PIPE CULVERT | LNFT | (BUF) | 30 |
| 60201-0800 | 24-INCH PIPE CULVERT | LNFT | 2847 | |
| 60201-0900 | 30-INCH PIPE CULVERT | LNFT | 162 | |
| 60220-4200 | 12 FEET SPAN, 11 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT | LNFT | 36 | |
| 60404-1000 | CATCH BASIN, FLH TYPE 1 | EACH | 13 | |
| 60404-1000 | CATCH BASIN, FLH TYPE 1 | EACH | (IP) | 6 |
| 60404-1000 | CATCH BASIN, FLH TYPE 1 | EACH | (BUF) | 1 |
| 60501-0000 | STANDARD UNDERDRAIN SYSTEM | LNFT | 500 | |
| 60510-0800 | 6-INCH OUTLET PIPE | LNFT | (BUF) | 6 |
| 60510-0900 | 8-INCH COLLECTOR PIPE | LNFT | 800 | |
| 60510-1000 | 8-INCH OUTLET PIPE | LNFT | 200 | |
| 60522-0000 | SAND | CUYD | 200 | |
| 60901-1700 | CURB, CONCRETE, 18-INCH DEPTH | LNFT | 3069 | |
| 60901-2900 | CURB, STONE, TYPE 1, 6-INCH DEPTH | LNFT | 699 | |
| 60901-7000 | CURB, LOG | LNFT | 3590 | |
| 61001-0000 | HORIZONTAL DRAIN PIPE | LNFT | (BUF) | 30 |
| 61501-0100 | SIDEWALK, CONCRETE | SQYD | (IP) | 185 |
| 61501-1100 | SIDEWALK, ASPHALT | SQYD | 102 | |
| 61501-1100 | SIDEWALK, ASPHALT | SQYD | (IP) | 255 |
| 61501-1100 | SIDEWALK, ASPHALT | SQYD | (BUF) | 730 |
| 61503-5000 | MEDIAN, STONE | SQYD | , Cobble | 17 |
| 61504-3000 | ACCESSIBILITY RAMP, ASPHALT | SQYD | 14 | |
| 61701-2000 | GUARDRAIL SYSTEM G4, TYPE 4, CLASS B WOOD POSTS | LNFT | 2025 | |
| 61702-1300 | TERMINAL SECTION, TYPE MELT | EACH | 2 | |
| 61901-1300 | FENCE, CHAIN LINK | LNFT | , TEMPORARY (IP) | 30 |
| 61901-1300 | FENCE, CHAIN LINK | LNFT | , TEMPORARY (BUF) | 50 |
| 61902-0900 | GATE, METAL | EACH | , 40 foot width (government furnished) | 2 |
| 62001-0000 | STONE MASONRY | CUYD | (headwall repair) | 11 |
| 62002-0000 | STONE MASONRY | SQYD | (MSE Wall Facing) | 1300 |
| 62002-0000 | STONE MASONRY | SQYD | , GUARDWALL (IP) | 70 |
| 62002-0000 | STONE MASONRY | SQYD | , WALL FACING (IP) | 26 |
| 62002-0000 | STONE MASONRY | SQYD | , PIPE COVER (IP) | 6 |
| 62002-0000 | STONE MASONRY | SQYD | , PAVING (BUF) | 80 |
| 62002-0000 | STONE MASONRY | SQYD | , WALL FACING (BUF) | 45 |
| 62002-0000 | STONE MASONRY | SQYD | , WALL ADJUSTMENTS (BUF) | 35 |
| 62002-0000 | STONE MASONRY | SQYD | , GUARDWALL (BUF) | 17 |
| 62002-1000 | CLASS B MASONRY, ROCK FACE FINISH | SQYD | 60 | |
| 62005-0000 | CONCRETE MASONRY UNITS | CUYD | 250 | |
| 62010-0000 | STONE MASONRY | LNFT | , EDGING (IP) | 130 |
| 62010-0000 | STONE MASONRY | LNFT | , SCUPPER (BUF) | 4 |
| 62010-0000 | STONE MASONRY | LNFT | , EDGING (BUF) | 18 |
| 62010-0000 | STONE MASONRY | LNFT | , SEAT WALL (BUF) | 40 |
| 62010-0000 | STONE MASONRY | LNFT | WALL (BUF) | 215 |
| 62011-0300 | STONE MASONRY HEADWALL FOR 18-INCH PIPE CULVERT | EACH | (IP) | 2 |
| 62011-0300 | STONE MASONRY HEADWALL FOR 18-INCH PIPE CULVERT | EACH | (BUF) | 1 |
| 62011-0500 | STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT | EACH | 58 | |
| 62011-0600 | STONE MASONRY HEADWALL FOR 30-INCH PIPE CULVERT | EACH | 6 | |
| 62026-1000 | REMOVE AND RESET STONE MASONRY | SQYD | (FLAGSTONE) | 20 |
| 62027-0000 | REMOVE AND RESET STONE MASONRY | LNFT | (Curb) | 350 |
| 62031-0000 | REPOINT STONE MASONRY | SQFT | (BUF) | 1950 |
| 62201-0000 | EQUIPMENT | HOUR | , JACKHAMMER | 40 |
| 62201-0300 | DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY | HOUR | 400 | |
| 62201-0300 | DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY | HOUR | (IP) | 40 |
| 62201-0300 | DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY | HOUR | (BUF) | 100 |
| 62201-0450 | BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH | HOUR | 50 | |
| 62201-0450 | BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH | HOUR | (IP) | 80 |
| 62201-0450 | BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH | HOUR | (BUF) | 100 |
| 62201-1000 | WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY | HOUR | 200 | |
| 62201-1000 | WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY | HOUR | (IP) | 80 |
| 62201-1000 | WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY | HOUR | (BUF) | 100 |
| 62201-1350 | BULLDOZER, 200HP MINIMUM FLYWHEEL POWER | HOUR | 200 | |
| 62201-1350 | BULLDOZER, 200HP MINIMUM FLYWHEEL POWER | HOUR | (BUF) | 40 |
| 62201-3000 | HYDRAULIC EXCAVATOR | HOUR | (ROCK HAMMER) | 200 |
| 62201-3000 | HYDRAULIC EXCAVATOR | HOUR | , 140HP MINIMUM WITH 3500 POUND MINIMUM HAMMER ATTACHMENT | 100 |
| 62201-3000 | HYDRAULIC EXCAVATOR | HOUR | , 140HP MINIMUM WITH 50 FOOT MINIMUM REACH | 40 |
| 62201-3000 | HYDRAULIC EXCAVATOR | HOUR | , MINI EXCAVATOR, 69" MINIMUM WIDTH, WITH THUMB ATTACHMENT | 40 |
| 62201-3150 | HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT | HOUR | 500 | |
| 62201-3150 | HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT | HOUR | (IP) | 40 |
| 62201-3150 | HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT | HOUR | (BUF) | 200 |
| 62201-3750 | CHAIN SAW | HOUR | 40 | |
| 62201-3750 | CHAIN SAW | HOUR | (IP) | 10 |
| 62201-3750 | CHAIN SAW | HOUR | (BUF) | 10 |
| 62301-0000 | GENERAL LABOR | HOUR | 1700 | |
| 62301-0000 | GENERAL LABOR | HOUR | (IP) | 200 |
| 62301-0000 | GENERAL LABOR | HOUR | (BUF) | 100 |
| 62302-0000 | SPECIAL LABOR | HOUR | (WETLAND RESTORATION) | 200 |
| 62302-0000 | SPECIAL LABOR | HOUR | , Carpenter | 200 |
| 62302-0000 | SPECIAL LABOR | HOUR | , Stone Mason | 200 |
| 62302-0000 | SPECIAL LABOR | HOUR | CARPENTER (IP) | 20 |
| 62302-0000 | SPECIAL LABOR | HOUR | STONE MASON (IP) | 40 |
| 62302-0000 | SPECIAL LABOR | HOUR | , Carpenter (BUF) | 20 |
| 62302-0000 | SPECIAL LABOR | HOUR | , Stone Mason (BUF) | 80 |
