C-Sheets.pdf
PDF 3 MB Posted
- Solicitation number
- DTFH70-15-R-00015
About this file
C
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q A_4-11-2016.pdf | ||
| A002_Norris.pdf | ||
| Q A_4-8-2016.pdf | ||
| A001.pdf | ||
| YELL_spreadsheet.xlsx | XLSX spreadsheet | |
| K-Sheets.pdf | ||
| Physical_Data_WY_PRA_YELL_10(19).pdf | ||
| G-Sheets.pdf | ||
| T-Sheets_-_Final.pdf | ||
| D-Sheets.pdf | ||
| P-sheets.pdf | ||
| X-Sheets_-_Final.pdf | ||
| S-Sheets_-_Final.pdf | ||
| H-Sheets.pdf | ||
| O-sheets.pdf | ||
| Plan_Request_for_WY_PRA_YELL_10(19).pdf | ||
| F-Sheets.pdf | ||
| RFP_Norris_reduced.pdf | ||
| V-Sheets_-_Final.pdf | ||
| W-Sheets_-_Final.pdf | ||
| M-Sheets.pdf | ||
| E-Sheets.pdf | ||
| L-sheets.pdf | ||
| U-Sheets_-_Final.pdf | ||
| B_-_SHEETS_-_Final.pdf | ||
| N-sheets.pdf | ||
| I-Sheets.pdf | ||
| J-Sheets.pdf | ||
| NorrisToGoldenGatePhase2-Plans-70_with_Canyon_Rim_sites.pdf | ||
| PROJECT_DESCRIPTION.pdf | ||
| Preliminary_Letter.pdf |
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUANTITIES
TYPICAL SECTION
TABULATION OF
C.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d y e ll c a .d g n
WY PRA YELL 10(19)
A
M
J a n u a r y
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
NPS Drwg. No. 101/130820
NPS PMIS Nos. 86308 & 2131522
EMBANKMENT QUANTITIES
TABULATION OF ROCK
C.2
STATE PROJECT
NUMBER
SHEET
WY NPS YELL 10(19)
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll fa .d g n
J a n u a r y
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
C le a r in g l im it s
Variable 2
2% crown
C le a r in g l im it s
Variable2
LC
Profile grade
Blotter
FILL SLOPE
ROUNDING DETAIL
Variable
D
CUT SLOPE
ROUNDING DETAIL
D
NOTE:
FOOTNOTE:
10'
Traveled way
11'
Traveled way
11'
D4
Original ground
Original ground D4
Detail, this sheet
Rounding
See Fill Slope
Final subgrade dohte m yr d , gni hcl uM
TYPICAL SECTIONS
MAINLINE AND TURNOUT
Rounding Detail, this sheet
See Cut Slope
Vari able
.5 ty p
Tack coat, (CSS-1, OR, CSS-1h)
Shoulder
4', typ.
Shoulder
4', typ.
Fog seal
(placed in two equal lifts)
ESAL, type III pavement roughness, 4" compacted depth nominal maximum size aggregate, 0.3 to < 3 million
" 4 3" or 2
1Asphalt concrete pavement, gyratory mix, NO SCALE
TYPICAL SECTION
Placing conserved topsoil, 2" depth
Placing conserved topsoil, 2" depth
Mulching, dry method
5" compacted depth (placed in two lifts)
Cold recycled asphalt base course, Edge of pavement
Rockery
437+29.77 to 440+66.26
C le a r in g l im it s
Varies
Edge of pavement
Existing ground
C le a r in g l im it s
TYPICAL BOTH SIDES
0-5'5'
Varies
Varies
0-10'
Slope stake limits
1:2- 1:4
Vari es
GRAND LOOP ROAD 306+75 to 556+50
1:2-1:4
Varies
Concrete curb
12" x 18"
(9" reveal)
449+25 to 476+57.54
5 6
Concrete curb
12" x 18"
(9" reveal)
Slope stake limits
Existing ground
See Sheet K.4 for compound cut detail.
directed by C.O.