| 62302-0100 | SPECIAL LABOR, SLOPE SCALING | HOUR | , Mechanical | 16 |
| 62302-1100 | SPECIAL LABOR, HIRED SURVEY SERVICES | HOUR | 50 | |
| 62302-1100 | SPECIAL LABOR, HIRED SURVEY SERVICES | HOUR | (IP) | 25 |
| 62302-1100 | SPECIAL LABOR, HIRED SURVEY SERVICES | HOUR | (BUF) | 25 |
| 62405-0200 | PLACING CONSERVED TOPSOIL, 3-INCH DEPTH | SQYD | (IP) | 40 |
| 62405-0200 | PLACING CONSERVED TOPSOIL, 3-INCH DEPTH | SQYD | (BUF) | 950 |
| 62406-0100 | PLACING CONSERVED TOPSOIL, 2-INCH DEPTH | ACRE | 30 | |
| 62515-1000 | MULCHING, DRY METHOD | ACRE | 30 | |
| 62516-1000 | MULCHING, DRY METHOD | SQYD | (IP) | 40 |
| 62516-1000 | MULCHING, DRY METHOD | SQYD | (BUF) | 1000 |
| 62650-1000 | REMOVE AND REPLANT TREE AND SHRUB | EACH | (IP) | 9 |
| 62650-1000 | REMOVE AND REPLANT TREE AND SHRUB | EACH | (BUF) | 19 |
| 63301-1000 | SIGN SYSTEM, GOVERNMENT FURNISHED SIGN | EACH | Panel | 21 |
| 63301-1000 | SIGN SYSTEM, GOVERNMENT FURNISHED SIGN | EACH | (IP) | 10 |
| 63301-1000 | SIGN SYSTEM, GOVERNMENT FURNISHED SIGN | EACH | (BUF) | 10 |
| 63302-0000 | SIGN SYSTEM | SQFT | 78 | |
| 63306-0700 | POST, STEEL, PIPE | EACH | , Hitching Post | 1 |
| 63306-0700 | POST, STEEL, PIPE | EACH | , Hitching Post (REMOVE AND RESET) | 2 |
| 63318-1000 | SNOW POLE HOLDER | EACH | 152 | |
| 63401-0000 | PAVEMENT MARKINGS | LNFT | , Stop Line | 170 |
| 63401-0300 | PAVEMENT MARKINGS, TYPE B, SOLID | LNFT | WHITE | 78478 |
| 63401-0300 | PAVEMENT MARKINGS, TYPE B, SOLID | LNFT | YELLOW | 76702 |
| 63401-0400 | PAVEMENT MARKINGS, TYPE B, BROKEN | LNFT | YELLOW | 2000 |
| 63401-0450 | PAVEMENT MARKINGS, TYPE B, DOTTED | LNFT | WHITE | 8550 |
| 63405-0550 | PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW | EACH | 3 | |
| 63405-0850 | PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL | EACH | 3 | |
| 63502-0400 | TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 1 | EACH | 100 | |
| 63502-0600 | TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 | EACH | 30 | |
| 63502-0600 | TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 | EACH | (IP) | 3 |
| 63502-0600 | TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 | EACH | (BUF) | 3 |
| 63502-1250 | TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 42-INCH | EACH | 230 | |
| 63502-1300 | TEMPORARY TRAFFIC CONTROL, DRUM | EACH | 200 | |
| 63502-1500 | TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A | EACH | 65 | |
| 63502-1600 | TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B | EACH | 95 | |
| 63502-1700 | TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C | EACH | 100 | |
| 63502-3700 | TEMPORARY TRAFFIC CONTROL, SNOW POLE | EACH | 80 | |
| 63503-0400 | TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER | LNFT | 1750 | |
| 63503-0700 | TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS | LNFT | 80650 | |
| 63504-1000 | TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN | SQFT | 1603 | |
| 63504-1000 | TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN | SQFT | (IP) | 35 |
| 63504-1000 | TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN | SQFT | (BUF) | 65 |
| 63506-0600 | TEMPORARY TRAFFIC CONTROL, PILOT CAR | HOUR | 4500 | |
| 63507-0700 | TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR | DAY | 500 | |
| 63509-1000 | TEMPORARY TRAFFIC CONTROL, FLAGGER | FXHR | 20000 | |
| 63701-0000 | FIELD OFFICE | EACH | (RELOCATION) | 1 |
| 64603-0100 | FIXTURE, TRASH RECEPTACLE | EACH | (IP) | 1 |
| 64603-0100 | FIXTURE, TRASH RECEPTACLE | EACH | (BUF) | 2 |
| 64603-0300 | FIXTURE, BENCH | EACH | MASONRY (IP) | 4 |
| 64603-0300 | FIXTURE, BENCH | EACH | WOOD (IP) | 4 |
| 64603-0300 | FIXTURE, BENCH | EACH | MASONRY (BUF) | 2 |
| 64603-0800 | FIXTURE, KIOSK | EACH | (BUF) | 1 |
| 64604-1000 | FIXTURE, HANDRAIL | LNFT | , TYPE 1 (IP) | 154 |
| 64604-1000 | FIXTURE, HANDRAIL | LNFT | , TYPE 2 (IP) | 60 |
| 64604-1000 | FIXTURE, HANDRAIL | LNFT | , TYPE 3 (IP) | 59 |
| 64604-1000 | FIXTURE, HANDRAIL | LNFT | , TYPE 1 (BUF) | 205 |
| 64604-1000 | FIXTURE, HANDRAIL | LNFT | , TYPE 2 (BUF) | 35 |
| 64604-3000 | FIXTURE, PEDESTRIAN RAILING | LNFT | (BUF) | 295 |
| 64605-1000 | FIXTURE, KIOSK | LPSM | , repairs | 1 |
| 64631-0000 | ROADSIDE DEVELOPMENT | LNFT | , MASONRY STEPS AND EDGE STONES (IP) | 385 |
| 64632-0000 | ROADSIDE DEVELOPMENT | SQYD | , STABILIZED EMBANKMENT (IP) | 155 |
| 64632-0000 | ROADSIDE DEVELOPMENT | SQYD | , STABILIZED EMBANKMENT (BUF) | 16 |
| 64702-1000 | MITIGATION, LANDSCAPING LOG | LNFT | 3800 | |
| 64703-1000 | MITIGATION, LANDSCAPING LOG | EACH | (IP) | 8 |
| 64703-1000 | MITIGATION, LANDSCAPING LOG | EACH | (BUF) | 15 |
| 64703-3000 | MITIGATION, LOG WEIR | EACH | 2 | |
| 64704-1000 | MITIGATION, STREAMBED MATERIAL | CUYD | 81 | |
| 65105-0000 | TEMPORARY ROCKFALL PROTECTION | LPSM | 1 |
Schedule B
| This spreadsheet is being provided for informational use only. We will not be updating this information for any amendments. This spreadsheet may not be used in place of the bid schedule issued in the RFP. | ||||
| Pay Item | Description | Unit | Description2 | Quantity |
| 15101-0000 | MOBILIZATION | LPSM | 1 | |
| 15101-0000 | MOBILIZATION | LPSM | (IP) | 1 |
| 15101-0000 | MOBILIZATION | LPSM | (BUF) | 1 |
| 15201-0000 | CONSTRUCTION SURVEY AND STAKING | LPSM | 1 | |
| 15201-0000 | CONSTRUCTION SURVEY AND STAKING | LPSM | (IP) | 1 |
| 15201-0000 | CONSTRUCTION SURVEY AND STAKING | LPSM | (BUF) | 1 |
| 15301-0010 | CONTRACTOR QUALITY CONTROL AND ASSURANCE | LPSM | 1 | |
| 15301-0010 | CONTRACTOR QUALITY CONTROL AND ASSURANCE | LPSM | (IP) | 1 |
| 15301-0010 | CONTRACTOR QUALITY CONTROL AND ASSURANCE | LPSM | (BUF) | 1 |
| 15401-0000 | CONTRACTOR TESTING | LPSM | 1 | |
| 15401-0000 | CONTRACTOR TESTING | LPSM | (IP) | 1 |
| 15401-0000 | CONTRACTOR TESTING | LPSM | (BUF) | 1 |
| 15501-0000 | CONSTRUCTION SCHEDULE | LPSM | 1 | |
| 15501-0000 | CONSTRUCTION SCHEDULE | LPSM | (IP) | 1 |
| 15501-0000 | CONSTRUCTION SCHEDULE | LPSM | (BUF) | 1 |
| 15701-0000 | SOIL EROSION CONTROL | LPSM | (IP) | 1 |
| 15701-0000 | SOIL EROSION CONTROL | LPSM | (BUF) | 1 |
| 15704-1000 | SOIL EROSION CONTROL, PLASTIC LINING | SQYD | 740 | |
| 15704-1100 | SOIL EROSION CONTROL, BRUSH BLANKET | SQYD | 40523 | |
| 15705-0100 | SOIL EROSION CONTROL, SILT FENCE | LNFT | 14298 | |
| 15705-1000 | SOIL EROSION CONTROL, TEMPORARY 48-INCH CULVERT PIPE | LNFT | 338 | |
| 15705-1400 | SOIL EROSION CONTROL, FIBER ROLL | LNFT | 36799 | |
| 15705-1400 | SOIL EROSION CONTROL, FIBER ROLL | LNFT | (IP) | 560 |
| 15705-1400 | SOIL EROSION CONTROL, FIBER ROLL | LNFT | (BUF) | 1935 |
| 15706-0200 | SOIL EROSION CONTROL, CHECK DAM | EACH | 96 | |
| 15706-0300 | SOIL EROSION CONTROL, SANDBAG | EACH | 4300 | |
| 15706-1000 | SOIL EROSION CONTROL, INLET PROTECTION | EACH | 14 | |
| 15802-0000 | WATERING FOR DUST CONTROL | LPSM | 1 | |
| 20101-0000 | CLEARING AND GRUBBING | ACRE | 41 | |
| 20103-0000 | CLEARING AND GRUBBING | SQYD | (IP) | 530 |
| 20103-0000 | CLEARING AND GRUBBING | SQYD | (BUF) | 1458 |
| 20301-0080 | REMOVAL OF BENCH | EACH | (IP) | 6 |
| 20301-0200 | REMOVAL OF BOULDER | EACH | , STOCKPILE | 211 |
| 20301-0300 | REMOVAL OF BOX CULVERT | EACH | 1 | |
| 20301-1100 | REMOVAL OF GATE | EACH | , double swing | 2 |
| 20301-1200 | REMOVAL OF HEADWALL | EACH | 64 | |
| 20301-1400 | REMOVAL OF INLET | EACH | 1 | |
| 20301-1900 | REMOVAL OF PIPE CULVERT | EACH | 41 | |
| 20301-2300 | REMOVAL OF SIGN/MARKER | EACH | 34 | |
| 20301-2300 | REMOVAL OF SIGN/MARKER | EACH | (IP) | 4 |
| 20301-2300 | REMOVAL OF SIGN/MARKER | EACH | (BUF) | 4 |
| 20301-2700 | REMOVAL OF STRUCTURE | EACH | , DRY STACK WALL | 2 |
| 20301-3000 | REMOVAL OF TRASH RECEPTACLE | EACH | (BUF) | 4 |
| 20302-0700 | REMOVAL OF FENCE | LNFT | (BUF) | 130 |
| 20302-1000 | REMOVAL OF FENCE, RAIL | LNFT | (IP) | 55 |
| 20302-2500 | REMOVAL OF HANDRAIL | LNFT | (IP) | 275 |
| 20302-2500 | REMOVAL OF HANDRAIL | LNFT | (BUF) | 170 |
| 20303-0000 | REMOVAL OF STRUCTURES AND OBSTRUCTIONS | SQYD | , CONC. STAIRS (IP) | 105 |
| 20303-0000 | REMOVAL OF STRUCTURES AND OBSTRUCTIONS | SQYD | , TIMBER STEPS (IP) | 12 |
| 20303-0300 | REMOVAL OF CONCRETE | SQYD | (IP) | 25 |
| 20303-1600 | REMOVAL OF PAVEMENT, ASPHALT | SQYD | (BUF) | 1290 |
| 20303-3000 | REMOVAL OF SIDEWALK, ASPHALT | SQYD | 71 | |
| 20303-3000 | REMOVAL OF SIDEWALK, ASPHALT | SQYD | (IP) | 10 |
| 20303-3000 | REMOVAL OF SIDEWALK, ASPHALT | SQYD | (BUF) | 938 |
| 20303-3200 | REMOVAL OF SIDEWALK, CONCRETE | SQYD | (BUF) | 66 |
| 20303-3500 | REMOVAL OF STONE MASONRY | SQYD | 91 | |
| 20401-0000 | ROADWAY EXCAVATION | CUYD | 167600 | |
| 20401-0000 | ROADWAY EXCAVATION | CUYD | (IP) | 340 |
| 20401-0000 | ROADWAY EXCAVATION | CUYD | (BUF) | 60 |
| 20402-0000 | SUBEXCAVATION | CUYD | 13000 | |
| 20402-0000 | SUBEXCAVATION | CUYD | (IP) | 350 |
| 20403-0000 | UNCLASSIFIED BORROW | CUYD | 5795 | |
| 20411-0000 | SELECT BORROW | TON | 35900 | |
| 20411-0000 | SELECT BORROW | TON | (IP) | 500 |
| 20411-0000 | SELECT BORROW | TON | (BUF) | 2200 |
| 20421-0000 | ROCK EXCAVATION | CUYD | (BUF) | 11 |
| 20426-1000 | DITCH, EXCAVATION | CUYD | (Apollinaris channel) | 171 |
| 20465-0000 | CONSERVE AND PLACE BOULDER | EACH | 154 | |
| 20466-0000 | CONSERVE AND STOCKPILE TOPSOIL | CUYD | (IP) | 3 |
| 20701-0100 | SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE A | SQYD | , WOVEN | 2500 |
| 20701-0200 | SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE B | SQYD | 250 | |
| 20701-0300 | SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C | SQYD | 18100 | |
| 20701-0300 | SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C | SQYD | (Special Rock Embankment) | 3600 |
| 20701-0300 | SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C | SQYD | , WOVEN | 1777 |
| 20703-0000 | GEOGRID | SQYD | (Biaxial) | 8600 |
| 20703-2000 | GEOGRID, STABILIZATION | SQYD | 3776 | |
| 20704-0000 | GEOMEMBRANE | SQYD | 2200 | |
| 20704-0000 | GEOMEMBRANE | SQYD | (IP) | 110 |
| 20705-1000 | INSULATION BOARD, POLYSTYRENE FOAM | SQYD | 2200 | |
| 20815-0000 | COFFERDAMS | LPSM | (Apollinairis Box Culvert) | 1 |
| 20815-0000 | COFFERDAMS | LPSM | (Glen Creek Box Culvert) | 1 |
| 21101-1000 | ROADWAY OBLITERATION, METHOD 1 | SQYD | 4400 | |
| 21101-1000 | ROADWAY OBLITERATION, METHOD 1 | SQYD | (IP) | 100 |
| 25101-0100 | PLACED RIPRAP, METHOD A, CLASS 1 | CUYD | 120 | |
| 25101-0200 | PLACED RIPRAP, METHOD A, CLASS 2 | CUYD | (IP) | 27 |
| 25101-0200 | PLACED RIPRAP, METHOD A, CLASS 2 | CUYD | (BUF) | 30 |
| 25101-0300 | PLACED RIPRAP, METHOD A, CLASS 3 | CUYD | 540 | |
| 25101-0300 | PLACED RIPRAP, METHOD A, CLASS 3 | CUYD | (IP) | 5 |
| 25120-0100 | RIPRAP DITCH, METHOD A, CLASS 1 | LNFT | 1900 | |
| 25125-0000 | BOULDER | EACH | (IP) | 140 |
| 25125-0000 | BOULDER | EACH | (BUF) | 55 |
| 25201-1000 | SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED | CUYD | (Class 2) | 350 |
| 25201-1000 | SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED | CUYD | (Class 2, Landslide) | 900 |
| 25201-1000 | SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED | CUYD | (Class 3) | 825 |