Clearing limits reduced near wetlands. Alter slope rounding as
See sheet H.2 for Rockery details.
road shoulder widths.
Data Listing. See E Sheets for turnout widening and approach
Provide additional widening according to the Staking Report
Listing.
Construct slopes and ditches as shown in the Staking Report Data under the curve data shown on the plan-profile.
Maximum superelevation on curves are at the rate 'e' as indicated
See sheets H.5 for guardrail placement on MSE wall.
designated areas, for use under Section 408.
Mill existing pavement surface and stockpile the material in mulching quantities at parking areas, trails and approach roads.
See Plan Section E for additional pavement structure, topsoil, and
Place conserved topsoil according to Section 624.
4.
3.
2.
1.
C.3
STATE PROJECT
NUMBER
SHEET
WY
PRA YELL 10(19)
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll c b .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
1" Radius
1" Radius base course Edge of shoulder
1:2-1:4
Varies 2
Final subgrade
Encapsulated
NO SCALE
Bottom of subexcavationSubexcavation
Roadway excavation
Existing pavement structure
Existing subgrade subgrade
Shoulder
Bottom of subexcavation
Shoulder subgrade
Existing ground
SUBEXCAVATION BACKFILL
TYPE 1
SUBEXCAVATION
TYPE 1
m in m in
SUBEXCAVATION AND BACKFILL SECTION
TYPE 1
LC LC
Shoulder subgrade
Shoulder subgrade
Select borrow See Sheet C.3
Pavement section, m in
NOTE:
12"
1% min.
AND BACKFILL
SUBEXCAVATION
TYPE 1
513+50 to 514+75 (SCHEDULE B)
510+00 to 511+00 (SCHEDULE A&B) geotextile, class 1, type C
Separation-stabilization
C.4
STATE PROJECT
P
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll c c .d g
S J a c k s o
S m it h
C h e c k e d b y
D e s ig n e d b y
Staking Report Data Listing.
Construct slope across bottom of subexcavation as shown in the 1.
NOTE:
FOOTNOTE:
Existing pavement structure
Subexcavation Bottom of subexcavation
Existing subgrade
"18"
Shoulder subgrade
Bottom of subexcavation trench
Bottom of subexcavation
C o ll e c to r p ip e
PLAN VIEW
SUBEXCAVATION AREA
(Mirror image for RT. side installation)
S u b e x c a v a ti o n l im it
S u b e x c a v a ti o n l im it or Outlet pipe
D it c h li n e
P r o fi le g r a d e
Subexcavation trench
COLLECTOR AND OUTLET PLAN
SUBEXCAVATION TRENCH DETAIL
Bottom of subexcavation
18"
Subgrade shoulder
Select borrow
Granular backfill
Existing ground
SUBEXCAVATION
TYPE 3
SUBEXCAVATION BACKFILL
TYPE 3
SUBEXCAVATION AND BACKFILL SECTION
TYPE 3
FOR TYPE 3 SUBEXCAVATION BACKFILL
COLLECTOR AND OUTLET PIPE DETAIL
8" outlet pipe
8" outlet pipe m in m in
LC
LC
see Sheet C.3
Pavement section, SUBEXCAVATION
TYPE 3
Shoulder subgrade Shoulder subgrade
Shoulder subgrade
Roadway excavation
Roadway excavation
Select borrow m in
8" collector pipe
8" collector pipe
1% min.
1% min.
1 % min.
548+25 to 554+50 (SCHEDULE B)
537+80 to 544+75 (SCHEDULE B)
521+75 to 523+25 (SCHEDULE B)
516+75 to 518+75 (SCHEDULE B)
440+00 to 444+50 (SCHEDULE A&B)
321+50 to 330+50 (SCHEDULE A&B) 5.
4.
3.
2.
1.
geotextile, class 1, type C
Separation-stabilization geotextile, class 1, type C
Separation-stabilization
C.5
STATE PROJECT
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll c d .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y according to Sections 605 and 708.
Provide and install outlet pipes, and standard underdrain collectors collector pipe with no less than one outlet per subexcavation.