| 25201-1000 | SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED | CUYD | (Class 5) | 350 |
| 25210-0000 | ROCKERY | SQFT | 4800 | |
| 25210-0000 | ROCKERY | SQFT | , SEAT WALL | 18 |
| 25210-0000 | ROCKERY | SQFT | , TYPE 1 (IP) | 1600 |
| 25210-0000 | ROCKERY | SQFT | , TYPE 2 (IP) | 220 |
| 25210-0000 | ROCKERY | SQFT | , TYPE 2 (BUF) | 600 |
| 25210-0000 | ROCKERY | SQFT | , TYPE 2A (BUF) | 600 |
| 25501-0000 | MECHANICALLY STABILIZED EARTH WALL | SQFT | 14000 | |
| 25501-0000 | MECHANICALLY STABILIZED EARTH WALL | SQFT | (IP) | 400 |
| 25701-0400 | CONTRACTOR FURNISHED REINFORCED CONCRETE RETAINING WALL DESIGN | LPSM | 1 | |
| 25801-0000 | REINFORCED CONCRETE RETAINING WALL | SQFT | (precast wing wall) | 659 |
| 27301-0000 | POLYURETHANE RESIN INJECTION | LB | (BUF) | 7600 |
| 27501-1000 | GEOFOAM, LIGHTWEIGHT FILL MATERIAL | CUYD | (IP) | 65 |
| 30202-1000 | ROADWAY AGGREGATE, METHOD 1 | TON | 73 | |
| 30202-2000 | ROADWAY AGGREGATE, METHOD 2 | TON | 1730 | |
| 30202-2000 | ROADWAY AGGREGATE, METHOD 2 | TON | (BUF) | 445 |
| 30801-0000 | RECYCLED AGGREGATE BASE | SQYD | 77600 | |
| 40101-5600 | ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL | TON | , TYPE III | 26300 |
| 40105-3000 | ANTISTRIP ADDITIVE, TYPE 3 | TON | 244 | |
| 40301-0100 | ASPHALT CONCRETE PAVEMENT, TYPE 1 | TON | (BUF) | 350 |
| 40601-0000 | FOG SEAL | TON | 35 | |
| 40605-0000 | BLOTTER | TON | 607 | |
| 40801-0000 | COLD RECYCLED ASPHALT BASE COURSE | TON | 28400 | |
| 41201-0000 | TACK COAT | TON | 43 | |
| 55201-0200 | STRUCTURAL CONCRETE, CLASS A (AE) | CUYD | (IP) | 38 |
| 55201-0200 | STRUCTURAL CONCRETE, CLASS A (AE) | CUYD | (BUF) | 8 |
| 55210-0000 | PRECAST STRUCTURAL CONCRETE | CUYD | (precast concrete footing) | 16 |
| 55401-1000 | REINFORCING STEEL | LB | (IP) | 11500 |
| 55401-3000 | REINFORCING STEEL, STAINLESS STEEL | LB | (BUF) | 2412 |
| 55501-0000 | STRUCTURAL STEEL | LPSM | BOARDWALK (IP) | 1 |
| 56701-0000 | MICROPILE | LNFT | , BOARDWALK (IP) | 640 |
| 56701-0000 | MICROPILE | LNFT | (IP) | 160 |
| 56701-0000 | MICROPILE | LNFT | (BUF) | 64 |
| 57501-0000 | MINOR BRIDGE WORK | LPSM | (BUF) | 1 |
| 60201-0400 | 12-INCH PIPE CULVERT | LNFT | 86 | |
| 60201-0400 | 12-INCH PIPE CULVERT | LNFT | (BUF) | 8 |
| 60201-0600 | 18-INCH PIPE CULVERT | LNFT | (IP) | 76 |
| 60201-0600 | 18-INCH PIPE CULVERT | LNFT | (BUF) | 30 |
| 60201-0800 | 24-INCH PIPE CULVERT | LNFT | 3107 | |
| 60201-0900 | 30-INCH PIPE CULVERT | LNFT | 259 | |
| 60201-1000 | 36-INCH PIPE CULVERT | LNFT | 264 | |
| 60220-3150 | 10 FEET SPAN, 8 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT | LNFT | 56 | |
| 60220-4200 | 12 FEET SPAN, 11 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT | LNFT | 36 | |
| 60404-1000 | CATCH BASIN, FLH TYPE 1 | EACH | 14 | |
| 60404-1000 | CATCH BASIN, FLH TYPE 1 | EACH | (IP) | 6 |
| 60404-1000 | CATCH BASIN, FLH TYPE 1 | EACH | (BUF) | 1 |
| 60501-0000 | STANDARD UNDERDRAIN SYSTEM | LNFT | 1150 | |
| 60510-0800 | 6-INCH OUTLET PIPE | LNFT | (BUF) | 6 |
| 60510-0900 | 8-INCH COLLECTOR PIPE | LNFT | 2500 | |
| 60510-1000 | 8-INCH OUTLET PIPE | LNFT | 450 | |
| 60522-0000 | SAND | CUYD | 200 | |
| 60901-1700 | CURB, CONCRETE, 18-INCH DEPTH | LNFT | 3069 | |
| 60901-2900 | CURB, STONE, TYPE 1, 6-INCH DEPTH | LNFT | 839 | |
| 60901-7000 | CURB, LOG | LNFT | 4324 | |
| 61001-0000 | HORIZONTAL DRAIN PIPE | LNFT | (BUF) | 30 |
| 61501-0100 | SIDEWALK, CONCRETE | SQYD | (IP) | 185 |
| 61501-1100 | SIDEWALK, ASPHALT | SQYD | 224 | |
| 61501-1100 | SIDEWALK, ASPHALT | SQYD | (IP) | 255 |
| 61501-1100 | SIDEWALK, ASPHALT | SQYD | (BUF) | 730 |
| 61503-5000 | MEDIAN, STONE | SQYD | , Cobble | 17 |
| 61504-3000 | ACCESSIBILITY RAMP, ASPHALT | SQYD | 21 | |
| 61701-2000 | GUARDRAIL SYSTEM G4, TYPE 4, CLASS B WOOD POSTS | LNFT | 2025 | |
| 61702-1300 | TERMINAL SECTION, TYPE MELT | EACH | 2 | |
| 61901-1300 | FENCE, CHAIN LINK | LNFT | , TEMPORARY (IP) | 30 |
| 61901-1300 | FENCE, CHAIN LINK | LNFT | , TEMPORARY (BUF) | 50 |
| 61902-0900 | GATE, METAL | EACH | , 40 foot width (government furnished) | 2 |
| 62001-0000 | STONE MASONRY | CUYD | (headwall repair) | 11 |
| 62002-0000 | STONE MASONRY | SQYD | (MSE Wall Facing) | 1300 |
| 62002-0000 | STONE MASONRY | SQYD | , WALL FACING (IP) | 26 |
| 62002-0000 | STONE MASONRY | SQYD | , PIPE COVER (IP) | 6 |
| 62002-0000 | STONE MASONRY | SQYD | , GUARDWALL (IP) | 70 |
| 62002-0000 | STONE MASONRY | SQYD | , PAVING (BUF) | 80 |
| 62002-0000 | STONE MASONRY | SQYD | , WALL FACING (BUF) | 45 |
| 62002-0000 | STONE MASONRY | SQYD | , WALL ADJUSTMENTS (BUF) | 35 |
| 62002-0000 | STONE MASONRY | SQYD | , GUARDWALL (BUF) | 17 |
| 62002-1000 | CLASS B MASONRY, ROCK FACE FINISH | SQYD | 120 | |
| 62005-0000 | CONCRETE MASONRY UNITS | CUYD | 250 | |
| 62010-0000 | STONE MASONRY | LNFT | , EDGING (IP) | 130 |
| 62010-0000 | STONE MASONRY | LNFT | , SCUPPER (BUF) | 4 |
| 62010-0000 | STONE MASONRY | LNFT | , EDGING (BUF) | 18 |
| 62010-0000 | STONE MASONRY | LNFT | , SEAT WALL (BUF) | 40 |
| 62010-0000 | STONE MASONRY | LNFT | WALL (BUF) | 215 |
| 62011-0300 | STONE MASONRY HEADWALL FOR 18-INCH PIPE CULVERT | EACH | (IP) | 2 |
| 62011-0300 | STONE MASONRY HEADWALL FOR 18-INCH PIPE CULVERT | EACH | (BUF) | 1 |
| 62011-0500 | STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT | EACH | 68 | |
| 62011-0600 | STONE MASONRY HEADWALL FOR 30-INCH PIPE CULVERT | EACH | 10 | |
| 62011-0700 | STONE MASONRY HEADWALL FOR 36-INCH PIPE CULVERT | EACH | 12 | |
| 62026-1000 | REMOVE AND RESET STONE MASONRY | SQYD | (FLAGSTONE) | 20 |
| 62027-0000 | REMOVE AND RESET STONE MASONRY | LNFT | (Curb) | 500 |
| 62031-0000 | REPOINT STONE MASONRY | SQFT | (BUF) | 1950 |
| 62201-0000 | EQUIPMENT | HOUR | , JACKHAMMER | 40 |
| 62201-0300 | DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY | HOUR | 400 | |
| 62201-0300 | DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY | HOUR | (IP) | 40 |
| 62201-0300 | DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY | HOUR | (BUF) | 100 |
| 62201-0450 | BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH | HOUR | 50 | |
| 62201-0450 | BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH | HOUR | (IP) | 80 |
| 62201-0450 | BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH | HOUR | (BUF) | 100 |
| 62201-1000 | WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY | HOUR | 200 | |
| 62201-1000 | WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY | HOUR | (IP) | 80 |
| 62201-1000 | WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY | HOUR | (BUF) | 100 |
| 62201-1350 | BULLDOZER, 200HP MINIMUM FLYWHEEL POWER | HOUR | 200 | |
| 62201-1350 | BULLDOZER, 200HP MINIMUM FLYWHEEL POWER | HOUR | (BUF) | 40 |
| 62201-3000 | HYDRAULIC EXCAVATOR | HOUR | , 140HP MINIMUM WITH 3500 POUND MINIMUM HAMMER ATTACHMENT | 100 |
| 62201-3000 | HYDRAULIC EXCAVATOR | HOUR | , 140HP MINIMUM WITH 50 FOOT MINIMUM REACH | 40 |
| 62201-3000 | HYDRAULIC EXCAVATOR | HOUR | , MINI EXCAVATOR, 69" MINIMUM WIDTH, WITH THUMB ATTACHMENT | 40 |
| 62201-3000 | HYDRAULIC EXCAVATOR | HOUR | (ROCK HAMMER) | 200 |
| 62201-3150 | HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT | HOUR | 500 | |
| 62201-3150 | HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT | HOUR | (IP) | 40 |
| 62201-3150 | HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT | HOUR | (BUF) | 200 |
| 62201-3750 | CHAIN SAW | HOUR | 40 | |
| 62201-3750 | CHAIN SAW | HOUR | (IP) | 10 |
| 62201-3750 | CHAIN SAW | HOUR | (BUF) | 10 |
| 62301-0000 | GENERAL LABOR | HOUR | 1700 | |
| 62301-0000 | GENERAL LABOR | HOUR | (IP) | 200 |
| 62301-0000 | GENERAL LABOR | HOUR | (BUF) | 100 |
| 62302-0000 | SPECIAL LABOR | HOUR | , Carpenter | 200 |
| 62302-0000 | SPECIAL LABOR | HOUR | , Stone Mason | 200 |
| 62302-0000 | SPECIAL LABOR | HOUR | (WETLAND RESTORATION) | 200 |
| 62302-0000 | SPECIAL LABOR | HOUR | CARPENTER (IP) | 20 |
| 62302-0000 | SPECIAL LABOR | HOUR | STONE MASON (IP) | 40 |
| 62302-0000 | SPECIAL LABOR | HOUR | , Carpenter (BUF) | 20 |
| 62302-0000 | SPECIAL LABOR | HOUR | , Stone Mason (BUF) | 80 |
| 62302-0100 | SPECIAL LABOR, SLOPE SCALING | HOUR | , Mechanical | 16 |
| 62302-1100 | SPECIAL LABOR, HIRED SURVEY SERVICES | HOUR | 50 | |
| 62302-1100 | SPECIAL LABOR, HIRED SURVEY SERVICES | HOUR | (IP) | 25 |
| 62302-1100 | SPECIAL LABOR, HIRED SURVEY SERVICES | HOUR | (BUF) | 25 |
| 62405-0200 | PLACING CONSERVED TOPSOIL, 3-INCH DEPTH | SQYD | (IP) | 40 |
| 62405-0200 | PLACING CONSERVED TOPSOIL, 3-INCH DEPTH | SQYD | (BUF) | 950 |
| 62406-0100 | PLACING CONSERVED TOPSOIL, 2-INCH DEPTH | ACRE | 35 | |
| 62515-1000 | MULCHING, DRY METHOD | ACRE | 35 | |
| 62516-1000 | MULCHING, DRY METHOD | SQYD | (IP) | 40 |
| 62516-1000 | MULCHING, DRY METHOD | SQYD | (BUF) | 1000 |
| 62650-1000 | REMOVE AND REPLANT TREE AND SHRUB | EACH | (IP) | 9 |
| 62650-1000 | REMOVE AND REPLANT TREE AND SHRUB | EACH | (BUF) | 19 |
| 63301-1000 | SIGN SYSTEM, GOVERNMENT FURNISHED SIGN | EACH | Panel | 27 |
| 63301-1000 | SIGN SYSTEM, GOVERNMENT FURNISHED SIGN | EACH | (IP) | 10 |
| 63301-1000 | SIGN SYSTEM, GOVERNMENT FURNISHED SIGN | EACH | (BUF) | 10 |
| 63302-0000 | SIGN SYSTEM | SQFT | 118 | |
| 63306-0700 | POST, STEEL, PIPE | EACH | , Hitching Post | 1 |
| 63306-0700 | POST, STEEL, PIPE | EACH | , Hitching Post (REMOVE AND RESET) | 2 |
| 63318-1000 | SNOW POLE HOLDER | EACH | 196 | |
| 63401-0000 | PAVEMENT MARKINGS | LNFT | , Stop Line | 227 |
| 63401-0300 | PAVEMENT MARKINGS, TYPE B, SOLID | LNFT | WHITE | 94300 |
| 63401-0300 | PAVEMENT MARKINGS, TYPE B, SOLID | LNFT | YELLOW | 90542 |
| 63401-0400 | PAVEMENT MARKINGS, TYPE B, BROKEN | LNFT | YELLOW | 3600 |
| 63401-0450 | PAVEMENT MARKINGS, TYPE B, DOTTED | LNFT | WHITE | 10600 |
| 63405-0550 | PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW | EACH | 3 | |
| 63405-0850 | PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL | EACH | 4 | |
| 63502-0400 | TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 1 | EACH | 100 | |
| 63502-0600 | TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 | EACH | 30 | |
| 63502-0600 | TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 | EACH | (IP) | 3 |
| 63502-0600 | TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 | EACH | (BUF) | 3 |
| 63502-1250 | TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 42-INCH | EACH | 230 | |
| 63502-1300 | TEMPORARY TRAFFIC CONTROL, DRUM | EACH | 200 | |
| 63502-1500 | TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A | EACH | 65 | |
| 63502-1600 | TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B | EACH | 95 | |
| 63502-1700 | TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C | EACH | 100 | |
| 63502-3700 | TEMPORARY TRAFFIC CONTROL, SNOW POLE | EACH | 80 | |
| 63503-0400 | TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER | LNFT | 1750 | |
| 63503-0700 | TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS | LNFT | 80650 | |
| 63503-1000 | TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE | LNFT | 159 | |