Provide one outlet for every 200 feet of
Mirror details to drain in opposite direction as needed.
of the subexcavation.
Slope all Outlet Pipes a minimum of 1% to drain at the low point
Staking Report Data Listing.
Construct slope across bottom of subexcavation as shown on the
Subsidiary to 8-inch collector pipe.
daylight to ditch ahead or back on line where applicable.
Outlet crossing road shown. Outlet to catch basins, culverts, or installation is subsidiary to subexcavation.
See Sheet G.18 for outlet details. All excavation associated with pipe
Place outlet(s) as directed by the CO to minimize resource impacts.
Top and bottom of sand layer
12"
4" min.
Fiber roll
NO SCALE
NOTE:
FOOTNOTE:
Existing subgrade Subexcavation excavation
Roadway
Va rie s
Va rie s
TYPICAL
Embankment
Shoulder subgrade topsoil, and mulch
Place conserved topsoil, and mulch
Place conserved
Bottom of thermal section
Bottom of subexcavation and thermal section
Subexcavation
Shoulder subgrade
Existing ground
2'
TYPICAL THERMAL SECTION
NPS PMIS No. 146047 NPS Drwg. No. 01-123635/109186
SUBEXCAVATION SECTION
TYPE 4
LC
m in m in
LC
pavement structure Existing see Sheet C.3
Pavement section, SUBEXCAVATION
TYPE 4
Shoulder subgrade
4"
3"
12" min.
Embedment (typ.)
3'
Embedment (typ.)
3'
Geomembrane m in
Roadway aggregate, method 2
Sand
Polystyrene foam
Geomembranethermal section
Bottom of
Shoulder subgrade
DETAIL A
DETAIL B
See Detail A below
315+50 to 319+00 (SCHEDULE A&B)
See Detail B below geotextile, class 1, type A, woven
Separation-stabilization
C.6
STATE PROJECT
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll c e .d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
Va rie s
1% min.
2.
1.
stakes.
Use sandbags to position Fiber roll in thermal areas. Do not drive than 2-feet in height above the proposed ditch line.
line. Do not place topsoil or mulch where finished slopes are less
Place above sediment wattle to be installed 12-inch above ditch area of installation.
continuous underlying layer of foam spanning the
Sheets placed in 2 layers with 12-inch lapped joints to be placed on a polystyrene insulation. Maximum roll width is 8-feet.
the base of the sand layer and between the geomembrane and on the outside of sand layer with a min. of 3-feet embedment along
Wrap separation-stabilization geotextile, class 1, type A, woven
Perform work within geothermal areas as directed by the CO.
Staking Report Data Listing.
Construct slope across bottom of subexcavation as shown in the
NOTE:
FOOTNOTE:
SUBEXCAVATION TRENCH DETAIL
Bottom of subexcavation
18"
8-inch outlet pipe
Granular backfill
FOR TYPE 5 SUBEXCAVATION BACKFILL
COLLECTOR AND OUTLET PIPE DETAIL
:1 structure, see Sheet C.3
Mainline pavement
1:4 1:
Select borrow
:2
LC
C o ll e c to r p ip e
PLAN VIEW
SUBEXCAVATION AREA
S u b e x c a v a ti o n l im it
S u b e x c a v a ti o n l im it or Outlet pipe
D it c h li n e
P r o fi le g r a d e
Subexcavation trench
COLLECTOR AND OUTLET PLAN
8-inch outlet pipe
SUBEXCAVATION
TYPE 5
Subsidiary to 8-inch collector pipe.
SUBEXCAVATION BACKFILL
TYPE 5
d e p th
S u b e x c a v a ti o n m in
Existing ground
SUBEXCAVATION LIFT DETAIL
Base of subexcavation
1st lift
Subsequent lifts
9" Pavement section
8-inch collector pipe
Trench Detail below
See Subexcavation See Subexcavation
Lift Detail below
1% min.
1% min.
5.
4.
3.
2.
1.
489+75 to 491+50 (SCHEDULE A&B)
487+00 to 488+25 (SCHEDULE A&B) stabilization at 9" vertical spacing (typ.)