| 63504-1000 | TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN | SQFT | 1603 | |
| 63504-1000 | TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN | SQFT | (IP) | 35 |
| 63504-1000 | TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN | SQFT | (BUF) | 65 |
| 63506-0600 | TEMPORARY TRAFFIC CONTROL, PILOT CAR | HOUR | 4500 | |
| 63507-0700 | TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR | DAY | 500 | |
| 63509-1000 | TEMPORARY TRAFFIC CONTROL, FLAGGER | FXHR | 20000 | |
| 63701-0000 | FIELD OFFICE | EACH | (RELOCATION) | 1 |
| 64603-0100 | FIXTURE, TRASH RECEPTACLE | EACH | (IP) | 1 |
| 64603-0100 | FIXTURE, TRASH RECEPTACLE | EACH | (BUF) | 2 |
| 64603-0300 | FIXTURE, BENCH | EACH | MASONRY (IP) | 4 |
| 64603-0300 | FIXTURE, BENCH | EACH | WOOD (IP) | 4 |
| 64603-0300 | FIXTURE, BENCH | EACH | MASONRY (BUF) | 2 |
| 64603-0800 | FIXTURE, KIOSK | EACH | (BUF) | 1 |
| 64604-1000 | FIXTURE, HANDRAIL | LNFT | , TYPE 1 (IP) | 154 |
| 64604-1000 | FIXTURE, HANDRAIL | LNFT | , TYPE 2 (IP) | 60 |
| 64604-1000 | FIXTURE, HANDRAIL | LNFT | , TYPE 3 (IP) | 59 |
| 64604-1000 | FIXTURE, HANDRAIL | LNFT | , TYPE 1 (BUF) | 205 |
| 64604-1000 | FIXTURE, HANDRAIL | LNFT | , TYPE 2 (BUF) | 35 |
| 64604-3000 | FIXTURE, PEDESTRIAN RAILING | LNFT | (BUF) | 295 |
| 64605-1000 | FIXTURE, KIOSK | LPSM | , repairs | 1 |
| 64620-1100 | REMOVE AND RESET KIOSK | EACH | 1 | |
| 64631-0000 | ROADSIDE DEVELOPMENT | LNFT | , MASONRY STEPS AND EDGE STONES (IP) | 385 |
| 64632-0000 | ROADSIDE DEVELOPMENT | SQYD | , STABILIZED EMBANKMENT (IP) | 155 |
| 64632-0000 | ROADSIDE DEVELOPMENT | SQYD | STABILIZED EMBANKMENT (BUF) | 16 |
| 64702-1000 | MITIGATION, LANDSCAPING LOG | LNFT | 4600 | |
| 64703-1000 | MITIGATION, LANDSCAPING LOG | EACH | (IP) | 8 |
| 64703-1000 | MITIGATION, LANDSCAPING LOG | EACH | (BUF) | 15 |
| 64703-3000 | MITIGATION, LOG WEIR | EACH | 6 | |
| 64704-1000 | MITIGATION, STREAMBED MATERIAL | CUYD | 138 | |
| 65105-0000 | TEMPORARY ROCKFALL PROTECTION | LPSM | 1 |
Option W
| This spreadsheet is being provided for informational use only. We will not be updating this information for any amendments. This spreadsheet may not be used in place of the bid schedule issued in the RFP. | ||||
| Pay Item | Description | Unit | Description2 | Quantity |
| 15201-0000 | CONSTRUCTION SURVEY AND STAKING | LPSM | 1 | |
| 15301-0010 | CONTRACTOR QUALITY CONTROL AND ASSURANCE | LPSM | 1 | |
| 15401-0000 | CONTRACTOR TESTING | LPSM | 1 | |
| 15501-0000 | CONSTRUCTION SCHEDULE | LPSM | 1 | |
| 15701-0000 | SOIL EROSION CONTROL | LPSM | 1 | |
| 15705-1400 | SOIL EROSION CONTROL, FIBER ROLL | LNFT | 2090 | |
| 15706-1000 | SOIL EROSION CONTROL, INLET PROTECTION | EACH | 3 | |
| 20103-0000 | CLEARING AND GRUBBING | SQYD | 1520 | |
| 20301-1400 | REMOVAL OF INLET | EACH | 3 | |
| 20301-2300 | REMOVAL OF SIGN/MARKER | EACH | 1 | |
| 20301-2800 | REMOVAL OF STRUCTURES AND OBSTRUCTIONS | EACH | , STAIRS AND HANDRAILS | 2 |
| 20302-0500 | REMOVAL OF CURB, CONCRETE | LNFT | 2090 | |
| 20302-2100 | REMOVAL OF PIPE CULVERT | LNFT | 100 | |
| 20303-3000 | REMOVAL OF SIDEWALK, ASPHALT | SQYD | 309 | |
| 20310-1000 | PLUG, EXISTING PIPE | EACH | 1 | |
| 20401-0000 | ROADWAY EXCAVATION | CUYD | 1600 | |
| 20411-0000 | SELECT BORROW | TON | 2800 | |
| 25101-0200 | PLACED RIPRAP, METHOD A, CLASS 2 | CUYD | 120 | |
| 25110-0300 | GROUTED RIPRAP, METHOD A, CLASS 3 | CUYD | 45 | |
| 25125-0000 | BOULDER | EACH | 22 | |
| 25210-0000 | ROCKERY | SQFT | , TYPE 1 | 450 |
| 25501-0000 | MECHANICALLY STABILIZED EARTH WALL | SQFT | , STONE MASONRY FACE | 2200 |
| 30202-2000 | ROADWAY AGGREGATE, METHOD 2 | TON | 2500 | |
| 30801-0000 | RECYCLED AGGREGATE BASE | SQYD | 7900 | |
| 40301-0100 | ASPHALT CONCRETE PAVEMENT, TYPE 1 | TON | 2030 | |
| 41201-000 | TACK COAT | TON | 2 | |
| 60201-0800 | 24-INCH PIPE CULVERT | LNFT | 405 | |
| 60404-1000 | CATCH BASIN, FLH TYPE 1 | EACH | 7 | |
| 60902-1000 | CURB AND GUTTER, CONCRETE, 12-INCH DEPTH | LNFT | 2205 | |
| 60902-1000 | CURB AND GUTTER, CONCRETE, 12-INCH DEPTH | LNFT | , MOUNTABLE | 485 |
| 61501-1100 | SIDEWALK, ASPHALT | SQYD | 1900 | |
| 61504-1000 | ACCESSIBILITY RAMP, CONCRETE | SQYD | 20 | |
| 61509-0000 | DETECTABLE WARNING PANELS | SQYD | 6 | |
| 62002-0000 | STONE MASONRY | SQYD | , WALL FACING | 220 |
| 62010-0000 | STONE MASONRY | LNFT | 223 | |
| 62028-1000 | REMOVE AND RESET STONE MASONRY HEADWALL | EACH | 1 | |
| 62201-0300 | DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY | HOUR | 100 | |
| 62201-0450 | BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH | HOUR | 100 | |
| 62201-1000 | WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY | HOUR | 100 | |
| 62201-1350 | BULLDOZER, 200HP MINIMUM FLYWHEEL POWER | HOUR | 60 | |
| 62201-3150 | HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT | HOUR | 200 | |
| 62201-3750 | CHAIN SAW | HOUR | 10 | |
| 62301-0000 | GENERAL LABOR | HOUR | 100 | |
| 62302-0000 | SPECIAL LABOR | HOUR | CARPENTER | 20 |
| 62302-0000 | SPECIAL LABOR | HOUR | STONE MASON | 40 |
| 62405-0200 | PLACING CONSERVED TOPSOIL, 3-INCH DEPTH | SQYD | 330 | |
| 62516-1000 | MULCHING, DRY METHOD | SQYD | 330 | |
| 62650-1000 | REMOVE AND REPLANT TREE AND SHRUB | EACH | 12 | |
| 63301-0000 | SIGN SYSTEM | EACH | 3 | |
| 63301-1000 | SIGN SYSTEM, GOVERNMENT FURNISHED SIGN | EACH | 14 | |
| 63309-1000 | DELINEATOR, TYPE SNOW POLE | EACH | 50 | |
| 63317-1000 | REMOVE AND RESET SIGN | SQYD | 2 | |
| 63318-1000 | SNOW POLE HOLDER | EACH | 50 | |
| 63401-0300 | PAVEMENT MARKINGS, TYPE B, SOLID | LNFT | (WHITE) | 1750 |
| 63405-0550 | PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW | EACH | (WHITE) | 4 |
| 63405-0850 | PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL | EACH | (WHITE) | 4 |
| 64603-0300 | FIXTURE, BENCH | EACH | 4 | |
| 64604-1000 | FIXTURE, HANDRAIL | LNFT | 50 | |
| 64604-3000 | FIXTURE, PEDESTRIAN RAILING | LNFT | 320 | |
| 64631-0000 | ROADSIDE DEVELOPMENT | LNFT | , MASONRY STEPS AND EDGE STONES | 310 |
Option X
| This spreadsheet is being provided for informational use only. We will not be updating this information for any amendments. This spreadsheet may not be used in place of the bid schedule issued in the RFP. | ||||
| Pay Item | Description | Unit | Description2 | Quantity |
| 15101-0000 | MOBILIZATION | LPSM | 1 | |
| 15201-0000 | CONSTRUCTION SURVEY AND STAKING | LPSM | 1 | |
| 15301-0010 | CONTRACTOR QUALITY CONTROL AND ASSURANCE | LPSM | 1 | |
| 15401-0000 | CONTRACTOR TESTING | LPSM | 1 | |
| 15501-0000 | CONSTRUCTION SCHEDULE | LPSM | 1 | |
| 15705-1400 | SOIL EROSION CONTROL, FIBER ROLL | LNFT | 1245 | |
| 20103-0000 | CLEARING AND GRUBBING | SQYD | 1400 | |
| 20301-0080 | REMOVAL OF BENCH | EACH | 4 | |
| 20301-2300 | REMOVAL OF SIGN/MARKER | EACH | 6 | |
| 20301-3000 | REMOVAL OF TRASH RECEPTACLE | EACH | 4 | |
| 20302-1000 | REMOVAL OF FENCE, RAIL | LNFT | 440 | |
| 20302-2500 | REMOVAL OF HANDRAIL | LNFT | 70 | |
| 20303-0000 | REMOVAL OF STRUCTURES AND OBSTRUCTIONS | SQYD | , WOOD BOARDWALK | 100 |
| 20303-0300 | REMOVAL OF CONCRETE | SQYD | 150 | |
| 20303-3000 | REMOVAL OF SIDEWALK, ASPHALT | SQYD | 1115 | |
| 20303-3500 | REMOVAL OF STONE MASONRY | SQYD | 20 | |
| 20401-0000 | ROADWAY EXCAVATION | CUYD | 100 | |
| 20411-0000 | SELECT BORROW | TON | 110 | |
| 21101-1000 | ROADWAY OBLITERATION, METHOD 1 | SQYD | 650 | |
| 25101-0200 | PLACED RIPRAP, METHOD A, CLASS 2 | CUYD | 30 | |
| 25125-0000 | BOULDER | EACH | 77 | |
| 25210-0000 | ROCKERY | SQFT | , TYPE 2 | 1220 |
| 60201-0400 | 12-INCH PIPE CULVERT | LNFT | 30 | |
| 60201-0800 | 24-INCH PIPE CULVERT | LNFT | 20 | |
| 60406-0000 | INLET ADJUSTMENT | EACH | 1 | |
| 61108-4000 | ADJUST VALVE BOX | EACH | 1 | |
| 61501-1100 | SIDEWALK, ASPHALT | SQYD | 1820 | |
| 61901-1300 | FENCE, CHAIN LINK | LNFT | , TEMPORARY | 80 |
| 62002-0000 | STONE MASONRY | SQYD | , GUARDWALL | 125 |
| 62010-0000 | STONE MASONRY | LNFT | , SCUPPER | 4 |
| 62010-0000 | STONE MASONRY | LNFT | , EDGING | 90 |
| 62011-0100 | STONE MASONRY HEADWALL FOR 12-INCH PIPE CULVERT | EACH | 4 | |
| 62201-0300 | DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY | HOUR | 100 | |
| 62201-0450 | BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH | HOUR | 100 | |
| 62201-1000 | WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY | HOUR | 100 | |
| 62201-1350 | BULLDOZER, 200HP MINIMUM FLYWHEEL POWER | HOUR | 40 | |
| 62201-3150 | HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT | HOUR | 200 | |
| 62201-3750 | CHAIN SAW | HOUR | 10 | |
| 62301-0000 | GENERAL LABOR | HOUR | 100 | |
| 62302-0000 | SPECIAL LABOR | HOUR | CARPENTER | 20 |
| 62302-0000 | SPECIAL LABOR | HOUR | STONE MASON | 80 |
| 62405-0200 | PLACING CONSERVED TOPSOIL, 3-INCH DEPTH | SQYD | 1100 | |
| 62516-1000 | MULCHING, DRY METHOD | SQYD | 1100 | |
| 62650-1000 | REMOVE AND REPLANT TREE AND SHRUB | EACH | 35 | |
| 63301-1000 | SIGN SYSTEM, GOVERNMENT FURNISHED SIGN | EACH | 7 | |
| 63502-0600 | TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 | EACH | 3 | |
| 63504-1000 | TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN | SQFT | 60 | |
| 64603-0100 | FIXTURE, TRASH RECEPTACLE | EACH | 2 | |
| 64603-0300 | FIXTURE, BENCH | EACH | , MASONRY | 3 |
| 64603-0300 | FIXTURE, BENCH | EACH | , WOOD | 2 |
| 64603-0800 | FIXTURE, KIOSK | EACH | 2 | |
| 64604-1000 | FIXTURE, HANDRAIL | LNFT | , TYPE 1 | 44 |
| 64604-1000 | FIXTURE, HANDRAIL | LNFT | , TYPE 2 | 30 |
| 64605-0000 | FIXTURE | LPSM | , ORIENTATION PAVILLION | 1 |
| 64631-0000 | ROADSIDE DEVELOPMENT | LNFT | , MASONRY STEPS AND EDGE STONES | 130 |
| 64632-0000 | ROADSIDE DEVELOPMENT | SQYD | , STABILIZED EMBANKMENT | 85 |
| 64703-1000 | MITIGATION, LANDSCAPING LOG | EACH | 32 |
Option Y
| This spreadsheet is being provided for informational use only. We will not be updating this information for any amendments. This spreadsheet may not be used in place of the bid schedule issued in the RFP. | ||||
| Pay Item | Description | Unit | Description2 | Quantity |
| 15101-0000 | MOBILIZATION | LPSM | 1 | |
| 15201-0000 | CONSTRUCTION SURVEY AND STAKING | LPSM | 1 | |
| 15301-0010 | CONTRACTOR QUALITY CONTROL AND ASSURANCE | LPSM | 1 | |
| 15401-0000 | CONTRACTOR TESTING | LPSM | 1 | |
| 15501-0000 | CONSTRUCTION SCHEDULE | LPSM | 1 | |
| 15705-1400 | SOIL EROSION CONTROL, FIBER ROLL | LNFT | 1460 | |
| 15706-1000 | SOIL EROSION CONTROL, INLET PROTECTION | EACH | 7 | |
| 20103-0000 | CLEARING AND GRUBBING | SQYD | 3905 | |
| 20301-1400 | REMOVAL OF INLET | EACH | 5 | |
| 20301-2100 | REMOVAL OF RESTROOM FACILITY | EACH | 1 | |
| 20301-2300 | REMOVAL OF SIGN/MARKER | EACH | 2 | |
| 20301-3000 | REMOVAL OF TRASH RECEPTACLE | EACH | 2 | |
| 20302-0300 | REMOVAL OF CURB AND GUTTER, CONCRETE | LNFT | 2750 | |
| 20302-0500 | REMOVAL OF CURB, CONCRETE | LNFT | 470 | |
| 20302-1000 | REMOVAL OF FENCE, RAIL | LNFT | 340 | |
| 20302-2100 | REMOVAL OF PIPE CULVERT | LNFT | 385 | |
| 20303-3000 | REMOVAL OF SIDEWALK, ASPHALT | SQYD | 1280 | |
| 20401-0000 | ROADWAY EXCAVATION | CUYD | 1200 | |
| 20411-0000 | SELECT BORROW | TON | 250 | |