Subsequent lifts, place geogrid, geotextile, class 1, type C (woven)
Separation-stabilization geotextile, class 1, type C (woven) Separation-stabilization
Geogrid, stabilization
1st lift, geogrid, stabilization at 12" vertical spacing (typ.)
Geogrid stabilization geotextile, class 1, type C (woven)
Separation-stabilization
C.7
STATE PROJECT
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll c f.
d g n
S J a c k s o n
C
S m it h
C h e c k e d b y
D e s ig n e d b y
Install a minimum of one outlet per subexcavation.
not in direct contact.
geogrid lap and the overlying geogrid layer so the two layers are layer. Provide a thin layer of select borrow between the 6-foot
Wrap each geogrid layer 6-feet horizontally back below the next of the subexcavation.
Slope all Outlet Pipes a minimum of 1% to drain at the low point is subsidiary to 8-inch outlet pipe.
G.18 for outlet details. All work associated with the pipe outlet as directed by the CO to minimize resource impacts. See Sheet spacing along length of deep patch underdrain. Skew outlet(s)
Provide solid outlet pipes at all low points and at maximum 100-foot
Staking Report Data Listing.
Construct slope across bottom of subexcavation as shown in the
DETAIL
SPECIAL ROCK EMBANKMENT
NO SCALE
FOOTNOTE:
with stepped slopes in accordance with 204.09 (d).
Temporary excavation face shall be constructed
See Staking Notes and Cross Sections.
SPECIAL ROCK EMBANKMENT
MECHANICALLY PLACED
LC
Existing ground
1:
SPECIAL ROCK EMBANKMENT
MECHANICALLY PLACED
CLASS 3 CLASS 5
LC
1:
Existing ground
1:
:1 .2
Placed riprap, class 3
Placed riprap, class 5
V a r ie s
V a r ie s geotextile, class 1, type C
Separation-stabilization geotextile, class 1, type C
Separation-stabilization topsoil, 2" depth
Placing conserved topsoil, 2" depth
Placing conserved
'3
514+75 to 515+75 LT (SCHEDULE B)
451+37 to 457+38 RT (SCHEDULE A&B)
449+75 to 450+75 RT (SCHEDULE A&B)
446+25 to 447+75 RT (SCHEDULE A&B)
SPECIAL ROCK EMBANKMENT
CONSERVED TOPSOIL ON
(TYPICAL)
Riprap Class 2, 3, or 5
Conserved topsoil, 2" depth
Choke surface voids with conserved topsoil
C.8
STATE PROJECT
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll c g .d g n
S J a c k s
S m
C h e c k e d b y
D e s ig n e d b y
DETAIL
SPECIAL ROCK EMBANKMENT
NO SCALE
FOOTNOTE:
SPECIAL ROCK EMBANKMENT
MECHANICALLY PLACED
CLASS 2
LC
Existing ground
:1 .5
Placed riprap, class 2
V a r ie s
:1 .5
Placed riprap, class 2
V a r ie s
Native Ground
CLASS 2 (FOR LANDSLIDE)
SPECIAL ROCK EMBANKMENT
MECHANICALLY PLACED
LC
topsoil, 2" depth
Placing conserved topsoil, 2" depth
Placing conserved with stepped slopes in accordance with 204.09 (d).
Temporary excavation face shall be constructed
See Staking Notes and Cross Sections.
544+75 TO 546+75 LT (SCHEDULE B)
geotextile, class 1, type C
Separation-stabilization geotextile, class 1, type C
Separation-stabilization
C.9
STATE PROJECT
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d y e ll c h .d g n
S J a c k s
S m
C h e c k e d b y
D e s ig n e d b y
457+00 to 457+38 RT (SCHEDULE A&B)
435+00 to 437+25 LT (SCHEDULE A&B)
| C.1 |
| C.2 |
| C.3 |
| C.4 |
| C.5 |
| C.6 |
| C.7 |
| C.8 |
| C.9 |
File details come from the government source that posted it. Updated .