| 25210-0000 | ROCKERY | SQFT | , TYPE 2 | 280 |
| 30202-2000 | ROADWAY AGGREGATE, METHOD 2 | TON | 3000 | |
| 30801-0000 | RECYCLED AGGREGATE BASE | SQYD | 8700 | |
| 40301-0100 | ASPHALT CONCRETE PAVEMENT, TYPE 1 | TON | 2600 | |
| 41201-0000 | TACK COAT | TON | 3 | |
| 60201-0800 | 24-INCH PIPE CULVERT | LNFT | 358 | |
| 60404-1000 | CATCH BASIN, FLH TYPE 1 | EACH | 6 | |
| 60801-0500 | PAVED WATERWAY, TYPE 5 | SQYD | 10 | |
| 60902-1000 | CURB AND GUTTER, CONCRETE, 12-INCH DEPTH | LNFT | 2369 | |
| 60902-1000 | CURB AND GUTTER, CONCRETE, 12-INCH DEPTH | LNFT | , MOUNTABLE | 733 |
| 61501-1100 | SIDEWALK, ASPHALT | SQYD | 1410 | |
| 61503-5000 | MEDIAN, STONE | SQYD | , GOVERNMENT SOURCED | 337 |
| 61504-1000 | ACCESSIBILITY RAMP, CONCRETE | SQYD | 64 | |
| 61509-0000 | DETECTABLE WARNING PANELS | SQYD | 12 | |
| 62201-0300 | DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY | HOUR | 100 | |
| 62201-0450 | BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH | HOUR | 100 | |
| 62201-1000 | WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY | HOUR | 100 | |
| 62201-1350 | BULLDOZER, 200HP MINIMUM FLYWHEEL POWER | HOUR | 40 | |
| 62201-3150 | HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT | HOUR | 100 | |
| 62201-3750 | CHAIN SAW | HOUR | 10 | |
| 62301-0000 | GENERAL LABOR | HOUR | 100 | |
| 62302-0000 | SPECIAL LABOR | HOUR | CARPENTER | 20 |
| 62302-0000 | SPECIAL LABOR | HOUR | STONE MASON | 20 |
| 62405-0200 | PLACING CONSERVED TOPSOIL, 3-INCH DEPTH | SQYD | 700 | |
| 62516-1000 | MULCHING, DRY METHOD | SQYD | 700 | |
| 62650-1000 | REMOVE AND REPLANT TREE AND SHRUB | EACH | 13 | |
| 63301-0000 | SIGN SYSTEM | EACH | 4 | |
| 63301-1000 | SIGN SYSTEM, GOVERNMENT FURNISHED SIGN | EACH | 15 | |
| 63309-1000 | DELINEATOR, TYPE SNOW POLE | EACH | 100 | |
| 63318-1000 | SNOW POLE HOLDER | EACH | 100 | |
| 63401-0000 | PAVEMENT MARKINGS | LNFT | (Stop Line) | 24 |
| 63401-0300 | PAVEMENT MARKINGS, TYPE B, SOLID | LNFT | (WHITE) | 4740 |
| 63405-0550 | PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW | EACH | (WHITE) | 22 |
| 63405-0850 | PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL | EACH | (WHITE) | 4 |
| 63503-1000 | TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE | LNFT | 320 | |
| 64603-0100 | FIXTURE, TRASH RECEPTACLE | EACH | 2 | |
| 64603-0300 | FIXTURE, BENCH | EACH | WOOD | 2 |
| 64603-0800 | FIXTURE, KIOSK | EACH | 1 | |
| 64603-1000 | FIXTURE, VAULT TOILET | EACH | , GOVERNMENT FURNISHED | 2 |
Option Z
| This spreadsheet is being provided for informational use only. We will not be updating this information for any amendments. This spreadsheet may not be used in place of the bid schedule issued in the RFP. | ||||
| Pay Item | Description | Unit | Description2 | Quantity |
| 15101-0000 | MOBILIZATION | LPSM | 1 | |
| 15201-0000 | CONSTRUCTION SURVEY AND STAKING | LPSM | 1 | |
| 15301-0010 | CONTRACTOR QUALITY CONTROL AND ASSURANCE | LPSM | 1 | |
| 15401-0000 | CONTRACTOR TESTING | LPSM | 1 | |
| 15501-0000 | CONSTRUCTION SCHEDULE | LPSM | 1 | |
| 15701-0000 | SOIL EROSION CONTROL | LPSM | 1 | |
| 15705-1400 | SOIL EROSION CONTROL, FIBER ROLL | LNFT | 1600 | |
| 20103-0000 | CLEARING AND GRUBBING | SQYD | 1200 | |
| 20303-0000 | REMOVAL OF STRUCTURES AND OBSTRUCTIONS | SQYD | , WOOD BOARDWALK | 120 |
| 20303-3000 | REMOVAL OF SIDEWALK, ASPHALT | SQYD | 500 | |
| 20304-2000 | REMOVAL OF BRIDGE | LPSM | , WOOD | 1 |
| 20401-0000 | ROADWAY EXCAVATION | CUYD | 700 | |
| 21101-1000 | ROADWAY OBLITERATION, METHOD 1 | SQYD | 600 | |
| 25101-0200 | PLACED RIPRAP, METHOD A, CLASS 2 | CUYD | 50 | |
| 25125-0000 | BOULDER | EACH | 45 | |
| 25210-0000 | ROCKERY | SQFT | , TYPE 1 | 1000 |
| 25210-0000 | ROCKERY | SQFT | , TYPE 2 | 830 |
| 25501-0000 | MECHANICALLY STABILIZED EARTH WALL | SQFT | 650 | |
| 55501-0000 | STRUCTURAL STEEL | LPSM | , BOARDWALK | 1 |
| 56701-0000 | MICROPILE | LNFT | 400 | |
| 60201-0400 | 12-INCH PIPE CULVERT | LNFT | 125 | |
| 60404-1000 | CATCH BASIN, FLH TYPE 1 | EACH | 2 | |
| 61501-1100 | SIDEWALK, ASPHALT | SQYD | 900 | |
| 62002-0000 | STONE MASONRY | SQYD | , WALL FACING | 50 |
| 62010-0000 | STONE MASONRY | LNFT | , EDGING | 122 |
| 62011-0100 | STONE MASONRY HEADWALL FOR 12-INCH PIPE CULVERT | EACH | 5 | |
| 62201-0300 | DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY | HOUR | 100 | |
| 62201-0450 | BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH | HOUR | 100 | |
| 62201-1000 | WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY | HOUR | 100 | |
| 62201-1350 | BULLDOZER, 200HP MINIMUM FLYWHEEL POWER | HOUR | 40 | |
| 62201-3150 | HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT | HOUR | 200 | |
| 62201-3750 | CHAIN SAW | HOUR | 20 | |
| 62301-0000 | GENERAL LABOR | HOUR | 100 | |
| 62302-0000 | SPECIAL LABOR | HOUR | CARPENTER | 40 |
| 62302-0000 | SPECIAL LABOR | HOUR | STONE MASON | 80 |
| 62405-0200 | PLACING CONSERVED TOPSOIL, 3-INCH DEPTH | SQYD | 500 | |
| 62516-1000 | MULCHING, DRY METHOD | SQYD | 500 | |
| 62650-1000 | REMOVE AND REPLANT TREE AND SHRUB | EACH | 34 | |
| 63301-1000 | SIGN SYSTEM, GOVERNMENT FURNISHED SIGN | EACH | 3 | |
| 64603-0300 | FIXTURE, BENCH | EACH | , MASONRY | 3 |
| 64604-1000 | FIXTURE, HANDRAIL | LNFT | , TYPE 1 | 35 |
| 64631-0000 | ROADSIDE DEVELOPMENT | LNFT | , MASONRY STEPS AND EDGE STONES | 50 |
| 64632-0000 | ROADSIDE DEVELOPMENT | SQYD | , STABILIZED EMBANKMENT | 50 |
| 64703-1000 | MITIGATION, LANDSCAPING LOG | EACH | 18 |
File details come from the government source that posted it. Updated .